Wall-attached embedded screw positioning frame of construction hoist
By designing a pre-embedded screw positioning frame for the construction hoist wall attachment, and using positioning components and scale adjustment screw positioning sleeves, the problem of insufficient positioning accuracy in existing technologies has been solved, achieving high precision and flexible adaptability for the construction hoist wall attachment, and improving construction safety and efficiency.
Patent Information
- Application Number
- CN202423277470.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2034-12-30
AI Technical Summary
The existing wall-mounted pre-embedded screw positioning method for construction hoists is difficult to guarantee accuracy and is easily affected by the complex environment of the construction site, affecting installation quality and safety. In addition, the positioning frame has poor versatility and practicality.
Positioning method adopted: The positioning frame of the scale adjustment screw adopts the structural design of the positioning component, including positioning tube, scale, locking plate and reinforcing plate, to realize flexible adjustment and precise positioning of the pre-embedded screw.
This improved the installation accuracy of the pre-embedded bolts for the construction hoist, enhanced the equipment's versatility and practicality, reduced positioning errors, and ensured construction safety and efficiency.
Smart Images

Figure CN223722490U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to pre -buried positioning frame technical field, specifically is a construction hoist wall pre -buried screw rod positioning frame. BACKGROUND
[0002] In the field of building construction, the construction hoist as the key equipment of vertical transportation, the stability of the wall structure plays a vital role for construction safety and efficiency, the accurate installation of the wall pre -buried screw rod is the basic link to ensure that the wall structure is firm and reliable, the traditional pre -buried screw rod positioning mode often relies on the simple template or the temporary positioning measure, these methods not only guarantee the positioning accuracy, are susceptible to the influence of the complex environment of construction site, lead to the position deviation of pre -buried screw rod, and then affect the installation quality and safety of construction hoist wall, therefore a construction hoist wall pre -buried screw rod positioning frame is proposed.
[0003] Chinese utility model patent publication number CN 214996184 U discloses a pre -buried positioning frame of building construction hoist, the pre -buried positioning frame of building construction hoist adopts pre -buried positioning frame, is equipped with pre -buried piece perforation and pre -buried piece positioning column on pre -buried positioning frame, screw rod (pre -buried piece) can pass through the perforation and positioning column, realizes the positioning of four screw rods, pours cement again to fix screw rod, and then can remove and recycle pre -buried positioning frame and install the chassis of hoist.The pre -buried positioning frame can be repeatedly used, and is repeatedly used with the transfer of construction, need not purchase positioning screw rod assembly, but the pre -buried positioning frame of building construction hoist, the width and height are not adjustable, can not match different model construction hoist and the diversified construction site environment, and the versatility and practicality of positioning frame are poor. SUMMARY
[0004] The utility model solves the technical problem that a construction hoist wall pre -buried screw rod positioning frame is provided, which can effectively solve the problems in the prior art.
[0005] The utility model adopts the technical scheme: a construction hoist wall pre -buried screw rod positioning frame, including positioning assembly, the positioning assembly is provided with same four, four The positioning assembly is locked and fixed through adjusting rod one and adjusting rod two, and the positioning assembly upper end positioning plug -in has pre -buried screw rod body;
[0006] The positioning assembly comprises a positioning pipe one, a positioning pipe two, a scale one, a locking plate, a screw positioning sleeve, a horizontal bubble tube, a positioning hole and a locking bolt, the positioning pipe one is provided with the positioning pipe two at the end away from the adjusting rod one, the upper end of the positioning pipe one is provided with the scale one, the outer sides of the positioning pipe one and the positioning pipe two are welded with the locking plate, the junctions of the positioning pipe one and the positioning pipe two are provided with the screw positioning sleeve, the outer sides of the positioning pipe one and the positioning pipe two are fixedly connected with the horizontal bubble tube, and the upper and lower ends of the positioning pipe one are provided with the positioning hole, and the center of the positioning hole is provided with the locking bolt.
[0007] Preferably, the positioning pipe one and the positioning pipe two are the same in structure, and the upper ends of the positioning pipe one and the positioning pipe two are provided with the scale one.
[0008] Through the above technical scheme, the upper ends of the positioning pipe one and the positioning pipe two are provided with the scale one, four positioning assemblies are assembled with the adjusting rod one and the adjusting rod two before positioning and installing the embedded screw rod body, the spacing between the screw positioning sleeves is adjusted according to the readings of the scale one and the scale two, so that the spacing between the embedded screw rod bodies is adjusted, the adjustable range is large, and the use is convenient.
