Vertical PP (polypropylene) spray tower for purifying chemical waste gas

By introducing pull-out drawers and turbine devices into the vertical PP spray tower, the problem of limited packing replacement due to the inspection window was solved, achieving efficient packing maintenance and improved purification effect.

CN223683321UActive Publication Date: 2025-12-19SUZHOU TEFUJIA LAB SYST ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520055242.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2025-12-19
Estimated Expiration
2035-01-10

AI Technical Summary

Technical Problem

The limited size of the inspection window opening in existing vertical PP spray towers makes it inconvenient to replace the packing material and affects maintenance efficiency.

Method used

The design incorporates drawers that are installed within a rectangular frame via a pull-out mechanism, facilitating the placement, removal, and replacement of the packing material. It is also equipped with a limiting plate, locking bolts, and rubber sealing rings to enhance stability and sealing. A turbine device is used to reduce the exhaust gas flow rate, thereby extending the purification time.

Benefits of technology

It significantly improves the efficiency of packing replacement and cleaning, enhances purification effect and equipment stability, reduces noise, and extends service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223683321U_ABST
    Figure CN223683321U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of chemical waste gas purification, and particularly relates to a chemical waste gas purification vertical PP (polypropylene) spray tower which comprises a tower body, the tower body comprises a plurality of round pipe joints which are connected end to end, a gas inlet is formed in the round pipe joint on the bottommost layer, and a visual inspection window and a liquid injection port are formed in the round pipe joint on the upper side. An exhaust port is formed in the top end of the circular pipe joint on the topmost layer, and the rectangular frame is fixed between every two adjacent circular pipe joints through a flange; the placement drawer is installed in the rectangular frame in a drawing and pulling mode, a disassembly and assembly opening allowing the placement drawer to penetrate through is machined in the outer wall of the rectangular frame, and air holes are evenly distributed in the placement drawer; according to the packing box, the arranged containing drawer is used for bearing the packing, the containing drawer is installed in a drawing and pulling mode, installation of the containing drawer is facilitated, meanwhile, the containing drawer is also convenient to detach for cleaning or replacement of new packing, and the working efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of chemical waste gas purification technology, specifically relating to a vertical PP spray tower for chemical waste gas purification. Background Technology

[0002] Vertical PP spray towers are widely used in industrial waste gas treatment. "Vertical" means that the spray tower is in an upright position when it is working, which is different from horizontal spray towers. "PP" means that the spray tower is made of polypropylene (PP) material.

[0003] The vertical PP spray tower mainly consists of a tower body, a liquid storage tank, an air inlet section, a spray layer, a packing layer, a cyclone demister layer, a viewing window, and an air outlet. The tower body is usually cylindrical and connected in sections by flanges. During operation, the exhaust gas enters the packing absorption layer from the bottom of the tower body under the power of the fan. The pollutants in the gas come into contact with the liquid medium on the packing and undergo a chemical reaction. The exhaust gas or oil is wrapped by water. The water droplets that wrap the pollutants collide with each other, increasing their surface area and gravity. Under the influence of gravity, the water droplets that wrap the pollutants fall into the liquid storage tank at the bottom of the spray tower. Heavier pollutants sink to the bottom of the tower body, while lighter pollutants float on the surface of the circulating water. The gas that is not completely absorbed continues to rise to the spray section and continues to react chemically with the liquid medium sprayed by the high-speed nozzles. The absorbent liquid droplets carried in the gas are removed in the demister layer equipped with a demister device. The treated clean air is discharged from the exhaust pipe at the top of the purification tower.

[0004] In the existing technology, the filler absorption layer is usually inspected and the filler is replaced through a visual inspection window. Although this can meet general usage needs, the limited opening size of the visual inspection window makes the work of replacing the filler inconvenient.

[0005] To address the aforementioned problems, this utility model proposes a vertical PP spray tower for purifying chemical waste gas. Utility Model Content

[0006] To address the aforementioned problems in the existing technology, this utility model provides a vertical PP spray tower for purifying chemical waste gas, which is convenient to use and easy to maintain.

[0007] To achieve the above objectives, this utility model provides the following technical solution: a vertical PP spray tower for purifying chemical waste gas, comprising a tower body, the tower body comprising multiple circular pipe sections connected end to end, an air inlet on the bottommost circular pipe section, a viewing window and a liquid injection port on each of the uppermost circular pipe sections, and an exhaust port at the top of the topmost circular pipe section, further comprising:

[0008] A rectangular frame, which is fixed between two adjacent circular pipe sections using flanges;

[0009] A placing drawer is mounted in the rectangular frame by pulling, and a dismounting opening is formed on the outer wall of the rectangular frame for the placing drawer to pass through.

