Novel hanging tool
By designing a new type of hanger, which adopts a combination structure of several load-bearing carriages and load-bearing beams, the problem of insufficient load-bearing capacity of existing hangers is solved, and the efficiency of suspending heavy components is improved, thus enhancing both suspension capacity and transportation efficiency.
Patent Information
- Application Number
- CN202423135595.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-19
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2034-12-19
AI Technical Summary
Existing hangers have low single load-bearing capacity and are difficult to suspend heavy components.
A novel hanging device is designed, comprising several load carriages, a load-bearing beam, and lifting rings. Two first chains are installed at the top of the load-bearing beam to connect with the load carriages, and the lifting rings are installed at the bottom of the load-bearing beam to suspend components. Several load carriages are linked by a second chain to improve synchronous conveying capacity.
The load-bearing capacity of the hangers has been improved, enabling the suspension of heavy components and enhancing transportation efficiency. The design of the lifting rings and chains has achieved balanced force distribution and robust connections, reducing oil contamination of components.
Smart Images

Figure CN223683764U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of hanger, especially a novel hanger. BACKGROUND
[0002] In the production of stereo garage components, the stereo garage components need to be surface powder spraying treated.
[0003] Commonly, in the surface powder spraying treatment, the components are usually hung on the hanger, and then the hanger moves along the track to drive the components to pass through the powder spraying room, so that the components can be powder sprayed in the moving process, which is conducive to the continuous production of powder spraying.
[0004] Specifically, the hanger comprises load carriages, the load carriages are hung on the track and move along the track, and one load carriage corresponds to one component hung.
[0005] However, the bearing capacity of the single load carriage in the existing hanger is low, and it is difficult to hang the heavy components. TECHNICAL CONTENT
[0006] The utility model aims at at least solving one of the technical problems existing in the prior art. For this purpose, the utility model provides a novel hanger, which can improve the bearing capacity and facilitate the hanging of heavy components.
[0007] According to the novel hanger of the utility model embodiment, the hanger comprises:
[0008] The load carriages are arranged in plurality, and the load carriages are hung on the track in sequence.
[0009] The load beam is provided with at least two first chains at the top, and one first chain is connected with one load carriage.
[0010] The lifting ring is arranged at the bottom of the load beam and used for hanging the components.
[0011] According to the novel hanger of the utility model embodiment, at least the following beneficial effects are achieved:
[0012] 1. The utility model sets the load carriages in plurality, and the load carriages are hung on the track in sequence, so as to facilitate the hanging of the hanger on the track and the movement along the track, and then facilitate the component conveying of the hanger.
[0013] 2. The utility model discloses a load bearing beam and a lifting ring are set, and the top of load bearing beam is provided with two first chains at least, one first chain is connected with one load slide, and the bottom of load bearing beam is provided with a lifting ring, which is used for suspending components, and it can be understood that at least two load slides bear one load bearing beam simultaneously, and the bottom of load bearing beam is provided with a lifting ring, which is used for suspending components, so that when the lifting ring of the bottom of load bearing beam suspends a component, the hanger can bear one component by using at least two load slides simultaneously, and further, the load bearing capacity of the hanger is improved, and the component with heavy weight is conveniently suspended.
[0014] According to some embodiments of the utility model, the bottom of the load bearing beam is provided with a plurality of lifting rings.
[0015] Beneficially, the utility model discloses a plurality of lifting rings are set on the bottom of load bearing beam, so that a plurality of components can be suspended on the bottom of one load bearing beam, which is beneficial to improve the number of components suspended by the hanger, reduce the spacing between two components suspended on the hanger, and further, more components with light weight are conveniently suspended, and the transportation efficiency of the hanger is improved.
[0016] According to some embodiments of the utility model, the number of lifting rings on the load bearing beam is at least one more than the number of first chains on the load bearing beam.
[0017] Beneficially, the utility model discloses that the number of lifting rings on the load bearing beam is at least one more than the number of first chains on the load bearing beam, and it can be understood that when the weight of the component suspended by the hanger is relatively heavy, the number of components suspended on the bottom of the load bearing beam can be less than the number of first chains, and the remaining lifting rings are not used to suspend components, so that the weight of the single component that can be borne by the hanger is improved, and when the weight of the component suspended by the hanger is relatively light, the number of components suspended on the bottom of the load bearing beam can be more than the number of first chains, so that the number of components suspended by the hanger is improved.
[0018] According to some embodiments of the utility model, the at least one lifting ring is located in the middle of the line connecting the two first chains.
[0019] Beneficially, the utility model discloses that the at least one lifting ring is located in the middle of the line connecting the two first chains, so that the stress of the lifting ring located in the middle of the line connecting the two first chains is more balanced, and further, the load bearing capacity of the hanger is improved.
