Boundary pile for construction land acquisition of water conservancy and hydropower engineering
The modular design of the boundary markers enables convenient replacement of the signs and provides protection against siltation, solving the problems of blurred boundary marker information and low maintenance efficiency in water conservancy and hydropower projects, and improving the long-term stability and ease of maintenance of the boundary markers.
Patent Information
- Application Number
- CN202423295303.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-12-23
- Estimated Expiration
- 2034-12-30
AI Technical Summary
The marking information of existing boundary markers for water conservancy and hydropower projects is easily blurred by environmental factors, resulting in low maintenance efficiency and easy accumulation of silt, which reduces the visibility of the information.
The boundary markers adopt a modular design, which allows for detachable connection of the signs through slots, inserts, and fixing components. Combined with the spring-loaded components, the replacement operation is simplified and the manual labor intensity is reduced.
It enables convenient replacement of signs, improves maintenance efficiency, reduces manual labor intensity, and prevents mud and sand from covering the signs, thus maintaining their clarity.
Smart Images

Figure CN223706332U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of hydraulic engineering tools especially a boundary post for land acquisition of water conservancy and hydropower engineering construction. BACKGROUND
[0002] In the construction process of water conservancy and hydropower engineering, land acquisition and demarcation are an important link. As a kind of marker for indicating land boundary, boundary post can clearly indicate the scope and boundary of construction land, and provide basis for the smooth implementation of the project. Boundary post is usually made of weather-resistant material, has a certain height and eye-catching sign characteristics, and at the same time, necessary information (such as land number, boundary number and warning slogans) is marked on the surface, so that construction personnel and surrounding residents can clearly identify the boundary. The boundary post for land acquisition of water conservancy and hydropower engineering construction not only serves for short-term boundary indication, but also needs to have long-term stability to ensure clear identification and good physical state under harsh environment (such as high temperature, low temperature and rain erosion).
[0003] At present, the common boundary post design is usually of integral structure, and the identification information is directly engraved or painted on the main body of the boundary post. This design has significant defects. On the one hand, the identification information on the surface of the boundary post is easily blurred or even lost due to fading, corrosion or wear in the long-term exposure to wind, sun, rain erosion and silt covering environment, affecting the clear identification of the boundary. On the other hand, when the information of the existing boundary post is blurred or damaged, the boundary post usually needs to be replaced or the identification needs to be engraved manually, which not only consumes time and effort, but also increases the maintenance cost. In addition, silt is easy to accumulate on the surface of the boundary post, which covers the identification information and further reduces the visibility of the information. Therefore, the existing boundary post has obvious deficiencies in durability and maintenance convenience in long-term use, and needs to be improved. SUMMARY
[0004] The purpose of this section is to outline some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the utility model name to avoid obscuring the purpose of this section, the abstract of the specification and the utility model name. Such simplifications or omissions cannot be used to limit the scope of the utility model.
[0005] In view of the above and / or existing problems in the prior art, the utility model is proposed.
[0006] Therefore, the technical problem to be solved by the utility model is to provide a boundary post which can conveniently replace the identification module and has a silt prevention design, so as to solve the problems of existing boundary post that the identification information is easily blurred by the environment and the maintenance efficiency is low.
[0007] To solve the above technical problems, the utility model provides technical scheme as follows: A boundary post for construction land acquisition of water conservancy and hydropower engineering, including fixed column, the top of fixed column is equipped with the slot, the bottom of slot is provided with the pop -up assembly, the top of pop -up assembly and the left and right sides of slot are provided with fixed assembly, the inside of slot is inserted with the plug -in rod, the top of plug -in rod extends to the outside fixed connection of fixed column and is equipped with the signboard, the plug -in rod is fixed in the top of fixed column through fixed assembly.
[0008] As a preferred scheme of the boundary post for construction land acquisition of water conservancy and hydropower engineering, wherein: the inside of fixed column and the left and right sides of slot are equipped with first telescopic cavity, the bottom of slot is equipped with second telescopic cavity.
[0009] As a preferred scheme of the boundary post for construction land acquisition of water conservancy and hydropower engineering, wherein: the fixed assembly includes the limiting plate slidingly connected in the first telescopic cavity, the center of limiting plate is fixedly installed with the positioning rod, one end of positioning rod penetrates the inner wall of first telescopic cavity and extends to the outside fixed connection of fixed column and is equipped with the pull ring, the other end of positioning rod penetrates the inner wall of first telescopic cavity and extends to the inside of slot, the middle part of positioning rod is sleeved with first telescopic spring, and one end of first telescopic spring is connected with the inner wall of first telescopic cavity, and the other end is fixedly connected with the outer wall of limiting plate.
