Pipe through type crack steel belt interlayer reinforcing and repairing complete device

By designing a complete set of equipment for reinforcing and repairing through-type cracks in pipelines with steel strip interlayer, and utilizing components such as a tractor head and a trolley workbench, the problem of repairing through-type cracks in small-diameter pipelines has been solved, achieving efficient and convenient repair results.

CN223524753UActive Publication Date: 2025-11-07ANHUI CONSTR ENG TRAFFIC & SHIPPING GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422238684.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2025-11-07
Estimated Expiration
2034-09-12

AI Technical Summary

Technical Problem

Existing technologies are insufficient for efficiently repairing through cracks in small-diameter pipes, especially in confined spaces and complex environments, where mechanical repair equipment is costly and uneconomical.

Method used

A complete set of equipment for reinforcing and repairing through-type cracks in pipelines with steel strip interlayers was designed, including a tractor unit, a trolley workbench, lighting, a monitoring camera, a limit component, a cleaning brush, a sealing steel plate, and a corrugated plate. These components enable the detection, cleaning, sealing, and repair of through-type cracks in pipelines.

Benefits of technology

It enables efficient repair of through cracks in small-diameter pipes, with simple and convenient construction, improving the stability and efficiency of repair operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223524753U_ABST
    Figure CN223524753U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipeline through type crack steel belt interlayer reinforcing and repairing complete device which comprises a traction vehicle head and a trolley workbench fixedly connected to the rear end of the traction vehicle head, the traction vehicle head is provided with an illuminating lamp, a monitoring camera and a limiting assembly, and the upper end of the trolley workbench is provided with a sliding groove. A cleaning brush, a blocking steel plate and a corrugated plate are installed in each sliding groove through a sliding supporting assembly. The reinforcing and repairing complete device for the through-type crack steel belt interlayer of the pipeline is compact in structure, convenient and fast to walk, simple in repairing operation of the through-type crack in the pipeline, convenient to control, high in construction efficiency and convenient and fast to operate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, specifically to a complete set of equipment for reinforcing and repairing pipe-through cracks with steel strip interlayer. Background Technology

[0002] Various types of pipelines are important infrastructure for the operation of cities. The intricate and interconnected drainage pipelines bear the heavy responsibility of the organized discharge of rainwater and sewage in cities, and play an important role in ensuring the cleanliness of the urban environment and preventing urban flooding.

[0003] Since most pipelines are buried underground, and the underground conditions are complex and changeable, pipelines often break and need repair. For old urban areas with limited surface working space, complex underground spaces with complex surrounding environment and many underground pipelines, and busy traffic areas with urban traffic needs, it is difficult to use the construction method of excavation repair followed by backfilling for buried pipeline repair. Trenchless repair is required.

[0004] For repairing through-cracks in smaller diameter pipes, workers cannot enter the pipe through inspection wells, and the smaller diameter pipes do not provide sufficient working space for workers to operate machinery for repair. Furthermore, due to the small damaged area, dispersed locations, and limited number of cracks, using large machinery is costly and uneconomical. Therefore, a complete set of pipe through-crack reinforcement and repair equipment with steel strip interlayer is urgently needed to solve the existing technical problems and is therefore essential. Utility Model Content

[0005] The purpose of this utility model is to provide a complete set of equipment for reinforcing and repairing pipe cracks with steel strip interlayer, so as to solve the above defects.

[0006] To achieve the above objectives, this utility model provides the following technical solution:

[0007] A complete set of equipment for reinforcing and repairing pipe-through cracks with steel strip interlayer includes: a tractor head and a trolley work platform fixed to the rear end of the tractor head. The tractor head is equipped with a lighting lamp, a monitoring camera and a limiting component. The upper end of the trolley work platform is provided with a chute. A cleaning brush, a sealing steel plate and a corrugated plate are respectively installed in the chute through sliding support components.

[0008] Preferably, two first telescopic rods are vertically installed on the front and rear sides of the upper surface of the tractor head, and the lighting lamp and the monitoring camera are respectively installed on the top of the first telescopic rods. The two first telescopic rods are controlled to extend and retract by motors.

[0009] Preferably, the limiting assembly comprises a support end and a second telescopic rod, the second telescopic rod is vertically installed on the upper end surface of the towing head, the support end is installed on the top end of the second telescopic rod through a universal hinge joint, and the second telescopic rod is controlled to be telescoped through a motor.