[0020] According to some embodiments of the utility model, the bottom end of the first chain is welded on the top of the load bearing beam.
[0021] Beneficially, the utility model discloses that the bottom end of the first chain is welded on the top of the load bearing beam, so that the connection between the first chain and the load bearing beam is more firm.
[0022] According to some embodiments of the utility model, the bearing beam is arranged as a flat through.
[0023] Beneficially, the utility model discloses a bearing beam is arranged as a flat through, thereby, the material of bearing beam is easy to obtain, and processing is convenient.
[0024] According to some embodiments of the utility model, the lifting ring is screw connected with the bottom of the bearing beam.
[0025] Beneficially, the utility model discloses a lifting ring is screw connected with the bottom of the bearing beam, thereby, the dismounting of lifting ring on the bearing beam is facilitated.
[0026] According to some embodiments of the utility model, the top of the bearing beam is further provided with an oil receiving disc.
[0027] Beneficially, the utility model discloses an oil receiving disc is further provided at the top of the bearing beam, thereby, the oil receiving disc can shield the component above the component, so that the oil receiving disc can receive the oil stain dropped by the track and load carriage, avoids the oil stain from dropping on the component, and further, is favorable to the oil stain protection of the component.
[0028] According to some embodiments of the utility model, further include second chain, the second chain is along the length direction of track extension setting, the second chain is connected with a plurality of load carriages in proper order.
[0029] Beneficially, the utility model discloses a second chain, the second chain is along the length direction of track extension setting, and the second chain is connected with a plurality of load carriages in proper order, thereby, a plurality of load carriages can be linked through the second chain, and further, is favorable to the synchronous conveying of the hanger to multiple components.
[0030] According to some embodiments of the utility model, the load carriage includes a frame body, a wheel body rotatably arranged on the top of the frame body, the wheel body is rollingly arranged on the track, and the bottom of the frame body is connected with the first chain.
[0031] Beneficially, the utility model discloses a load carriage includes a frame body, a wheel body rotatably arranged on the top of the frame body, the wheel body is rollingly arranged on the track, and the bottom of the frame body is connected with the first chain, thereby, the frictional resistance between the load carriage and the track is smaller, and further, the movement of the load carriage on the track is more stable and labor-saving.
[0032] Additional aspects and advantages of the utility model will be partially given in the following description, partially become obvious from the following description, or be understood through the practice of the utility model. BRIEF DESCRIPTION OF DRAWINGS
[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present application or the prior art, the following will briefly introduce the drawings needed to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description only constitute some embodiments of the present application, and for those skilled in the art, other drawings can also be obtained without creative labor on the basis of these drawings.
[0034] Figure 1 A structural schematic diagram of a novel hanger according to an embodiment of the present application is shown in the figure.
[0035] Figure 2 A structural schematic diagram of a novel hanger according to an embodiment of the present application is shown in the figure. Figure 1 A partial structural schematic diagram is shown in the figure.
[0036] Figure 3 A structural schematic diagram of a novel hanger according to an embodiment of the present application is shown in the figure. Figure 2 A side view is shown in the figure.
[0037] Reference signs: 100 - load carriage, 110 - track, 120 - bearing beam, 130 - first chain, 140 - lifting ring, 150 - oil receiving disc, 160 - second chain, 170 - frame body, 180 - wheel body. DETAILED DESCRIPTION
[0038] The embodiments of the present application will be described in detail below, and examples of the embodiments are shown in the drawings, wherein the same or similar reference signs represent the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the drawings are exemplary and are only used to explain the present application, and cannot be understood as a limitation of the present application.
[0039] In the description of the present application, it should be understood that the orientation description, such as the orientation or position relationship indicated by up, down, front, back, left, right, etc. is based on the orientation or position relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, and therefore cannot be understood as a limitation of the present application.
[0040] In the description of the present application, the meaning of several is one or more, and the meaning of multiple is more than two, greater than, less than, more than, etc. are understood as not including the number, and above, below, etc. are understood as including the number. If the first and the second are described, this is only for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features or the sequence of indicated technical features.
[0041] In the description of the utility model, it is necessary to explain that, unless there is definite stipulation and limitation, the term "installation, connection and connection" should be understood broadly, for example, it can be fixed connection, also can be detachable connection, or integrally connected, can be mechanical connection, also can be electrical connection, can be direct connection, also can be indirectly connected through intermediate medium, can be the communication inside two elements. For ordinary skilled in the art, the specific meaning of the above-mentioned term in the utility model can be understood according to specific circumstances.
