Steel sheet pile supporting equipment in river water conservancy project

By improving the component design of sheet pile support equipment and utilizing structures such as sliding rods and mounting strips, the problem of instability of existing equipment under water flow impact has been solved, enabling rapid assembly and disassembly and improving structural stability, thereby reducing maintenance frequency and costs.

CN223675364UActive Publication Date: 2025-12-16刘忠亮
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202520057022.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2025-12-16
Estimated Expiration
2035-01-10

AI Technical Summary

Technical Problem

Existing sheet pile support equipment is not structurally stable enough under the impact of water flow, is difficult to disassemble and assemble quickly, is easily damaged, and affects construction efficiency and cost.

Method used

The design incorporates components such as sliding rods, mounting strips, limit rods, fixing bolts, and positioning plates. Through threaded connections and positioning structures, it enhances connection stability, strengthens the bending resistance of steel sheet piles, and prevents displacement.

Benefits of technology

It enables rapid assembly and disassembly of sheet pile support equipment, improving structural stability and service life, and reducing maintenance frequency and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223675364U_ABST
    Figure CN223675364U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel sheet pile support equipment in riverway water conservancy project, which comprises two groups of sliding rods, the ends of the two groups of sliding rods, which are far away from each other, are provided with mounting strips, and the upper and lower ends of the mounting strips are inserted with mounting bolts which are matched with threaded grooves on the sliding rods, so that the connection between the mounting strips and the sliding rods is firmer, and the mounting strips are more stable. The installation bolts can be easily inserted and taken out through the design of the threaded grooves, convenience is provided for installation and disassembly of the installation strips, the positioning pieces are fixed to the outer sides of the reinforcing ribs through the positioning bolts, it is guaranteed that the relative positions between the installation strips and the steel plate are accurate, and the installation strips are not damaged. And under the action of water flow impact or other external force, the positioning pieces can effectively prevent the mounting strips and the steel plates from displacing, the integrity of the structure is kept, the mounting process is simpler, more convenient and quicker through the design of the positioning pieces and the positioning bolts, supporting equipment can be quickly assembled, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to water conservancy engineering technical field, concretely is a steel sheet pile support equipment in river water conservancy engineering. BACKGROUND

[0002] The cofferdam refers to the temporary enclosure structure built for the construction of permanent water conservancy facilities in water conservancy construction. Its function is to prevent water and soil from entering the construction site of the building, so as to drain water in the cofferdam, excavate the foundation pit, and build the building. Except as part of the formal building, the cofferdam is generally removed after use. The cofferdam is higher than the highest water level that may occur during the construction period. In bridge foundation construction, when the bridge pier and platform foundation is below the ground water level, according to the local materials, various forms of earth cofferdam are built; in deep and fast flowing rivers, wooden sheet pile or steel sheet pile (single or double layer) cofferdam, and double layer thin wall steel cofferdam can be used. The cofferdam can not only prevent water, but also support the pit wall of the foundation pit. Steel sheet pile cofferdam is the most commonly used type of sheet pile cofferdam. Steel sheet pile is a type of steel with a lock. Its cross section has straight plate shape, groove shape and Z shape, etc. There are various sizes and interlocking forms. It can form cofferdams of various shapes according to needs and can be reused many times, so it is widely used. At present, domestic steel sheet pile enclosure technology is mainly used in bridge cofferdam, large pipeline laying, temporary trench excavation for soil, water and sand retaining wall. In the wharf, unloading yard, retaining wall, retaining wall, embankment protection, flood control, anti-collapse, anti-sand flow and other projects, it plays an important role.

[0003] The utility model discloses a kind of steel sheet pile support equipment in river water conservancy engineering, including first support beam and second support beam supported in two side steel sheet pile assembly, first support beam and second support beam section are all in the shape of and butt joint end mutually clamped, side plate and the side wall of first support beam form clamping groove, two side plates are equipped with hydraulic support device, first perforation is aligned after being fixed by bolt with second perforation. Hydraulic support device is hydraulic cylinder assembly or jack, for opening two side steel sheet pile assembly to enough compactness, then adjusting second support beam, make support beam end and steel sheet pile assembly alignment, replace the support of hydraulic device, second support beam is fixed in second support beam by the cooperation of bolt and perforation, finally dismounting hydraulic support device, the above-mentioned device structure is relatively simple, when using, damage is inevitable due to impact, but the above-mentioned device cannot quickly disassemble and assemble structure, for this, we propose a kind of steel sheet pile support equipment in river water conservancy engineering. UTILITY MODEL CONTENTS

[0004] The utility model aims at providing a kind of steel sheet pile support equipment in river water conservancy engineering to solve the problems raised in the above background.

