Emergency flood control tool
By designing a combination of splicing base, splicing groove and support structure, the problems of slow assembly speed and poor stability of existing flood control tools are solved, and rapid splicing and stable flood control effect are achieved.
Patent Information
- Application Number
- CN202520123939.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-20
- Publication Date
- 2025-12-30
- Estimated Expiration
- 2035-01-20
AI Technical Summary
Existing emergency flood control tools, such as flood barriers, are fixed with bolts, which are slow to assemble and easily washed away at high water levels, leading to the spread of floodwaters.
The design incorporates a splicing base, splicing groove, connecting lugs, and connecting steel pipes to achieve rapid splicing and a combination of support structures, enhancing the connection of the flood control barrier. The interlocking structure of the splicing base and splicing groove is used, and the barrier is fixed in the riverbank soil by support rods and support nails to form a stable flood control barrier.
It enables rapid assembly and enhances the stability of flood control barriers, preventing the barriers from collapsing and effectively blocking the spread of floodwaters.
Smart Images

Figure CN223738546U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to waterproof equipment technical field, and specifically refers to a tool for emergency flood control. BACKGROUND
[0002] In order to prevent and reduce flood disaster, the relevant work in flood forecasting, flood control scheduling, flood control engineering operation and other aspects, the main content of flood control includes, long-term, medium-term, short-term weather situation forecast, flood water regime forecast, the scheduling and operation of flood control engineering such as embankment, reservoir, sluice, flood detention area, emergency rescue after the occurrence of dangerous situation, emergency measures under extraordinary circumstances, prevent flood damage during flood season, guarantee the safety of the protection area, the preparation before flood season includes, training flood control personnel, checking flood control engineering facilities, eliminating hidden dangers, making flood control scheme, preparing enough flood control materials, establishing and perfecting flood warning system.
[0003] But the existing emergency flood control tool is various, the flood control baffle is mostly fixed through bolt between the flood control baffles, the assembling speed is slow, when the water level is blocked, the water level on both sides is large, causes the baffle to be washed away, and the flood spreads. CONTENT OF THE UTILITY MODEL
[0004] In view of the above situation, in order to overcome the defects of prior art, the utility model provides a tool for emergency flood control, which effectively solves the problems of various emergency flood control tools, the flood control baffle is mostly fixed through bolt between the flood control baffles, the assembling speed is slow, when the water level is blocked, the water level on both sides is large, causes the baffle to be washed away, and the flood spreads.
[0005] The technical scheme adopted by the utility model is as follows: the utility model provides a tool for emergency flood control, which comprises a flood control fence, a connecting structure and a supporting structure, the connecting structure is arranged on the flood control fence, the supporting structure is arranged on the flood control fence, the connecting structure comprises a splicing seat, a splicing groove, a connecting lug and a connecting steel pipe, the splicing seat is arranged on the front side of the flood control fence, the splicing groove is arranged on the back side of the flood control fence, the connecting lug is fixedly arranged on the right side of the flood control fence, and the connecting steel pipe is arranged through the connecting lug.
[0006] Preferably, the supporting structure comprises a connecting lug, a fixed rod, a fixed seat, a rotating seat, a connecting screw rod, a supporting rod and a supporting nail seat, the connecting lug is fixed on the left side of the flood control fence, the fixed rod is arranged through the connecting lug, the fixed seat is fixed on the left side of the flood control fence, the rotating seat is rotatably arranged on the fixed seat, the connecting screw rod is threadedly arranged on the rotating seat through the fixed seat, the supporting rod is fixedly arranged on the rotating seat, and the supporting nail seat is fixedly arranged on the bottom of the supporting rod.
[0007] In order to better realize the splicing effect, the splicing seat and the splicing groove are arranged in a splicing interlocking structure.
[0008] In order to achieve the purpose of splicing faster, the connecting lug one is vertically arranged on the flood control fence, and four groups of connecting lug one are arranged on each group of flood control fence.
[0009] Further, the flood control fence is arranged in a sun shape.
[0010] In order to achieve the effect of support, the support rod is supported in the upper part of the flood control fence.
[0011] The beneficial effects achieved by the utility model are as follows: the utility model provides an emergency flood control tool, which connects flood control fences side by side to form a waterproof fence, performs emergency flood control, and avoids being washed away. BRIEF DESCRIPTION OF DRAWINGS
[0012] Figure 1 It is a whole structure schematic view of the utility model provided by the utility model;
[0013] Figure 2 It is a whole structure schematic view of the utility model provided by the utility model;
[0014] Figure 3 It is a whole structure schematic view of the utility model provided by the utility model.
[0015] 1, flood control fence, 2, connecting structure, 3, support structure, 4, splicing seat, 5, splicing groove, 6, connecting lug one, 7, connecting steel pipe, 8, connecting lug two, 9, fixed rod, 10, fixed seat, 11, rotating seat, 12, connecting screw, 13, support rod, 14, support nail seat.
[0016] The drawings are used to provide further understanding of the utility model, and constitute a part of the specification, are used together with the embodiments of the utility model to explain the utility model, and do not constitute the limitation of the utility model. DETAILED DESCRIPTION
[0017] The technical scheme in the embodiments of the utility model will be clearly and completely described below in combination with the drawings in the embodiments of the utility model, obviously, the described embodiments are only a part of the embodiments of the utility model, not all the embodiments; based on the embodiments in the utility model, all other embodiments obtained by the ordinary skilled in the art without creative labor are within the protection scope of the utility model.
