Building building equipment

By adopting components including Bailey bridge truss components and adjustment components, the problem of low installation accuracy of existing steel platform modules for building construction has been solved, achieving an efficient and safe construction process.

CN223724178UActive Publication Date: 2025-12-26GUANGDONG NANAL CONSTR ROBOT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422949320.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-12-26
Estimated Expiration
2034-11-29

AI Technical Summary

Technical Problem

The steel platform modules of existing building construction machines are difficult to align precisely during installation, leading to accumulated errors that affect the strength, stability, and safety of the construction structure, as well as the construction progress and quality.

Method used

The system employs a connecting rod assembly, which includes multiple first walkway plate assemblies, a connecting steel platform module, a Bailey bridge assembly, connecting blocks, and an adjustment assembly. Pre-positioning is achieved through the positioning columns of the connecting blocks, and precise alignment and efficient welding are achieved by combining the adjustment plate and positioning blocks of the adjustment assembly.

Benefits of technology

It improves installation convenience and safety, reduces error accumulation, shortens construction time, and enhances construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223724178U_ABST
    Figure CN223724178U_ABST
Patent Text Reader

Abstract

The utility model discloses building equipment which comprises a steel platform module, a jacking module supporting the steel platform and a hanging frame module connected with the steel platform, the steel platform module comprises a walkway plate assembly, the walkway plate assembly comprises a plurality of first walkway plates, the jacking module comprises an upper rod assembly and a lower rod assembly, and the upper rod assembly comprises a plurality of second walkway plates. The upper rod assembly is connected to the upper portion of the lower rod assembly, the hanging frame module comprises a hanging frame and a plurality of second walkway plates arranged on the hanging frame in a layered mode, and the steel platform module further comprises a plurality of bailey truss assemblies used for fixing the walkway plate assemblies. The bailey truss assembly comprises a first connecting rod and a second connecting rod, a connecting block is further arranged between the first connecting rod and the second connecting rod, and positioning columns on the two sides of the connecting block can be connected with the first connecting rod and the second connecting rod respectively. According to the utility model, the installation convenience and safety can be improved, the installation efficiency is improved, and the construction time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building machine technical field especially relates to a building equipment. BACKGROUND

[0002] In modern construction, building machine as a kind of efficient, fast construction equipment is widely used in the construction of high-rise and super high-rise building. Building machine generally includes steel platform module, jacking module and hanger module, wherein steel platform module as the installation basis of construction equipment, bears the weight and operation of the whole construction process. The steel platform module of existing building machine mostly adopts traditional connection mode such as bolt fastening, buckle locking or direct welding, these connection modes although meet the connection demand to some extent, but there is certain limitation. In the installation process, due to the lack of pre-fixing mechanism, steel platform module volume is relatively large, in the installation process, it is often difficult to realize accurate alignment, leading to the gradual accumulation of error. This not only will affect the overall structural strength and stability of building machine, but also can have adverse effects on the safety and construction quality in the construction process. For example, if there is deviation in the connection of steel platform and jacking module, it can lead to shaking or tilting in the construction process, increase the construction risk. At the same time, the low precision can also affect the smooth progress of subsequent construction process, such as formwork setting, steel bar binding, etc., and further affect the whole construction progress and quality. SUMMARY

[0003] The utility model wants to solve the technical problem in, provide a kind of building equipment, can improve installation convenience and security, improve installation efficiency, shorten construction time.

[0004] In order to solve the above technical problems, the utility model provides a kind of building equipment, including steel platform module, the jacking module of supporting the steel platform and the hanger module connected with the steel platform, the steel platform module includes walkway board assembly, the walkway board assembly includes multiple first walkway board, the jacking module includes upper rod assembly and lower rod assembly, the upper rod assembly is connected in the upper portion of the lower rod assembly, the hanger module includes hanger and multiple second walkway boards layered on the hanger.