[0005] To achieve the above object, the utility model provides the following technical scheme: A steel sheet pile support equipment in river water conservancy project, including two groups of sliding rods,

[0006] Two groups of the far end of sliding rod all are installed with installation strip, and the far end of two groups of installation strip all is installed with steel sheet.

[0007] Preferably, two groups of the sliding rod close to one side all are provided with two groups of limit rods, and two groups of limit rods all are opposite and insert in the inside of sliding rod, facilitate sliding rod movement.

[0008] Preferably, the upper end of right side sliding rod left side is installed with fixed peg, and fixed peg lower end is sleeved with fixed block through screw structure, and left side sliding rod right end is evenly provided with multiple groups of thread holes matched with it, facilitate the position of fixed sliding rod.

[0009] Preferably, two groups of the installation strip upper and lower ends all are inserted with installation peg, and two groups of sliding rod far end upper and lower sides all are provided with matched thread groove, facilitate installation strip dismounting in sliding rod end.

[0010] Preferably, two groups of the inside of installation strip all are provided with multiple groups of reinforcing frame, and reinforcing frame is provided with X-shaped structure, strengthens the strength of installation strip.

[0011] Preferably, two groups of the far side of steel sheet all are evenly provided with multiple groups of trapezoidal protruding block, and the inside of two groups of steel sheet all is provided with reinforcing rib, strengthens the service life of steel sheet.

[0012] Preferably, two groups of the far side of installation strip all are opposite and provided with six groups of positioning sheet, and six groups of positioning sheet are installed on the outside of reinforcing rib through positioning peg, facilitate the dismounting of installation strip and steel sheet.

[0013] The utility model at least has following beneficial effects:

[0014] Through being provided with installation peg, through inserting installation peg on the upper and lower ends of installation strip and being matched with the thread groove on the sliding rod, can ensure that the connection between installation strip and sliding rod is more firm, thereby increases the stability of whole structure, and the design of thread groove makes installation peg can be inserted and taken out easily, this provides the convenience for the installation and dismounting of installation strip.

[0015] Through being provided with positioning sheet and positioning peg, positioning sheet is fixed on the outside of reinforcing rib through positioning peg, ensures the relative position between installation strip and steel sheet is accurate, thereby improves the stability of whole support structure, under the impact of water flow or other external force, positioning sheet can effectively prevent the displacement of installation strip and steel sheet, maintains the integrity of structure, and the design of positioning sheet and positioning peg makes the installation process more simple and convenient, can complete the assembly of support equipment quickly, shortens the construction period. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 It is the structure schematic view of the utility model;

[0017] Figure 2 It is the disassembling structure schematic view of the utility model;

[0018] Figure 3 It is the sliding rod sectional structure schematic view of the utility model;

[0019] Figure 4 It is the installation strip structure schematic view of the utility model.

[0020] In the drawing: 1, sliding rod; 2, limiting rod; 3, fixed bolt; 4, fixed block; 5, installation strip; 6, installation bolt; 7, reinforcing frame; 8, steel plate; 9, protruding block; 10, reinforcing rib; 11, positioning sheet; 12, positioning bolt. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0022] Please refer to Figures 1-4 The utility model provides a kind of technical solutions: a steel sheet pile support equipment in river water conservancy project, including two groups of sliding rods 1:

[0023] Two groups of sliding rods 1 are installed with installation strip 5 at one end away from each other, and two groups of installation strips 5 are installed with steel plate 8 at one end away from each other.

[0024] Two groups of sliding rods 1 are provided with two groups of limiting rods 2 on one side close to each other, and two groups of limiting rods 2 are oppositely inserted in the inside of sliding rod 1, by inserting limiting rod 2 in the inside of sliding rod 1, the moving range of sliding rod 1 can be effectively limited, prevent its excessive movement or deviate from predetermined track, to increase the stability and reliability of entire structure.

[0025] Fixed bolt 3 is installed on the left side of the upper end of right side sliding rod 1, and fixed block 4 is sleeved with fixed bolt 3 at lower end by screw structure, and a plurality of threaded holes matched with it are evenly provided in the right end of left side sliding rod 1, by adjusting the distance between two groups of sliding rods 1, then fixed bolt 3 is inserted into suitable position threaded hole, and fixed block 4 is installed outside fixed bolt 3 by screw structure, to strengthen the fixing effect of sliding rod 1.

