Special tool for hoisting concrete conduit
By designing a detachable clamp lifting tool, the instability and wear problems during the lifting of concrete ducts were solved, ensuring the stability and safety of the ducts during lifting and construction, and facilitating subsequent construction.
Patent Information
- Application Number
- CN202520288402.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-21
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2035-02-21
AI Technical Summary
The existing concrete duct hoisting process lacks stability, is prone to tilting and movement, and causes wear and tear on the duct sidewalls, making subsequent construction inconvenient.
The hoisting body consists of two detachable clamps, which are fixed by clips to form an annular opening that is compatible with the conduit. The supporting surface contacts the annular boss to avoid wear and maintain stability.
This ensures stability and safety during the conduit hoisting process, reduces wear, and facilitates subsequent construction, especially the vertical movement and sealed connection of the conduit.
Smart Images

Figure CN223592232U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a special tool for hoisting concrete conduit. BACKGROUND
[0002] The concrete conduit is used for pouring concrete underwater and is suitable for pouring cofferdams, caisson foundations, open caisson foundations, underground continuous walls or underground projects.
[0003] In the existing construction, no special tool is used for hoisting the concrete conduit, and a cable is generally directly wound under the annular boss at the end of the concrete conduit, since the outer diameter of the annular boss is larger than the outer diameter of the body of the concrete conduit, the cable can be fixed there, however, this method is not safe and stable during hoisting of the concrete conduit. Figure 6 The existing arc-shaped ring structure is shown in the figure, the cable is hoisted after being punched into the arc-shaped ring structure at both end faces, this improvement can increase stability during hoisting, the cable is clamped under the annular boss of the concrete conduit in cooperation with the arc-shaped ring structure during lifting of the concrete conduit, which to some extent avoids the trouble of winding and fixing the cable on the concrete conduit and increases hoisting safety, but the concrete conduit is moved in an inclined state during hoisting, and the clamping action of the arc-shaped ring structure on one side of the concrete conduit is prone to wear the side wall of the concrete conduit due to the tightening action of the cable during hoisting, especially when the hoisted concrete conduit is sequentially sealed and connected for construction, the vertical alignment of the upper and lower conduits is inconvenient.
[0004] Based on this, the application provides a special tool for hoisting a concrete conduit.
[0005] It should be noted that the above content belongs to the technical cognition range of the inventor and does not necessarily constitute the prior art. CONTENT OF THE UTILITY MODEL
[0006] In order to solve the above problems, the utility model provides a special tool for hoisting a concrete conduit, which is simple in structure, convenient to use, ensures the stability of the concrete conduit during hoisting and reduces the wear of the side wall of the concrete conduit caused by the existing hoisting method, is convenient for subsequent construction and solves the problems in the prior art.
[0007] The utility model provides the following technical scheme:
[0008] A special tool for hoisting a concrete conduit, comprising a hoisting body, the hoisting body is composed of two hoop members which are detachably connected, the hoop members are assembled to form an annular opening which is matched with the concrete conduit, the hoop member has a supporting surface which abuts against the bottom wall of the annular boss at the end of the concrete conduit and a hoisting part which is arranged outside the supporting surface.
[0009] Further, the annular opening is circular, and the circular opening is slightly larger than the outer diameter of the concrete conduit.
[0010] Further, the inner diameter of the circular opening is between the outer diameter of the concrete conduit and the outer diameter of the annular boss provided at the end of the concrete conduit.
[0011] Further, the hoop member comprises a semicircular sheet, and a vertical plate is provided on the top surface of each end of the semicircular sheet, and the vertical plate is spaced from the arc-shaped inner wall of the semicircular sheet on one side close to the arc-shaped inner wall, and the supporting surface is formed on the semicircular ring range of the surface of the semicircular sheet with the spacing as the width; a lifting hole is provided on each vertical plate, and an assembly hole is provided below the lifting hole of one vertical plate; after the two hoop members are assembled correspondingly, the vertically aligned vertical plates are fixed by a clip to form the lifting body.
[0012] Further, the clip comprises a first clip plate and a second clip plate connected to the first clip plate, a pin hole is provided on the first clip plate corresponding to the assembly hole, and the second clip plate is lower than the pin hole; the first and second clip plates jointly enclose an assembly space for accommodating the adjacent vertical plates of the two hoop members.
[0013] Further, the horizontal distance between the first and second clip plates is slightly larger than the thickness of the two adjacent vertical plates of the two hoop members assembled together.
[0014] Further, the clip is assembled and fixed to the two hoop members by a pin sequentially inserted into the pin hole and the assembly hole of the vertical plate.