[0042] A novel hanger according to the embodiments of the utility model is described below with reference to the drawings.
[0043] The utility model aims at providing an embodiment of a novel hanger.
[0044] Referring to Figure 1 , Figure 2 and Figure 3 In the embodiment, a novel hanger mainly comprises load carriages 100, a bearing beam 120 and a lifting ring 140.
[0045] For the load carriage 100, the load carriage 100 is provided with several, and the several load carriages 100 are sequentially hung on the track 110, so that the hanger is conveniently hung on the track 110 and moved along the track 110, and then the hanger conveying member is facilitated.
[0046] In some specific embodiments, a second chain 160 is further included, the second chain 160 is arranged in the length direction of the track 110, and the second chain 160 is sequentially connected with the several load carriages 100.
[0047] In the embodiment, the second chain 160 is arranged in the length direction of the track 110, and the second chain 160 is sequentially connected with the several load carriages 100, so that the several load carriages 100 can be linked through the second chain 160, and then it is beneficial to synchronously conveying multiple members by the hanger.
[0048] Specifically, the second chain 160 is hinged with the load carriage 100.
[0049] In some specific embodiments, the load carriage 100 comprises a frame body 170, a wheel body 180 rotatably arranged on the top of the frame body 170, the wheel body 180 is rollingly arranged on the track 110, and the bottom of the frame body 170 is connected with the first chain 130 below.
[0050] The embodiment makes the load carriage 100 include a frame body 170, a wheel body 180 rotatably arranged on the top of the frame body 170, the wheel body 180 is rollingly arranged on the track 110, and the bottom of the frame body 170 is connected with the first chain 130, so that the frictional resistance between the load carriage 100 and the track 110 is smaller, and the movement of the load carriage 100 on the track 110 is more stable and labor-saving.
[0051] Further, the top of the wheel body 180 is rotatably connected with two wheel bodies 180, and the two wheel bodies 180 are rollingly arranged on the two sides of the track 110, so that the suspension of the load carriage 100 on the track 110 is more stable.
[0052] For the load-bearing beam 120, the top of the load-bearing beam 120 is provided with at least two first chains 130, and one first chain 130 is connected with one load carriage 100, so that one load-bearing beam 120 is provided with at least two load carriages 100 for bearing, and the bearing capacity of a single load-bearing beam 120 is improved.
[0053] Specifically, the first chain 130 is hingedly connected with the load carriage 100.
[0054] In some specific embodiments, the bottom end of the first chain 130 is welded to the top of the load-bearing beam 120, so that the connection between the first chain 130 and the load-bearing beam 120 is more firm.
[0055] In some specific embodiments, the load-bearing beam 120 is provided in a flat and through manner, so that the load-bearing beam 120 is easy to obtain materials and convenient to process.
[0056] Specifically, the width of the flat and through beam is 50 mm, the height is 100 mm, and the wall thickness is 6 mm.
[0057] For the lifting ring 140, the lifting ring 140 is arranged at the bottom of the load-bearing beam 120, and the lifting ring 140 is used for suspending a component.
[0058] The embodiment sets the load-bearing beam 120 and the lifting ring 140, the top of the load-bearing beam 120 is provided with at least two first chains 130, one first chain 130 is connected with one load carriage 100, and the lifting ring 140 is arranged at the bottom of the load-bearing beam 120 and is used for suspending a component, so that at least two load carriages 100 can simultaneously bear one component when the lifting ring 140 at the bottom of the load-bearing beam 120 suspends a component, the load-bearing capacity of the hanger is improved, and a component with large weight is conveniently suspended.
[0059] In some specific embodiments, the bottom of the bearing beam 120 is provided with a plurality of lifting rings 140, so as to facilitate the suspension of a plurality of components at the bottom of a bearing beam 120, which is conducive to increasing the number of components suspended by the hanger, reducing the distance between two components suspended by the hanger, and thus facilitating the suspension of more lightweight components and improving the transportation efficiency of the hanger.
[0060] Further, the number of lifting rings 140 on the bearing beam 120 is at least one more than the number of first chains 130 on the bearing beam 120.
[0061] It can be understood that when the components suspended by the hanger are relatively heavy, the number of components suspended at the bottom of the bearing beam 120 can be less than the number of first chains 130, and the remaining lifting rings 140 are empty and do not suspend components, so as to facilitate the increase of the weight of a single component that can be carried by the hanger, and when the components suspended by the hanger are relatively light, the number of components suspended at the bottom of the bearing beam 120 can be more than the number of first chains 130, so as to facilitate the increase of the number of components suspended by the hanger.
