Quickly-mounted self-locking steel hoop construction device

By designing a self-locking steel clamp construction device, and utilizing support units and motor-driven locking plates, the problems of complex construction and high safety risks of steel clamps for bridge pier cap beams were solved. This enabled the rapid, safe, and economical construction platform setup, adapting to changes in pier dimensions and improving construction efficiency and safety.

CN223607756UActive Publication Date: 2025-11-28CCCC WUHAN HARBOR ENG DESIGN & RES
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202423131983.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2025-11-28
Estimated Expiration
2034-12-18

AI Technical Summary

Technical Problem

The existing construction method for steel clamps for bridge pier cap beams has problems such as complex construction, high safety risks, high cost, inconvenient operation and low construction efficiency, which is particularly evident in the scenario of installing pier columns on water.

Method used

A self-locking steel clamp construction device for rapid installation was designed, comprising two support units arranged in parallel. The device is fastened to the pier column through support modules, locking plates and semi-ring clamps. Combined with motor drive and follow-up unit, it enables rapid installation and disassembly.

Benefits of technology

It enables the rapid, safe, and economical construction of a platform on bridge piers, reduces the risk of power usage, adapts to changes in pier dimensions, improves construction efficiency and safety, and simplifies the installation and dismantling process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223607756U_ABST
    Figure CN223607756U_ABST
Patent Text Reader

Abstract

The utility model provides a quick installation self-locking steel hoop construction device which comprises two supporting units which are oppositely arranged in parallel, a top plate and a bottom plate are symmetrically arranged at the tops and the bottoms of the two supporting units respectively, each supporting unit comprises a supporting module, and each supporting module comprises two straight plates which are oppositely arranged in a hinged mode. Two ends of the straight plate are respectively connected with the top plate and the bottom plate; and semi-ring clamping plates are arranged on the inner sides of the bottom plates, the two opposite bottom plates are connected through a locking unit and a pull rope, the upper side of the straight plate is connected with a locking plate through a flat connecting plate, and the two oppositely-arranged semi-ring clamping plates and the locking plate detachably abut against the outer side wall of the pier column. The splicing device is compact in structure and convenient to operate, splicing can be rapidly completed according to needs, construction efficiency is improved, and construction safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building construction, especially to a self-locking steel hoop construction device of quick installation. BACKGROUND

[0002] When the current pier cap beam steel hoop is constructed, the construction personnel needs to manually install the steel hoop at the top of the pier, and the existing construction method and construction platform have low reliability, poor economy, high safety risk, complicated and time-consuming installation and removal process, and the installation of the support platform is limited by the pier gap, the bottom foundation and many other site conditions.

[0003] The existing steel hoop construction platform is mainly built in the following ways: 1) a scaffold is erected to provide a steel hoop installation platform, if the pier or pipe pile is too high, the workers have safety hazards when climbing up and down; the installation and removal consume manpower, material resources and time, and the ground needs to be hardened and drained; 2) a ladder truck is used as a liftable operation platform, but the arrangement and deployment of the vehicle consume a certain space, and in areas with dense piers or high piers, the vehicle cannot be deployed and the height is insufficient; at the same time, when the ladder truck is used as an operation platform for construction, only one side (180°) of the pier can be considered, and the vehicle needs to be moved and redeployed for back construction, which requires a high deployment site condition, high maintenance cost of the mobile ladder truck, small operation range, and multiple movements and position adjustments; 3) a safety ladder cage is used, and the specific operation steps are as follows: the finished safety ladder cage is centered on the pier, and is installed by hoisting, and has stairs and a walkway around the inside, which can be used by construction personnel to walk and move up and down. Since it is a prefabricated product, the price is relatively high, the ground needs to be hardened during installation, and the cost is high.

[0004] In addition, it should be pointed out that when working on land, the ground has a supporting foundation, and the operation conditions are relatively good, but when facing the hoop installation scene of a pier on water, the operation is very troublesome, and the scaffold, ladder truck and safety ladder cage cannot be used at all, which leads to complex overall construction and delayed construction period.

[0005] Chinese patent document CN 221740977 U discloses an anti-overturning device for reinforcing a single-column pier based on a steel truss cap beam, which is relatively troublesome to install and has a large volume; Chinese patent document CN 117780066 A discloses a construction platform self-locking steel hoop structure and its use method, but the structure is inconvenient to disassemble and the use scene is limited, so it needs to be improved. UTILITY MODEL CONTENTS

[0006] The utility model provides a kind of self-locking steel hoop construction device of quick installation, solve the hoop installation relatively troublesome, operation adjustment is not inconvenient and unsafe, and the technical problem of lower construction efficiency.