[0015] Further, the clip is rotated to the horizontal direction outside the two hoop members by the pin as the axis, so that the two hoop members can be easily separated.
[0016] Further, the outer edge of each end of the semicircular sheet and the top end of the vertical plate are chamfered.
[0017] Further, the semicircular sheet and the vertical plate of the hoop member are integrally formed.
[0018] Further, the hoop member is an iron or stainless steel hoop member.
[0019] The concrete conduit lifting special tool provided by the present application can bring the following beneficial effects:
[0020] The utility model discloses more scientific structure design, adopt detachable assembly connection structure, and processing and manufacturing are convenient, simple, and easy, and dismounting is flexible.
[0021] The clamping piece setting structure of the concrete conduit hoisting special tool is designed ingeniously, and is more simple and quick when two hoop pieces are assembled with the concrete conduit and separated and disassembled. BRIEF DESCRIPTION OF DRAWINGS
[0022] The drawings described herein are used to provide further understanding of the present application, and form a part of the utility model, and the illustrative embodiment and the description of the utility model are used to explain the present application, and do not constitute improper limitation to the utility model. In the drawings:
[0023] Figure 1 It is the structural schematic diagram of the utility model;
[0024] Figure 2 It is Figure 1 The structural schematic diagram of the middle hoop;
[0025] Figure 3 It is the schematic of the range of the supporting surface in Figure 2
[0026] Figure 4 It is Figure 1 The structural schematic diagram of the clamping piece;
[0027] Figure 5 It is the reference diagram of the utility model in use state;
[0028] Figure 6 It is the arc-shaped sheet ring of the prior art mentioned in the background art.
[0029] Among them, 1 semicircle sheet body, 2 vertical plate, 201 hoisting hole, 202 assembly hole, 3 supporting surface, 4 clamping piece, 401 first clamping plate, 402 second clamping plate, 403 pin hole, 5 pin, 6 cable. DETAILED DESCRIPTION
[0030] In order to clearly explain the technical features of the scheme, the utility model is described in detail below through specific implementation mode, combined with the drawings.
[0031] In the description of the utility model, it is understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer" and the like indicate the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model.
[0032] Referring to Figures 1-5 The embodiment discloses the structure of the special tool for hoisting concrete pipes and the reference of the use state thereof, specifically, the special tool for hoisting concrete pipes comprises two hoop members fixedly assembled together, the hoop member comprises a semicircular sheet body 1, a vertical plate 2 is arranged on the top surface of the two ends of the semicircular sheet body, and a horizontal spacing is left between the side of the vertical plate close to the arc-shaped inner wall of the semicircular sheet body and the arc-shaped inner wall of the semicircular sheet body, a semicircular ring range (such as Figure 3 the surface of the semicircular sheet body with the horizontal spacing as the width forms a supporting surface 3 for supporting the annular boss arranged at the end of the concrete pipe. Hoisting holes 201 are arranged on the two vertical plates of each hoop member, and an assembly hole 202 is arranged below the hoisting hole of one of the vertical plates; after the two hoop members are assembled at the corresponding semicircular sheet bodies, the vertical plates aligned with each other are fixed through a clip 4, and the circular opening formed by the closed semicircular sheet bodies is adapted to the outer diameter of the concrete pipe and limits the annular boss at the end of the concrete pipe.
[0033] The clip 4 comprises a first clamping plate 401 and a second clamping plate 402 connected with the first clamping plate, a pin hole 403 is arranged on the first clamping plate corresponding to the assembly hole 202, and the second clamping plate is arranged below the pin hole; the first and second clamping plates jointly enclose an assembly space for accommodating the adjacent vertical plates of the two hoop members. The horizontal spacing of the space enclosed by the first and second clamping plates is slightly greater than the thickness of the adjacent vertical plates of the two hoop members assembled together, so that the two vertical plates are gap-fitted with the clip outside the two vertical plates. The clip 4 is assembled and fixed to the two hoop members through a pin 5 sequentially arranged in the pin hole 403 and the assembly hole in the vertical plate corresponding to the pin hole 403.
[0034] The outer edges of the two ends of the semicircular sheet body 1 and the top end of the vertical plate 2 are all arranged in a chamfered manner.