[0005] The steel platform module further includes multiple Bailey frame assemblies for fixing the walkway board assembly, multiple the first walkway board is mutually connected the Bailey frame assembly includes first connecting rod and second connecting rod, the first walkway board is along the Bailey frame assembly and is fixed on the first connecting rod or the second connecting rod, connecting block is further provided between the first connecting rod and the second connecting rod, the connecting rod is located at the outer side of the first walkway board, the connecting block both sides are respectively equipped with positioning column, the positioning column of the connecting block both sides can be connected with the first connecting rod and the second connecting rod respectively.

[0006] The hanger module further comprises a buckling assembly, the buckling assembly comprises a connecting steel strip, the top of the connecting steel strip is connected to the bottom of the steel platform module, and the bottom of the connecting steel strip is connected to the hanger.

[0007] As an improvement of the above scheme, the steel platform module further comprises an adjusting assembly, the connecting block comprises a first folded edge, the first folded edge is flush with the upper surfaces of the first connecting rod and the second connecting rod, and a connecting hole is arranged on the first folded edge, the adjusting assembly comprises an adjusting plate and a positioning block, the positioning block is capable of sliding on the adjusting plate in a direction perpendicular to the length of the first walkway plate, the adjusting plate is provided with a fixing hole capable of being fixed in the connecting hole, and the side of the positioning block is capable of abutting against the side edge of the first walkway plate and sliding along the length direction of the first walkway plate to form installation positioning of the first walkway plate.

[0008] As an improvement of the above scheme, the connecting block further comprises a second folded edge and an intermediate folded edge, the first folded edge and the second folded edge are arranged in parallel, the intermediate folded edge is arranged vertically and located between the first folded edge and the second folded edge, the second folded edge is flush with the lower surfaces of the first connecting rod and the second connecting rod, the same side of the first folded edge and the second folded edge abuts against the first connecting rod, and the other side of the first folded edge and the second folded edge abuts against the second connecting rod; one side of the intermediate folded edge abuts against the first connecting rod, and the other side of the intermediate folded edge abuts against the second connecting rod.

[0009] As an improvement of the above scheme, the adjusting assembly further comprises an adjusting table and an adjusting screw, the adjusting table is fixed to the side of the adjusting plate away from the walkway plate, the end of the adjusting screw penetrates through the adjusting table and is rotationally connected with the positioning block, the external thread of the adjusting screw is capable of being engaged with the internal thread of the adjusting table, and the adjusting screw is capable of moving relative to the adjusting table and driving the positioning block to move when the adjusting screw rotates.

[0010] As an improvement of the above scheme, the adjusting plate comprises an upper plate, a vertical plate and a lower plate, the upper plate, the vertical plate and the lower plate enclose a groove, the side of the first connecting rod or the second connecting rod is capable of being inserted into the groove, the positioning block is arranged on the upper plate, the upper plate is provided with a sliding groove, the bottom of the positioning block is provided with a sliding table, the sliding table is capable of being inserted into the sliding groove and sliding in the sliding groove, and the side of the sliding groove is further provided with a scale bar.

[0011] As the improvement of the above-mentioned scheme, the upper rod assembly comprises an upper support disc and an upper support frame, the lower rod assembly comprises a lower support disc and a lower support frame, the upper support disc is connected with the upper support frame, the upper support frame is connected with the lower support disc, the lower support disc is connected with the lower support frame, the lower support disc is provided with a pre-positioning mechanism, the pre-positioning mechanism comprises a positioning strip arranged on the lower support disc, the positioning strip is arranged on the side of the connection position of the upper support frame and the lower support disc, and the upper support frame can abut on the positioning strip when the upper support frame is connected with the lower support disc.

[0012] As the improvement of the above-mentioned scheme, the lower support disc is provided with a connecting hole, the bottom of the upper support frame is provided with a connecting block, the connecting block can be connected in the connecting hole, the positioning strip is arranged on the side of the connecting hole, the positioning strip protrudes from the surface of the lower support disc, and the side of the connecting block can abut on the side of the positioning strip.