[0010] Preferably, the sliding support assembly comprises a sliding base, a hinged lug plate and a third telescopic rod, the sliding base is installed in a sliding groove on the upper end of the trolley workbench and is controlled to slide through a motor, the hinged lug plate is provided with two and is symmetrically installed on the front and rear sides of the upper end surface of the sliding base, the third telescopic rod is hingedly installed between the two hinged lug plates, and the cleaning brush, the blocking steel plate or the corrugated plate is installed on the top end of the third telescopic rod.

[0011] Preferably, the sliding groove is arranged at the center of the upper end surface of the trolley workbench in the front-rear direction.

[0012] Preferably, a shaft rod is installed between the two hinged lug plates, both ends of the shaft rod are installed on the two hinged lug plates through bearings, and the lower end of the third telescopic rod is fixed on the shaft rod; the shaft rod is controlled to rotate through a stepping motor.

[0013] Preferably, the blocking steel plate and the corrugated plate are both adsorbed on the top end of the third telescopic rod through a magnetic adsorption device.

[0014] Preferably, a plurality of walking wheels are arranged on the bottom of the towing head and the trolley workbench, the walking wheels are controlled to walk through a motor, and the plurality of walking wheels on the bottom of the towing head are symmetrically installed on the bottom of the towing head in two rows in the front-rear direction.

[0015] Preferably, the limiting assembly is provided with a group, and the bottom end of the second telescopic rod of the group limiting assembly is installed at the center of the upper end surface of the towing head.

[0016] Preferably, the limiting assembly is provided with two groups, and the two second telescopic rods of the two groups of limiting assemblies are symmetrically installed on the upper end surface of the towing head with the center line of the upper end surface of the towing head in the front-rear direction as a center axis.

[0017] The utility model discloses the beneficial effect lies in:

[0018] The utility model discloses pipeline through formula crack steel band interlayer reinforcing repair complete device, through setting up the lighting lamp, monitoring camera on the tractor head, can to the real -time monitoring of pipeline inside, to realize the detection to pipeline through formula crack, through the limiting component installed on the tractor head, can carry out the limiting fixation to whole device when pipeline through formula crack repair operation in later period, improves the stability of repair operation, through the cleaning brush, plugging steel sheet and corrugated board of setting up through sliding support component on the trolley workstation upper end, can carry out the cleaning, plugging etc. repair operation to pipeline through formula crack. BRIEF DESCRIPTION OF DRAWINGS

[0019] Fig. 1 The utility model discloses structure schematic diagram;

[0020] Fig. 2 The utility model discloses the left view of tractor head;

[0021] Fig. 3 The utility model discloses the right view of trolley workstation. DETAILED DESCRIPTION

[0022] The utility model makes further explanation to the following combined embodiment, need explaining, just is to the example and the explanation of the utility model concept, the skilled in the art to the described specific embodiment makes various kinds of modification or supplement or adopts the similar mode replacement, only need not deviate the concept of the utility model or surmount the range defined in this patent claim, should be regarded as falling into the protection range of the utility model.

[0023] Embodiment 1:

[0024] As Figs. 1-3 Shown, a kind of pipeline through formula crack steel band interlayer reinforcing repair complete device, comprising: tractor head 1 and consolidation in the trolley workstation 2 of tractor head 1 rear end, tractor head 1 is provided with lighting lamp 11, monitoring camera 12 and limiting component 14, to facilitate the illumination of entire device in pipeline, real -time monitoring and the stability of later repair operation. Trolley workstation 2 upper end is provided with sliding slot 21, cleaning brush 5, plugging steel sheet 6 and corrugated board 7 are respectively installed in sliding slot 21 by sliding support component 4, can realize the cleaning, plugging, covering and sticking etc. repair operation to pipeline through formula crack.

[0025] Embodiment 2:

[0026] As Figs. 1-3As shown, a pipeline through crack steel strip sandwich reinforcement repair complete device, comprising: a tractor head 1 and consolidated in the rear end of the tractor head 1 trolley workbench 2.