[0062] Specifically, the top of the bearing beam 120 is provided with two first chains 130, and one first chain 130 is connected to one load carrier 100. The bottom of the bearing beam 120 is provided with three lifting rings 140.
[0063] It can be understood that when suspending small-weight components, compared with the conventional hanger that suspends one small-weight component for each load carrier 100, i.e., two load carriers 100 can suspend two small-weight components, the new hanger of the present embodiment can suspend three small-weight components for each two load carriers 100, so as to facilitate the improvement of the transportation efficiency of the new hanger for small-weight components, and the transportation efficiency of the new hanger for small-weight components is improved by 50%.
[0064] In some specific embodiments, at least one lifting ring 140 is located at the middle of the connecting line of the two first chains 130, so that the stress of the lifting ring 140 located at the middle of the connecting line of the two first chains 130 is more balanced, and thus the carrying capacity of the hanger is improved.
[0065] In some specific embodiments, the lifting ring 140 is threadedly connected to the bottom of the bearing beam 120, so as to facilitate the disassembly and assembly of the lifting ring 140 on the bearing beam 120.
[0066] In some specific embodiments, the top of the bearing beam 120 is further provided with an oil receiving disc 150.
[0067] The embodiment further sets the oil receiving disc 150 on the top of the bearing beam 120, so that the oil receiving disc 150 can shield the component above the component, so that the oil receiving disc 150 can receive the oil stains dropped by the track 110 and the load carriage 100, and avoid the oil stains from dropping on the component, thereby facilitating the oil stain protection of the component.
[0068] In the description of the present specification, the description of the terms "one embodiment, some embodiments, illustrative embodiments, examples, specific examples, or some examples" means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present application. In the present specification, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0069] The terms "first, second, third, fourth" and the like (if any) in the specification and claims of the present application and the above-described drawings are used to distinguish similar objects, and do not necessarily describe a specific order or sequence. It should be understood that the data thus used can be interchanged under appropriate circumstances, so that the embodiments described herein can be implemented in an order other than that illustrated or described herein.
[0070] It should also be noted that in the description of the present specification, the relationship terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or sequence between the entities or operations.
[0071] In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device including a series of steps or units does not necessarily limit to those steps or units clearly listed, but can also include other steps or units not clearly listed or inherent to the process, method, product or device.
[0072] Moreover, the terms "include", "contain" or any other variation thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements not only includes those elements, but also includes other elements not explicitly listed or inherent to such process, method, article or device. Without more limitation, the element defined by the statement "including a" does not exclude the presence of other identical elements in the process, method, article or device including the element.
[0073] The utility model embodiment makes the detailed explanation in combination with the drawing, but the utility model is not limited to the above -mentioned embodiment, still can make various changes in the knowledge range that the person skilled in the art has possesses without departing from the utility model's tenet under the precondition that the knowledge range that the person skilled in the art has possesses.
Claims
1. A new hanger characterized in that, The utility model relates to a load carrier (100) is provided with a plurality of, a plurality of load carrier (100) is hung in order on the track (110); The top of the load-bearing beam (120) is provided with at least two first chains (130), and one first chain (130) is connected with one load carrier (100); The bottom of the load-bearing beam (120) is provided with a plurality of lifting rings (140) for suspending components. The bottom of the load-bearing beam (120) is provided with a plurality of lifting rings (140).
2. A new hanger as claimed in claim 1, wherein, The number of lifting rings (140) on the load-bearing beam (120) is at least one more than the number of first chains (130) on the load-bearing beam (120).
3. A new hanger according to claim 2, characterized in that, At least one lifting ring (140) is located in the middle of the connecting line of two first chains (130).
4. A new hanger according to claim 2, characterized in that, The bottom end of the first chain (130) is welded to the top of the load-bearing beam (120).
5. A new hanger as claimed in claim 1, wherein, The load-bearing beam (120) is provided as a flat through.
6. A new hanger as claimed in claim 1, wherein, The lifting ring (140) is threadedly connected to the bottom of the load-bearing beam (120).
7. A new hanger as claimed in claim 1, wherein, The top of the load-bearing beam (120) is further provided with an oil pan (150).
8. A new hanger as claimed in claim 1, wherein, Further comprising a second chain (160), the second chain (160) is arranged along the length direction of the track (110), and the second chain (160) is connected with a plurality of load carriers (100) in order.
9. A new hanger as claimed in claim 1, wherein, The load carrier (100) comprises a frame body (170) and a wheel body (180) rotatably arranged on the top of the frame body (170), the wheel body (180) is rollingly arranged on the track (110), and the bottom of the frame body (170) is connected with the first chain (130).
10. A new hanger as claimed in claim 1, wherein,