[0009] Preferably, the screw positioning sleeve penetrates through and is fixedly connected with the positioning pipe one and the positioning pipe two, the positioning pipe one and the positioning pipe two are perpendicular to each other, and the positioning assembly further comprises a reinforcing plate, and the junctions of the positioning pipe one and the positioning pipe two are welded with the reinforcing plate.
[0010] Through the above technical scheme, the setting of the screw positioning sleeve ensures the stability of the embedded screw rod body in the positioning process, the setting of the reinforcing plate enhances the structural strength of the junctions of the positioning pipe one and the positioning pipe two, the whole positioning assembly is more stable and reliable, and the service life and the deformation resistance are improved.
[0011] Preferably, the adjusting rod one comprises an adjusting pipe, an adjusting hole and a scale two, the upper and lower ends of the adjusting pipe are provided with the adjusting hole, the upper end of the adjusting pipe is provided with the scale two, and the adjusting rod one and the adjusting rod two are the same in structure.
[0012] Through the above technical scheme, the setting of the scale two facilitates accurate adjustment of the lengths of the adjusting rod one and the adjusting rod two, so as to adapt to different construction sites and installation requirements, and the versatility and flexibility of the positioning frame are improved.
[0013] Preferably, the diameter of the positioning hole is the same as that of the adjusting hole, and the positioning hole and the adjusting hole are matched with the locking bolt.
[0014] Through the above technical scheme, the adjusting hole facilitates the connection and fixation between the positioning assembly and the adjusting rod one and the adjusting rod two, ensures the integrity and stability of the whole positioning frame structure, helps to quickly and accurately complete the positioning work of the wall-attached embedded screw rod of the construction hoist, and improves the construction efficiency.
[0015] Preferably, the inner diameter of the positioning tube is the same as that of the adjusting tube, and the positioning tube and the adjusting tube are in sliding connection.
[0016] Through the above technical scheme, the sliding connection mode enables the positioning assembly to move flexibly on the adjusting rod, facilitating accurate adjustment of the position of the positioning assembly according to actual construction requirements.
[0017] Preferably, the embedded screw body and the screw positioning sleeve are in sliding connection.
[0018] Through the above technical scheme, the embedded screw body is conveniently inserted into the screw positioning sleeve for positioning, and at the same time, the embedded screw body is allowed to have a certain adjustment space to a certain extent, so as to ensure the installation accuracy in the vertical direction, effectively prevent the embedded screw body from tilting or displacing during pouring of concrete, ensure the connection reliability between the construction hoist wall and the building structure, and improve the operation safety of the construction hoist.
[0019] Compared with the prior art, the construction hoist wall embedded screw positioning frame has the following beneficial effects:
[0020] 1. The construction hoist wall embedded screw positioning frame, the setting of the adjusting rod one and the adjusting rod two enables the length of the positioning frame to be flexibly adjusted according to actual construction sites and wall installation requirements, scale two provides accurate adjustment basis for the operator, can adapt to different models of construction hoists and diversified construction site environments, improves the versatility and practicality of the positioning frame, and reduces the cost and time consumption of customizing different positioning tools.
[0021] 2. The construction hoist wall embedded screw positioning frame, the positioning tube one and the positioning tube two in the positioning assembly are perpendicular to each other and are both provided with scale one, cooperate with the screw positioning sleeve, can accurately determine the position of the embedded screw body, can effectively reduce positioning error, ensure the high-precision requirement of the construction hoist wall installation, and the modular design of the positioning assembly, the adjusting rod one and the adjusting rod two has low production cost, small single volume, and is convenient for transportation and carrying. DETAILED DESCRIPTION
[0022] Figure 1 is a three-dimensional structure diagram of the utility model Figure 1 ;
[0023] Figure 2 is a three-dimensional structure diagram of the utility model Figure 2 ;
[0024] Figure 3 is a three-dimensional structure diagram of the utility model Figure 3 ;
[0025] Figure 4 This is a schematic diagram of the disassembled structure of this utility model;
[0026] Figure 5 This is a schematic diagram of the disassembled structure of the positioning component and adjusting rod of this utility model.
[0027] The components include: 1. Positioning assembly; 101. Positioning tube one; 102. Positioning tube two; 103. Scale one; 104. Locking plate; 105. Screw positioning sleeve; 106. Horizontal bubble tube; 107. Reinforcing plate; 108. Positioning hole; 109. Locking bolt; 2. Adjusting rod one; 201. Adjusting tube; 202. Adjusting hole; 203. Scale two; 3. Adjusting rod two; 4. Embedded screw body. Detailed Implementation
[0028] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0029] Example 1: As Figures 1-5 As shown, the present invention provides a positioning frame for a construction hoist wall-mounted pre-embedded screw, including a positioning component 1. Four identical positioning components 1 are provided. The four positioning components 1 are locked and fixed by adjusting rod 1 2 and adjusting rod 2 3. The pre-embedded screw body 4 is positioned and inserted into the upper end of the positioning component 1.