[0010] As a preferred technical scheme of the utility model, further comprising:

[0011] A limiting plate is fixed to one end of the placing drawer.

[0012] Four locking bolts are diagonally distributed, and the locking bolts are connected with the rectangular frame by screwing after penetrating the limiting plate.

[0013] As a preferred technical scheme of the utility model, further comprising:

[0014] A rubber sealing ring is fixed to the outer wall of the rectangular frame, and the placing drawer penetrates the rubber sealing ring.

[0015] As a preferred technical scheme of the utility model, further comprising:

[0016] A handle is fixed to the outer wall of the limiting plate.

[0017] As a preferred technical scheme of the utility model, further comprising:

[0018] A porous limiting plate is fixed to the inner wall of the rectangular frame to limit the placing drawer from the upper part.

[0019] As a preferred technical scheme of the utility model, the outer wall of the placing drawer abuts against the inner wall of the rectangular frame.

[0020] As a preferred technical scheme of the utility model, further comprising:

[0021] A turbine is rotatably installed in the circular pipe section close to the air inlet.

[0022] As a preferred technical scheme of the utility model, further comprising:

[0023] A rotating column, the turbine is fixed on the rotating column;

[0024] A bearing, the inner ring of the bearing is fixedly connected with the rotating column;

[0025] A fixing ring is fixed to the inner wall of the circular pipe section.

[0026] Supporting rods, a plurality of the supporting rods are equidistantly distributed in a circumferential direction, and one end of the supporting rods is fixedly connected with the fixed ring, and the other end is fixedly connected with the outer ring of the bearing.

[0027] Compared with the prior art, the utility model has the beneficial effects that:

[0028] In the utility model, the placing drawer is used for bearing filler, and is installed through a pulling mode, so that the installation of the placing drawer is facilitated, and the placing drawer is convenient to disassemble and clean or replace new filler, and the work efficiency is greatly improved.

[0029] Other additional advantages and beneficial effects of the utility model will be partially given in the following description, and some will become obvious from the following description or be understood through the practice of the utility model. BRIEF DESCRIPTION OF DRAWINGS

[0030] The accompanying drawings are used to provide a further understanding of the utility model, and constitute a part of the specification, and are used to explain the utility model together with embodiments of the utility model, and do not constitute a limitation to the utility model. In the drawings:

[0031] Figure 1 It is a structural schematic diagram of the utility model;

[0032] Figure 2 It is an enlarged structural schematic diagram of A in the utility model; Figure 1

[0033] Figure 3 It is a structural schematic diagram of the placing drawer in the utility model;

[0034] Figure 4 It is a rectangular frame axis measurement structural schematic diagram in the utility model;

[0035] Figure 5 It is a circular pipe section structural schematic diagram in the utility model.

[0036] In the drawings: 1, tower body; 11, circular pipe section; 111, gas inlet; 112, visual inspection window; 113, gas outlet; 114, liquid injection port; 12, rectangular frame; 121, dismounting port; 122, multi-hole limiting plate; 2, placing drawer; 21, limiting plate; 22, air vent; 23, handle; 3, locking bolt; 4, rubber sealing ring; 5, turbine; 6, rotating column; 7, bearing; 8, fixed ring; 9, supporting rod. DETAILED DESCRIPTION

[0037] ​The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the present utility model.

[0038] Please refer to Figures 1-5 The present utility model provides the following technical scheme: a chemical waste gas purification vertical PP spray tower, comprising a tower body 1, the tower body 1 comprises a plurality of circular pipe sections 11 connected in head-tail mode, an air inlet 111 is arranged on the bottommost circular pipe section 11, a sight window 112 and a liquid injection port 114 are arranged on each of the upper circular pipe sections 11, and an air outlet 113 is arranged at the top end of the topmost circular pipe section 11; the vertical PP spray tower further comprises a rectangular frame 12 and a placing drawer 2.

