Tool box for green building design

By designing a toolbox for green building design, and utilizing mounting rails and movable partitions to classify and protect tools, the problems of insufficient space and damage to drawing materials in traditional toolboxes are solved, thereby improving work efficiency and safety.

CN223671210UActive Publication Date: 2025-12-16SHENYANG JIANZHU UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520115398.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-12-16
Estimated Expiration
2035-01-17

AI Technical Summary

Technical Problem

Traditional toolboxes lack space for categorization, cannot adjust tool sizes, and lack independent storage for drawing materials, leading to problems such as tool clutter, damage, and information loss.

Method used

A toolbox for green building design has been designed, which includes mounting rails, movable partitions, drawing tool slots, and locking mechanisms to achieve the classification, protection, and fixation of tools.

Benefits of technology

It enables the effective classification and protection of tools, prevents tools from being bumped or damaged, ensures the safe storage of drawing materials, improves work efficiency, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223671210U_ABST
    Figure CN223671210U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of building design auxiliary tools, and discloses a tool box for green building design, which comprises a box and a box cover, a pair of mounting rails is arranged in the box body, a plurality of mounting grooves are uniformly arranged on the mounting rails, a plurality of movable partition plates are arranged in the box body, and a pull ring is arranged at the top end of the middle of each movable partition plate. C-shaped mounting buckles are arranged on the two sides of the pull ring and are inserted into the mounting grooves. When the working space needs to be expanded and the size of the space needed by stored and stored tools needs to be adjusted, the C-shaped mounting buckles are pulled out of the mounting grooves by pulling up the pull rings, so that the distance between the movable partition plates is freely adjusted, and the storage space is utilized and the tools of different sizes are classified.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the field of architectural design auxiliary tool, especially to a tool box for green building design. BACKGROUND

[0002] In modern architectural design, tool box is the key equipment for storing and managing tools needed in the design process. However, traditional tool box has many limitations in design, which cannot meet the actual needs of designers.

[0003] Firstly, many traditional tool boxes lack sufficient classification space, resulting in mixed and disordered tools. In the work site, designers need to quickly find specific tools, but due to the ineffective classification of tools, it becomes cumbersome to find and use tools, which reduces work efficiency. This design defect is particularly evident in the case of frequent tool switching.

[0004] Secondly, traditional tool box usually does not have the function of adjusting space according to the size of tools. In architectural design, there are many kinds of tools needed, including large and small tools. If the tool box cannot adjust the space to adapt to the size of different tools, designers will easily face the problem of insufficient space or excessive waste when placing. This not only causes the tools to be collided and worn during use, resulting in the decline of tool performance, but also increases the subsequent maintenance cost. In addition, traditional tool box lacks space for storing drawing books and drawings independently. Drawing materials are essential for architectural design, but when drawings are mixed with other tools, they are easily damaged or worn during transportation. In the construction site, the lack of special storage space will cause the drawings to be squeezed, folded and torn by other tools, resulting in the loss of design information and irreversible impact. In summary, traditional architectural design tool box has deficiencies in classification space, adjustable space and independent storage of drawing materials. SUMMARY

[0005] The utility model aims at providing a tool box for green building design to solve the problems of insufficient extensibility of traditional workbench and large space occupied by tool plate and the drawer under the workbench is easy to knock the leg.

[0006] To achieve the above purpose, the utility model provides the following technical scheme, a tool box for green building design, including the box and the lid, the box is equipped with a pair of installation track, the installation track is evenly equipped with a plurality of installation slot, the box is equipped with a plurality of movable partitions, the movable partition middle top is equipped with the pull ring, the pull ring both sides are equipped with C type installation buckle, the C type installation buckle is inserted in the installation slot.

[0007] As preferred in the utility model, one end of the installation track is connected to the fixed partition, the other side of the fixed partition is provided with a drawing tool slot, one side of the drawing tool slot is provided with a plurality of pen racks.

[0008] As the utility model is preferred, the box body two sides top is equipped with slide rail, the box cover is slidably arranged on the slide rail, one end of the box cover is equipped with push-pull handle, the other end of the box cover is equipped with locating block, the inside of the locating block is equipped with locating hole.

