Hoisting equipment for high-speed steel pre-hardened material

By improving the structural design of the hoisting equipment and utilizing the combination of components such as the base plate, connecting plate, sleeve, and fixing frame, the problem of shaking and swaying during the hoisting of high-speed steel pre-hardened materials was solved, achieving stable connection and convenient operation of the equipment.

CN223561126UActive Publication Date: 2025-11-18YANTAI BAITE MOULD MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423195494.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-11-18
Estimated Expiration
2034-12-24

AI Technical Summary

Technical Problem

In the existing technology, high-speed steel pre-hardened material hoisting equipment is prone to shaking and swaying during hoisting due to excessive weight, which can cause materials to fall and affect operational stability.

Method used

Through the combined design of base plate, connecting plate, sleeve, fixing frame and bracket, and by using the cooperation of components such as bolts, positioning pins, threaded heads and motors, the equipment is ensured to be stably connected and adjusted, and shaking is prevented.

Benefits of technology

This improves the overall stability of the hoisting equipment, prevents high-speed steel pre-hardened materials from falling during hoisting, and enhances the convenience and safety of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223561126U_ABST
    Figure CN223561126U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hoisting equipment, and discloses hoisting equipment for high-speed steel pre-hardened materials, which comprises a connecting plate fixedly connected to the upper end of a bottom plate, a sleeve for positioning is fixedly mounted at the upper end of the connecting plate, and a fixing frame for supporting is clamped in the sleeve. A support used for reinforcing is fixedly installed on the side face of the fixing frame. According to the hoisting equipment for the high-speed steel pre-hardened material, through cooperative arrangement of the bottom plate, the connecting plate, the sleeve, the fixing frame and the support, when a worker uses the hoisting equipment for the high-speed steel pre-hardened material to hoist the high-speed steel pre-hardened material, the fixing frame can be firmly fixed to the ground through the bottom plate, the connecting plate and the sleeve; and the stability of the fixing frame is further guaranteed, and therefore it is guaranteed that when the hoisting equipment for the high-speed steel pre-hardened material is used for hoisting the high-speed steel pre-hardened material, the whole equipment does not shake or shake.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to hoisting equipment technical field, concretely is a hoisting equipment for high speed steel prehard material. BACKGROUND

[0002] The hoisting equipment for high speed steel prehard material plays a vital role in industrial production, and can quickly and accurately move high speed steel prehard material from one position to another, thereby shortening the production cycle and improving production efficiency. Through the application of automation and intelligent technology, the hoisting equipment can realize continuous operation, reduce manual intervention, and further improve production efficiency. The hoisting equipment can be flexibly adjusted according to the layout of the production line to optimize the production process. Through reasonable hoisting path planning, the waiting time and transportation distance of materials on the production line can be reduced, and the overall efficiency of the production line can be improved.

[0003] However, the prior art has the following problems in actual use:

[0004] In the prior art, when hoisting high speed steel prehard material, the hoisting equipment as a whole may shake and vibrate due to the excessive weight of the high speed steel prehard material, which may cause the high speed steel prehard material to fall off due to shaking and vibration during hoisting, thereby causing inconvenience to the operator. UTILITY MODEL CONTENTS

[0005] (I) Technical problem solved

[0006] In order to overcome the above-mentioned defects of the prior art, the utility model provides a hoisting equipment for high speed steel prehard material, which solves the problem that in the prior art, when hoisting high speed steel prehard material, the hoisting equipment as a whole may shake and vibrate due to the excessive weight of the high speed steel prehard material, which may cause the high speed steel prehard material to fall off due to shaking and vibration during hoisting, thereby causing inconvenience to the operator.

[0007] (II) Technical scheme

[0008] In order to achieve the above-mentioned purposes, the utility model is realized by the following technical scheme: a hoisting equipment for high speed steel prehard material, comprising a connecting plate fixedly connected to the upper end of a bottom plate, a sleeve for positioning is fixedly installed on the upper end of the connecting plate, a fixing frame for supporting is clamped in the inside of the sleeve, a support for reinforcing is fixedly installed on the side surface of the fixing frame, a carrier plate for positioning is fixedly installed on one side of the upper end of the fixing frame.

[0009] As a preferred, the upper end of the bottom plate is provided with a circular hole for positioning, and a bolt for fixing is inserted into the inside of the circular hole.

[0010] As preferred, the upper end of the bottom plate is fixedly connected with a clamping plate for positioning, and the side surface of the clamping plate is clamped with a limiting frame for supporting.

[0011] As preferred, the side surface of the sleeve is inserted with a positioning pin for fixing, and the positioning pin is screwed in the side surface of the sleeve and screwed in the other side of the fixing frame.