[0030] The positioning assembly 1 includes a positioning tube 101, a positioning tube 2 102, a scale 103, a locking plate 104, a screw positioning sleeve 105, a horizontal bubble tube 106, a positioning hole 108, and a locking bolt 109. The positioning tube 2 102 is provided at the end of the positioning tube 101 away from the adjusting rod 2. The scale 103 is provided at the upper end of the positioning tube 101. The locking plate 104 is welded to the outside of the positioning tube 101 and the positioning tube 2 102. The screw positioning sleeve 105 is provided at the junction of the positioning tube 101 and the positioning tube 2 102. The horizontal bubble tube 106 is fixedly connected to the outside of the positioning tube 101 and the positioning tube 2 102. The positioning hole 108 is provided at the upper and lower ends of the positioning tube 101. The locking bolt 109 is placed in the center of the positioning hole 108.
[0031] Specifically, the positioning pipe one 101 and the positioning pipe two 102 have the same structure, and the upper end of the positioning pipe one 101 and the positioning pipe two 102 is provided with a scale one 103. Advantage is that the upper end of the positioning pipe one 101 and the positioning pipe two 102 is provided with the scale one 103, four positioning assemblies 1 and adjustment rods one 2 and adjustment rods two 3 are assembled before positioning and installing the embedded screw rod body 4, the spacing between the screw rod positioning sleeves 105 is adjusted according to the readings of the scale one 103 and the scale two 203, so that the spacing between the embedded screw rod bodies 4 is adjusted, the adjustable range is larger, and use is facilitated.
[0032] Specifically, the screw rod positioning sleeve 105 penetrates and is fixedly connected with the positioning pipe one 101 and the positioning pipe two 102, the positioning pipe one 101 and the positioning pipe two 102 are perpendicular to each other, the positioning assembly 1 further includes a reinforcing plate 107, and the reinforcing plate 107 is welded and connected at the junction of the positioning pipe one 101 and the positioning pipe two 102. Advantage is that the setting of the screw rod positioning sleeve 105 ensures the stability of the embedded screw rod body 4 during positioning, the setting of the reinforcing plate 107 enhances the structural strength of the junction of the positioning pipe one 101 and the positioning pipe two 102, the whole positioning assembly 1 is more stable and reliable, and the service life and deformation resistance are improved.
[0033] Embodiment two: as shown in the following table, as an improvement on the previous embodiment. Figures 2-5
[0034] Specifically, the adjustment rod one 2 includes an adjustment pipe 201, an adjustment hole 202 and a scale two 203, the adjustment pipe 201 is provided with the adjustment hole 202 at the upper end and the lower end, and the adjustment pipe 201 is provided with the scale two 203 at the upper end. The adjustment rod one 2 and the adjustment rod two 3 have the same structure. Advantage is that the setting of the scale two 203 facilitates accurate adjustment of the length of the adjustment rod one 2 and the adjustment rod two 3 to adapt to different construction sites and installation requirements, and improves the versatility and flexibility of the positioning frame.
[0035] Specifically, the diameter of the positioning hole 108 is the same as that of the adjustment hole 202, and the positioning hole 108 and the adjustment hole 202 are matched with the locking bolt 109. Advantage is that the adjustment hole 202 facilitates the connection and fixation between the positioning assembly 1 and the adjustment rod one 2 and the adjustment rod two 3, ensures the integrity and stability of the whole positioning frame structure, helps to quickly and accurately complete the positioning work of the construction elevator wall-attached embedded screw rod, and improves construction efficiency.
[0036] Specifically, the inner diameter of the positioning pipe one 101 is the same as that of the adjustment pipe 201, and the positioning pipe one 101 and the adjustment pipe 201 are in sliding connection. Advantage is that the sliding connection mode enables the positioning assembly 1 to move flexibly on the adjustment rod one 2, and facilitates accurate adjustment of the position of the positioning assembly 1 according to actual construction requirements.
[0037] Specifically, the embedded screw body 4 is in sliding connection with the screw positioning sleeve 105. The advantage is that the embedded screw body 4 is conveniently inserted into the screw positioning sleeve 105 for positioning, and at the same time, the embedded screw body 4 is allowed to have a certain adjustment space to a certain extent, so as to ensure the installation accuracy in the vertical direction, effectively prevent the embedded screw body 4 from being inclined or displaced during the pouring of concrete, ensure the connection reliability between the construction hoist wall-attached and the building structure, and improve the operation safety of the construction hoist.