[0007] To solve the above technical problems, the utility model adopts the technical scheme of: a kind of self-locking steel hoop construction device of quick installation, including two support units of relative parallelism, the top and bottom of two support units are respectively symmetrically provided with top plate and bottom plate, and support unit includes support module, and support module includes two straight plates of relative hinged arrangement, the both ends of straight plate are connected with top plate and bottom plate respectively;

[0008] The inner side of bottom plate is provided with half ring clamping plate, and the opposite two bottom plates are connected by locking unit and pull rope, and the upper side of straight plate is connected with locking plate by flat link plate, and the opposite two half ring clamping plates and locking plates are detachably abutted on the outer sidewall of pier column.

[0009] In the preferred scheme, the inner side of bottom plate is provided with limit plate, and half ring clamping plate is connected with limit plate by follow-up unit, and one side of follow-up unit is electrically connected with mobile power supply.

[0010] In the preferred scheme, follow-up unit includes motor and driving sleeve, driving sleeve is screw-connected with follow-up rod, follow-up rod is arranged on limit plate, and the end of follow-up rod is hinged with half ring clamping plate.

[0011] In the preferred scheme, the middle part of limit plate is provided with alignment hole, and the middle part of the outer side of half ring clamping plate is provided with hinged seat, follow-up rod is connected with hinged seat, and spring is further sleeved on the outer side of follow-up rod.

[0012] In the preferred scheme, the two sides of alignment hole are provided with waist round hole, and the two sides of hinged seat are respectively provided with straight extension rod, and adjusting plate is sleeved on straight extension rod, and adjusting plate is arranged in waist round hole.

[0013] In the preferred scheme, locking plate includes first circular-arc clamping plate, and the two sides of first circular-arc clamping plate are respectively provided with ear plate, and the outer side of ear plate is provided with at least two cylinders in parallel, and cylinder is arranged in flat link plate.

[0014] In the preferred scheme, locking unit includes uniform line roller and lock sleeve, uniform line roller is fixed on the opposite bottom plate, lock sleeve is provided with locking rod on one side, and the two sides of pull rope are respectively fixed on lock sleeve and locking rod, and pull rope is arranged on uniform line roller.

[0015] In the preferred scheme, locking unit further includes meshed connection worm and worm wheel, lock sleeve is located in the lower side of worm wheel, and worm wheel and lock sleeve are sleeved on rotating shaft.

[0016] In the preferred scheme, the middle part of straight plate is provided with first through hole, shaft rod is arranged in first through hole, and the two sides of straight plate are further provided with a plurality of lock holes, and bolt is arranged in fixed plate and lock hole.

[0017] In the preferred scheme, the two sides of the flat joint plate are respectively provided with positioning discs, the middle part of the positioning disc is provided with a fixing hole, the positioning disc is fixed through bolts and straight plates, and the bolts are arranged in the fixing hole and the locking hole.

[0018] The utility model discloses the beneficial effects are: through installing top plate and bottom plate respectively at the top and bottom of the two support units of relative arrangement, support unit installs through support module quickly, guarantees the bearing capacity fully simultaneously, utilizes the lock plate and half ring clamping plate to hold tightly and clamps the pier column, utilizes the friction with the pier column and locks, two top plates of top are connected and form the working platform of top, and the bottom plate is as the temporary foothold of operating personnel, and it is convenient to build the operation platform and the pouring formwork above the pier column, sets up the follow-up unit still can cope with the condition that the external dimension of pier column has certain change, and the lock unit can guarantee the locking efficiency of whole, adopts motor initiative alignment, and the manual further locking mode carries out hard connection to avoid the working condition that the device whole exists the security risk when the circuit component failure, the device is convenient to assemble and disassemble, and the operation is simple, and has good economic benefit. BRIEF DESCRIPTION OF DRAWINGS

[0019] The utility model will be further described in connection with the drawings and examples:

[0020] Figure 1 It is the whole structure of the utility model whole schematic Figure 1 ;

[0021] Figure 2 It is Figure 1 The top view schematic drawing of

[0022] Figure 3 It is Figure 1 The front view schematic drawing of

[0023] Figure 4 It is Figure 1 The left view schematic drawing of

[0024] Figure 5 It is the whole structure of the utility model whole schematic Figure 2 ;

[0025] Figure 6 It is the whole structure of the utility model whole schematic Figure 3 ;

[0026] Figure 7 It is the whole structure of the utility model whole schematic Figure 4 ;

[0027] Figure 8 It is Figure 7 The explosion structure schematic drawing of

[0028] Figure 9 It is Figure 8Support module structure schematic diagram of the application;