[0010] As a preferred scheme of the boundary post for construction land acquisition of water conservancy and hydropower engineering, wherein: the inside of plug -in rod is equipped with the positioning hole matched with positioning rod, and one end of two positioning rods located in the inside of slot is respectively inserted in the left and right sides of positioning hole.
[0011] As a preferred scheme of the boundary post for construction land acquisition of water conservancy and hydropower engineering, wherein: the upper part of plug -in rod is cylindrical, and the bottom is conical.
[0012] As a preferred scheme of the boundary post for construction land acquisition of water conservancy and hydropower engineering, wherein: the pop -up assembly includes the second telescopic spring fixedly connected with the bottom wall of second telescopic cavity, the top of second telescopic spring is fixedly connected with the limiting seat, the top of limiting seat is equipped with the limiting slot, and the bottom of plug -in rod is inserted in the limiting slot.
[0013] The utility model discloses the beneficial effect has: through modularization design, realized the detachable connection between the signboard and fixed column, and staff only needs to operate the pull ring of fixed column both sides to be able to quickly remove the location fixing of plug-in rod, thereby the signboard is conveniently replaced, does not need to replace the whole interface stake main body, and the maintenance efficiency is improved greatly, simultaneously, plug-in rod designs automatic pop-up assembly, and the rebound force of second telescopic spring can push out plug-in rod a distance, further simplifies the operation of replacing signboard, and reduces manual labor intensity. BRIEF DESCRIPTION OF DRAWINGS
[0014] In order to more clearly illustrate the technical scheme of the embodiment of the utility model, the following will be briefly introduced the drawing needed to be used in the embodiment description, obviously, the drawing in the following description only is some embodiments of the utility model, for the ordinary skilled person in the art, under the premise of not paying the creative labor, still can obtain other drawings according to these drawings. Among them:
[0015] Fig. 1 It is the overall structure schematic diagram of the utility model;
[0016] Fig. 2 It is the local enlarged schematic diagram of plug-in rod and fixed assembly, pop-up assembly connection of the utility model;
[0017] Fig. 3 It is the perspective view of plug-in rod of the utility model. DETAILED DESCRIPTION
[0018] In order to make the above-mentioned purpose, features and advantages of the utility model more obvious and easy to understand, the following will be the specific embodiment of the utility model detailed description with the drawing of the specification.
[0019] In the following description, a lot of specific details are set forth in order to fully understand the utility model, but the utility model can also be implemented in other ways different from the description, and the skilled person in the art can make similar generalization without violating the connotation of the utility model, therefore the utility model is not limited by the specific embodiments disclosed below.
[0020] Secondly, the utility model is described in detail in conjunction with the schematic diagram, when detailing the embodiment of the utility model, for the convenience of explanation, the section view of the device structure will not be enlarged locally according to the general proportion, and the schematic diagram is only an example, which should not limit the scope of protection of the utility model here. In addition, three-dimensional spatial dimensions of length, width and depth should be included in actual production.
[0021] Thirdly, the "one embodiment" or "embodiment" referred to herein is intended to mean a specific feature, structure, characteristic, or combination of features and characteristics described herein that is included in at least one implementation of the present application. The various appearances of "in one embodiment" or "in an embodiment" in the specification are not necessarily all referring to the same embodiment.
[0022] Embodiments
[0023] Referring to Figs. 1-3 The embodiment provides a boundary post for land acquisition for construction of a water conservancy and hydropower project, which comprises a fixed column 1, the bottom of the fixed column 1 can be fixed on the ground through cement pouring, so that the stability of the boundary post and the reliability of long-term use are ensured, a plug slot 101 is formed at the top end of the fixed column 1, the plug slot 101 is provided with a fixed assembly 3 on the left and right sides, the plug slot 101 is provided with a pop-up assembly 2 at the bottom, the plug slot 101 is provided with a plug rod 4 for inserting a signboard 5, the plug rod 4 can be fixed in the plug slot 101 through a positioning rod 302 in the fixed assembly 3, so that the signboard 5 can be stably installed at the top end of the fixed column 1, and the plug rod 4 can be pushed out a distance after the positioning rod 302 releases the fixed plug rod 4, so that the operation of replacing the signboard is further simplified, and the labor intensity is reduced.
[0024] Specifically, a first telescopic cavity 102 is formed in the fixed column 1 and located on the left and right sides of the plug slot 101, the cavity is used for accommodating a limiting plate 301 and the positioning rod 302 of the fixed assembly 3, and space is provided for sliding of the positioning rod 302 and telescoping of a first telescopic spring 304. A second telescopic cavity 103 is formed at the bottom end of the plug slot 101 and is used for accommodating the pop-up assembly, the pop-up assembly comprises a second telescopic spring 201 and a limiting seat 202, so that the plug rod 4 can be pushed out upward through the pop-up assembly after the positioning rod 302 releases the fixed plug rod 4, and the signboard can be quickly replaced by the staff.