[0013] As the improvement of the above-mentioned scheme, the lower support disc is further provided with a positioning groove, the positioning groove is surrounded by two or more positioning strips, and the connecting block can be inserted into the positioning groove.

[0014] As the improvement of the above-mentioned scheme, the buckling assembly further comprises a first connecting buckle and a second connecting buckle, the second connecting buckle is fixed to the bottom of the first connecting buckle, the two sides of the first connecting buckle are respectively provided with first buckling arms, the first buckling arms extend towards the inner side of the first connecting buckle and can be buckled on the two sides of the falsework assembly, the two sides of the second connecting buckle are respectively provided with second buckling arms, the second buckling arms extend towards the inner side of the second connecting buckle and can be buckled on the two sides of the connecting steel bar.

[0015] As the improvement of the above-mentioned scheme, the hanger comprises a support rod and a third connecting buckle, the third connecting buckle is fixed to the top of the support rod, the two sides of the third connecting buckle are respectively provided with third buckling arms, the third buckling arms extend towards the inner side of the third connecting buckle and can be buckled on the two sides of the connecting steel bar.

[0016] The utility model discloses, have following beneficial effect:

[0017] The utility model discloses a building equipment is equipped with steel platform module, jacking module and hanger module, wherein the steel platform module includes walkway board subassembly and bailey frame subassembly, the walkway board subassembly includes a plurality of first walkway board, a plurality of first walkway board is connected with each other and sets up on bailey frame subassembly, bailey frame subassembly includes first connecting rod and second connecting rod, is used for merging and is connected to form stronger support, and in order to facilitate the first connecting rod and the second connecting rod are connected, still be equipped with connecting block between first connecting rod and second connecting rod, both sides of connecting block are equipped with positioning column respectively, and the positioning column of connecting block both sides can be connected with first connecting rod and second connecting rod respectively, utilize connecting block, can connect first connecting rod and second connecting rod in advance, facilitate subsequent welding of first connecting rod and second connecting rod, reduce the complexity of operation, and welding precision is high, can therefore reduce error accumulation as far as possible, improve the efficiency and safety of installation. Therefore the building equipment of the utility model can improve installation convenience and safety, improve installation efficiency, shorten construction time. BRIEF DESCRIPTION OF DRAWINGS

[0018] Figure 1 It is the structural schematic diagram of building equipment of the utility model;

[0019] Figure 2 It is the structural schematic diagram of steel platform of the utility model;

[0020] Figure 3 It is the structural schematic diagram of adjusting assembly and bailey frame subassembly of the utility model;

[0021] Figure 4 It is the structural schematic diagram of bailey frame subassembly of the utility model;

[0022] Figure 5 It is the structural schematic diagram of adjusting assembly of the utility model;

[0023] Figure 6 It is the structural schematic diagram of jacking module of the utility model;

[0024] Figure 7 It is the structural schematic diagram of lower support disc of the utility model;

[0025] Figure 8 It is the structural schematic diagram of hanger module of the utility model. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical scheme and advantage of the utility model more clearly, the utility model will be described further in detail below with the drawings. Only this declaration, the up, down, left, right, front, back, inside, outside etc. of the orientation words appearing or about to appear in the utility model in the text, only with the drawings of the utility model for the base, its is not the specific limitation of the utility model.

[0027] Referring to Figures 1-5 The utility model discloses a kind of building equipment, including steel platform module 100, the jacking module 200 of supporting the steel platform and the hanger module 300 being connected with the steel platform, the steel platform module 100 is used to support construction personnel, construction equipment and material etc., the jacking module 200 can support steel platform, and using oil cylinder system, the steel platform module 100 and the hanger module 300 can be lifted. The steel platform module 100 includes walkway board assembly 1, the walkway board assembly 1 includes multiple first walkway board 11, the first walkway board 11 can place construction equipment, material etc., construction personnel can also walk. The jacking module 200 includes upper rod assembly 4 and lower rod assembly 5, the upper rod assembly 4 is connected in the upper portion of the lower rod assembly 5, the hanger module 300 includes hanger 7 and multiple second walkway board 9 layered on the hanger 7, the second walkway board 9 is hung in the lower of the steel platform, and multiple layers are equipped, correspond to different building layer respectively, to supply construction worker to carry out construction in different building layer.

