Coal gangue ecological revetment for coal mining subsidence area

By setting up a horizontal cage structure and material guide holes in the coal gangue slope protection, cement mortar is introduced, which solves the problem of uneven cement mortar filling and improves the stability of the coal gangue slope protection and the vegetation growth environment.

CN223510321UActive Publication Date: 2025-11-04山西低碳环保产业集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422939487.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-11-04
Estimated Expiration
2034-11-29

AI Technical Summary

Technical Problem

In the existing coal gangue slope protection, the cement mortar cannot be evenly filled during the laying process, resulting in voids, which affects vegetation growth and slope stability.

Method used

The skeleton adopts a horizontal cage structure, and cement mortar is introduced through the guide holes of the horizontal pipe and connecting pipe to enhance the support and connection strength of the coal gangue base. The guide pipe and vibrator are used to make the cement mortar evenly fill the voids.

Benefits of technology

It improved the stability of the coal gangue ecological bank protection, prevented soil erosion, and enhanced the growth environment for vegetation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223510321U_ABST
    Figure CN223510321U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of ecological revetments, and particularly relates to a coal mining subsidence area coal gangue ecological revetment which comprises a coal gangue base layer, the coal gangue base layer is laid on a foundation, a framework is arranged in the coal gangue base layer and comprises a plurality of transverse pipes and connecting pipes, the transverse pipes are evenly distributed in the coal gangue base layer, and the connecting pipes are connected with the coal gangue base layer. The connecting pipes are communicated between the transverse pipes, material guiding holes are formed in the pipe walls of the transverse pipes and the connecting pipes, a plurality of material guiding pipes are arranged at the top end of the coal gangue base layer, the bottom ends of the material guiding pipes are communicated with the transverse pipes at the top end of the framework, a plurality of inserting rods are detachably connected to the bottom of the framework, and the bottoms of the inserting rods are inserted into a foundation. According to the coal gangue ecological revetment for the coal mining subsidence area, the stability of the coal gangue ecological revetment is effectively improved, and water and soil loss on a coal gangue base layer is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of ecological bank protection technology, specifically relating to an ecological bank protection system for coal gangue in coal mining subsidence areas. Background Technology

[0002] Ecological revetments mainly consist of slope protection, small animals, aquatic plants, and microorganisms. Common cross-sectional slope protection structures include stone slope protection, concrete slope protection, and geotechnical slope protection.

[0003] Currently, the slope protection in riverbank protection is generally made of coal gangue. However, the existing coal gangue is generally large in volume. During the laying process, cement mortar cannot be evenly filled into the gaps of the coal gangue, resulting in voids in the slope protection. When soil for planting vegetation is laid on the slope protection, the soil will sink into the voids, leading to soil erosion. After a period of time, this will cause the ground where vegetation is planted to collapse, affecting the growth of vegetation. At the same time, the large number of voids will affect the stability of the slope protection. Utility Model Content

[0004] To address the aforementioned problems, this utility model provides an ecological revetment for coal gangue in coal mining subsidence areas, which effectively improves the stability of the ecological revetment and prevents soil and water erosion on the coal gangue base layer.

[0005] To achieve the above objectives, this utility model provides the following technical solution: an ecological revetment for coal gangue in a coal mining subsidence area, comprising a coal gangue base layer, the coal gangue base layer being laid on the foundation, a framework being provided in the coal gangue base layer, the framework including several horizontal pipes and connecting pipes, the horizontal pipes being evenly distributed in the coal gangue base layer, the connecting pipes being connected between the horizontal pipes, and material guiding holes being provided on the pipe walls of both the horizontal pipes and the connecting pipes, several material guiding pipes being provided at the top of the coal gangue base layer, the bottom ends of the material guiding pipes being connected to the horizontal pipes at the top of the framework, and several insert rods being detachably connected to the bottom of the framework, the bottom ends of the insert rods being inserted into the foundation.

[0006] As a further embodiment of this utility model: the frame is a horizontal cage structure.

[0007] As a further improvement of this utility model: the end of the horizontal tube is provided with a tee connector, and the horizontal tube and the connecting tube are connected through the tee connector.

[0008] As a further embodiment of this utility model: both the horizontal pipe and the connecting pipe are provided with reinforcing members, the reinforcing members include several cross support frames and steel bars, the cross support frames are provided with several collars, and the steel bars are movably passed through the collars on the same axis.

