Splicing device for construction of calcium silicate board external wall insulation and decoration integrated board

By combining steel pipes, positioning structures, and clamping structures, the problem of difficult position adjustment during the splicing process of calcium silicate board exterior walls was solved, achieving convenient alignment and a stable splicing effect.

CN223738933UActive Publication Date: 2025-12-30ZHEJIANG XINSHENG CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520001195.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-12-30
Estimated Expiration
2035-01-02

AI Technical Summary

Technical Problem

In existing technologies, calcium silicate boards are difficult to position during splicing, leading to splicing difficulties and low strength.

Method used

The splicing device, which includes steel pipes, positioning structures, limiting structures, and clamping structures, uses the cooperation of steel pipes and rollers on the outer wall, and the rotation of limiting plates and screws to adjust the position, thereby achieving the alignment and fixation of the outer wall.

Benefits of technology

It enables convenient alignment and stable splicing of calcium silicate board exterior walls, improving installation efficiency and splicing strength.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223738933U_ABST
    Figure CN223738933U_ABST
Patent Text Reader

Abstract

The utility model provides a splicing device for construction of a calcium silicate board external wall insulation and decoration integrated board. The splicing device comprises a steel pipe. The positioning structure is installed on the side wall of the steel pipe, the positioning structure comprises a hoop, a roller and a fixing bolt, the hoop is installed on the side wall of the steel pipe, the roller is arranged on the side wall of one end of the hoop, and the fixing bolt is installed on the side wall of the other end of the hoop; the limiting structure is installed on the side wall of the steel pipe, the limiting structure comprises a fixing block, a screw rod and a limiting plate, the limiting plate is rotationally connected to one end of the screw rod, and the fixing block is in threaded connection to the side wall of the screw rod; the clamping structure is mounted at one end of the fixing block; the splicing device for construction of the calcium silicate board outer wall heat preservation and decoration integrated board has the advantage that the calcium silicate board outer walls can be conveniently aligned and spliced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building design technical field especially relates to a kind of splicing devices for calcium silicate board outer wall thermal decoration integrated board construction. BACKGROUND

[0002] As a new green environmental protection building material, calcium silicate board has superior fireproof performance and long service life in addition to the function of traditional gypsum board, and is suitable for new building outer wall thermal insulation and decoration, and is also suitable for energy saving and decoration reconstruction of old building.

[0003] However, the existing calcium silicate board outer wall is too large in use, and it is difficult to adjust the position of the calcium silicate board outer wall during splicing, and it is difficult to align and inconvenient to splice and install between the calcium silicate board outer walls, so that the installation progress cannot be improved.

[0004] Therefore, it is necessary to provide a new splicing device for calcium silicate board outer wall thermal decoration integrated board construction to solve the above technical problems. UTILITY MODEL CONTENTS

[0005] The utility model solves the technical problem to provide a kind of splicing device for calcium silicate board outer wall thermal decoration integrated board construction which is convenient for alignment and splicing between calcium silicate board outer walls.

[0006] To solve the above technical problems, the splicing device for calcium silicate board outer wall thermal decoration integrated board construction provided by the utility model comprises a steel pipe, a positioning structure, the positioning structure is installed on the side wall of the steel pipe, the positioning structure comprises a hoop, a roller and a fixed bolt, the hoop is installed on the side wall of the steel pipe, the roller is arranged on the side wall of one end of the hoop, and the fixed bolt is installed on the side wall of the other end of the hoop, a limiting structure, the limiting structure is installed on the side wall of the steel pipe, the limiting structure comprises a fixed block, a screw rod and a limiting plate, the limiting plate is rotatably connected to one end of the screw rod, and the fixed block is threadedly connected to the side wall of the screw rod, a clamping structure, the clamping structure is installed on one end of the fixed block, the clamping structure comprises a clamping plate, a lead screw and a nut, the fixed block is installed on one end of the lead screw, the nut is threadedly connected to one end of the lead screw, and the clamping plate is fixed to the other end of the lead screw.

[0007] Preferably, the side wall of the fixed block is provided with two screw holes, and the screw rod penetrates the side wall of the fixed block through the screw holes.

[0008] Preferably, the inner and outer side walls of one end of the nut are provided with threads, the threads of the inner and outer side walls of one end of the nut are consistent, and the nut is threadedly connected to the fixed block through the outer threads.

[0009] Preferably, the limiting plate is slidingly connected to the side wall of the screw rod, the side wall of the limiting plate is semicircular, and the limiting plate is abutted to the side wall of the steel pipe through a semicircular groove.

[0010] Preferably, the clamping plate is fixedly connected to the screw rod in a T shape, and one end of the clamping plate is abutted to the side wall of the outer wall edge.