[0028] The steel platform module 100 further includes adjusting assembly 2 for positioning the walkway board assembly 1 and multiple Bailey frame assemblies 3 for fixing the walkway board assembly 1, the adjusting assembly 2 can pre-position the walkway board assembly 1, so that subsequent welding efficiency and accuracy can be improved. Multiple first walkway board 11 is connected and arranged on the Bailey frame assembly 3, forming coherent construction space. The Bailey frame assembly 3 includes first connecting rod 31 and second connecting rod 32, the first walkway board 11 is arranged along the Bailey frame assembly 3 and fixed on the first connecting rod 31 or the second connecting rod 32, the length direction of the first walkway board 11 is parallel with the length direction of the first connecting rod 31 and the second connecting rod 32, the first connecting rod 31 and the second connecting rod 32 can support the first walkway board 11 after being connected.

[0029] Referring to Figure 4In order to facilitate the connection between the first connecting rod 31 and the second connecting rod 32, the connecting block 33 is arranged between the first connecting rod 31 and the second connecting rod 32, and the connecting block 33 is welded between the first connecting rod 31 and the second connecting rod 32, so that the first connecting rod 31 and the second connecting rod 32 are integrated; in order to facilitate positioning and welding, the connecting block 33 is provided with positioning columns 3312 on both sides, and the positioning columns 3312 on both sides of the connecting block 33 are connected with the first connecting rod 31 and the second connecting rod 32, respectively. Before welding, the positioning columns 3312 are connected with the first connecting rod 31 and the second connecting rod 32, respectively, to form pre-positioning, and then welding is performed, so that the probability of deviation of the connecting block 33 is reduced, and the welding precision and welding quality are improved.

[0030] The hanger module 300 further comprises a buckling assembly 8, which comprises a connecting steel bar, the top of the connecting steel bar being connected to the bottom of the steel platform module 100, and the bottom of the connecting steel bar being connected with the hanger 7; by using the connecting steel bar, the hanger 7 and the steel platform module 100 can be connected, and then each layer of the second walkway plate 9 can be hung below the steel platform.

[0031] The beneficial effects of the embodiment of the utility model are as follows:

[0032] The building equipment of the embodiment of the utility model comprises a steel platform module 100, a jacking module 200 and a hanger module 300, wherein the steel platform module 100 comprises a walkway plate assembly 1, an adjusting assembly 2 and a Bailey frame assembly 3; the walkway plate assembly 1 comprises a plurality of first walkway plates 11, the first walkway plates 11 are connected with each other and arranged on the Bailey frame assembly 3; the Bailey frame assembly 3 comprises a first connecting rod 31 and a second connecting rod 32, which are used for being connected to form strong support; in order to facilitate the connection between the first connecting rod 31 and the second connecting rod 32, a connecting block 33 is further arranged between the first connecting rod 31 and the second connecting rod 32; the connecting block 33 is welded between the first connecting rod 31 and the second connecting rod 32, so that the first connecting rod 31 and the second connecting rod 32 are integrated; in order to facilitate positioning and welding, the connecting block 33 is provided with positioning columns 3312 on both sides, and the positioning columns 3312 on both sides of the connecting block 33 are connected with the first connecting rod 31 and the second connecting rod 32, respectively; by using the connecting block 33, the first connecting rod 31 and the second connecting rod 32 can be connected in advance, which facilitates subsequent welding of the first connecting rod 31 and the second connecting rod 32, and the welding precision is high, so that error accumulation can be reduced as much as possible, and the installation efficiency and safety are improved. Therefore, the building equipment of the utility model can improve installation convenience and safety, improve installation efficiency and shorten construction time.