[0026] The two groups of installation bars 5 are provided with installation bolts 6 at the upper and lower ends, and the distal ends of the two groups of sliding rods 1 are provided with matching threaded grooves on the upper and lower sides. By inserting the installation bolts 6 at the upper and lower ends of the installation bars 5 and matching them with the threaded grooves on the sliding rods 1, the connection between the installation bars 5 and the sliding rods 1 can be ensured to be more firm, thereby increasing the stability of the entire structure.

[0027] The two groups of installation bars 5 are provided with multiple groups of reinforcing frames 7, and the reinforcing frames 7 are provided in an X-shaped structure. The X-shaped reinforcing frames 7 can effectively disperse the stress acting on the steel plates 8, reduce the case of excessive stress on a single point, thereby protecting the steel plates 8 from being easily deformed or damaged. The X-shaped structure has good bending resistance and can significantly improve the ability of the entire support structure to resist bending, especially when subjected to lateral pressure. This structure can provide stronger support.

[0028] The distal sides of the two groups of steel plates 8 are uniformly provided with multiple groups of trapezoidal protrusions 9, and the interiors of the two groups of steel plates 8 are provided with reinforcing ribs 10. The design of the trapezoidal protrusions 9 can effectively disperse the stress acting on the steel plates 8, reduce the case of excessive stress on a single point, thereby protecting the steel plates 8 from being easily deformed or damaged. The reinforcing ribs 10 not only enhance the structural strength but also help to disperse wear, thereby prolonging the service life of the steel plate 8 pile support equipment. Due to the reinforcing effect of the trapezoidal protrusions 9 and the reinforcing ribs 10, local damage caused by stress concentration is reduced, thereby reducing the frequency and cost of daily maintenance.

[0029] The distal sides of the two groups of installation bars 5 are oppositely provided with six groups of positioning pieces 11, and the six groups of positioning pieces 11 are installed on the outer sides of the reinforcing ribs 10 through positioning bolts 12. The positioning pieces 11 are fixed on the outer sides of the reinforcing ribs 10 through the positioning bolts 12, ensuring the relative position between the installation bars 5 and the steel plates 8 to be accurate, thereby improving the stability of the entire support structure. Under the action of water flow impact or other external forces, the positioning pieces 11 and the positioning bolts 12 can effectively prevent the installation bars 5 and the steel plates 8 from being displaced, maintaining the integrity of the structure.

[0030] It should be noted that, in this text, relational terms such as first and second are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "contain" or any other variant thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements not only includes those elements but also includes other elements not explicitly listed or inherent to such a process, method, article or device.

[0031] Although the embodiments of the present application have been shown and described, it is to be understood that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present application, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A steel sheet pile support device in a river water conservancy project, characterized by, Including two groups of sliding rods (1): Two groups of the sliding rods (1) are installed with mounting strips (5) at the far ends, and two groups of the mounting strips (5) are installed with steel plates (8) at the far ends.

2. The steel sheet pile support equipment in a riverway water conservancy project according to claim 1, characterized in that: Two groups of the sliding rods (1) are provided with two groups of limiting rods (2) on the sides close to each other, and two groups of the limiting rods (2) are oppositely inserted into the sliding rods (1).

3. The steel sheet pile support equipment in a riverway water conservancy project according to claim 1, characterized in that: The right end of the left side of the upper end of the right side sliding rod (1) is installed with a fixed bolt (3), the lower end of the fixed bolt (3) is sleeved with a fixed block (4) through a threaded structure, and the right end of the left side sliding rod (1) is uniformly provided with a plurality of threaded holes matched therewith.

4. The steel sheet pile support equipment in a riverway water conservancy project according to claim 1, characterized in that: Two groups of the mounting strips (5) are inserted with mounting bolts (6) at the upper and lower ends, and two groups of the sliding rods (1) are provided with threaded grooves matched therewith at the upper and lower sides of the far ends.

5. The steel sheet pile support equipment in a riverway water conservancy project according to claim 1, characterized in that: Two groups of the mounting strips (5) are provided with a plurality of reinforcing frames (7) inside, and the reinforcing frames (7) are provided with X-shaped structures.

6. The steel sheet pile support equipment in a riverway water conservancy project according to claim 1, characterized in that: Two groups of the steel plates (8) are uniformly provided with a plurality of trapezoidal protrusions (9) on the sides far away from each other, and the steel plates (8) are provided with reinforcing ribs (10) inside.

7. The steel sheet pile support equipment in a riverway water conservancy project according to claim 6, characterized in that: Two groups of the mounting strips (5) are oppositely provided with six groups of positioning pieces (11) on the sides far away from each other, and the six groups of positioning pieces (11) are installed on the outer side of the reinforcing ribs (10) through positioning bolts (12).