Sewage treatment tank body for ecological chain treatment

By designing the assembly components and connecting columns, the wastewater treatment tank can be quickly constructed, disassembled, and recycled, solving the problems of cumbersome construction and high costs, improving construction efficiency and reducing operating costs.

CN223633130UActive Publication Date: 2025-12-05GUANGXI WILSON ENVIRONMENTAL PROTECTION TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421488661.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-12-05
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

The construction process of existing sewage treatment ponds is cumbersome, time-consuming, and cannot be recycled, resulting in high operating costs.

Method used

The design employs assembly components and connecting columns, enabling rapid assembly through insert plates and sliding connections. Bolts and nuts are used for fixing, and the locking blocks and movable blocks are pressed to release the fixation during disassembly, allowing for rapid disassembly and recycling.

Benefits of technology

It shortened the construction cycle of sewage treatment ponds, reduced operating costs, and improved construction and dismantling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223633130U_ABST
    Figure CN223633130U_ABST
Patent Text Reader

Abstract

The utility model discloses a sewage treatment pond body of ecological chain governance, including base, assembling subassembly, sealing pad and connecting post, base four corners are equipped with four connecting post, base top is equipped with a plurality of assembling subassembly, and the assembling subassembly top is equipped with first jack, the assembling subassembly bottom is equipped with the flashboard, and the flashboard is equipped with second jack. A stop block is fixed to the top of the inserting plate, a first inserting hole is formed in the top of the assembling assembly, a fixing block is arranged in the assembling assembly, and a sealing gasket is fixed to the inner side of the assembling assembly. The sewage treatment tank body for ecological chain treatment is provided with the assembling components and the connecting columns, and when the sewage treatment tank is constructed, the connecting columns are fixed at four corners of the base, then the assembling components are inserted into the base through the inserting plates, so that the assembling components are fixed on the base, and then the assembling components are assembled upwards; the treatment tank is transversely fixed through bolts and connecting pieces, so that the construction of the sewage treatment tank can be quickly completed, and the construction period of the sewage treatment tank is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to sewage treatment technical field, concretely is a sewage treatment tank body of ecological chain management. BACKGROUND

[0002] The existing sewage treatment tank body is generally through the profile of treatment tank body that template splicing is connected when building, then through the material pouring to the template, then waits for the material solidification to shape, can use only, not only is the construction process complicated, and the construction period is long, the existing sewage treatment tank can only be demolished after use, but cannot be recycled, thereby increase the use cost of sewage treatment tank.

[0003] Therefore, we propose a sewage treatment tank body of ecological chain management in order to solve the problems raised in the above. UTILITY MODEL CONTENT

[0004] The utility model discloses a sewage treatment tank body of ecological chain management to solve the problem of the construction process complicated, the construction period is long and cannot be recycled, and the use cost is high in the above background art.

[0005] In order to achieve the above object, the utility model provides the following technical scheme: a sewage treatment tank body of ecological chain management, including base, assembly component, gasket and connecting column, four connecting columns are arranged in the base four corners, a plurality of assembly components are installed at the top of base, and the top of assembly component is provided with first jack, and the bottom of assembly component is provided with plugboard, and the top of plugboard is fixed with block, the top of assembly component is provided with first jack, and the inside of assembly component is provided with fixed block, and the inside of assembly component is provided with gasket.

[0006] Preferably, the sliding rail is arranged between the fixed block and the bottom of the assembly component, and the block and the sliding rail are in sliding connection, and the plugboard and the bottom of the assembly component are in sliding connection.

[0007] Preferably, the size of the first jack is equal to the size of the cross section of the plugboard, a second jack is arranged at the center position of the fixed block, and the size of the second jack is consistent with the size of the first jack, two symmetrical second grooves are arranged in the inside of the plugboard, and a second spring and a clamping block are arranged in the second grooves.

[0008] Preferably, four symmetrical through grooves are arranged on the two sides of the assembly component, and the through grooves are connected with open grooves, two assembly components are connected through connecting pieces, and nuts are penetrated through the connecting pieces, and the connecting pieces and the nuts are in threaded connection.

[0009] Preferably, four symmetrical through grooves are formed on both sides of the assembly component, and the through grooves are connected with open grooves, two assembly components are connected through a connecting piece, and the connecting piece penetrates a nut, and the connecting piece and the nut are in threaded connection.

[0010] Preferably, the assembly component is fixed with the connecting column through bolts, and the connecting column and the base are in detachable structure.

[0011] Compared with the prior art, the ecological chain management sewage treatment pool body has the advantages that:

[0012] (1) The assembly component and the connecting column are arranged, when the sewage treatment pool is built, only the connecting column needs to be fixed at four corners of the base, then the assembly component is inserted into the base through the inserting plate, the assembly component is fixed on the base, the assembly component is assembled upward, and the horizontal fixing of the pool is realized through the bolts and the connecting piece, so that the building of the sewage treatment pool is quickly completed, and the building period of the sewage treatment pool is shortened.