[0025] The fixed assembly 3 includes a limiting plate 301 slidingly connected in the first telescopic cavity 102, which supports and guides the sliding of the positioning rod 302, and transmits the elastic force of the first telescopic spring 304. The center of the limiting plate 301 is fixedly installed with the positioning rod 302, one end of which penetrates the inner wall of the first telescopic cavity 102 and extends to the outside of the fixed column 1, and the outer end is fixedly connected with a pull ring 303. The pull ring 303 is used to facilitate the manual pulling of the positioning rod 302 by the staff, so as to pull out the positioning rod 302 from the positioning hole 401 of the plug rod 4, and release the limiting and fixing of the plug rod 4. The other end of the positioning rod 302 penetrates the inner wall of the first telescopic cavity 102 and extends into the plug slot 101, and is used to be inserted into the positioning hole 401 of the plug rod 4, and the limiting and fixing of the plug rod 4 is achieved by clamping. The middle part of the positioning rod 302 is sleeved with the first telescopic spring 304, one end of which is fixedly connected to the inner wall of the first telescopic cavity 102, and the other end is fixedly connected with the limiting plate 301, which provides a rebound force to make the positioning rod 302 automatically reset after the operation is completed.
[0026] The inside of the plug rod 4 is provided with a positioning hole 401 matched with the positioning rod 302, and the two positioning rods 302 located at the left and right sides of the positioning hole 401 in the plug slot 101 are inserted into the positioning hole 401 respectively, so as to realize stable limiting and fixing. The upper part of the plug rod 4 is cylindrical, and the bottom part is conical. The function of this design is that when the plug rod 4 is inserted into the plug slot 101, the gradually expanding part of the conical bottom part can push the positioning rod 302 to slide into the first telescopic cavity 102, and compress the first telescopic spring 304, so as to provide space for the insertion of the plug rod 4. When the plug rod 4 continues to extend into the positioning hole 401 and aligns with the positioning rod 302, the rebound force of the first telescopic spring 304 pushes the positioning rod 302 to insert into the positioning hole 401, so as to realize the limiting and fixing of the plug rod 4.
[0027] The elastic lifting assembly 2 includes a second telescopic spring 201 fixedly connected to the bottom wall of the second telescopic cavity 103. The spring provides an upward elastic force, which pushes the plug rod 4 to move upward by a distance after the positioning rod 302 releases the limiting and fixing of the plug rod 4, so as to facilitate the staff to take out the signboard. The top end of the second telescopic spring 201 is fixedly connected with a limiting seat 202. The limiting seat 202 serves as a supporting member for the bottom end of the plug rod 4, bears the plug rod 4 and transmits the elastic force of the second telescopic spring 201 to the plug rod 4, so as to realize the stable elastic lifting of the plug rod 4. The top end of the limiting seat 202 is provided with a limiting groove 202a for accommodating and positioning the bottom end of the plug rod 4, so as to ensure that the plug rod 4 remains stable and does not deviate during the up and down movement in the plug slot 101. The bottom end of the plug rod 4 is inserted into the limiting groove 202a, and the conical design at the bottom part is tightly matched with the limiting groove 202a, so as to provide stable support and guidance when the plug rod 4 is inserted or elastically lifted.
[0028] The working principle of the device is: when the sign needs to be replaced, the staff only needs to pull the pull ring 303 on both sides of the fixed column 1 at the same time, and then the clamping end of the two positioning rods 302 can be pulled out of the positioning hole 401, at this time, under the action of the rebounding force of the second extension spring 201, the insertion rod 4 can be pushed out a distance upward through the limiting seat 202, at this time, the insertion rod 4 can be separated from the positioning rod 302 in the insertion slot 101, and the limiting and fixing of the insertion rod 4 are released, so that the sign 5 can be removed and a new sign can be replaced; when the new sign 5 is installed, only the bottom end of the insertion rod 4 needs to be quickly inserted into the insertion slot 101, when the insertion rod 4 enters the insertion slot 101, the sharp end at the bottom of the insertion rod 4 can pass through the gap between the two positioning rods 302, and as the insertion rod 4 continues to penetrate, the cross section at the bottom gradually expands, which will force the clamping end of the two positioning rods 302 to move into the first extension cavity 102, the limiting plate 301 on the positioning rod 302 can press the first extension spring 304, so that the first extension spring 304 is compressed, and as the insertion rod 4 continues to penetrate, the bottom end of the insertion rod 4 can be inserted into the limiting groove 202a of the limiting seat 202 and drive the limiting seat 202 to move downward, the limiting seat 202 can force the second extension spring 201 to compress, when the bottom surface of the limiting seat 202 abuts against the inner bottom wall of the insertion slot 101, the positioning hole 401 opened in the insertion rod 4 can be on the same horizontal line with the two positioning rods 302, at this time, without the blockage of the side wall of the insertion rod 4, under the action of the rebounding force of the first extension spring 304, the two positioning rods 302 can be bounced back to the initial position, that is, the clamping end of the two positioning rods 302 can be inserted into the positioning hole 401, so that the insertion rod 4 is limited and fixed in the insertion slot 101, thereby completing the replacement work of the sign 5.
