Movable operation frame for bridge construction
By introducing a movable structure and protective components into the bridge construction operation frame, the lack of safety protection in existing technologies has been solved, thereby improving the safety of construction personnel and the stability of the equipment.
Patent Information
- Application Number
- CN202520151097.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2026-01-02
- Estimated Expiration
- 2035-01-22
AI Technical Summary
The existing bridge construction operation scaffolds lack effective protective measures, making it easy for construction workers to have safety accidents while working.
A bridge construction mobile operating frame was designed, which includes a mobile structure and protective components. The mobile structure provides flexibility and stability through lifting columns and mobile trolleys, while the protective components provide safety protection through buffer columns, stabilizing piles, buffer frames and protective canopies, forming a shield structure to prevent injury from falling objects.
It improves the safety of construction workers by reducing injuries from falling objects through buffering and shielding functions, while also enhancing the structural stability and operational flexibility of the device.
Smart Images

Figure CN223753662U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to bridge construction technical field, concretely is a bridge construction activity operation frame. BACKGROUND
[0002] Bridge construction refers to the process of building a bridge according to the design content, mainly including construction technology, construction organization, construction management and construction quality and so on.
[0003] The bridge construction activity operation frame is a facility installed on the bridge structure, mainly used for assisting the construction personnel to operate various operations on the bridge.
[0004] For example, the utility model no. 202221330033.9 discloses a kind of stable device of movable operation frame for bridge construction, the stable device of movable operation frame, limit rod is equipped in the groove of the inner wall of the two sides of bottom cavity, limit rod is slidably connected with horizontal plate, support plate is connected to the lower surface of horizontal plate, the upper surface of horizontal plate is equipped with trapezoidal block, the inclined surface of trapezoidal block is in rolling contact with ball, can be stabilized operation frame in time, guarantee the safety of construction personnel, according to actual use demand, the height of operation frame is adjusted, device structure is simple, but similar to the stable device of movable operation frame in the above-mentioned file lacks effective protection to work personnel, so that work personnel is prone to safety accident when working.
[0005] Therefore, in view of the above, the existing structure and deficiency are improved, and a kind of bridge construction movable operation frame is provided. UTILITY MODEL CONTENT
[0006] The utility model aims at providing a kind of bridge construction movable operation frame to solve the problems in the above background.
[0007] To achieve the above object, the utility model provides the following technical scheme: a kind of bridge construction movable operation frame, including mobile structure and protection assembly, the top surface of mobile structure is vertically installed with lifting column left and right symmetry, and the top of lifting column is installed with workbench, and the vertical installation of workbench one side is with ladder, the protection assembly is set up in the top of workbench, the protection assembly includes buffer column, stabilizing pile, buffer frame and protective shed, the top of buffer column is installed with stabilizing pile, and the side of stabilizing pile is connected and installed with buffer frame, and the top surface of buffer frame is covered and installed with protective shed.
[0008] Further, the mobile structure includes mobile trolley, fixed pile, buffer pile and buffer plate, the top of mobile trolley is installed with fixed pile, and the front and rear sides of mobile trolley are both horizontally installed with buffer pile, and the end, away from mobile trolley, of buffer pile is connected with buffer plate.
[0009] Further, the fixed piles are arranged at four opposite corners of the top surface of the mobile trolley, and the buffer piles are symmetrically arranged on the left and right sides of the mobile trolley.
[0010] Further, the bottom end of the lifting column is fixedly connected to the top of the fixed pile, and the lifting column is vertically provided with four groups of connecting structures for connecting the mobile structure and the operation table.
[0011] Further, the operation table comprises an operation bench, a connecting pile and a protective frame, the operation bench is provided with the connecting piles at four opposite corners of the bottom thereof, and the operation bench is provided with the protective frame on the top thereof.
[0012] Further, the operation table further comprises a movable column and a self-locking damping shaft, the protective frame is provided with the movable column near the top of a section of the ladder, and the self-locking damping shaft is arranged at the joint of the protective frame and the movable column.
[0013] Further, the ladder is vertically arranged on one side of the operation bench near the movable column, and the connecting pile and the operation bench are arranged in an integrated structure.
[0014] Further, the top end of the lifting column is fixedly connected to the connecting pile, the movable column is symmetrically arranged on one side of the protective frame, and the buffer piles are vertically arranged at four opposite corners of the top of the protective frame.
[0015] The bridge construction movable operation frame has the following beneficial effects:
[0016] 1、The protective assembly fixed frame provided with the buffer piles is arranged on the top of the protective frame, the buffer frame is arranged on the top of the buffer pile through the stable pile, the protective shed is arranged on the outer surface of the top of the buffer frame, a shielding structure is formed above the operation table, the buffer frame and the protective shed are combined for use, external falling objects can be shielded to a certain extent, the protective assembly can also be used for sun-shading, the buffer piles can provide good structural support for the buffer frame and the protective shed, further impact absorption and buffering can be achieved, the overall structural strength and service life of the protective assembly are ensured, good structural protection is provided for the operation personnel, and the practicality of the device is ensured.