[0011] Preferably, the steel pipe is abutted to the side wall of the outer wall through the roller, and the roller is rotatably connected between the clamping structure and the hoop.

[0012] Preferably, the clamping plate is clamped to the edge of the outer wall together with the steel pipe.

[0013] Compared with the related art, the splicing device for the calcium silicate board outer wall heat preservation and decoration integrated board construction has the following beneficial effects:

[0014] The splicing device for the calcium silicate board outer wall heat preservation and decoration integrated board construction can first hoist two outer walls to the outer wall mounting position and make the two outer walls be suspended together in the same row, then install the clamping structure at the same position on the edges of the two end side walls of the two outer walls, insert the steel pipe into the other end of the clamping structure corresponding to the position of the clamping structure, install the positioning structure on the side wall of the steel pipe, make one end of the roller on the positioning structure face the outer wall, then insert the limiting structure into one end of the clamping structure, fix the limiting structure at one end of the clamping structure, make the steel pipe connect the two outer walls together, rotate the screw rod of the limiting structure to push the steel pipe towards the outer wall, when one end of the four positioning structures abut on the outer wall, the two outer walls are on the same horizontal line through the steel pipe, and the two outer walls are in the aligned state, then move the two outer walls together, remove one of the clamping structures in the middle, clamp the two outer walls on the two sides of the clamping structure, remove the limiting structure at one end of the clamping structure, then lower the two outer walls at the same time, support and stabilize them, remove the steel pipe and the clamping structures on the two sides, insert the independent fixing block into one end of the clamping structure in the middle, until the fixing block abuts on the side walls of the two outer walls, then fix the fixing nut, clamp and fix the two outer walls together, and the splicing of the two adjacent outer walls is completed. BRIEF DESCRIPTION OF DRAWINGS

[0015] Figure 1A preferred embodiment structure schematic view of the splicing device for construction of the calcium silicate board outer wall heat preservation and decoration integrated board is provided by the utility model.

[0016] Figure 2 For Figure 1 The limiting structure and the clamping structure connection three-dimensional display structure schematic view is shown.

[0017] Figure 3 For Figure 1 The positioning structure three-dimensional display structure schematic view is shown.

[0018] Figure 4 For Figure 1 The overall overhead structure schematic view is shown.

[0019] Figure 5 For Figure 2 The side view section structure schematic view is shown.

[0020] Marked number in the drawing: 1, steel pipe, 2, positioning structure, 21, hoop, 22, roller, 23, fixed bolt, 3, limiting structure, 31, fixed block, 32, screw rod, 33, limiting plate, 4, outer wall, 5, clamping structure, 51, clamping plate, 52, screw rod, 53, nut. Specific implementation

[0021] The utility model is further explained below in combination with the drawings and implementation.

[0022] Please refer to Figures 1 to 5 Among them Figure 1 A preferred embodiment structure schematic view of the splicing device for construction of the calcium silicate board outer wall heat preservation and decoration integrated board is provided by the utility model. Figure 2 For Figure 1 The limiting structure and the clamping structure connection three-dimensional display structure schematic view is shown. Figure 3 For Figure 1 The positioning structure three-dimensional display structure schematic view is shown. Figure 4 For Figure 1 The overall overhead structure schematic view is shown. Figure 5 For Figure 2The structure schematic view of the shown side view section; the calcium silicate board outer wall heat preservation decoration integrated board construction splicing device includes: a steel pipe 1; a positioning structure 2 is installed on the side wall of the steel pipe 1, the positioning structure 2 includes a hoop 21, a roller 22 and a fixing bolt 23, the hoop 21 is installed on the side wall of the steel pipe 1, the roller 22 is arranged on the side wall of one end of the hoop 21, and the fixing bolt 23 is installed on the side wall of the other end of the hoop 21; a limiting structure 3 is installed on the side wall of the steel pipe 1, and the limiting structure 3 includes a fixed block 31, a screw rod 32 and a limiting plate 33, the limiting plate 33 is rotationally connected to one end of the screw rod 32, and the fixed block 31 is threadedly connected to the side wall of the screw rod 32; a clamping structure 5 is installed on one end of the fixed block 31, and the clamping structure 5 includes a clamping plate 51, a lead screw 52 and a nut 53, the fixed block 31 is installed on one end of the lead screw 52, the nut 53 is threadedly connected to one end of the lead screw 52, and the clamping plate 51 is fixed to the other end of the lead screw 52.

[0023] In the specific implementation process, as shown in Figure 1 , Figure 2 , Figure 4 and Figure 5 , the side wall of the fixed block 31 is provided with two screw holes, and the screw rod 32 penetrates the side wall of the fixed block 31 through the screw holes; the inner and outer side walls of one end of the nut 53 are provided with threads, and the threads of the inner and outer side walls of one end of the nut 53 are consistent; and the nut 53 is threadedly connected with the fixed block 31 through the outer thread; the nut 53 is threadedly connected with the screw rod 32 and the fixed block 31 at the same time, so that the fixed block 31 is fixed to one end of the screw rod 32.