[0013] (2) The clamping block and the movable block are arranged, after the sewage treatment pool is used, the clamping blocks on both sides of the inserting plate are pressed inward, the movable block is slid upward, the upper and lower fixing state between the two assembly components is released, then the nut is screwed, the connecting piece is taken out from the through groove, the movable block on both sides of the inserting plate on the surface of the base is pressed inward, and the assembly component is taken off from the base, so that the sewage treatment pool body is disassembled and recycled, and the use cost is reduced. BRIEF DESCRIPTION OF DRAWINGS

[0014] Figure 1 It is an assembly component splicing internal structure schematic view of the utility model;

[0015] Figure 2 It is an assembly component splicing structure schematic view of the utility model;

[0016] Figure 3 It is an assembly component cross section structure schematic view of the utility model;

[0017] Figure 4 It is an assembly component side cross section structure schematic view of the utility model;

[0018] Figure 5 It is a front view structure schematic view of the utility model;

[0019] Figure 6 It is a top view structure schematic view of the utility model;

[0020] Figure 7 It is an assembly component splicing internal structure schematic view of the utility model; Figure 5 It is an assembly component splicing internal structure schematic view of the utility model;

[0021] In the figure: 1, base; 101, first empty slot; 102, first spring; 103, movable block; 104, limiting groove; 2, assembly component; 3, sliding rail; 4, plug plate; 5, blocking block; 6, second empty slot; 7, second spring; 8, clamping block; 9, first insertion hole; 10, fixed block; 11, second insertion hole; 12, connecting piece; 13, nut; 14, open slot; 15, through slot; 16, sealing gasket; 17, connecting column. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0023] Please refer to Figures 1-7 The utility model provides a kind of technical scheme: an ecological chain management sewage treatment tank, including base 1, assembly component 2, sealing gasket 16 and connecting column 17, base 1 four corners are provided with four connecting columns 17, base 1 top is equipped with multiple assembly components 2, and assembly component 2 top is provided with first insertion hole 9, and assembly component 2 bottom is provided with plug plate 4, and plug plate 4 top is fixed with blocking block 5, and assembly component 2 top is provided with first insertion hole 9, and assembly component 2 is provided with fixed block 10 in the inside, and assembly component 2 is provided with sealing gasket 16 fixed in the inside.

[0024] Sliding rail 3 is arranged between fixed block 10 and the bottom of assembly component 2, and blocking block 5 and sliding rail 3 are in sliding connection, plug plate 4 and the bottom of assembly component 2 are in sliding connection, can be slid on sliding rail 3 by blocking block 5, and plug plate 4 is received in assembly component 2 during transportation, convenient for transportation.

[0025] The size of first insertion hole 9 is equal to the size of the cross section of plug plate 4, second insertion hole 11 is arranged at the center position of fixed block 10, and the size of second insertion hole 11 is consistent with the size of first insertion hole 9, two symmetrical second empty slots 6 are arranged in plug plate 4, and second spring 7 and clamping block 8 are arranged in second empty slot 6, can be clamped by plug plate 4 and first insertion hole 9, and connected by plug plate 4 and second insertion hole 11, so that two assembly components 2 are fixed up and down, and the assembly of sewage treatment tank is facilitated.

[0026] Four symmetrical through grooves 15 are formed on both sides of the assembly component 2, and the through grooves 15 are connected with the open grooves 14, two assembly components 2 are connected through the connecting pieces 12, and the connecting pieces 12 penetrate the nuts 13, the connecting pieces 12 and the nuts 13 are in threaded connection, the adjacent assembly components 2 can be fixed by placing the connecting pieces 12 in the through grooves 15 and tightening the nuts 13, so as to facilitate the assembly of the sewage treatment tank body.

[0027] A first spring 102 and a movable block 103 are arranged in a first empty groove 101 formed at both sides of the clamping block 8 of the plug plate 4 in the base 1, the left end of the first spring 102 is fixed in the left end of the first empty groove 101, and the right end of the first spring 102 is connected with the movable block 103, a limiting groove 104 is formed in the side surface of the base 1 at the position of the movable block 103, and the movable distance of the movable block 103 in the limiting groove 104 is equal to the length of the clamping block 8 extending out of the plug plate 4, the clamping block 8 can be returned to the inside of the plug plate 4 by pressing the movable block 103 inward, so as to facilitate the disassembly of the assembly component 2 from the base 1.

[0028] The assembly component 2 is fixed with the connecting column 17 through bolts, and the connecting column 17 and the base 1 are in a detachable structure, so that the connecting column 17 can be detached from the base 1 during transportation, facilitating the transportation of the assembly.

