Dirt cleaning and distributing mechanism
By installing a first filter plate, a housing, a U-shaped frame, and a manual lifting assembly in the rainwater and sewage separation well, the temporary storage and sealing of garbage are achieved, solving the problem of blockage in the separation well, ensuring smooth rainwater and sewage separation, and simplifying the cleaning process.
Patent Information
- Application Number
- CN202520270823.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-20
- Publication Date
- 2025-12-23
- Estimated Expiration
- 2035-02-20
AI Technical Summary
During continuous rain, the filter screens of existing rainwater and sewage separation wells are easily clogged by debris such as branches and fallen leaves, causing blockages in the wells and making them difficult to clean in a timely manner.
A wastewater separation mechanism was designed, comprising a separation well, a first filter plate, a housing, a U-shaped frame, a manual lifting assembly, and a manual hoisting assembly. By setting an upper through hole, a lower through hole, a second filter plate, and a valve plate, waste can be temporarily stored and blocked, preventing waste from accumulating on the filter plate.
It effectively prevents blockage of the diversion well, ensures smooth separation of rainwater and sewage, simplifies the garbage cleaning process, and reduces the frequency of manual cleaning.
Smart Images

Figure CN223706667U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a clean pollution shunt technical field especially relates to a clean pollution shunt mechanism. BACKGROUND
[0002] Clean pollution shunt is a kind of drainage system, it refers to rainwater and sewage are separated, each uses a pipeline to transport, discharges or subsequent treatment sewage discharge mode.Rainwater can be directly discharged to river through rainwater pipe network, sewage needs to be collected through sewage pipe network, and then sent to sewage treatment plant for treatment, and then discharged into river after water quality reaches standard, so as to prevent river pollution.
[0003] Rain and sewage shunt well is a common clean pollution shunt mechanism, rain and sewage shunt well is connected to rain and sewage main pipe of drainage, and is also provided with sewage discharge pipe and rainwater discharge pipe, rainwater and sewage are separated.
[0004] Filtering net pocket is generally provided in rain and sewage shunt well to filter branches, fallen leaves and other garbage in water, but the filtering space of filtering net pocket is limited, branches, fallen leaves and other garbage also continuously flow to net pocket during continuous rain, and it is not convenient for relevant personnel to clean up in time due to continuous rain, so rain and sewage shunt well is easily blocked, therefore, a clean pollution shunt mechanism is provided. UTILITY MODEL CONTENT
[0005] The utility model discloses in order to solve the shortcoming in the prior art, and provide a kind of clean pollution shunt mechanism.
[0006] In order to achieve the above object, the utility model discloses the following technical scheme: a kind of clean pollution shunt mechanism, including shunt well, rain and sewage inlet pipe are fixed through in the middle region of the outer surface one side of the shunt well, the first filter plate is fixedly connected in the inside of the shunt well with inclination;
[0007] The outer surface one side of the shunt well is fixedly connected with shell, and the shell and the shunt well are collectively provided with upper through-hole and lower through-hole, the inside of the shell is equipped with U type frame, the inner surface of the U type frame is fixedly connected with the second filter plate on the side of the shunt well;
[0008] Manual lifting assembly is installed on the top of the shell, and the two movable ends of manual lifting assembly are connected with U type frame;
[0009] Manual lifting assembly is collectively installed between the shell and the shunt well, and the movable end of manual lifting assembly is fixedly installed with valve plate, and the valve plate is matched with upper through-hole.
[0010] Further, the manual lifting assembly comprises a first hand wheel, the first hand wheel is arranged outside the shell, a mounting shaft of the first hand wheel extends through the outer wall of the shell to the inside and is fixedly connected with a winding wheel, the winding wheel is rotatably connected with the shell, the outer surface of the winding wheel is fixedly wound with two pull ropes, and the pull ropes are fixedly connected with the U-shaped frame to drive the U-shaped frame to move.
[0011] Further, the manual lifting assembly comprises a first hand wheel, the first hand wheel is arranged outside the shell, a mounting shaft of the first hand wheel extends through the outer wall of the shell to the inside and is fixedly connected with a winding wheel, the winding wheel is rotatably connected with the shell, the outer surface of the winding wheel is fixedly wound with two pull ropes, and the pull ropes are fixedly connected with the U-shaped frame to drive the U-shaped frame to move.
[0012] Further, the two side inner walls of the shell are fixedly connected with sliding rails, the sliding rails are slidably connected with the U-shaped frame, the U-shaped frame is matched with the shell in a gap manner, the sliding rails limit the U-shaped frame, and the stability of the movement of the U-shaped frame is ensured.
[0013] Further, the valve plate is attached to the inner wall of the diversion well, and the valve plate is beneficial to the plugging operation of the upper through hole.
[0014] Further, the outer surface of the shell is provided with a waste discharge opening extending to the inside at the top of one side, and the waste discharge opening is beneficial to the discharge of garbage.