[0035] In use, the concrete conduit hoisting special tool can be directly assembled on the outer wall of the concrete conduit, and is limited by the annular boss at the end of the concrete conduit, connected with the cable 6 through the special tool to realize the hoisting and moving of the concrete conduit. Specifically, the two hoop members of the special tool are assembled around the annular boss of the concrete conduit on the side wall of the concrete conduit, at this time, the two semicircular pieces 1 surround the outer wall of the concrete conduit, the supporting surfaces 3 of the two hoop members cooperatively form an annular supporting surface, the annular supporting surface is in contact with the bottom surface of the annular boss of the concrete conduit, and the adjacent vertical plates of the two hoop members are fixed together by the clamps 4. When hoisting is needed, the cable 6 is wound around the hoisting holes 202 aligned on the two groups of vertical plates to hoist and move the concrete conduit. Due to the effective cooperation between the structure and the concrete conduit, the concrete conduit is gradually lifted and kept in a vertical state during hoisting and moving, which facilitates the fixation of the concrete conduit in subsequent construction and facilitates the sealing connection construction of the upper and lower concrete conduits.
[0036] Through the use of the concrete conduit hoisting special tool, compared with the existing direct cable winding on the annular boss of the concrete conduit for hoisting or the hoisting tool for the arc-shaped piece ring of the fixed concrete conduit for the cable to pass through (see Figure 6 ), the problems of unstable and inconvenient subsequent installation and construction of the concrete conduit during hoisting are better avoided; on the other hand, the wear of the outer wall of the concrete conduit caused by the gravity center of the cable is also avoided; and due to the detachable assembly structure of the concrete conduit hoisting special tool, the assembly and hoisting can be more convenient and faster, and the step of adjusting the cable to separate from the concrete conduit after the arc-shaped piece ring used for hoisting is completed is omitted. After hoisting is completed, the worker rotates the two clamps 4 outward and upward, separates the second clamping plate 402 of each clamp from the corresponding vertical plate, separates the two hoop members, separates the special tool from the concrete conduit which has been hoisted, and continues to be used on another concrete conduit which needs to be hoisted.
[0037] It should be understood that the annular boss on the concrete conduit mentioned in the utility model is a conventional structure of the existing concrete conduit, which is generally provided on the outer side of the two ends of the concrete conduit and has an outer diameter greater than the outer diameter of the pipe body of the concrete conduit.
[0038] It should be noted that the terms "first", "second", and the like in the specification and claims of the utility model and the above drawings are used to distinguish similar objects, and do not necessarily describe a specific order or sequence. It should be understood that the data used in this way can be interchanged under appropriate circumstances, so that the embodiments of the application described herein can be implemented in an order other than those illustrated or described herein.
[0039] The above merely describes some embodiments of the present application, and is not intended to limit the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present application shall be included in the scope of claims of the present application.
[0040] The parts not described in the present utility model are well-known technology for those skilled in the art.
Claims
1. A concrete pipe hoisting tool, characterized by, The lifting body is composed of two hoop members connected detachably, and the hoop members are assembled to form a ring-shaped opening matched with the concrete conduit; the hoop member has a supporting surface matched with the bottom wall of the annular boss of the end of the concrete conduit and a lifting part arranged outside the supporting surface.
2. The concrete pipe hoist-on tool as claimed in claim 1, wherein, The ring-shaped opening is circular, and the circular opening is larger than the outer diameter of the concrete conduit.
3. The concrete pipe hoist-on tool of claim 1, wherein, The hoop member includes a semicircular sheet, and a vertical plate is arranged on the top surface of the two ends of the semicircular sheet; the vertical plate is spaced from the arc-shaped inner wall of the semicircular sheet on one side close to the arc-shaped inner wall, and the supporting surface is formed on the surface of the semicircular ring range of the semicircular sheet with the spacing as the width; a lifting hole is arranged on the two vertical plates of each hoop member, and an assembly hole is arranged below the lifting hole of one vertical plate; after the two hoop members are assembled correspondingly at the two semicircular sheets, the aligned vertical plates are fixed by a clip, and the lifting body is formed.
4. The concrete conduit hoisting tool according to claim 3, characterized in that, The clip includes a first clamping plate and a second clamping plate connected with the first clamping plate, a pin hole is arranged on the first clamping plate corresponding to the assembly hole, and the second clamping plate is arranged below the pin hole; the first and second clamping plates jointly enclose an assembly space for accommodating the adjacent vertical plates of the two hoop members.
5. The concrete conduit hoisting tool according to claim 3, characterized in that, The clip is assembled and fixed with the two hoop members by a pin sequentially arranged in the pin hole and the assembly hole of the vertical plate.
6. The concrete pipe hoist-on tool of claim 3, wherein, The outer edges of the two ends of the semicircular sheet and the top ends of the vertical plates are all arranged in a chamfered manner.
7. A concrete pipe handling tool according to any one of claims 1 to 6, wherein, The hoop member is an iron or stainless steel hoop member.