[0038] Working principle: in use, firstly, the four positioning assemblies 1 are preliminarily assembled through the adjusting rod one 2 and the adjusting rod two 3. According to the construction requirements, the operator can adjust the relative distance between the four positioning assemblies 1 by sliding the positioning assembly 1 on the adjusting pipe 201 to meet the preset spacing requirements of the construction hoist wall-attached embedded screw, refer to the second scale 203, and after adjustment, the locking bolt 109 is used to pass through the positioning hole 108 and the adjusting hole 202 to lock and fix the positioning assembly 1 with the adjusting rod one 2 and the adjusting rod two 3. The positioning assembly 1 is placed on the construction wall, and the horizontal bubble tube 106 can help the operator to judge whether the positioning assembly 1 is in the horizontal state, so as to ensure the accuracy of positioning. The locking plate 104 is fixed with the wall by using the bolt, and the wall is pre-bored by using the punching device to pass through the screw positioning sleeve 105. The embedded screw body 4 is inserted into the screw positioning sleeve 105 from the upper end of the positioning assembly 1 and inserted into the embedded hole of the wall. The positioning assembly 1 ensures the perpendicularity of the embedded screw body 4. After the embedded screw body 4 is installed on the wall, the positioning assembly 1 can be removed for repeated use, or the positioning frame and the embedded screw body 4 can be embedded at the same time to improve the load resistance strength of the embedded screw body 4.
[0039] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.
Claims
1. A construction hoist wall-attached pre-buried screw rod positioning frame, comprising a positioning assembly (1), characterized in that: The positioning assembly (1) is provided with four same positioning assemblies (1), which are locked and fixed through adjusting rod one (2) and adjusting rod two (3), and the upper end of the positioning assembly (1) is provided with a pre-buried screw body (4) through positioning plug-in. The positioning assembly (1) comprises positioning pipe one (101), positioning pipe two (102), scale one (103), locking plate (104), screw positioning sleeve (105), horizontal bubble tube (106), positioning hole (108) and locking bolt (109), one end of the positioning pipe one (101) away from the adjusting rod one (2) is provided with the positioning pipe two (102), the upper end of the positioning pipe one (101) is provided with the scale one (103), the outer sides of the positioning pipe one (101) and the positioning pipe two (102) are welded and connected with the locking plate (104), the junctions of the positioning pipe one (101) and the positioning pipe two (102) are provided with the screw positioning sleeve (105), the outer sides of the positioning pipe one (101) and the positioning pipe two (102) are fixedly connected with the horizontal bubble tube (106), the upper and lower ends of the positioning pipe one (101) are provided with the positioning hole (108), and the positioning hole (108) is provided with the locking bolt (109) at the center.
2. The wall attachment pre-buried screw positioning frame of construction hoist according to claim 1, characterized in that: The positioning pipe one (101) and the positioning pipe two (102) are the same in structure, and the upper ends of the positioning pipe one (101) and the positioning pipe two (102) are provided with the scale one (103).
3. The wall attachment pre-buried screw rod positioning frame of construction hoist according to claim 1, characterized in that: The screw positioning sleeve (105) penetrates and is fixedly connected with the positioning pipe one (101) and the positioning pipe two (102), the positioning pipe one (101) and the positioning pipe two (102) are perpendicular to each other, and the positioning assembly (1) further comprises a reinforcing plate (107), and the junctions of the positioning pipe one (101) and the positioning pipe two (102) are welded and connected with the reinforcing plate (107).
4. The wall attachment pre-buried screw rod positioning frame of construction hoist according to claim 1, characterized in that: The adjusting rod one (2) comprises adjusting pipe (201), adjusting hole (202) and scale two (203), the upper and lower ends of the adjusting pipe (201) are provided with the adjusting hole (202), and the upper end of the adjusting pipe (201) is provided with the scale two (203).
5. The wall attachment pre-bored screw positioning frame of construction hoist according to claim 4, characterized in that: The diameter of the positioning hole (108) is the same as that of the adjusting hole (202), and the positioning hole (108) and the adjusting hole (202) are matched with the locking bolt (109).
6. The wall attachment pre-bored screw positioning frame of construction hoist according to claim 4, characterized in that: The inner diameter of the positioning pipe one (101) is the same as that of the adjusting pipe (201), and the positioning pipe one (101) and the adjusting pipe (201) are in sliding connection.
7. The wall attachment pre-buried screw rod positioning frame of construction hoist according to claim 1, characterized in that: The pre-buried screw body (4) and the screw positioning sleeve (105) are in sliding connection.