[0015] Further, the outer surface of the diversion well is fixedly provided with a rainwater drain pipe and a sewage drain pipe, and the rainwater drain pipe and the sewage drain pipe are beneficial to the connection of the diversion well with the urban water treatment pipeline.
[0016] The utility model discloses the beneficial effects of:
[0017] In use, the pollution diversion mechanism is provided with the first filter plate, the shell, the upper through hole, the lower through hole, the second filter plate, the U-shaped frame and the manual lifting assembly, and an additional garbage temporary storage mechanism is arranged, so that garbage can enter the temporary storage mechanism under the impact of water in rainy days, and garbage can be prevented from being accumulated on the first filter plate all the time, thereby achieving the anti-clogging effect. BRIEF DESCRIPTION OF DRAWINGS
[0018] In order to more clearly illustrate the technical scheme of the utility model, the following will be briefly introduced the drawings needed to be used in the specific embodiment description, and obviously, the drawings in the following description are only some embodiments of the utility model, and other drawings can be obtained according to these drawings without the creative labor for the ordinary skilled in the art.
[0019] Figure 1 : the perspective view of the utility model;
[0020] Figure 2 : the sectional view of the utility model;
[0021] Figure 3 : the U-shaped frame and the second filter plate are connected and the utility model discloses a schematic drawing;
[0022] Figure 4 : the manual lifting assembly and the valve plate are connected and the utility model discloses a schematic drawing;
[0023] Figure 5 : the utility model discloses a Figure 4 enlarged view of A place in the middle.
[0024] The reference signs are as follows:
[0025] 1, shunt well, 2, sewage pipe, 3, shell, 4, rainwater pipe, 5, rain and sewage inlet pipe, 6, first hand wheel, 7, winding wheel, 8, waste outlet, 9, slide rail, 10, pull rope, 11, upper through hole, 12, U-shaped frame, 13, sliding plate, 14, first filter plate, 15, lower through hole, 16, second filter plate, 17, screw rod, 18, valve plate, 19, second hand wheel, 20, mounting block. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.
[0027] As shown in Figures 1 to 5 , it relates to a kind of pollution separation mechanism, including shunt well 1, the middle region of the outer surface side of shunt well 1 is fixed with rain and sewage inlet pipe 5, the inside of shunt well 1 is fixedly connected with first filter plate 14, the inner bottom of rain and sewage inlet pipe 5 is flush with the highest point of first filter plate 14, to avoid affecting rain and sewage to enter shunt well 1.
[0028] The outer surface of the shunt well 1 is fixedly connected with the shell 3, and the shell 3 and the shunt well 1 are jointly provided with an upper through hole 11 and a lower through hole 15, the inner surface of the U-shaped frame 12 is fixedly connected with the second filter plate 16 on one side of the shunt well 1, the two inner walls of the shell 3 are fixedly connected with the sliding rails 9, and the sliding rails 9 are slidingly connected with the U-shaped frame 12, and the U-shaped frame 12 and the shell 3 are matched by a gap. The inner bottom of the upper through hole 11 is flush with the bottom of the first filter plate 14, which is beneficial to the garbage entering the upper through hole 11; the gap between the outer wall of the U-shaped frame 12 and the inner wall of the shell 3 is smaller than the filter hole diameter of the second filter plate 16, which avoids the garbage such as fallen leaves and branches from falling into the bottom of the shunt well 1, and also avoids affecting the movement of the U-shaped frame 12.
[0029] The top of the shell 3 is provided with a manual lifting assembly, and the two movable ends of the manual lifting assembly are connected with the U-shaped frame 12, the manual lifting assembly comprises a first hand wheel 6, and the first hand wheel 6 is arranged on the outer side of the shell 3, the mounting shaft of the first hand wheel 6 extends through the outer wall of the shell 3 to the inside and is fixedly connected with a winding wheel 7, and the winding wheel 7 is rotatably connected with the shell 3, the outer surface of the winding wheel 7 is fixedly wound with two pull ropes 10, and the pull ropes 10 are fixedly connected with the U-shaped frame 12, and the winding wheel 7 and the shell 3 are rotatably connected with a bearing, the inner ring of the bearing is fixedly connected with the winding wheel 7, and the outer ring of the bearing is fixedly connected with the shell 3, so that the shell 3 supports the winding wheel 7.
[0030] The shell 3 and the shunt well 1 are jointly provided with a manual lifting assembly, and the movable end of the manual lifting assembly is fixedly provided with a valve plate 18, the manual lifting assembly comprises a mounting block 20, and the mounting block 20 is fixedly connected with the shell 3, the inner surface of the mounting block 20 is limitingly rotatably connected with a screw rod 17, the top of the screw rod 17 is fixedly connected with a second hand wheel 19, the outer surface of the screw rod 17 is threadedly sleeved with a sliding plate 13, and the sliding plate 13 extends through the top of the shunt well 1 to the inside and is slidingly connected therewith, and the sliding plate 13 is fixedly connected with the valve plate 18, and the valve plate 18 is matched with the upper through hole 11, and the valve plate 18 is attached to the inner wall of the shunt well 1. The mounting block 20 supports the screw rod 17, which is beneficial to the installation of the screw rod 17; a sliding sleeve is sleeved on the outer surface of the sliding plate 13, the sliding sleeve is fixedly connected with the shunt well 1, so as to achieve the sliding connection of the sliding plate 13 and the shunt well 1, ensure the stability of the movement of the sliding plate 13, and also ensure the stability of the movement of the valve plate 18; the valve plate 18 can close the upper through hole 11.