[0029] Working principle: when using the ecological chain management sewage treatment tank body, first, install the connecting column 17 at the four corners of the base 1, then insert the assembly component 2 into the base 1 through the plug plate 4, so that the clamping block 8 on both sides of the plug plate 4 enters the first empty groove 101, and the assembly component 2 is fixed on the base 1, then repeat the step until the top of the base 1 is filled with the assembly component 2, then insert the plug plate 4 into the first insertion hole 9 on the top of the first layer of assembly component 2 and the second insertion hole 11 between the fixed blocks 10, and fix the upper and lower two assembly components 2 through the clamping of the clamping block 8 and the first insertion hole 9, then repeat the step until the sewage treatment tank body with appropriate height is assembled, then fix the assembly component 2 and the connecting column 17 through bolts, repeat the step until all the assembly components 2 adjacent to the connecting column 17 are fixed with the connecting column 17, then put the connecting piece 12 through the open groove 14 into the through groove 15 of the two adjacent assembly components 2, and tighten the nut 13 to fix the two adjacent assembly components 2, repeat the step until all the adjacent assembly components 2 are fixed, which completes the assembly of the ecological chain management sewage treatment tank body.

[0030] When the ecological chain treatment sewage tank body needs to be recycled after use, first, all the bolts between the connecting column 17 and the assembly component 2 are unscrewed, then the nut 13 on the connecting piece 12 is loosened, and the connecting piece 12 is taken out from the through slot 15 through the open slot 14, the step is repeated until all the connecting pieces 12 are taken out, then the clamping blocks 8 on both sides of the plug-in plate 4 are pressed back into the second empty slot 6, and the sliding block 5 is slid along the slide rail 3, so that the plug-in plate 4 returns to the assembly component 2, the step is repeated until all the assembly components 2 except the first layer are taken down, then the movable block 103 on both sides of the plug-in plate 4 is pressed inward along the limiting slot 104, so that the clamping block 8 returns to the second empty slot 6, and the assembly component 2 is lifted, the assembly component 2 is taken down, then the step is repeated until all the assembly components 2 around the top of the base 1 are taken down, finally, the connecting column 17 on the four corners of the base 1 is removed, which completes the disassembly and recycling of the ecological chain treatment sewage tank body, and the contents not described in detail in the specification all belong to the prior art known to those skilled in the art.

[0031] Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement to part of the technical features, any modification, equivalent replacement, improvement, etc. within the spirit and principles of the utility model should be included in the protection scope of the utility model.

Claims

1. An ecological chain management sewage treatment tank body, comprising a base (1), an assembly component (2), a sealing gasket (16) and a connecting column (17), characterized in that: The base (1) four corners are provided with four connecting columns (17), the base (1) top is provided with a plurality of assembly components (2), and the assembly component (2) top is provided with a first jack (9), the assembly component (2) bottom is provided with an insertion board (4), and the insertion board (4) top is fixed with a blocking block (5), the assembly component (2) top is provided with a first jack (9), and the assembly component (2) is provided with a fixed block (10), the assembly component (2) is provided with an inner sealing gasket (16).

2. The ecological chain management sewage treatment tank of claim 1, wherein: The fixed block (10) and the assembly component (2) bottom are provided with a slide rail (3), and the blocking block (5) and the slide rail (3) are in sliding connection, the insertion board (4) and the assembly component (2) bottom are in sliding connection.

3. The ecological chain management sewage treatment tank of claim 1, wherein: The size of the first jack (9) is equal to the size of the cross section of the insertion board (4), the fixed block (10) center is provided with a second jack (11), and the size of the second jack (11) is consistent with the size of the first jack (9), the insertion board (4) is provided with two symmetrical second grooves (6) in the inside, and the second groove (6) is provided with a second spring (7) and a clamping block (8).

4. The ecological chain management sewage treatment tank of claim 1, wherein: The assembly component (2) both sides are provided with four symmetrical through grooves (15), and the through groove (15) is connected with an open slot (14), two assembly components (2) are connected through a connecting piece (12), and the connecting piece (12) penetrates a nut (13), the connecting piece (12) and the nut (13) are in threaded connection.

5. The ecological chain management sewage treatment tank of claim 1, wherein: The base (1) inside the clamping block (8) of the insertion board (4) is provided with a first groove (101) at both sides, and the first groove (101) is provided with a first spring (102) and a movable block (103) in the inside, the first spring (102) left end is fixed in the first groove (101) inside left end, and the first spring (102) right end is connected with the movable block (103), the base (1) side in the movable block (103) position is provided with a limiting groove (104), and the movable distance of the movable block (103) in the limiting groove (104) is equal to the length of the clamping block (8) extending out of the insertion board (4).

6. The ecological chain management sewage treatment tank of claim 1, wherein: The assembly component (2) is fixed with the connecting column (17) through the bolt, and the connecting column (17) and the base (1) are detachable structure.