[0039] Further, as shown in Figures 1-3 In the embodiment, the rectangular frame 12 is fixed between two adjacent circular pipe sections 11 by flanges, the placing drawer 2 is installed in the rectangular frame 12 by a pulling mode, a dismounting opening 121 is processed on the outer wall of the rectangular frame 12 for the placing drawer 2 to pass through, air holes 22 are uniformly arranged on the placing drawer 2, and the above scheme is used. In use, the filler is stored in the placing drawer 2, the waste gas enters the tower body 1 from the air inlet 111 for purification, and the clean air after purification is discharged from the air outlet 113. The placing drawer 2 is arranged to carry the filler, the placing drawer 2 is installed by a pulling mode, the installation of the placing drawer 2 is facilitated, and the placing drawer 2 is also convenient to dismount for cleaning or replacement of new fillers, thereby greatly improving the work efficiency.

[0040] It should be noted that the chemical waste gas purification vertical PP spray tower of the present utility model further comprises a liquid storage tank, a spraying layer and a cyclone demisting layer, which are all arranged in the tower body 1, the spraying layer is located above the placing drawer 2, and the working principle of the spraying tower is known in the prior art, and the spraying tower in the prior art can be referred to, and the spraying tower will not be described in detail herein.

[0041] Preferably, as shown in Figures 1-3 In the embodiment, the rectangular frame 12 is fixed between two adjacent circular pipe sections 11 by flanges, the placing drawer 2 is installed in the rectangular frame 12 by a pulling mode, a dismounting opening 121 is processed on the outer wall of the rectangular frame 12 for the placing drawer 2 to pass through, air holes 22 are uniformly arranged on the placing drawer 2, and the above scheme is used. In use, the filler is stored in the placing drawer 2, the waste gas enters the tower body 1 from the air inlet 111 for purification, and the clean air after purification is discharged from the air outlet 113. The placing drawer 2 is arranged to carry the filler, the placing drawer 2 is installed by a pulling mode, the installation of the placing drawer 2 is facilitated, and the placing drawer 2 is also convenient to dismount for cleaning or replacement of new fillers, thereby greatly improving the work efficiency.

[0042] Preferably, as shown inFigures 1-3 As shown, in the embodiment, the rubber sealing ring 4 is fixedly connected to the outer wall of the rectangular frame 12, and the drawer 2 is placed through the rubber sealing ring 4. After the drawer 2 is installed, the rubber sealing ring 4 is in a contracted state, thereby improving the sealing performance of the drawer 2 after installation.

[0043] Preferably, the rubber sealing ring 4 is made of rubber. Figures 1-3 As shown, in the embodiment, the handle 23 is fixed to the outer wall of the limiting plate 21. After the handle 23 is arranged, the drawer 2 can be easily pulled out for cleaning or replacement of new filler.

[0044] Preferably, the handle 23 is made of plastic. Figure 1 、 Figure 2 and Figure 4 As shown, in the embodiment, the porous limiting plate 122 is fixed to the inner wall of the rectangular frame 12 to limit the drawer 2 from above. After the porous limiting plate 122 is arranged, the drawer 2 is further limited, thereby effectively improving the stability of the drawer 2 after installation and avoiding longitudinal shaking of the drawer 2.

[0045] In addition, the porous limiting plate 122 also limits the filler, thereby avoiding the filler from being affected by wind and separated from the drawer 2, and improving the reliability of the spray tower.

[0046] Preferably, the porous limiting plate 122 is made of metal. Figure 1 and Figure 2 As shown, in the embodiment, the outer wall of the drawer 2 abuts against the inner wall of the rectangular frame 12. After the arrangement is adopted, the close-fitting arrangement effectively improves the stability of the drawer 2 after installation, avoids shaking of the drawer 2 relative to the rectangular frame 12 during work, improves the safety of work, effectively avoids noise and damage caused by collision, and prolongs the service life of the drawer 2.

[0047] Preferably, the drawer 2 is made of metal. Figure 1 and Figure 5 As shown, in the embodiment, the turbine 5 is rotatably installed in the circular pipe joint 11 near the air inlet 111. After the waste gas enters the tower body 1, part of kinetic energy of the waste gas is converted into kinetic energy of the turbine 5, thereby reducing the flow rate of the waste gas, prolonging the purification time of the waste gas, and being beneficial to improving the purification effect.

[0048] In addition, the turbine 5 also stirs the waste gas when rotating, thereby ensuring that the waste gas and the liquid medium fully react chemically and being beneficial to improving the purification effect.