[0009] As the utility model is preferred, the box body top one end is equipped with connecting groove, the locating block and the specification size of connecting groove are compatible, one side of the connecting groove is equipped with fixed block, the inside of the fixed block is movably equipped with locating rod, one end of the locating rod has pull handle, the locating rod is equipped with fixed baffle, locking spring is equipped between the fixed baffle and the fixed block, one end of the locking spring close to the fixed block is equipped with gasket.

[0010] As the utility model is preferred, the box cover top is equipped with backing plate, a pair of carrying handle is hinged in the backing plate.

[0011] As the utility model is preferred, the box body all around is equipped with several buckles

[0012] Compared with the prior art, the above technical scheme of the utility model has the following beneficial technical effects:

[0013] 1, through C type installation buckle on movable partition, the position of movable partition on installation rail can be adjusted, the placement and classification of different size surveying and mapping tools are satisfied, so as to prevent mutual knock damage between tools.

[0014] 2, through drawing tool groove on one side of fixed partition, drawing book and drawing paper and surveying and mapping tools are placed separately, so as to prevent drawing tools from damaging drawing book and surveying and mapping tools due to knock, pen holder arranged in drawing tool groove can fix drawing pen during transportation to prevent loss or smearing of drawing book and drawing paper.

[0015] 3, the cooperation of connecting groove and fixed block mechanism on box body and box cover realizes the locking between box body and box cover, prevents the loss of stored tools, through the buckle arranged around the box body, the tool box can be fixed by rope or binding belt when it needs to be fixed in construction site. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 It is the whole structure schematic view of the utility model;

[0017] Figure 2 It is the whole structure reverse surface schematic view of the utility model;

[0018] Figure 3 It is the whole structure box cover structure view of the utility model;

[0019] Figure 4The whole structure diagram of the box body inside is shown in the utility model.

[0020] Figure 5 The whole structure diagram of the box body inside is shown in the utility model.

[0021] Figure 6 For Figure 5 The structure enlarged schematic view of A in the utility model.

[0022] The drawing shows that: the box body 1, the box cover 2, the installation rail 3, the installation slot 301, the movable baffle 302, the pull ring 303, the C type installation buckle 304, the fixed baffle 4, the drawing tool slot 401, the pen rack 402, the sliding rail 5, the push-pull handle 501, the positioning block 502, the positioning hole 503, the connecting slot 6, the fixed block 601, the positioning rod 602, the pull handle 603, the fixed baffle 604, the locking spring 605, the gasket 606, the backing plate 7, the handle 8, the buckle 9. Specific implementation

[0023] In order to make the purpose, technical scheme and advantage of the utility model more clear and obvious, the utility model is explained in further detail below by combining with specific implementation and referring to the drawings. It should be understood that these descriptions are only exemplary, and are not intended to limit the scope of the utility model. In addition, in the following description, the description of the known structure and technology is omitted to avoid unnecessary confusion of the concept of the utility model.

[0024] The utility model provides a kind of technical scheme: a tool box for green building design, as shown in Figure 1 , Figure 4 The drawing tool slot 401 is provided with a plurality of pen racks 402 on one side, and the pen rack 402 can clamp the drawing pen to prevent the drawing pen from damaging the drawing book or drawing due to jolt.

[0025] As shown in Figure 5 One end of the installation rail 3 is connected to the fixed baffle 4, and the other side of the fixed baffle 4 is provided with a drawing tool slot 401.

[0026] As shown in Figure 3 , Figure 4 The two sides of the box body 1 are provided with sliding rails 5 at the top, and the box cover 2 is slidably arranged on the sliding rails 5.

[0027] like Figure 3 , Figure 6 As shown, a connecting groove 6 is provided at one end of the top of the box 1. The positioning block 502 is adapted to the size of the connecting groove 6. A fixing block 601 is provided on one side of the connecting groove 6. A positioning rod 602 is movably provided inside the fixing block 601. A pull handle 603 is provided at one end of the positioning rod 602. A fixing baffle 604 is provided on the positioning rod 602. A locking spring 605 is provided between the fixing baffle 604 and the fixing block 601. A washer 606 is provided at the end of the locking spring 605 near the fixing block 601.

[0028] like Figure 3 As shown, the top of the box cover 2 is provided with a pad 7, and a pair of handles 8 are hinged inside the pad 7.

[0029] like Figures 1-2 As shown, the box body 1 has several buckles 9 around its perimeter. The buckles 9 can be used with ropes or straps to secure the toolbox when it needs to be fixed or transported.