[0029] Figure 10 Support module structure schematic diagram of the application;

[0030] Figure 11 Support module structure schematic diagram of the application; Figure 10 Support module structure schematic diagram of the application;

[0031] Figure 12 Support module structure schematic diagram of the application; Figure 10 Support module structure schematic diagram of the application; Figure 1 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0032] Support module structure schematic diagram of the application; Figure 13 Support module structure schematic diagram of the application; Figure 10 Support module structure schematic diagram of the application; Figure 2 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0033] Support module structure schematic diagram of the application; Figure 14 Support module structure schematic diagram of the application; Figure 10 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0034] Support module structure schematic diagram of the application; Figure 15 Support module structure schematic diagram of the application; Figure 14 Support module structure schematic diagram of the application; Figure 1 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0035] Support module structure schematic diagram of the application; Figure 16 Support module structure schematic diagram of the application; Figure 14 Support module structure schematic diagram of the application; Figure 2 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0036] Support module structure schematic diagram of the application; Figure 17 Support module structure schematic diagram of the application; Figure 16 Support module structure schematic diagram of the application; Figure 1 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0037] Support module structure schematic diagram of the application; Figure 18 Support module structure schematic diagram of the application; Figure 16 Support module structure schematic diagram of the application; Figure 2 Support module structure schematic diagram of the application; Support module structure schematic diagram of the application;

[0038] In the figure: base plate 1; limiting plate 2; alignment hole 201; waist round hole 202; half ring clamp plate 3; hinged seat 301; straight rod 302; support unit 4; top plate 5; flat plate 6; positioning disc 601; fixing hole 602; locking plate 7; first circular arc clamp plate 701; ear plate 702; boss 703; cylinder 704; friction pad 705; pier 8; follow-up unit 9; fixing frame 901; motor 902; drive sleeve 903; driving gear 904; driven gear 905; first check ring 906; second through hole 907; third through hole 908; follow-up rod 909; fourth through hole 910; second check ring 911; first threaded portion 912; spring 913; side plate 914; inclined support plate 915; locking unit 10; worm 1001; rotating shaft 1002; worm gear 1003; lock sleeve 1004; fastening nail 1005; helical groove 1006; flat key 1007; clamping groove 1008; first threaded hole 1009; locking rod 1010; sleeve 1011; top ring 1012; second threaded hole 1013; sixth through hole 1014; second insertion rod 1015; second threaded portion 1016; square hole 1017; turntable 1018; base 1019; square table 1020; third threaded portion 1021; conical hole 1022; seventh through hole 1023; first mounting plate 1024; bearing plate 1025; second mounting plate 1026; line roller 1027; cover plate 1028; clamping groove 1029; anti-dropping rod 1030; mobile power supply 11; fixed plate 12; support module 13; straight plate 1301; shaft 1302; groove 1303; baffle 1304; first through hole 1305; lock hole 1306; bolt 14; adjusting plate 15; fifth through hole 1501; limiting rod 1502; nut 16; bearing 17; washer 18; support ring 1801; ball 1802; positioning seat 19; first ring groove 1901; second ring groove 1902; conical rod 1903; third threaded portion 1904; locking groove 1905; pull rope 20. DETAILED DESCRIPTION

[0039] As Figures 1-9 In the embodiment, a quick installation self-locking steel hoop construction device includes two support units 4 arranged in parallel, and the top and bottom of each support unit 4 is respectively provided with a top plate 5 and a base plate 1, and the support unit 4 includes a support module 13, and the support module 13 includes two straight plates 1301 arranged in relative hinging, and the two ends of each straight plate 1301 are respectively connected with the top plate 5 and the base plate 1.

[0040] The inner side of the base plate 1 is provided with a half ring clamp plate 3, and the opposite two base plates 1 are connected through a locking unit 10 and a pull rope 20, and the upper side of the straight plate 1301 is connected with a locking plate 7 through a flat plate 6, and the opposite two half ring clamp plates 3 and the locking plate 7 are detachably abutted on the outer side wall of the pier 8.

[0041] The device is used, first of all, through the lifting tool and the lifting rope is fixed on the two top plates 5 and the two bottom plates 1, that is, the state of the supporting unit 4 can be changed through the lifting rope, initially, the supporting unit 4 is in the unlocked state, the hinge structure is arranged in the supporting unit 4, the straight plates 1301 of the supporting modules 13 are matched with each other, and are connected to form an "X-shaped" structure, the opening state of the device can be changed through the lifting rope, after the pier column 8 is constructed, the device is installed on the top or side of the upper side of the pier column 8 through the lifting tool and the lifting rope, then the workers tighten the self-locking hoop again to ensure that the device is firmly installed on the pier column 8.