[0017] 2, the utility model discloses, be provided with mobile structure, wherein utilize the structure operation of mobile trolley, can make the whole device flexible movement on ground, can also provide the overall bottom gravity center balance effect for device, reduce the unnecessary shaking problem of operating personnel when operating on the upper workbench, in addition, utilize the buffer board of buffer stake connection installation on the front and rear two sides of mobile trolley respectively, utilize the telescopic buffer of its structure, can reduce the unnecessary collision damage of mobile trolley in the process of operation as far as possible, when also reduce the vibration produced when contacting with other articles or structure, to guarantee the structural stability of whole device, in addition, the lifting column provides the structure support for workbench simultaneously, can also provide the effect of lifting adjustment within a certain range, to guarantee the use flexibility of device, and the cat ladder of workbench side is convenient for user to go up and down operating platform, to provide the effect of convenient structure. BRIEF DESCRIPTION OF DRAWINGS
[0018] Figure 1 It is the body axis side view structural schematic diagram of the utility model one kind for bridge construction activity operating frame;
[0019] Figure 2 It is the mobile structure structural schematic diagram of the utility model one kind for bridge construction activity operating frame;
[0020] Figure 3 It is the workbench three-dimensional structure schematic diagram of the utility model one kind for bridge construction activity operating frame;
[0021] Figure 4 It is the protection assembly three-dimensional structure schematic diagram of the utility model one kind for bridge construction activity operating frame.
[0022] In the drawing: 1, mobile structure;101, mobile trolley;102, fixed stake;103, buffer stake;104, buffer board;2, lifting column;3, workbench;301, operating platform;302, link stake;303, protection frame;304, movable column;305, self-locking damping shaft;4, cat ladder;5, protection assembly;501, buffer column;502, stabilizing stake;503, buffer frame;504, protection shed. DETAILED DESCRIPTION
[0023] The embodiment of the utility model will be described in further detail below in combination with the drawings and examples. The following examples are used to illustrate the utility model, but cannot be used to limit the scope of the utility model.
[0024] As Figures 1 to 4As shown in the figure, a bridge construction activity operating frame, including mobile structure 1 and protection assembly 5, the top surface of mobile structure 1 is vertically installed with lifting column 2 left and right symmetrically, and the top of lifting column 2 is installed with workbench 3, and one side of workbench 3 is vertically installed with ladder 4, and protection assembly 5 is erected on the top of workbench 3, protection assembly 5 includes buffer column 501, stabilizing pile 502, buffer frame 503 and protection shed 504, the top end of buffer column 501 is installed with stabilizing pile 502, and one side of stabilizing pile 502 is connected and installed with buffer frame 503, and the top surface of buffer frame 503 is covered and installed with protection shed 504, the top end of lifting column 2 is connected and fixed with connection pile 302, movable rail 304 is arranged left and right symmetrically on one side of protection frame 303, and buffer column 501 is vertically installed at the top four corners of protection frame 303, wherein buffer frame 503 is installed on the top of buffer column 501 by using stabilizing pile 502, and protection shed 504 is arranged on the top outer surface of buffer frame 503, thereby forming a shading structure above the entire workbench 3.
[0025] As shown in the figure, Figures 1 to 4 The mobile structure 1 includes mobile trolley 101, fixed pile 102, buffer pile 103 and buffer plate 104, the top of mobile trolley 101 is installed with fixed pile 102, and the front and rear sides of mobile trolley 101 are both horizontally installed with buffer pile 103, and the end away from mobile trolley 101 of buffer pile 103 is connected with buffer plate 104, fixed pile 102 is arranged at the four corners of the top surface of mobile trolley 101, and buffer pile 103 is installed left and right symmetrically on the side of mobile trolley 101, the bottom end of lifting column 2 is fixedly connected to the top of fixed pile 102, and lifting column 2 is vertically provided with four groups for connecting mobile structure 1 and workbench 3, workbench 3 includes operation table 301, connection pile 302 and protection frame 303, the bottom four corners of operation table 301 are provided with connection pile 302, and the top of operation table 301 is installed with protection frame 303, workbench 3 further includes movable rail 304 and self-locking damping shaft 305, protection frame 303 is provided with movable rail 304 on the top near ladder 4, and self-locking damping shaft 305 is installed at the junction of protection frame 303 and movable rail 304, ladder 4 is vertically installed on one side of operation table 301 near movable rail 304, and connection pile 302 and operation table 301 are arranged in an integrated structure, wherein the structure of mobile trolley 101 can make the entire device move flexibly on the ground while providing overall bottom center of gravity balance for the device, and through the connection and installation of buffer plate 104 on the front and rear sides of mobile trolley 101 by using buffer pile 103, the telescopic buffer property of the structure can reduce unnecessary collision damage of mobile trolley 101 in the operation process as much as possible.