[0033] Referring to Figure 4The connecting block 33 further comprises a first folded edge 331 which is flush with the upper surfaces of the first connecting rod 31 and the second connecting rod 32, thus avoiding interference with the installation of the walkway plate. The first folded edge 331 is provided with a connecting hole 3311. The adjusting assembly 2 comprises an adjusting plate 21 and a positioning block 22. The adjusting plate 21 is fixed in the connecting hole 3311. The positioning block 22 can slide on the adjusting plate 21 in a direction perpendicular to the length of the first walkway plate 11. In use, the adjusting plate 21 is fixed in the connecting hole 3311, and then the positioning block 22 is slid to a predetermined position. The side of the positioning block 22 can abut against the side edge of the walkway plate and can slide along the length of the first walkway plate 11, so as to limit the installation position of the walkway plate and form a predetermined position, thereby forming installation positioning of the walkway plate and avoiding errors or deviations in subsequent installation of the walkway plate.

[0034] The connecting block 33 further comprises a second folded edge 332 and an intermediate folded edge 333. The first folded edge 331 and the second folded edge 332 are arranged in parallel, and the intermediate folded edge 333 is arranged vertically between the first folded edge 331 and the second folded edge 332. When pre-positioning, after the positioning column 3312 is connected, the first folded edge 331 is flush with the upper surfaces of the first connecting rod 31 and the second connecting rod 32, and the second folded edge 332 is flush with the lower surfaces of the first connecting rod 31 and the second connecting rod 32. By controlling the flush effect of the upper and lower surfaces, the quality of positioning can be controlled, and the first folded edge 331 and the second folded edge 332 can be prevented from deviating, thereby ensuring the welding quality. The same side of the first folded edge 331 and the second folded edge 332 abuts against the first connecting rod 31, and the other side of the first folded edge 331 and the second folded edge 332 abuts against the second connecting rod 32, so as to achieve the positioning effect.

[0035] The intermediate fold 333 is vertically arranged, the first fold 331 and the second fold 332 are arranged at the upper and lower ends of the intermediate fold 333 respectively, one side of the intermediate fold 333 abuts against the first connecting rod 31, and the other side abuts against the second connecting rod 32. The intermediate fold 333 not only improves the connection strength of the first fold 331 and the second fold 332, but also connects the first fold 331 and the second fold 332 into a whole, which facilitates the overall placement of the connecting block 33 between the first connecting rod 31 and the second connecting rod 32, saves the placement step, facilitates the overall pre-positioning, improves the positioning effect, and the volume of the connecting block 33 is larger than that of a single connecting piece, which is conducive to installation and welding, and the pre-positioning is not easy to deviate. The arrangement of the intermediate fold 333 also facilitates the arrangement of the positioning column 3312. The first fold 331 and the second fold 332 are located at the upper and lower parts of the first connecting rod 31 and the second connecting rod 32, the first connecting rod 31 and the second connecting rod 32 are usually channel steels, the upper and lower parts of which have wing plates, and it is not easy to arrange positioning holes on the wing plates, but after the arrangement of the intermediate fold 333, the positioning column 3312 can be arranged on the intermediate fold 333.

[0036] The positioning column 3312 is arranged on both sides of the intermediate fold 333, the positioning columns 3312 on both sides of the intermediate fold 333 protrude towards the side where the first connecting rod 31 and the second connecting rod 32 are located, the first connecting rod 31 and the second connecting rod 32 are each provided with a positioning hole, the positioning hole is arranged at the middle position of the first connecting rod 31 and the second connecting rod 32, avoiding the position of the wing plate, and the positioning column 3312 can be inserted into the positioning hole to form pre-positioning.