[0042] The top plate 5 is used as the construction platform of the top, the bottom plate 1 is used as the temporary standing base of the workers, in addition, vertical rods are installed on the bottom plate 1 near the edge, the vertical rods and the bottom plate 1 are detachably designed, the protective nets are installed between the adjacent vertical rods, and the safety of the construction workers is further ensured.

[0043] In the preferred scheme, the half-ring clamping plate 3 is connected through the follow-up unit 9 and the limiting plate 2, one side of the follow-up unit 9 is electrically connected with the mobile power supply 11, one side of the follow-up unit 9 is provided with the locking unit 10, the locking units 10 on the two bottom plates 1 are connected through the pull rope 20;

[0044] The locking unit 10 comprises the meshed worm 1001, the worm wheel 1003 and the uniform line roller 1027, the lower side of the worm wheel 1003 is provided with the lock sleeve 1004, the uniform line roller 1027 is fixed on the opposite bottom plate 1, one side of the lock sleeve 1004 is provided with the locking rod 1010, the two sides of the pull rope 20 are respectively fixed on the lock sleeve 1004 and the locking rod 1010, the pull rope 20 is wound on the uniform line roller 1027, and the length adjustment of the pull rope 20 is completed by rotating the lock sleeve 1004.

[0045] The preferred mobile power supply 11 adopts a portable outdoor power supply, which can ensure the stability of power supply, and does not need to be externally connected to the power box on land through a cable, for water operation, greatly reduces the safety risk of power use, avoids the trouble of cable installation, and effectively controls the risk points.

[0046] In the process of construction of the pier column 8, it is difficult to ensure that the upper and lower parts are coaxial and the outer wall profile is projected to the lower end in an absolutely consistent state. In actual construction, there is a certain fluctuation within the allowable range. After positioning by the follow-up unit 9, the above problems can be overcome. The bottom plate 1 and the half-ring clamping plate 3 can be adjusted within a certain angle range, that is, the half-ring clamping plate 3 is fully attached to the pier column 8, and the two side bottom plates 1 can have a certain horizontal fluctuation. Then the locking unit 10 tightly pulls and fixes the two opposite bottom plates 1 by the pull rope, until the half-ring clamping plate 3 is stably fixed on the pier column 8 by the friction force. Since the worm 1001 and the worm gear 1003 have self-locking ability, that is, when the length of the pull rope 20 is adjusted by the worm 1001 and the worm gear 1003, the two bottom plates 1 are pulled together under the action of their own gravity during installation. In order to improve the degree of automation of the whole, a servo motor (which can bear the torque required for use) is preferably installed on one side of the worm 1001 to transmit torque to the worm 1001. If necessary, a reducer is connected between the servo motor and the worm 1001. At this time, the overall self-locking safety is higher. When the device is hoisted onto the pier column 8, part of the position of the half-ring clamping plate 3 contacts the pier column 8 under the action of gravity. At this time, the servo motor is manually controlled to work, so that the two bottom plates 1 are adjusted to the design position by the pull rope 20. Then the person approaches the device by the basket and fixes it again. After the fixing is completed, even if the servo motor is in an inactive state, the whole device has a certain safety guarantee.

[0047] As Figures 10-13 In the preferred scheme, the follow-up unit 9 includes a fixed frame 901, and the upper side and the lower side of the fixed frame 901 are respectively provided with a motor 902 and a driving sleeve 903. The output shaft of the motor 902 is provided with a driving gear 904, and the end of the driving sleeve 903 is provided with a driven gear 905. The driving gear 904 and the driven gear 905 are engaged, and the driving sleeve 903 is threadedly connected with a follow-up rod 909. The follow-up rod 909 is arranged on the limiting plate 2, and the end of the follow-up rod 909 is hingedly connected with the half-ring clamping plate 3.

[0048] The motor 902 can drive the driving sleeve 903 to rotate, so that when the upper locking plate 7 gradually approaches the pier column 8, the motor 902 can drive the support unit 4 and the bottom plate 1 to approach, thereby changing the position thereof. Since the half-ring clamping plate 3 is attached to the pier column 8, an inclination angle can be formed between the bottom plate 1 and the half-ring clamping plate 3, so that the locking plate 7 and the half-ring clamping plate 3 of different heights can be installed on the pier column 8.