[0024] In the specific implementation process, as shown in Figure 1 , Figure 2 and Figure 5 , the limiting plate 33 is slidably connected to the side wall of the screw rod 32, the side wall of the limiting plate 33 is semicircular, and the limiting plate 33 is abutted on the side wall of the steel pipe 1 through a semicircular groove; the position of the steel pipe 1 is limited through the semicircular groove in the side wall of the limiting plate 33.

[0025] In the specific implementation process, as shown in Figure 1 , Figure 2 and Figure 5As shown, the clamping plate 51 and the screw rod 32 are fixedly connected in a "T" shape, and one end of the clamping plate 51 abuts against the side wall of the outer wall 4; the steel pipe 1 abuts against the side wall of the outer wall 4 through the roller 22, and the roller 22 is rotatably connected with the clamp 21; the clamping plate 51 is clamped on the edge of the outer wall 4 in cooperation with the steel pipe 1; by abutting the clamping plate 51 on the side wall of the edge of the outer wall 4, the limiting plate 33 can be pushed to slide along the lead screw 52 by rotating the screw rod 32, so as to push the steel pipe 1 to approach the outer wall 4, until the roller 22 abuts against the side wall of the outer wall 4, and the clamping plate 51 and the steel pipe 1 are clamped on the edge of the outer wall 4.

[0026] The working principle of the splicing device for the calcium silicate board outer wall heat preservation and decoration integrated board construction is as follows:

[0027] In use, first, a said outer wall 4 is hoisted to the installation position by hoisting, and is in a suspended state, then the clamping plate 51 is hooked on the edge of the side wall of the outer wall 4 at both ends, the steel pipe 1 is penetrated through the gap between the two lead screws 52, then the other said outer wall 4 is hoisted, and is in the same row with the former said outer wall 4, then the clamping plate 51 is erected at the same position of the said outer wall 4, the steel pipe 1 is continuously extended forward and is penetrated through the gap between the lead screws 52 installed on the said outer wall 4, so that the two said outer walls 4 are connected together by the steel pipe 1, then one end of the limiting plate 33 groove is slid into the lead screw 52 from one end, and the fixed block 31 is also slid into the lead screw 52 from one end, so that the side wall of the lead screw 52 is flush with the side wall of the fixed block 31, then the fixed bolt 23 is screwed into the lead screw 52 from one end, and is also screwed with the fixed block 31, the position of the fixed block 31 is fixed, then the roller 22 is installed on the side wall of the steel pipe 1 through the clamp 21, one end of the roller 22 is towards the outer wall 4, the steel pipe 1 is horizontally erected on the side wall of the outer wall 4, then the screw rod 32 on the front and rear said outer walls 4 is rotated at the same time, the screw rod 32 is screwed with the fixed block 31, and then pushes the limiting plate 33 to slide on the side wall of the lead screw 52, and then pushes the steel pipe 1 to slide between the lead screws 52, until the roller 22 installed on the side wall of the steel pipe 1 is in contact with the side wall of the outer wall 4, so that the steel pipe 1 and the outer wall 4 are in parallel state, and at this time, the steel pipe 1 is limited due to the supporting force position, after the position is adjusted, the screw rod 32 on the rear said outer wall 4 is slightly loosened, so that the steel pipe 1 can slide on the inner side of the limiting plate 33, and then the rear said outer wall 4 is adjusted along the reverse displacement of the steel pipe 1, and then under the drive of the roller 22, the outer wall 4 can not rub with the steel pipe 1, after the two said outer walls 4 are close, the clamping plate 51 close to the middle of the rear said outer wall 4 is disassembled, the outer walls 4 are close together, the clamping plate 51 in the middle is in contact with the side wall of the outer wall 4 at the edge, then the fixed nut 53 in the middle is disassembled, the fixed plate and the limiting plate 33 are disassembled, the disassembled fixed block 31 is sleeved on the screw rod 32 and is in contact with the side wall of the outer wall 4, and then the fixed nut 53 is used for fixing, so that the two said outer walls 4 are connected together, and then they are put down together, that is, the splicing of the two adjacent said outer walls 4 is completed, and the device has the advantages that the calcium silicate board outer wall 4 is convenient to align and splice.