[0030] In practice, when the operator needs to place architectural design tools into toolbox 1, first pull the handle 603. The handle 603 drives the positioning rod 602, and the fixed baffle 604 at the top of the positioning rod 602 is driven to compress the locking spring 605. Then, the positioning rod 602 is pulled out from the positioning hole 503 in the positioning block 502, completing the unlocking. Pull the push-pull handle 501, and the push-pull handle 501 pulls the box cover 2 outward along the slide rail 5, revealing the interior of the box body 1. Pull up the pull ring 303, and the movable partition 302 is pulled up under the action of the pull ring 303. The C-type mounting buckle 304 is lifted out of the mounting slot 301. Then, the operator can adjust the movable partition 302 to a suitable position according to the size of the surveying tools to be placed, according to the mounting slot 301 on the mounting rail 3. Then, press down to insert the C-type mounting buckle 304 into the mounting slot 301 to adjust the distance between the movable partitions 302, which facilitates the classified placement of surveying tools of different sizes. When it is necessary to place drawing tools, the drawing book or drawing paper can be placed in the drawing tool slot 401. The drawing tool slot 401 is separated from the area for placing surveying tools on the other side by a partition 4 to prevent damage to the drawing book or drawing paper due to collision. Various drawing pens are placed on the pen holder 402 to prevent the drawing pens from making corrections or damaging the drawing book or drawing paper due to bumps. After placement, pull the positioning rod 602 so that it does not block the connecting slot 6. Push the box cover 2 along the slide rail 5 until the positioning hole 503 and the positioning rod 602 are aligned. Release the pull handle 603. The locking spring 605, due to its elasticity, pushes the fixing plate 604, causing the positioning rod 602 to insert into the positioning hole 503, completing the locking. Pull out the handle 8 from the pad 7 to carry the toolbox 1 by hand. When it is necessary to fix the toolbox 1 at the architectural design site, ropes or straps can be used to tie and secure it through the buckles 9 around the box body 1.

[0031] It should be understood that the above detailed description of the present application is only intended to illustrate or explain the principles of the present application, and does not constitute a limitation on the present application. Therefore, any modification, equivalent replacement, improvement, etc. made without departing from the spirit and scope of the present application shall be included in the protection scope of the present application. In addition, the appended claims of the present application are intended to cover all changes and modifications falling within the scope and boundary of the appended claims, or the equivalent forms of such scope and boundary.

Claims

1. A tool box for green building design comprising a box body (1) and a box cover (2), characterized in that: The box (1) is internally provided with a pair of mounting rails (3), the mounting rails (3) are uniformly provided with a plurality of mounting grooves (301), the box (1) is internally provided with a plurality of movable partitions (302), the movable partitions (302) are provided with pull rings (303) at the middle top ends, the pull rings (303) are provided with C-shaped mounting buckles (304) on both sides, and the C-shaped mounting buckles (304) are inserted into the mounting grooves (301).

2. A kit for green building design according to claim 1, wherein: One end of the mounting rail (3) is connected to the fixed partition (4), the other side of the fixed partition (4) is provided with a drawing tool groove (401), and one side of the drawing tool groove (401) is provided with a plurality of pen racks (402).

3. A kit for green building design according to claim 2, wherein: The box (1) is provided with a slide rail (5) on both sides of the top, the box cover (2) is slidably arranged on the slide rail (5), one end of the box cover (2) is provided with a push-pull handle (501), the other end of the box cover (2) is provided with a positioning block (502), and the inside of the positioning block (502) is provided with a positioning hole (503).

4. A kit for green building design according to claim 3, wherein: One end of the top of the box (1) is provided with a connecting groove (6), the specifications and sizes of the positioning block (502) and the connecting groove (6) are matched, one side of the connecting groove (6) is provided with a fixed block (601), the inside of the fixed block (601) is movably provided with a positioning rod (602), one end of the positioning rod (602) is provided with a pull handle (603), the positioning rod (602) is provided with a fixed baffle (604), the fixed baffle (604) and the fixed block (601) are provided with a locking spring (605), and one end of the locking spring (605) close to the fixed block (601) is provided with a gasket (606).

5. A kit for green building design according to claim 4, wherein: The box cover (2) is provided with a gasket (7) on the top, and a pair of handles (8) are hingedly connected in the gasket (7).

6. A kit for green building design according to claim 5, wherein: The box (1) is provided with a plurality of buckles (9) around.