[0027] The tractor head 1 is provided with a lighting lamp 11 and a monitoring camera 12, and two first telescopic rods 13 are vertically installed on the upper end face of the tractor head 1. The lighting lamp 11 and the monitoring camera 12 are installed at the top end of the first telescopic rod 13, and the two first telescopic rods 13 are controlled to extend and retract by a motor. Through the extension and retraction adjustment of the two first telescopic rods 13, the local light brightness inside the pipeline can be effectively adjusted, and the real-time shooting clarity of the monitoring camera 12 inside the pipeline can also be improved.

[0028] The tractor head 1 is provided with a limiting assembly 14, which includes a support end head 141 and a second telescopic rod 142. The second telescopic rod 142 is vertically installed on the upper end face of the tractor head 1, and the support end head 141 is installed on the top end of the second telescopic rod 142 through a universal hinge joint. The second telescopic rod 142 is controlled to extend and retract by a motor.

[0029] The limiting assembly 14 is provided with at least one group. If the limiting assembly 14 is provided with one group, the bottom end of the second telescopic rod 142 of the limiting assembly 14 is installed at the center of the upper end face of the tractor head 1. If the limiting assembly 14 is provided with two groups (such as Fig. 2 Fig. 3 As shown), the two second telescopic rods 142 of the two limiting assemblies 14 are installed on the upper end face of the tractor head 1 in line symmetry with the center line of the upper end face of the tractor head 1 as the center axis. If the limiting assembly 14 is provided with more than three groups, at least two second telescopic rods 142 are installed on the upper end face of the tractor head 1 in line symmetry with the center line of the upper end face of the tractor head 1 as the center axis, and the other second telescopic rods 142 are installed on the center line of the upper end face of the tractor head 1.

[0030] The limiting assembly 14 installed on the tractor head 1 can be adjusted in length by the second telescopic rod 142 of the limiting assembly 14 during the later pipeline through crack repair operation, until the support end head 141 of all limiting assemblies 14 is pressed on the inner wall of the pipeline, so that the entire device can be limited and fixed. Thereafter, the repair operation of the pipeline can be carried out, which can ensure the stability of the repair operation.

[0031] The upper end of the trolley workbench 2 is provided with a sliding groove 21, which is arranged in the center of the upper end face of the trolley workbench 2 in the front-rear direction, i.e. on the center line of the upper end face of the trolley workbench 2 in the front-rear direction. The cleaning brush 5, the plugging steel plate 6 and the corrugated plate 7 are respectively installed in the sliding groove 21 through the sliding support assembly 4.

[0032] The sliding support assembly 4 comprises a sliding base 41, hinged ear plates 42 and a third telescopic rod 43. The sliding base 41 is installed in the sliding groove 21 at the upper end of the trolley workbench 2 and is controlled to slide by a motor. The lower end of the third telescopic rod 43 is hingedly installed between the two hinged ear plates 42. The cleaning brush 5, the blocking steel plate 6 or the corrugated plate 7 are installed at the top end of the third telescopic rod 43, wherein the blocking steel plate 6 and the corrugated plate 7 are both adsorbed at the top end of the third telescopic rod 43 by magnetic adsorption devices.

[0033] The hinged ear plates 42 are provided with two and symmetrically installed on the front and rear sides of the upper end surface of the sliding base 41. A shaft rod is installed between the two hinged ear plates 42. The two ends of the shaft rod are both installed on the two hinged ear plates 42 through bearings. The lower end of the third telescopic rod 43 is fixed on the shaft rod. The shaft rod is controlled to rotate by a stepping motor.

[0034] Through the sliding of the sliding base 41 in the sliding groove 21 and the rotation and telescoping of the third telescopic rod 43, the cleaning brush 5 is used to clean the through cracks in the pipeline. The blocking steel plate 6 is coated with adhesive glue. The through cracks in the pipeline are adhered and blocked by the blocking steel plate 6. Finally, the through cracks in the pipeline are adhered and covered by the corrugated plate 7, so that the cleaning, blocking and other repair operations of the through cracks in the pipeline are completed.

[0035] The traction vehicle head 1 and the bottom of the trolley workbench 2 are provided with a plurality of walking wheels 3. The walking wheels 3 are controlled to walk by a motor. The plurality of walking wheels 3 at the bottom of the traction vehicle head 1 are symmetrically installed at the bottom of the traction vehicle head 1 in two rows in the front-rear direction, so as to facilitate the walking of the whole device in the pipeline.