[0049] In the preferred embodiment, the middle part of the limiting plate 2 is provided with a positioning hole 201, the outer middle part of the half-ring clamping plate 3 is provided with a hinge seat 301, the end of the follower rod 909 is provided with a fourth through hole 910, the bolt 14 is arranged in the fixed frame 901 and the fourth through hole 910, and the bolt 14 is fixed in the hinge seat 301 through the nut 16.

[0050] The follower rod 909 is provided with a second blocking ring 911, and the outer side of the follower rod 909 is further sleeved with a spring 913, and the two sides of the spring 913 abut against the second blocking ring 911 and the inner side of the limiting plate 2 respectively.

[0051] Since the spring 913 can further eliminate the gap of the thread, when the half-ring clamping plate 3 is attached to the pier column 8, the rotation direction of the motor 902 is changed, the support unit 4 and the bottom plate 1 are close to the half-ring clamping plate 3, and the preliminary locking is performed, then the secondary locking of the locking unit 10 is performed, and the artificial final locking is performed, so that the multiple locking steps ensure the firm installation with the pier column 8, and the safe and stable construction of the staff is facilitated.

[0052] In the preferred embodiment, the two sides of the positioning hole 201 are provided with waist round holes 202, the two sides of the hinge seat 301 are respectively provided with straight rods 302, the straight rods 302 are sleeved with adjusting plates 15, and the adjusting plates 15 are arranged in the waist round holes 202.

[0053] The two sides of the adjusting plate 15 are respectively provided with a fifth through hole 1501 and a limiting rod 1502, the straight rod 302 is arranged in the fifth through hole 1501, the adjusting plate 15 is connected with the straight rod 302 through the nut 16, the outer side of the fixed frame 901 is further provided with a side plate 914 and an inclined support plate 915, the third through hole 908 is arranged on the side plate 914 and the inclined support plate 915, the upper side of the fixed frame 901 is provided with a second through hole 907, the output shaft of the fixed frame 901 is arranged in the second through hole 907, the driving sleeve 903 is provided with a first blocking ring 906 on one side opposite to the driven gear 905, the first blocking ring 906 abuts against the inner side of the fixed frame 901, one side of the follower rod 909 is provided with a first threaded part 912, and the first threaded part 912 and the driving sleeve 903 have the same screw rotation direction.

[0054] The adjusting plate 15 cooperates with the waist round hole 202 to facilitate the formation of a certain included angle between the half-ring clamping plate 3 and the limiting plate 2, so as to ensure the convenience of installation and adapt to the construction state of the pier column 8, the side plate 914 and the inclined support plate 915 provide a support basis for the driving sleeve 903, so as to ensure that the driving sleeve 903 rotates with the rotation of the motor 902, thereby converting the circular motion into linear motion, changing the distance between the limiting plate 2 and the half-ring clamping plate 3, and facilitating the quick installation and disassembly of the device after the construction is completed.

[0055] In use, especially for the installation scene of the pier column 8 on land, the lifting appliance and the lifting rope are used for lifting from the top of the pier column 8, at this time the support unit 4 is in the form of installation of the support module 13 and the fixed plate 12, the two straight plates 1301 of the support module 13 cooperate with the shaft rod 1302 to form an “X-shaped” structure, the opening size between the respective top plate 5, the locking plate 7 and the half-ring clamp plate 3 can be changed by changing the angle between the two straight plates 1301, so as to facilitate entering from the top to the pier column 8 and locking at the designed position, after the construction is completed, since the top cover beam has been blocked at the top of the pier column 8, the device cannot be taken out from the top, the device is disassembled as a whole and then is lifted to the ground, at this time the artificial disassembly is carried out, the device is taken off from the pier column 8 and is stored for subsequent repeated use.

[0056] When the pier column 8 is installed, the lifting appliance and the lifting rope are used for lifting from the side of the pier column 8, the connection between the pull rope 20 and the locking rod 1010 needs to be released, a plurality of lifting points are arranged on the top plate 5 and the bottom plate 1, the length of the lifting rope is changed to open the half-ring clamp plate 3 on the two bottom plates 1, the half-ring clamp plate 3 is close to the pier column 8, until the half-ring clamp plate 3 is completely close to the pier column 8, the length of the respective lifting rope on the top plate 5 and the bottom plate 1 is kept equal at this time, then the state of the follow-up unit 9 is adjusted, the half-ring clamp plate 3 is attached to the pier column 8, then the lifting appliance lifts the worker to the side of the device through the lifting basket, the pull rope 20 and the locking rod 1010 are locked again, then the locking unit 10 continues to work, the two bottom plates 1 are close to each other and are locked, finally the locking plate 7 is fixed through the bolt 14 and the nut 16, which is convenient to use.