[0009] As a further embodiment of this utility model: the top end of the insertion rod is connected to the connecting pipe at the bottom of the skeleton through a connector. The connector includes a first pipe clamp and a second pipe clamp. The two ends of the first pipe clamp and the second pipe clamp are connected by bolts. The bottom end of the second pipe clamp is provided with a connecting seat. The bottom of the connecting seat is provided with an internal thread interface. The top end of the insertion rod is provided with an external thread connecting section. The internal thread interface and the external thread connecting section are threadedly connected.

[0010] As a further improvement of this utility model, the horizontal pipe and the connecting pipe are filled with cement mortar.

[0011] Compared with the prior art, this utility model has the following advantages:

[0012] 1. This utility model adds a horizontal cage-like frame, and the horizontal pipes filled with cement mortar can provide support for the coal gangue base layer. At the same time, the frame can limit the position of the coal gangue base layer, thereby improving the stability of the coal gangue base layer laying.

[0013] 2. This utility model, through the addition of a material guide hole, facilitates the introduction of cement mortar filled in the horizontal pipe and connecting pipe into the cavities in the coal gangue base layer, thereby preventing soil erosion of the soil layer above the coal gangue base layer.

[0014] 3. This utility model strengthens the connection between adjacent horizontal tubes by adding a connecting pipe, thereby increasing the stability of the frame;

[0015] 4. This utility model, through the addition of a guide pipe, facilitates the uniform filling of cement mortar between multiple horizontal pipes and multiple connecting pipes under the action of a vibrating rod. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the side structure of the ecological revetment for coal gangue in a coal mining subsidence area according to this utility model.

[0017] Figure 2 This is a partial structural diagram of the connection between the horizontal pipe and the connecting pipe of the ecological revetment for coal gangue in coal mining subsidence areas according to this utility model.

[0018] Figure 3 This is a cross-sectional view of the internal structure of the horizontal pipe and connecting pipe of the ecological revetment for coal gangue in coal mining subsidence area according to this utility model.

[0019] Figure 4 This is a schematic diagram of the reinforcing structure of the ecological revetment for coal gangue in coal mining subsidence areas according to this utility model.

[0020] Figure 5 This is a schematic diagram of the insert rod and connector structure of the ecological revetment for coal gangue in coal mining subsidence areas according to this utility model.

[0021] Figure 6 This is a cross-sectional view of the connecting component structure for the ecological revetment of coal gangue in coal mining subsidence areas according to this utility model.

[0022] In the diagram: 1. Coal gangue base layer; 2. Skeleton; 3. Horizontal pipe; 4. Connecting pipe; 5. Material guide hole; 6. Material guide pipe; 7. Insert rod; 8. T-connector; 9. Reinforcing member; 10. Cross support frame; 11. Reinforcing bar; 12. Collar; 13. Connector; 14. First pipe clamp; 15. Second pipe clamp; 16. Bolt; 17. Connecting seat; 18. Internal threaded connection port; 19. External threaded connection section. Detailed Implementation

[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0024] refer to Figures 1 to 6 An ecological revetment for coal gangue in a coal mining subsidence area includes a coal gangue base layer 1, which is laid on the foundation. The coal gangue base layer 1 has a framework 2, which includes several horizontal pipes 3 and connecting pipes 4. The horizontal pipes 3 are evenly distributed in the coal gangue base layer 1, and the connecting pipes 4 are connected between the horizontal pipes 3. The walls of the horizontal pipes 3 and the connecting pipes 4 are provided with material guiding holes 5. Several material guiding pipes 6 are provided at the top of the coal gangue base layer 1, and the bottom ends of the material guiding pipes 6 are connected to the horizontal pipes 3 at the top of the framework 2. Several insert rods 7 are detachably connected to the bottom of the framework 2, and the bottom of the insert rods 7 are inserted into the foundation, which improves the tightness of the connection between the coal gangue base layer 1 and the foundation.

[0025] To improve the stability of frame 2, frame 2 is a horizontal cage structure.

[0026] To facilitate the connection between the horizontal pipe 3 and the connecting pipe 4, a tee connector 8 is provided at the end of the horizontal pipe 3, and the horizontal pipe 3 and the connecting pipe 4 are connected through the tee connector 8.