[0026] In summary, as shown in the figure, Figures 1 to 4As shown, the bridge construction activity operating frame, in use, first, the operating personnel can use the operation of the mobile trolley 101 to move the entire device to the position required for operation, then through the ladder 4 can directly board the operating table 3, during which the self-locking damping shaft 305 can be used to expand the movable column 304 on one side of the protective frame 303 structure, so as to facilitate the operating personnel to enter and exit the protective frame 303, and the protective frame 303 cooperates with the movable column 304 to provide structural protection for the operating personnel working on the operating table 301;
[0027] During the operation of the operating personnel, the fixed pile 102 and the lifting column 2 structure between the fixed pile 102 can be used to provide a certain degree of lifting adjustment for the top operating table 3, so as to facilitate the operating personnel to continue to twist the construction, and the protective assembly 5 erected on the top of the protective frame 303 can provide structural protection during the operation of the operating personnel, and the buffer frame 503 with the surface covered with the protective shed 504 can provide shielding protection under the structure of the buffer column 501, so as to reduce the harm of falling objects to the operating personnel.
[0028] The embodiments of the present application are given for the purpose of example and description, and are not exhaustive or limit the present application to the disclosed forms. Many modifications and variations will be apparent to those skilled in the art. The embodiments are selected and described in order to better illustrate the principles and practical application of the present application, and to enable those skilled in the art to understand the present application so as to design various embodiments with various modifications suitable for specific purposes.
Claims
1. A bridge construction activity operating deck comprising a mobile structure (1) and a protection assembly (5), characterized in that: The top surface of the mobile structure (1) is vertically installed with lifting columns (2) left and right symmetrically, the top of the lifting columns (2) is installed with a workbench (3), one side of the workbench (3) is vertically installed with a ladder (4), the protection assembly (5) is erected on the top of the workbench (3), the protection assembly (5) comprises a buffer column (501), a stabilizing pile (502), a buffer frame (503) and a protective shed (504), the top end of the buffer column (501) is installed with the stabilizing pile (502), one side of the stabilizing pile (502) is connected and installed with the buffer frame (503), and the top surface of the buffer frame (503) is covered and installed with the protective shed (504).
2. A bridge construction activity operating deck according to claim 1, characterised in that The mobile structure (1) comprises a mobile trolley (101), a fixed pile (102), a buffer pile (103) and a buffer plate (104), the top of the mobile trolley (101) is installed with the fixed pile (102), the front and rear sides of the mobile trolley (101) are both horizontally installed with the buffer pile (103), and one end of the buffer pile (103) away from the mobile trolley (101) is connected with the buffer plate (104).
3. A bridge construction activity operating deck according to claim 2, characterised in that The fixed pile (102) is arranged at four opposite corners of the top surface of the mobile trolley (101), and the buffer pile (103) is symmetrically installed on the side edges of the mobile trolley (101).
4. A bridge construction activity operating deck according to claim 2, characterised in that The bottom end of the lifting column (2) is fixedly connected to the top of the fixed pile (102), and the lifting column (2) is vertically provided with four groups for connecting the mobile structure (1) and the workbench (3).
5. A bridge construction activity operating deck according to claim 1, characterised in that The workbench (3) comprises an operation table (301), a linking pile (302) and a protective frame (303), the bottom four corners of the operation table (301) are provided with the linking pile (302), and the top of the operation table (301) is installed with the protective frame (303).
6. A bridge construction activity operating deck according to claim 5, characterised in that The workbench (3) further comprises a movable fence (304) and a self-locking damping shaft (305), one section of the top of the protective frame (303) near the ladder (4) is provided with the movable fence (304), and the self-locking damping shaft (305) is installed at the junction of the protective frame (303) and the movable fence (304).
7. A bridge construction activity operating deck according to claim 6, characterised in that The ladder (4) is vertically installed on one side of the operation table (301) near the movable fence (304), and the linking pile (302) and the operation table (301) are arranged in an integrated structure.
8. A bridge construction activity operating deck according to claim 6, characterised in that The top end of the lifting column (2) is fixedly connected with the linking pile (302), the movable fence (304) is symmetrically arranged on one side of the protective frame (303), and the buffer columns (501) are vertically installed at four opposite corners of the top of the protective frame (303). The top surface of the mobile structure (1) is vertically installed with lifting columns (2) left and right symmetrically, the top of the lifting columns (2) is installed with a workbench (3), one side of the workbench (3) is vertically installed with a ladder (4), the protection assembly (5) is erected on the top of the workbench (3), the protection assembly (5) comprises a buffer column (501), a stabilizing pile (502), a buffer frame (503) and a protective shed (504), the top end of the buffer column (501) is installed with the stabilizing pile (502), one side of the stabilizing pile (502) is connected and installed with the buffer frame (503), and the top surface of the buffer frame (503) is covered and installed with the protective shed (504).