[0057] As Figure 8 In the preferred scheme, the locking plate 7 comprises a first circular arc clamp plate 701, the two sides of the first circular arc clamp plate 701 are respectively provided with an ear plate 702, the inner side of the ear plate 702 is provided with a friction pad 705, the friction pad 705 is attached to the outer side wall of the pier column 8, the outer side of the ear plate 702 is provided with a boss 703, at least two cylindrical rods 704 are arranged in parallel on the boss 703, the bolt 14 is arranged on the opposite two ear plates 702, the two ear plates 702 are connected through the bolt 14 and the nut 16, the cylindrical rod 704 is arranged on the flat plate 6, the cylindrical rod 704 is fixed through the at least two nuts 16 and the flat plate 6, and the two nuts 16 are respectively located on the two sides of the flat plate 6.

[0058] The locking plate 7 adopts a modular design and can be replaced and adjusted according to the needs of different pier columns 8, meanwhile the half-ring clamp plate 3 is replaced according to the size and specification of the locking plate 7, so as to meet the needs of various different construction scenes, the locking plate 7 and the flat plate 6 are fixed firmly and the overall stress is fully stable.

[0059] As Figures 14-18In the preferred scheme, the worm 1001 is rotatably arranged on the bearing plate 1025, the bottom of the bearing plate 1025 is provided with a first mounting plate 1024, the worm wheel 1003 and the lock sleeve 1004 are connected through the flat key 1007 and the rotating shaft 1002 respectively, and the rotating shaft 1002 is rotatably arranged on the first mounting plate 1024;

[0060] The second threaded hole 1013 and the sixth through hole 1014 are respectively arranged through the bearing plate 1025 on both sides, the second insertion rod 1015 is arranged through the second threaded hole 1013 and the sixth through hole 1014, one side of the second insertion rod 1015 is provided with a second threaded part 1016, the second threaded part 1016 and the second threaded hole 1013 have the same screw rotation direction, both sides of the worm 1001 are provided with a square hole 1017, one side of the rotating disc 1018 is connected with a square table 1020 through the bottom disc 1019, and the square table 1020 is inserted with the square hole 1017.

[0061] The first mounting plate 1024 is provided with a sleeve 1011 in the middle, the top and the bottom of the sleeve 1011 are respectively provided with a top ring 1012 and a seventh through hole 1023, one side of the sleeve 1011 is provided with a first threaded hole 1009, the locking rod 1010 is located in the first threaded hole 1009, the rotating shaft 1002 is inserted into the top ring 1012 and the sleeve 1011, and the bottom of the rotating shaft 1002 is connected with a positioning seat 19.

[0062] The worm wheel 1003 and the worm 1001 of the locking unit 10 have self-locking, the rotating shaft 1002 is installed into the sleeve 1011 through the positioning seat 19, the overall rotation accuracy is high, the lateral bearing capacity is stable, when the manual operation mode is adopted, the rotating direction of the rotating disc 1018 is changed, then the worm 1001 is rotated, the rotating disc 1018 is locked again by the second insertion rod 1015 after being rotated to the designed position, the rotating disc 1018 is circumferentially locked at this time, the second insertion rod 1015 can cope with the problem of inclination and will not fall off the bearing plate 1025, and the locking effect is good.

[0063] In the preferred scheme, two clamping grooves 1008 are arranged in parallel on the outside of the rotating shaft 1002, the flat key 1007 is located in the clamping groove 1008, the seventh through hole 1023 is further provided with a bearing 17 and a washer 18, the top of the bearing 17 abuts against the bottom of the top ring 1012, the bearing 17 is sleeved on the outside of the rotating shaft 1002, the washer 18 comprises a supporting ring 1801, a plurality of rolling balls 1802 are arranged on the upper part of the supporting ring 1801, and the rolling balls 1802 abut against the lower part of the bearing 17.

[0064] The lock sleeve 1004 is provided with a spiral groove 1006 on the outside, the lock sleeve 1004 is further threadedly connected with a fastening nail 1005, one side of the pull rope 20 is fixed on the fastening nail 1005, and the other side of the pull rope 20 is fixed on the locking rod 1010.

[0065] The inner side of the positioning seat 19 is provided with a first ring groove 1901 and a second ring groove 1902, the middle part of the first ring groove 1901 is provided with a conical rod 1903, the bottom of the rotating shaft 1002 is provided with a conical hole 1022, the outer side of the conical hole 1022 is provided with a third threaded part 1021, the positioning seat 19 and the rotating shaft 1002 are threadedly connected, the conical rod 1903 is attached to the inner wall of the conical hole 1022, the inner side of the first ring groove 1901 is provided with a third threaded part 1904, the bottom of the positioning seat 19 is provided with a locking groove 1905, and the support ring 1801 is attached to the second ring groove 1902.