[0036] The pipeline through crack steel belt interlayer reinforcing and repairing complete device has the advantages of compact structure, convenient walking, simple repairing operation of the through cracks in the pipeline, convenient control, high construction efficiency and convenient operation.

[0037] The above is an exemplary description of the utility model. Apparently, the specific implementation of the utility model is not limited by the above method. As long as the method concept and technical solution of the utility model are used for non-essential improvement or direct application in other occasions, it is within the protection scope of the utility model.

Claims

1. A complete set of pipe-penetrating crack steel belt interlayer reinforcement repair device, characterized in that, Include: The towing head (1) and the trolley workbench (2) fixed at the rear end of the towing head (1), the towing head (1) is provided with lighting lamp (11), monitoring camera (12) and limiting assembly (14), the upper end of the trolley workbench (2) is provided with sliding groove (21), the sliding groove (21) is respectively installed with cleaning brush (5), sealing steel plate (6) and corrugated plate (7) through sliding support assembly (4).

2. The pipe-penetration crack steel belt interlayer reinforcement repair complete device according to claim 1, characterized in that, The upper end surface of the towing head (1) is vertically installed with two first telescopic rods (13) on the front and back sides respectively, the lighting lamp (11) and the monitoring camera (12) are installed at the top end of the first telescopic rod (13) respectively, and the two first telescopic rods (13) are controlled to stretch out and draw back by the motor respectively.

3. The complete set of steel belt layer repair device for pipe penetrating crack according to claim 1, characterized in that, The limiting assembly (14) comprises a support end (141) and a second telescopic rod (142), the second telescopic rod (142) is vertically installed on the upper end surface of the towing head (1), the support end (141) is installed at the top end of the second telescopic rod (142) through the universal hinge joint, and the second telescopic rod (142) is controlled to stretch out and draw back by the motor.

4. The complete set of steel belt strip reinforcement repair device for pipe penetrating cracks according to claim 1, characterized in that, The sliding support assembly (4) comprises a sliding base (41), a hinged lug plate (42) and a third telescopic rod (43), the sliding base (41) is installed in the sliding groove (21) on the upper end of the trolley workbench (2) and is controlled to slide by the motor, the hinged lug plate (42) is provided with two and is symmetrically installed on the upper end surface of the sliding base (41) on the front and back sides, the third telescopic rod (43) is hingedly installed between the two hinged lug plates (42) at the lower end, and the cleaning brush (5), the sealing steel plate (6) or the corrugated plate (7) is installed at the top end of the third telescopic rod (43).

5. The complete set of steel belt strip reinforcement repair device for pipe penetrating cracks according to claim 1, characterized in that, The sliding groove (21) is arranged at the center of the upper end surface of the trolley workbench (2) in the front and back directions.

6. The pipe-penetration crack steel belt interlayer reinforcement repair complete set according to claim 4, characterized in that, Shaft rods are installed between the two hinged lug plates (42), both ends of the shaft rod are installed on the two hinged lug plates (42) through bearings, and the lower end of the third telescopic rod (43) is fixed on the shaft rod; the shaft rod is controlled to rotate by the stepping motor.

7. The pipe-penetration crack steel belt interlayer reinforcement repair complete set according to claim 4, characterized in that, The sealing steel plate (6) and the corrugated plate (7) are adsorbed on the top end of the third telescopic rod (43) through the magnetic attraction device.

8. The complete set of steel belt strip reinforcement repair device for pipe penetrating cracks according to claim 1, characterized in that, The bottom of the towing head (1) and the trolley workbench (2) is provided with a plurality of walking wheels (3), the walking wheels (3) are controlled to walk by the motor, and the plurality of walking wheels (3) on the bottom of the towing head (1) are symmetrically installed on the bottom of the towing head (1) in two rows in the front and back directions.

9. The pipe-penetration crack steel belt interlayer reinforcement repair complete set according to claim 3, characterized in that, The limiting assembly (14) is provided with one group, and the bottom end of the second telescopic rod (142) of the one group of limiting assemblies (14) is installed at the center of the upper end surface of the towing head (1).

10. The pipe-penetration crack steel belt interlayer reinforcement repair complete set according to claim 3, characterized in that, The limiting assembly (14) is provided with two groups, and the two second telescopic rods (142) of the two groups of limiting assemblies (14) are symmetrically installed on the upper end surface of the towing head (1) with the center line of the upper end surface of the towing head (1) in the front and back directions as the center axis.