[0012] As preferred, the side surface of the bracket is inserted with a threaded head for fixing, and the threaded head is screwed in the other side of the fixing frame.

[0013] As preferred, the inner side wall of the carrier plate is clamped with a lead screw for adjusting, and one end of the carrier plate is fixedly installed with a motor.

[0014] As preferred, the outer surface of the lead screw is screwed with a positioning block for adjusting, the lower end of the positioning block is fixedly installed with a side plate for positioning, and the side surface of the side plate is fixedly installed with a motor.

[0015] As preferred, the other side of the side plate is clamped with a receiving shaft, the outer surface of the receiving shaft is provided with a traction rope, and the lower end of the traction rope is provided with a hook.

[0016] (Three) beneficial effects

[0017] The utility model provides a kind of hoisting equipment for high speed steel prehard material, with the following beneficial effects:

[0018] The hoisting equipment for high speed steel prehard material, through the cooperation of bottom plate, connecting plate, sleeve, fixing frame and bracket, when staff uses the hoisting equipment for high speed steel prehard material to hoist high speed steel prehard material, through bottom plate, connecting plate and sleeve, the fixing frame can be fixed firmly on the ground, further guarantee the stability of fixing frame, so that the equipment as a whole does not appear to shake and shake problem when using the hoisting equipment for high speed steel prehard material to hoist high speed steel prehard material, prevent from falling situation of high speed steel prehard material due to shaking or shaking amplitude too large when hoisting, and further strengthen the stability of the equipment as a whole, while achieving the purpose of facilitating staff operation. ACCURACY OF DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the utility model;

[0020] Figure 2 It is a structural schematic diagram of the fixing frame of the utility model;

[0021] Figure 3 It is a structural schematic diagram of the carrier plate of the utility model;

[0022] Figure 4 It is a schematic view of the support structure of the utility model;

[0023] Figure 5 It is a schematic view of the positioning block structure of the utility model.

[0024] In the figure: 1, bottom plate; 2, connecting plate; 3, sleeve; 4, fixed frame; 5, support; 6, carrier plate; 7, round hole; 8, bolt; 9, clamping plate; 10, limiting frame; 11, positioning pin; 12, threaded head; 13, screw; 14, motor; 15, positioning block; 16, side plate; 17, motor; 18, storage shaft; 19, traction rope; 20, hook. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the utility model will be described clearly and completely below with reference to the drawings in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0026] Please refer to Figures 1 to 5 The utility model embodiment provides a kind of hoisting equipment for high speed steel prehard material, which is applied to the scene of hoisting high speed steel prehard material, and the structure of the hoisting equipment for high speed steel prehard material is improved in the embodiment, so that it has the advantage of further ensuring overall stability when hoisting high speed steel prehard material.

[0027] Embodiment one:

[0028] Please refer to Figure 1 And Figure 2 In order to more stably fix the bottom plate 1 on the ground, the connecting plate 2 is fixedly connected to the upper end of the bottom plate 1, the upper end of the bottom plate 1 is provided with a round hole 7 for positioning, the inside of the round hole 7 is inserted with a bolt 8 for fixing, the upper end of the bottom plate 1 is fixedly connected with a clamping plate 9 for positioning, and the side surface of the clamping plate 9 is clamped with a limiting frame 10 for supporting.

[0029] Through the setting of the round hole 7 and the bolt 8, the bottom plate 1 can be more firmly fixed on the ground, and the stability of the bottom plate 1 is further ensured. Through the setting of the clamping plate 9 and the limiting frame 10, the stability of the fixed frame 4 is further reinforced, and the overall stability of the equipment is further improved.

[0030] Embodiment two:

[0031] Please refer to Figures 1 to 4In order to further strengthen the stability of the whole fixing frame 4, the upper end of the connecting plate 2 is fixedly provided with a sleeve 3 for positioning, the inside of the sleeve 3 is clamped with a fixing frame 4 for supporting, the side surface of the fixing frame 4 is fixedly provided with a support 5 for reinforcing, the side surface of the sleeve 3 is inserted with a positioning pin 11 for fixing, the positioning pin 11 penetrates through the side surface of the sleeve 3 and is threadedly connected to the side surface of the fixing frame 4, the side surface of the support 5 is inserted with a threaded head 12 for fixing, and the threaded head 12 penetrates through the side surface of the support 5 and is threadedly connected to the other side of the fixing frame 4.

[0032] Through the positioning pin 11, after the fixing frame 4 is clamped in the inside of the sleeve 3, the fixing frame 4 clamped in the inside of the sleeve 3 can be fixed through the positioning pin 11, and through the threaded head 12, the support 5 can be more firmly fixed to the side surface of the fixing frame 4, so that the stability of the whole fixing frame 4 is further ensured, and the fixing frame 4 is reinforced.