[0066] The bottom of the tensioning roller 1027 is provided with a second mounting plate 1026, the second mounting plate 1026 and the bottom plate 1 are fixedly connected, the top and bottom of the tensioning roller 1027 are respectively provided with a cover plate 1028, the cover plate 1028 is provided with a plurality of clamping grooves 1029 in the circumferential direction, the clamping grooves 1029 are provided with anti-dropping rods 1030, the anti-dropping rods 1030 are connected to the cover plate 1028 through nuts 16, and the two sides of the pull rope 20 are attached to the side walls of the tensioning roller 1027 and the anti-dropping rods 1030.

[0067] By changing the rotating direction of the worm 1001, the rotating direction of the worm wheel 1003 is changed, so as to drive the rotating shaft 1002 and the lock sleeve 1004 to rotate, at this time, the lock sleeve 1004 and the worm wheel 1003 rotate synchronously, one side of the pull rope 20 is fixed on the fastening nail 1005, and then the pull rope 20 can be completely reeled in or payed out along with the lock sleeve 1004, in the process of rotating the rotating shaft 1002, the bearing 17 is reliably fixed to the rotating shaft 1002 due to the interference fit between the bearing 17 and the rotating shaft 1002, and the bearing 17 is deviated from the bottom through the rolling balls 1802 on the washer 18, so as to ensure that the outer ring of the bearing 17 is attached to the inner side of the sleeve 1011, that is, the bottom of the top ring 1012, then the positioning seat 19 and the rotating shaft 1002 are fixed, threadedly connected, and coated with thread glue, so as to ensure that the positioning seat 19 and the rotating shaft 1002 are fixed firmly, then the second ring groove 1902 provided in the middle part of the positioning seat 19 supports the washer 18, the coaxiality of the overall installation is reliably ensured, the coaxiality is high, the effect is good, the conical rod 1903 is opposite to the conical hole 1022 of the rotating shaft 1002, the overall alignment accuracy is good, the conical surface also has a certain locking effect, after overall installation, the rigidity is strong, the effect is good, and the vertical accuracy with the first mounting plate 1024 can be ensured, so that the meshing accuracy with the worm 1001 is high, and the problem of tooth disengagement is avoided, at the same time, the tensioning roller 1027 provided on the opposite bottom plate 1 is firmly pulled through the cooperation of the cover plate 1028 and the anti-dropping rod 1030, and the tensioning roller 1027 plays a role of a movable pulley, so as to ensure that the overall driving effect is better and the response speed is faster.

[0068] AsFigures 6-9 In the preferred scheme, the support unit 4 comprises a fixed plate 12 and a support module 13, the support module 13 comprises two straight plates 1301 arranged oppositely, the straight plates 1301 are provided with first through holes 1305 in the middle, shaft rods 1302 are arranged in the first through holes 1305, the straight plates 1301 are provided with grooves 1303 in the middle, the shaft rods 1302 are provided with baffle plates 1304 on both sides, the baffle plates 1304 are attached to the outer sides of the straight plates 1301, and the straight plates 1301 are further provided with a plurality of lock holes 1306, and the bolts 14 are arranged in the fixed plate 12 and the lock holes 1306.

[0069] When the device is used on the pier column 8, the fixed plate 12 and the support module 13 can ensure the locking precision of the whole, the "X-shaped" architecture is adopted, the whole installation is more convenient, the adjustment is more convenient, after the construction is completed, the device is directly hoisted to the ground and then the pull rope 20 is opened to complete the release of the pier column 8, and the top and bottom of the straight plate 1301 are fixed through the bolts 14 and the top plate 5 and the bottom plate 1, which is convenient for rapid installation and disassembly in the later period.

[0070] As Figures 15-16 In the preferred scheme, the both sides of the flat plate 6 are respectively provided with positioning discs 601, the positioning discs 601 are provided with fixed holes 602 in the middle, the positioning discs 601 are fixed through the bolts 14 and the straight plates 1301, and the bolts 14 are arranged in the fixed holes 602 and the lock holes 1306.

[0071] The locking plate 7 can be positioned and installed through the flat plate 6 in a quick installation mode, the installation position of the locking plate 7 can be adjusted through the plurality of lock holes 1306, so that the use needs are ensured, the whole operation is convenient, the use is simpler, and it is more convenient to disassemble and maintain when necessary, and the use effect is good.