[0018] As Figure 1 , Figure 2 and Figure 3As shown, the utility model provides an emergency flood control tool, including flood control fender 1, connecting structure 2 and support structure 3, connecting structure 2 is located on flood control fender 1, flood control fender 1 is set to present day character, support structure 3 is located on flood control fender 1, connecting structure 2 includes splicing seat 4, splicing groove 5, connecting lug one 6 and connecting steel pipe 7, splicing seat 4 is set in flood control fender 1 front side, splicing groove 5 is set in flood control fender 1 rear side, splicing seat 4 and splicing groove 5 set to present splicing interlocking structure, connecting lug one 6 is fixedly arranged on the right side of flood control fender 1, connecting lug one 6 is vertically arranged on flood control fender 1 and is set four groups of connecting lug one 6 on every group flood control fender 1, and connecting steel pipe 7 is set through connecting lug one 6.
[0019] As Figure 1 And Figure 3 As shown, support structure 3 includes connecting lug two 8, fixed rod 9, fixed seat 10, rotating seat 11, connecting screw 12, support rod 13 and support nail seat 14, connecting lug two 8 is fixed on the left side of flood control fender 1, fixed rod 9 is set through connecting lug two 8, fixed seat 10 is fixed on the left side of flood control fender 1, rotating seat 11 is rotatably arranged on fixed seat 10, connecting screw 12 is threadedly arranged on rotating seat 11 through fixed seat 10, support rod 13 is fixedly arranged on rotating seat 11, and support rod 13 is supported in the upper part of flood control fender 1, and support nail seat 14 is fixedly arranged on the bottom of support rod 13.
[0020] Specific use, flood control fender 1 is inserted into the low-lying place of river bank by pile driver, then the splicing seat 4 of second group flood control fender 1 is inserted into the splicing groove 5 of first group flood control fender 1, then the second group flood control fender 1 is inserted into the river bank soil, so that two groups of flood control fender 1 are spliced, then multiple groups of flood control fender 1 are inserted into the river bank soil, and the splicing seat 4 is spliced with the splicing groove 5, then the connecting steel pipe 7 is inserted into the connecting lug one 6 on flood control fender 1, so that multiple groups of flood control fender 1 form a whole, the strength is increased, then the fixed rod 9 is inserted into the ground through the connecting lug two 8 on flood control fender 1, so that flood control fender 1 is fixed, and collapse is avoided, at the same time, the support nail seat 14 at the bottom of support rod 13 is inserted into the river bank soil, the head rotating seat 11 of support rod 13 is clamped on fixed seat 10, and the fixed seat 10 is connected with the rotating seat 11 by using connecting screw 12, so that the support is formed, and the lapping of flood control fender is completed, and the use process of the whole emergency flood control tool is as above.
[0021] It is to be noted that, in the present document, relational terms such as first and second and the like can be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus.
[0022] While the embodiments of the present application have been illustrated and described, it will be understood by those skilled in the art that various changes, modifications, substitutions, and alterations can be made therein without departing from the spirit and scope of the application, which is defined by the following claims and their equivalents.
[0023] The above description of the present application and its embodiments has been described, which is not restrictive, and the embodiments shown in the drawings are only one of the embodiments of the present application, and the actual structure is not limited thereto. In general, if a person skilled in the art is inspired by it, without departing from the creative purpose of the present application, without creative design, similar structure and embodiments of the technical scheme should belong to the protection scope of the present application.
Claims
1. A tool for emergency flood control, characterized by: Including flood prevention fender, connecting structure and support structure, the connecting structure is equipped on the flood prevention fender, the support structure is equipped on the flood prevention fender, the connecting structure includes splicing seat, splicing groove, connecting lug one and connecting steel pipe, the splicing seat is set on the front side of flood prevention fender, the splicing groove is set on the back side of flood prevention fender, the connecting lug one is fixedly equipped on the right side of flood prevention fender, the connecting steel pipe is set through the connecting lug one.
2. The tool for emergency flood control according to claim 1, characterized in that: The support structure includes connecting lug two, fixed rod, fixed seat, rotating seat, connecting screw rod, support rod and support nail seat, the connecting lug two is fixed on the left side of flood prevention fender, the fixed rod is set through the connecting lug two, the fixed seat is fixed on the left side of flood prevention fender, the rotating seat is rotatably set on the fixed seat, the connecting screw rod is screwedly set on the rotating seat through the fixed seat, the support rod is fixedly equipped on the rotating seat, and the support nail seat is fixedly equipped on the bottom of the support rod.
3. The tool for emergency flood control according to claim 2, characterized in that: The splicing seat and splicing groove are set as splicing interlocking structure.
4. The tool for emergency flood control according to claim 3, characterized in that: The connecting lug one is vertically set on the flood prevention fender, and four groups of connecting lug one are arranged on each group of flood prevention fender.
5. The tool for emergency flood control according to claim 4, characterized in that: The flood prevention fender is set as a sun-shaped shape.
6. The tool for emergency flood control according to claim 5, characterized in that: The support rod is supported in the upper part of the flood prevention fender.