[0037] Referring to Figure 5In order to satisfy the first walkway board 11 of different specifications and adjust the pre-positioning position, the adjusting assembly 2 further comprises an adjusting platform 23 and an adjusting screw 24. The adjusting platform 23 is fixed to the side of the adjusting plate 21 away from the first walkway board 11, and protrudes upward from the surface of the adjusting plate 21. The adjusting screw 24 can be a common screw, and the rod body of the adjusting screw 24 is provided with a thread. The adjusting platform 23 is also provided with a thread for engagement. The end of the adjusting screw 24 penetrates the adjusting platform 23 and is rotationally connected with the positioning block 22. The adjusting platform 23 is fixed to the adjusting plate 21 and can be stationary relative to the adjusting plate 21, while the positioning block 22 can slide relative to the adjusting plate 21. The external thread of the adjusting screw 24 can be engaged with the internal thread of the adjusting platform 23, and the end of the adjusting screw 24 is rotationally connected with the positioning block 22. When the adjusting screw 24 rotates, it can only rotate relative to the positioning block 22 and cannot be separated from the positioning block 22. When the adjusting screw 24 rotates, it can move relative to the adjusting platform 23 and drive the positioning block 22 to move. During adjustment, the positioning block 22 can be pushed to move on the adjusting plate 21 by rotating the adjusting screw 24, so as to adjust the position of the side of the first walkway board 11, achieve the effect of adjusting the pre-positioning position, and be applicable to the first walkway board 11 of different specifications.

[0038] Further, in order to enable the adjusting plate 21 to be fixedly connected to the Bailey frame assembly 3, the adjusting plate 21 comprises an upper plate 212, a vertical plate 213 and a lower plate 214, which surround a groove 215 in which the side of the first connecting rod 31 or the second connecting rod 32 can be inserted. The upper plate 212, the vertical plate 213 and the lower plate 214 form a limiting position, which, in combination with the fixation of the connecting hole 3311, can play a firm fixing role. The positioning block 22 is arranged on the upper plate 212, and the upper plate 212 is provided with a sliding groove 2121. The bottom of the positioning block 22 is provided with a sliding platform 221, which can be inserted into and slide in the sliding groove 2121. The sliding groove 2121 limits the movement direction of the positioning block 22. Further, the side of the sliding groove 2121 is further provided with a scale bar 216. By using the scale bar 216, the adjusted distance can be known, and the position can be adjusted according to the scale bar 216.

[0039] Referring to Figure 6The upper rod assembly 4 comprises an upper support disc 41 and an upper support frame 42, the lower rod assembly 5 comprises a lower support disc 51 and a lower support frame 52, the upper support disc 41 is connected with the upper support frame 42, the upper support frame 42 is connected with the lower support disc 51, and the lower support disc 51 is connected with the lower support frame 52. During installation, the upper rod assembly 4 is first connected to the bottom of the steel platform module 100, and then the lower rod assembly 5 is connected with the upper rod assembly 4, specifically the upper support frame 42 is connected to the lower support disc 51.

[0040] In order to facilitate the connection of the upper rod assembly 4 and the lower rod assembly 5, the lower support disc 51 is provided with a positioning mechanism 6, which comprises a positioning strip 61 provided on the lower support disc 51. The positioning strip 61 is arranged on the side of the connection between the upper support frame 42 and the lower support disc 51. When the upper support frame 42 is connected with the lower support disc 51, the upper support frame 42 can abut against the positioning strip 61. The positioning strip 61 has a pre-positioning effect on the upper support frame 42, thereby facilitating the centering of the hole position between the upper support frame 42 and the lower support frame 52, and further facilitating the installation and connection.

[0041] Specifically, referring to Figure 6 and Figure 7 , the lower support disc 51 is provided with a through hole 511, and the bottom of the upper support frame 42 is provided with a connecting table 421. The connecting table 421 can be connected in the through hole 511 by using a fastener such as a bolt. The positioning strip 61 is arranged on the side of the through hole 511. During installation, the positioning strip 61 on the side of the through hole 511 can be used for pre-positioning, so that the through hole 511 can be aligned with the connecting position of the connecting table 421.