[0033] Example three:

[0034] Please refer to Figures 1 to 5 In order to facilitate the staff to hoist the target high-speed steel pre-hard material, the upper end of the fixing frame 4 is fixedly provided with a carrier plate 6 for positioning on one side, the inner side wall of the carrier plate 6 is clamped with a lead screw 13 for adjusting, one end of the carrier plate 6 is fixedly provided with a motor 14, the outer surface of the lead screw 13 is threadedly connected with a positioning block 15 for adjusting, the lower end of the positioning block 15 is fixedly provided with a side plate 16 for positioning, the side surface of the side plate 16 is fixedly provided with a motor 17, the other side of the side plate 16 is clamped with a receiving shaft 18, the outer surface of the receiving shaft 18 is provided with a traction rope 19, and the lower end of the traction rope 19 is provided with a hook 20.

[0035] Through the lead screw 13, the motor 14 and the positioning block 15, the position of the positioning block 15 can be adjusted by starting the motor 14, and through the side plate 16, the motor 17, the receiving shaft 18, the traction rope 19 and the hook 20, the position of the hook 20 can be adjusted by the motor 17 after the position of the positioning block 15 is adjusted, so that the target high-speed steel pre-hard material is hoisted.

[0036] The electrical components appearing in the text are all connected with the main controller and 220V mains electricity, and the main controller can be a conventional known device such as a computer.

[0037] In the utility model, the working steps of the device are as follows:

[0038] First, the lifting equipment is moved to the appropriate position, then the bottom plate 1 is fixed on the ground through the bottom plate 1 and the bolt 8, second, the fixed frame 4 is clamped in the sleeve 3, then the fixed frame 4 is fixed through the positioning pin 11, then the fixed frame 4 clamped in the sleeve 3 is further reinforced through the clamping plate 9 and the limiting frame 10, then the load plate 6 is fixed on one side of the upper end of the fixed frame 4, then the position of the positioning block 15 is adjusted by starting the motor 14, finally, the height of the hook 20 is adjusted by starting the motor 17 through the traction rope 19, and the high-speed steel pre-hard material can be lifted.

[0039] Although the embodiments of the present application have been shown and described, it should be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A high speed steel pre-hardened material hoisting device, comprising a connecting plate (2) fixedly connected to the upper end of a base plate (1), characterized in that: The upper end of the connecting plate (2) is fixedly provided with a sleeve (3) for positioning, the inner part of the sleeve (3) is clamped with a fixing frame (4) for supporting, the side of the fixing frame (4) is fixedly provided with a support (5) for reinforcing, one side of the upper end of the fixing frame (4) is fixedly provided with a carrier plate (6) for positioning.

2. A high speed steel pre-hardened material handling apparatus as claimed in claim 1, wherein: The upper end of the bottom plate (1) is provided with a circular hole (7) for positioning, the inner part of the circular hole (7) is inserted with a bolt (8) for fixing.

3. The high speed steel pre-hardened material handling apparatus of claim 1, wherein: The upper end of the bottom plate (1) is fixedly connected with a clamping plate (9) for positioning, the side of the clamping plate (9) is clamped with a limiting frame (10) for supporting.

4. The high speed steel pre-hardened material handling apparatus of claim 1, wherein: The side of the sleeve (3) is inserted with a positioning pin (11) for fixing, the positioning pin (11) penetrates through the side of the sleeve (3) and is screw-connected on the side of the fixing frame (4).

5. The high speed steel pre-hardened material handling apparatus of claim 1, wherein: The side of the support (5) is inserted with a threaded head (12) for fixing, the threaded head (12) penetrates through the side of the support (5) and is screw-connected on the other side of the fixing frame (4).

6. A high speed steel pre-hardened material handling apparatus as claimed in claim 1, wherein: The inner side wall of the carrier plate (6) is clamped with a lead screw (13) for adjusting, one end of the carrier plate (6) is fixedly provided with a motor (14).

7. A high speed steel pre-hardened material handling apparatus as claimed in claim 6, wherein: The outer surface of the lead screw (13) is screw-connected with a positioning block (15) for adjusting, the lower end of the positioning block (15) is fixedly provided with a side plate (16) for positioning, the side of the side plate (16) is fixedly provided with a motor (17).

8. The high speed steel pre-hardened material handling apparatus of claim 7, wherein: The other side of the side plate (16) is clamped with a receiving shaft (18), the outer surface of the receiving shaft (18) is provided with a traction rope (19), the lower end of the traction rope (19) is provided with a hook (20). The other side of the side plate (16) is clamped with a receiving shaft (18), the outer surface of the receiving shaft (18) is provided with a traction rope (19), the lower end of the traction rope (19) is provided with a hook (20).