[0027] To enhance the support strength and stability of the horizontal pipe 3 and the connecting pipe 4, both the horizontal pipe 3 and the connecting pipe 4 are provided with reinforcing members 9. The reinforcing members 9 include several cross support frames 10 and steel bars 11. Several collars 12 are provided on the cross support frames 10, and the steel bars 11 are movably inserted through the collars 12 on the same axis.

[0028] To facilitate the handling of the insertion rod 7 and the connector 13, the top end of the insertion rod 7 is connected to the connecting pipe 4 at the bottom of the frame 2 via the connector 13. The connector 13 includes a first pipe clamp 14 and a second pipe clamp 15. The two ends of the first pipe clamp 14 and the second pipe clamp 15 are connected by bolts 16. The bottom end of the second pipe clamp 15 is provided with a connecting seat 17. The bottom of the connecting seat 17 is provided with an internal thread interface 18. The top end of the insertion rod 7 is provided with an external thread connecting section 19. The internal thread interface 18 and the external thread connecting section 19 are threaded together.

[0029] The horizontal pipe 3 and the connecting pipe 4 are filled with cement mortar.

[0030] During the laying process, when laying a layer of coal gangue, some horizontal pipes 3 are evenly laid on the coal gangue. After multiple layers of coal gangue are laid, the multiple layers of horizontal pipes 3 are connected by connecting pipes 4. After the coal gangue is laid, a support skeleton 2 is formed in the coal gangue base layer 1. When cement mortar enters the skeleton 2 from the guide pipe 6, it fills the entire skeleton 2 through the multiple layers of horizontal pipes 3 and connecting pipes 4, and penetrates into the cavities of the coal gangue base layer 1 through the guide holes 5 on the horizontal pipes 3 and connecting pipes 4. After the cement mortar solidifies, it not only improves the support and stability of the skeleton 2, but also improves the tightness of the connection between adjacent coal gangue.

[0031] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A coal gangue ecological revetment for coal mining subsidence areas, comprising a coal gangue base layer (1), wherein the coal gangue base layer (1) is laid on a foundation, characterized in that: The coal gangue base layer (1) is provided with a skeleton (2), the skeleton (2) includes several horizontal pipes (3) and connecting pipes (4), the horizontal pipes (3) are evenly distributed in the coal gangue base layer (1), the connecting pipes (4) are connected between the horizontal pipes (3), the horizontal pipes (3) and the connecting pipes (4) are provided with material guide holes (5) on the pipe walls, the top of the coal gangue base layer (1) is provided with several material guide pipes (6), the bottom end of the material guide pipes (6) is connected to the horizontal pipes (3) at the top of the skeleton (2), and the bottom of the skeleton (2) is detachably connected with several insert rods (7), the bottom of the insert rods (7) is inserted into the foundation.

2. The ecological revetment for coal gangue in coal mining subsidence areas according to claim 1, characterized in that: The skeleton (2) is a horizontal cage structure.

3. The ecological revetment for coal gangue in coal mining subsidence areas according to claim 2, characterized in that: The end of the horizontal tube (3) is provided with a three-way connector (8), and the horizontal tube (3) and the connecting tube (4) are connected through the three-way connector (8).

4. The ecological revetment for coal gangue in coal mining subsidence areas according to claim 3, characterized in that: Both the horizontal tube (3) and the connecting tube (4) are provided with reinforcing members (9). The reinforcing members (9) include several cross support frames (10) and steel bars (11). Several collars (12) are provided on the cross support frames (10). The steel bars (11) are movably inserted through the collars (12) on the same axis.

5. The ecological revetment for coal gangue in coal mining subsidence areas according to claim 4, characterized in that: The top end of the insertion rod (7) is connected to the connecting pipe (4) at the bottom of the skeleton (2) via a connector (13). The connector (13) includes a first pipe clamp (14) and a second pipe clamp (15). The two ends of the first pipe clamp (14) and the second pipe clamp (15) are connected by bolts (16). The bottom end of the second pipe clamp (15) is provided with a connecting seat (17). The bottom of the connecting seat (17) is provided with an internal thread interface (18). The top end of the insertion rod (7) is provided with an external thread connecting section (19). The internal thread interface (18) and the external thread connecting section (19) are threaded together.

6. The ecological revetment for coal gangue in coal mining subsidence areas according to claim 5, characterized in that: The horizontal pipe (3) and the connecting pipe (4) are filled with cement mortar.