[0042] The positioning strip 61 protrudes from the surface of the lower support disc 51, and the side of the connecting table 421 can abut against the side of the positioning strip 61.

[0043] In order to further improve the pre-positioning effect, the lower support disc 51 is further provided with a positioning groove 512, which is surrounded by two or more positioning strips 61. The two or more positioning strips 61 form a groove shape to form the positioning groove 512. The groove opening of the positioning groove 512 faces upward or to the side. In this way, during installation, the connecting table 421 can be inserted into the positioning groove 512. The pre-positioning directions of the positioning groove 512 and the positioning strip 61 are different, and they can jointly limit the connecting table 421 from multiple directions to form a better limiting effect.

[0044] Referring to Figure 8, in order to connect the connecting steel bar 83 and the first connecting buckle 81, the second connecting buckle 82 is arranged on the bottom of the first connecting buckle 81, and the first connecting buckle 81 and the second connecting buckle 82 are oppositely arranged, wherein the two sides of the first connecting buckle 81 are respectively provided with first buckling arms 811, the first buckling arms 811 are shaped as "7" and are extended to the inner side of the first connecting buckle 81 and buckled on the two sides of the connecting steel bar 83, so that the first connecting buckle 81 is connected with the connecting steel bar 83, and the two sides of the second connecting buckle 82 are respectively provided with second buckling arms 821, the second buckling arms 821 are shaped as "7" and are extended to the inner side of the second connecting buckle 82 and buckled on the two sides of the connecting steel bar 83, so that the second connecting buckle 82 is connected with the connecting steel bar 83.

[0045] In addition, the hanger 7 comprises a supporting rod 71 and a third connecting buckle 72, the third connecting buckle 72 is arranged on the top of the supporting rod 71, and the two sides of the third connecting buckle 72 are respectively provided with third buckling arms 721, the third buckling arms 721 are shaped as "7" and are extended to the inner side of the third connecting buckle 72 and buckled on the two sides of the connecting steel bar 83, so that the third connecting buckle 72 is connected with the connecting steel bar 83.

[0046] The above is the preferred embodiment of the utility model, and it should be pointed out that, for ordinary skilled in the art, on the premise of not departing from the principles of the utility model, a number of improvements and refinements can be made, and these improvements and refinements are also regarded as the protection scope of the utility model.

Claims

1. A building construction apparatus, characterized by comprising: The steel platform module comprises a walkway plate assembly, the walkway plate assembly comprises a plurality of first walkway plates, the jacking module comprises an upper rod assembly and a lower rod assembly, the upper rod assembly is connected to the upper part of the lower rod assembly, and the hanger module comprises a hanger and a plurality of second walkway plates arranged on the hanger in layers; The steel platform module further comprises a plurality of Bailey frame assemblies for fixing the walkway plate assembly, the first walkway plates are connected to each other through the Bailey frame assemblies, the Bailey frame assemblies comprise first connecting rods and second connecting rods, the first walkway plates are arranged along the Bailey frame assemblies and fixed to the first connecting rods or the second connecting rods, and connecting blocks are arranged between the first connecting rods and the second connecting rods. The hanger module further comprises a buckling assembly, the buckling assembly comprises a connecting steel bar, the top of the connecting steel bar is connected to the bottom of the steel platform module, and the bottom of the connecting steel bar is connected to the hanger.

2. The building apparatus according to claim 1, wherein The steel platform module further comprises an adjusting assembly, the connecting block comprises a first folded edge, the first folded edge is flush with the upper surfaces of the first connecting rods and the second connecting rods, and a connecting hole is arranged on the first folded edge, the adjusting assembly comprises an adjusting plate and a positioning block, the positioning block can slide on the adjusting plate in a direction perpendicular to the length of the first walkway plate, the adjusting plate is provided with a fixing hole, the fixing hole can be fixed in the connecting hole, and the side of the positioning block can abut against the side edge of the first walkway plate and slide along the length direction of the first walkway plate to form installation positioning on the first walkway plate.