[0049] Optionally, by Figure 1 and Figure 5 As shown in the embodiment, it further includes a rotating column 6, a bearing 7, a fixed ring 8 and a supporting rod 9, the turbine 5 is fixed on the rotating column 6, the inner ring of the bearing 7 is fixedly connected with the rotating column 6, the fixed ring 8 is fixed to the inner wall of the circular pipe section 11, a plurality of supporting rods 9 are distributed equidistantly in the circumferential direction, one end of the supporting rod 9 is fixedly connected with the fixed ring 8, and the other end is fixedly connected with the outer ring of the bearing 7, the fixed ring 8 and the plurality of supporting rods 9 support the turbine 5 as a framework, and the rotating column 6 and the bearing 7 realize the rotary installation of the turbine 5.

[0050] The components not described in detail herein are prior art.

[0051] The working principle and use process of the vertical PP spray tower are as follows: in use, the filler is stored in the placing drawer 2, the waste gas enters the tower body 1 from the gas inlet 111 for purification, and the clean air after purification is discharged from the gas outlet 113.

[0052] The placing drawer 2 is used for bearing the filler, and the placing drawer 2 is installed in a pulling manner, so that the installation of the placing drawer 2 is facilitated, and the placing drawer 2 is also convenient to disassemble for cleaning or replacement of new fillers, and the working efficiency is greatly improved.

[0053] In another aspect of the utility model, when in use, part of kinetic energy of the waste gas is converted into kinetic energy of the rotation of the turbine 5 after the waste gas enters the tower body 1, so that the flow rate of the waste gas is reduced, the purification time of the waste gas is prolonged, and the purification effect is improved.

[0054] In addition, the turbine 5 also stirs the waste gas when rotating, so that the chemical reaction between the waste gas and the liquid medium is fully ensured, and the purification effect is improved.

[0055] Finally, it should be pointed out that: the above only describes the preferred embodiments of the utility model, and is not used to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art, the technical solutions recorded in the foregoing embodiments can be modified, or some technical features can be replaced equivalently. Any modification, equivalent replacement, improvement, etc. within the spirit and principles of the utility model should be included in the protection scope of the utility model.

Claims

1. A vertical PP spray tower for purification of chemical waste gas, comprising a tower body (1), the tower body (1) comprising a plurality of circular pipe sections (11) connected in a head-to-tail manner, an air inlet (111) being arranged on the bottommost circular pipe section (11), a visual inspection window (112) and a liquid injection port (114) being arranged on each of the upper circular pipe sections (11), and an exhaust port (113) being arranged at the top end of the topmost circular pipe section (11), characterized in that, Also include: A rectangular frame (12) is fixed between two adjacent circular pipe sections (11) by flanges; A placing drawer (2) is installed in the rectangular frame (12) by pulling, and a dismounting opening (121) is processed on the outer wall of the rectangular frame (12) for the placing drawer (2) to pass through, and air holes (22) are uniformly distributed on the placing drawer (2).

2. The vertical PP spray tower for purifying chemical waste gas according to claim 1, characterized in that: Also include: A limiting plate (21) is fixed to one end of the placing drawer (2); Four locking bolts (3) are diagonally distributed, and the locking bolts (3) are connected with the rectangular frame (12) by screwing after penetrating the limiting plate (21).

3. The vertical PP spray tower for purifying chemical waste gas according to claim 2, characterized in that: Also include: A rubber sealing ring (4) is adhesively fixed to the outer wall of the rectangular frame (12), and the placing drawer (2) penetrates the rubber sealing ring (4).

4. The vertical PP spray tower for purifying chemical waste gas according to claim 2, characterized in that: Also include: A handle (23) is fixed to the outer wall of the limiting plate (21).

5. The vertical PP spray tower for purifying chemical waste gas according to claim 1, characterized in that: Also include: A porous limiting plate (122) is fixed to the inner wall of the rectangular frame (12) to limit the placing drawer (2) from the upper part.

6. The vertical PP spray tower for purifying chemical waste gas according to claim 1, characterized in that: The outer wall of the placing drawer (2) abuts against the inner wall of the rectangular frame (12).

7. The vertical PP spray tower for purifying chemical waste gas according to claim 1, characterized in that: Also include: A turbine (5) is rotatably installed in the circular pipe section (11) near the air inlet (111).

8. The vertical PP spray tower for purifying chemical waste gas according to claim 7, characterized in that: Also include: A rotating column (6), the turbine (5) is fixed on the rotating column (6); A bearing (7), the inner ring of the bearing (7) is fixedly connected with the rotating column (6); A fixed ring (8) is fixed to the inner wall of the circular pipe section (11); A supporting rod (9) is equally spaced in the circumferential direction, and one end of the supporting rod (9) is fixedly connected with the fixed ring (8), and the other end is fixedly connected with the outer ring of the bearing (7).