[0031] The outer surface of the shell 3 is provided with a waste discharge hole 8 extending to the inside at the top of one side, and an inclined plate is fixedly connected at the inner bottom of the waste discharge hole 8, which is beneficial to the discharge of garbage.
[0032] The outer surface of the shunt well 1 is fixedly provided with a rainwater drain pipe 4 and a sewage drain pipe 2.
[0033] Working principle: rain and sewage enter into the distribution well 1 through the rain and sewage inlet pipe 5, the garbage such as fallen leaves and branches falls on the first filter plate 14, then is washed to the upper through hole 11 under the action of water flow, then enters the shell 3, and finally falls in the U-shaped frame 12, the water entering the U-shaped frame 12 can also return to the distribution well 1 again through the second filter plate 16, when the garbage in the U-shaped frame 12 needs to be cleaned in the rainy day, the second hand wheel 19 is rotated, the second hand wheel 19 drives the screw rod 17 to rotate, the screw rod 17 drives the sliding plate 13 to move downwards, the sliding plate 13 drives the valve plate 18 to move downwards, when a larger resistance is felt, the second hand wheel 19 can be rotated to drive the valve plate 18 to rise a little through each component, the garbage causing resistance is washed away by rainwater, then the valve plate 18 is driven to descend again, until the closure of the upper through hole 11 is completed (the operation here can be adjusted according to actual situation).
[0034] The preferred embodiments disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details and limit the utility model to the specific implementation. Obviously, according to the content of the specification, many modifications and changes can be made. The specification selects and specifically describes these embodiments in order to better explain the principle and practical application of the utility model, so that the person skilled in the art can well understand and utilize the utility model. The utility model is limited by the claims and the whole scope and equivalents.
Claims
1. A decontamination and diversion mechanism comprising a diversion well (1), characterized in that: The outer surface side of the distribution well (1) is fixed with a rain and sewage inlet pipe (5) penetrating through, and the inner side of the distribution well (1) is fixedly connected with a first filter plate (14) in an inclined manner; The outer surface side of the distribution well (1) is fixedly connected with a shell (3), and the shell (3) and the distribution well (1) are jointly provided with an upper through hole (11) and a lower through hole (15), and the inner side of the shell (3) is provided with a U-shaped frame (12), and the inner surface of the U-shaped frame (12) is fixedly connected with a second filter plate (16) on one side of the distribution well (1); The top of the shell (3) is provided with a manual lifting assembly, and the two movable ends of the manual lifting assembly are connected with the U-shaped frame (12); The shell (3) and the distribution well (1) are jointly provided with a manual lifting assembly, and the movable end of the manual lifting assembly is fixedly provided with a valve plate (18), and the valve plate (18) is matched with the upper through hole (11).
2. A sewage separating mechanism according to claim 1, characterised in that: The manual lifting assembly comprises a first hand wheel (6), and the first hand wheel (6) is arranged on the outer side of the shell (3), the mounting shaft of the first hand wheel (6) extends through the outer wall of the shell (3) to the inside and is fixedly connected with a winding wheel (7), and the winding wheel (7) is rotatably connected with the shell (3), the outer surface of the winding wheel (7) is fixedly wound with two pull ropes (10), and the pull ropes (10) are fixedly connected with the U-shaped frame (12).
3. A sewage separating mechanism according to claim 1, wherein: The manual lifting assembly comprises a mounting block (20), and the mounting block (20) is fixedly connected with the shell (3), the inner surface of the mounting block (20) is rotatably connected with a screw rod (17), the top of the screw rod (17) is fixedly connected with a second hand wheel (19), the outer surface of the screw rod (17) is threadedly sleeved with a sliding plate (13), the sliding plate (13) extends through the top of the distribution well (1) to the inside and is slidably connected therewith, and the sliding plate (13) is fixedly connected with the valve plate (18).
4. A pollution separation mechanism according to claim 1, characterized in that: The inner walls on both sides of the shell (3) are fixedly connected with sliding rails (9), and the sliding rails (9) are slidably connected with the U-shaped frame (12), and the U-shaped frame (12) and the shell (3) are matched in clearance.
5. A sewage separating mechanism according to claim 1, wherein: The valve plate (18) is attached to the inner wall of the distribution well (1).
6. A pollution separation mechanism according to claim 1, characterized in that: The outer surface side of the shell (3) is provided with a waste discharge port (8) penetrating to the inside.
7. A pollution separation mechanism according to claim 1, characterized in that: The outer surface side of the distribution well (1) is fixedly provided with a rainwater discharge pipe (4) and a sewage discharge pipe (2).