[0029] It is important to note that the construction and arrangements of the application shown in the various exemplary embodiments are illustrative only. Although only a few embodiments have been described in detail in this disclosure, those skilled in the art who review this disclosure will readily appreciate that many modifications can be made to the embodiments without departing from the novel teachings and advantages of the subject matter described herein. For example, elements described as integrated in a single unit can be separated, elements described as separate can be integrated, and the position, number, shape, and arrangements of elements can be varied. Accordingly, all such modifications are intended to be included within the scope of the present inventive subject matter. The order or sequence of any process or method steps can be varied or re-sequenced without departing from the general nature of the claims. Any "means plus function" clauses are intended to cover the structures described herein as performing the recited functionality and not only structural equivalents but also equivalent structures. Other substitutions, modifications, changes, and omissions can be made in the design, operating conditions, and arrangement of the exemplary embodiments without departing from the scope of the present inventive subject matter. Accordingly, the present inventive subject matter is not limited to the particular embodiments described and illustrated herein, but extends to equivalents of which the foregoing describes are intended to cover.
[0030] Furthermore, in order to provide a concise description of the exemplary embodiments, not all features of an actual implementation can be described (i.e., those related to the
[0031] It is understood that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions can be made. Such development efforts can inevitably lead to a number of substitutions, modifications, changes, and omissions of parts illustrated as having a specific configuration. Such are the natural consequences of research and development efforts, and
[0032] It should be noted that the above examples are intended to illustrate the technical solutions of the present application but not limit the present application, and although the present application has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present application can be modified or replaced equivalently without departing from the spirit and scope of the present application, and all should be included in the scope of the claims of the present application.
Claims
1. A boundary marker for land acquisition in the construction of a water conservancy and hydropower project, characterized in that: Includes a fixed post (1), the top of the fixed post (1) is provided with a slot (101), the bottom of the slot (101) is provided with a spring-loaded component (2), the top of the spring-loaded component (2) and the left and right sides of the slot (101) are provided with fixed components (3), a plug rod (4) is inserted into the slot (101), the top of the plug rod (4) extends to the outside of the fixed post (1) and is fixedly connected with an identification plate (5), the plug rod (4) is limited and fixed to the top of the fixed post (1) by the fixed components (3); The fixed post (1) has a first telescopic cavity (102) inside and on the left and right sides of the slot (101), and the slot (101) has a second telescopic cavity (103) at the bottom. The fixing component (3) includes a limiting plate (301) slidably connected in the first telescopic cavity (102). A positioning rod (302) is fixedly installed at the center of the limiting plate (301). One end of the positioning rod (302) passes through the inner wall of the first telescopic cavity (102) and extends to the outside of the fixing column (1) and is fixedly connected to a pull ring (303). The other end of the positioning rod (302) passes through the inner wall of the first telescopic cavity (102) and extends into the slot (101). A first telescopic spring (304) is sleeved in the middle of the positioning rod (302). One end of the first telescopic spring (304) is connected to the inner wall of the first telescopic cavity (102), and the other end is fixedly connected to the outer wall of the limiting plate (301).
2. The boundary markers for land acquisition in water conservancy and hydropower projects according to claim 1, characterized in that: The insert (4) has a positioning hole (401) that is compatible with the positioning rod (302) inside. The two positioning rods (302) are respectively inserted into the left and right sides inside the positioning hole (401) at one end inside the slot (101).
3. The boundary markers for land acquisition in water conservancy and hydropower projects according to claim 2, characterized in that: The upper part of the insertion rod (4) is cylindrical, and its bottom is conical.
4. The boundary markers for land acquisition in water conservancy and hydropower projects according to claim 3, characterized in that: The spring assembly (2) includes a second telescopic spring (201) fixedly connected to the bottom wall of the second telescopic cavity (103). The top end of the second telescopic spring (201) is fixedly connected to a limiting seat (202). The top end of the limiting seat (202) has a limiting groove (202a). The bottom end of the insertion rod (4) is inserted into the limiting groove (202a).