3. The building apparatus according to claim 2, wherein, The connecting block further comprises a second folded edge and an intermediate folded edge, the first folded edge and the second folded edge are arranged in parallel, the intermediate folded edge is arranged vertically and located between the first folded edge and the second folded edge, the second folded edge is flush with the lower surfaces of the first connecting rods and the second connecting rods, the same side of the first folded edge and the second folded edge abuts against the first connecting rod, and the other side of the first folded edge and the second folded edge abuts against the second connecting rod; one side of the intermediate folded edge abuts against the first connecting rod, and the other side abuts against the second connecting rod.

4. The building apparatus according to claim 2, wherein The adjusting assembly further comprises an adjusting platform and an adjusting screw, the adjusting platform is fixed to the side of the adjusting plate away from the walkway plate, the tail end of the adjusting screw penetrates through the adjusting platform and is rotationally connected with the positioning block, the external thread of the adjusting screw can be engaged with the internal thread of the adjusting platform, and the adjusting screw can move relative to the adjusting platform and drive the positioning block to move when the adjusting screw rotates.

5. The building apparatus according to claim 2, wherein, The adjusting plate comprises an upper plate, a vertical plate and a lower plate, the upper plate, the vertical plate and the lower plate enclose a groove, the side of the first connecting rod or the second connecting rod can be inserted into the groove, the positioning block is arranged on the upper plate, the upper plate is provided with a sliding groove, the bottom of the positioning block is provided with a sliding table, the sliding table can be inserted into and slide in the sliding groove, the side of the sliding groove is further provided with a scale bar.

6. The building apparatus according to claim 1, wherein, The upper rod assembly comprises an upper support disc and an upper support frame, the lower rod assembly comprises a lower support disc and a lower support frame, the upper support disc is connected with the upper support frame, the upper support frame is connected with the lower support disc, the lower support disc is connected with the lower support frame, the lower support disc is provided with a pre-positioning mechanism, the pre-positioning mechanism comprises a positioning bar arranged on the lower support disc, the positioning bar is arranged on the side of the connection between the upper support frame and the lower support disc, when the upper support frame is connected with the lower support disc, the upper support frame can abut on the positioning bar.

7. The building apparatus according to claim 6, wherein The lower support disc is provided with a connecting hole, the bottom of the upper support frame is provided with a connecting block, the connecting block can be connected into the connecting hole, the positioning bar is arranged on the side of the connecting hole, the positioning bar protrudes from the surface of the lower support disc, the side of the connecting block can abut on the side of the positioning bar.

8. The building apparatus according to claim 7, wherein, The lower support disc is further provided with a positioning groove, the positioning groove is enclosed by two or more positioning bars, the connecting block can be inserted into the positioning groove.

9. The building apparatus according to claim 1, wherein, The buckling assembly further comprises a first connecting buckle and a second connecting buckle, the second connecting buckle is fixed to the bottom of the first connecting buckle, the two sides of the first connecting buckle are respectively provided with a first buckling arm, the first buckling arm extends towards the inside of the first connecting buckle and can be buckled on the two sides of the Bailey frame assembly, the two sides of the second connecting buckle are respectively provided with a second buckling arm, the second buckling arm extends towards the inside of the second connecting buckle and can be buckled on the two sides of the connecting steel bar.

10. The building apparatus according to claim 1, wherein, The hanger comprises a support rod and a third connecting buckle, the third connecting buckle is fixed to the top of the support rod, the two sides of the third connecting buckle are respectively provided with a third buckling arm, the third buckling arm extends towards the inside of the third connecting buckle and can be buckled on the two sides of the connecting steel bar.