[0072] The above-mentioned embodiments are only preferred technical solutions of the utility model, and should not be regarded as limitations of the utility model, and the protection scope of the utility model should be the technical solutions recorded in the claims, including the equivalent replacement schemes of the technical features in the technical solutions recorded in the claims. That is, the equivalent replacement improvement in this range is also within the protection scope of the utility model.

Claims

1. A quick installation self-locking steel hoop construction device, characterized in that: The two support units (4) are provided with a top plate (5) and a bottom plate (1) symmetrically at the top and bottom respectively, the support unit (4) comprises a support module (13), the support module (13) comprises two straight plates (1301) provided in a relative hinged manner, and the two ends of the straight plate (1301) are connected with the top plate (5) and the bottom plate (1) respectively; The inner side of the bottom plate (1) is provided with a half-ring clamping plate (3), the two bottom plates (1) are connected through a locking unit (10) and a pull rope (20), the upper side of the straight plate (1301) is connected with a locking plate (7) through a flat connecting plate (6), and the two half-ring clamping plates (3) and the locking plate (7) provided in a relative manner are detachably abutted against the outer side wall of the pier column (8).

2. The quick installation self-locking steel hoop construction device according to claim 1, characterized in that: The inner side of the bottom plate (1) is provided with a limiting plate (2), the half-ring clamping plate (3) is connected with the limiting plate (2) through a follow-up unit (9), and one side of the follow-up unit (9) is electrically connected with a mobile power supply (11).

3. The quick installation self-locking steel hoop construction device according to claim 2, characterized in that: The follow-up unit (9) comprises a motor (902) and a driving sleeve (903), the driving sleeve (903) is threadedly connected with a follow-up rod (909), the follow-up rod (909) penetrates through the limiting plate (2), and the end of the follow-up rod (909) is hinged with the half-ring clamping plate (3).

4. The quick installation self-locking steel hoop construction device according to claim 3, characterized in that: The middle part of the limiting plate (2) is provided with a positioning hole (201), the outer middle part of the half-ring clamping plate (3) is provided with a hinged seat (301), the follow-up rod (909) is connected with the hinged seat (301), and the outer side of the follow-up rod (909) is further provided with a spring (913).

5. The quick installation self-locking steel hoop construction device according to claim 4, characterized in that: The two sides of the positioning hole (201) are provided with waist round holes (202), the two sides of the hinged seat (301) are provided with straight extension rods (302) respectively, the straight extension rods (302) are provided with adjusting plates (15), and the adjusting plates (15) penetrate through the waist round holes (202).

6. The quick installation self-locking steel hoop construction device according to claim 1, characterized in that: The locking plate (7) comprises a first circular-arc clamping plate (701), the two sides of the first circular-arc clamping plate (701) are provided with ear plates (702) respectively, the outer side of the ear plate (702) is provided with at least two circular columns (704) in parallel, and the circular columns (704) penetrate through the flat connecting plate (6).

7. The quick installation self-locking steel hoop construction device according to claim 1, characterized in that: The locking unit (10) comprises a uniform line roller (1027) and a locking sleeve (1004), the uniform line roller (1027) is fixed on the two bottom plates (1) in a relative manner, one side of the locking sleeve (1004) is provided with a locking rod (1010), the two sides of the pull rope (20) are fixed on the locking sleeve (1004) and the locking rod (1010) respectively, and the pull rope (20) is wound on the uniform line roller (1027).

8. The quick installation self-locking steel hoop construction device according to claim 7, characterized in that: The locking unit (10) further comprises a worm (1001) and a worm wheel (1003) connected in meshing, the locking sleeve (1004) is located at the lower side of the worm wheel (1003), and the worm wheel (1003) and the locking sleeve (1004) are sleeved on a rotating shaft (1002).

9. The quick installation self-locking steel hoop construction device according to claim 1, characterized in that: The middle part of the straight plate (1301) is provided with a first through hole (1305), a shaft rod (1302) penetrates through the first through hole (1305), and the two sides of the straight plate (1301) are further provided with a plurality of locking holes (1306), and a bolt (14) penetrates through the fixing plate (12) and the locking hole (1306).

10. The quick installation self-locking steel hoop construction device according to claim 9, characterized in that: Both sides of the flat link plate (6) are respectively provided with positioning discs (601), the middle part of the positioning disc (601) is provided with a fixing hole (602), the positioning disc (601) is fixed through bolts (14) and straight plates (1301), the bolt (14) is arranged in the fixing hole (602) and a lock hole (1306).

Citation Information

Patent Citations

  • Self-locking steel hoop structure of construction platform and use method of self-locking steel hoop structure

    CN117780066A

  • Anti-overturning device for reinforcing single-column pier based on steel truss bent cap

    CN221740977U