[0028] Compared with the related art, the splicing device for calcium silicate board outer wall heat preservation and decoration integrated plate construction has the following advantages:

[0029] The utility model provides a kind of splicing device for calcium silicate board outer wall thermal insulation decoration integrated board construction, first can two described outer wall 4 hoisting to the outer wall 4 installation position of described, and in can make two described outer wall 4 same row suspension together, then by the same position of the edge of two ends side wall of the clamping structure 5 respectively installed in two described outer wall 4, the position of the steel pipe 1 corresponding the clamping structure 5, from the other end of the clamping structure 5, and the positioning structure 2 is installed in the side wall of the steel pipe 1, make the one end of the roller 22 on the positioning structure 2 towards the outer wall 4, then again in the one end of the clamping structure 5, and the limiting structure 3 is fixed in the one end of the clamping structure 5, make the steel pipe 1 two described outer wall 4 is connected together, then by rotating the screw rod 32 of the limiting structure 3, just can extrude push the steel pipe 1 to the outer wall 4, when the one end of four positioning structures 2 is all resisted on the outer wall 4, two described outer wall 4 can be in the same horizontal line by the steel pipe 1, two described outer wall 4 is in the state of alignment, then by two described outer wall 4 center close, while removing the one of two clamping structures 5 in center, make two described outer wall 4 clamping in the two sides of the clamping structure 5, the limiting structure 3 of the one end of the clamping structure 5 that is clamped is removed, then two described outer wall 4 is lowered simultaneously, and it is supported stable, again the steel pipe 1 and the holding structure on two sides are removed, and independent fixed block 31 is reinserted from the one end of the clamping structure 5 in center, until being resisted on the side wall of two described outer wall 4, then again by the fixed nut 53 is fixed, just can two described outer wall 4 clamping fixed together, that is completed the splicing of two adjacent described outer wall 4, device has the advantage that convenient for the alignment splicing between calcium silicate board outer wall 4.

[0030] The above-mentioned is only the embodiment of the utility model, and does not limit the patent range of the utility model, and equivalent structure or equivalent flow conversion using the contents of the utility model specification and drawings, or direct or indirect application in other related technical fields, are also included in the patent protection range of the utility model.

Claims

1. A splicing device for the construction of a calcium silicate board external wall thermal insulation and decoration integrated board, characterized in that, Comprise; Steel pipe (1); Positioning structure (2) is installed to the side wall of steel pipe (1), and the positioning structure (2) comprises hoop (21), roller (22) and fixed bolt (23), the hoop (21) is installed to the side wall of steel pipe (1), the roller (22) is arranged to the side wall of one end of the hoop (21), and the fixed bolt (23) is installed to the side wall of the other end of the hoop (21); Limiting structure (3) is installed to the side wall of steel pipe (1), and the limiting structure (3) comprises fixed block (31), screw rod (32) and limiting plate (33), the limiting plate (33) is rotatably connected to one end of the screw rod (32), and the fixed block (31) is threadedly connected to the side wall of the screw rod (32); Clamping structure (5) is installed to one end of the fixed block (31), and the clamping structure (5) comprises clamping plate (51), lead screw (52) and nut (53), the fixed block (31) is installed to one end of the lead screw (52), the nut (53) is threadedly connected to one end of the lead screw (52), and the clamping plate (51) is fixed to the other end of the lead screw (52).

2. The splicing device for the calcium silicate board external wall heat preservation and decoration integrated board construction according to claim 1, characterized in that, The side wall of the fixed block (31) is provided with two screw holes, and the screw rod (32) penetrates the side wall of the fixed block (31) through the screw holes.

3. The splicing device for the calcium silicate board external wall heat preservation and decoration integrated board construction according to claim 1, characterized in that, The inner and outer side walls of one end of the nut (53) are provided with threads, and the inner and outer threads of one end of the nut (53) are consistent, and the nut (53) is threadedly connected with the fixed block (31) through the outer thread.

4. The splicing device for the calcium silicate board external wall heat preservation and decoration integrated board construction according to claim 1, characterized in that, The limiting plate (33) is slidably connected to the side wall of the screw rod (32), one end of the limiting plate (33) is semicircular, and the limiting plate (33) is abutted to the side wall of the steel pipe (1) through the semicircular groove.

5. The splicing device for the construction of calcium silicate board external wall thermal decoration integrated board according to claim 1, characterized in that, The clamping plate (51) and the screw rod (32) are fixedly connected in the shape of "T", and one end of the clamping plate (51) is abutted to the side wall of the edge of the outer wall (4).

6. The splicing device for the construction of calcium silicate board external wall thermal insulation and decoration integrated board according to claim 5, characterized in that, The steel pipe (1) is abutted to the side wall of the outer wall (4) through the roller (22), and the roller (22) is rotatably connected with the hoop (21).

7. The splicing device for the calcium silicate board external wall heat preservation and decoration integrated board construction according to claim 5, characterized in that, The clamping plate (51) is clamped to the edge of the outer wall (4) in cooperation with the steel pipe (1).