Heating and ventilation efficient air pipe
By introducing a positioning mechanism into the HVAC duct, and utilizing the cooperation of the support plate, bearing plate, and locking components, the duct can be pre-fixed, solving the problem of high labor intensity in duct hoisting and connection in existing technologies and improving installation efficiency.
Patent Information
- Application Number
- CN202520614688.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-03
- Publication Date
- 2026-01-02
- Estimated Expiration
- 2035-04-03
AI Technical Summary
During the hoisting and connection of existing heating and ventilation ducts, workers need to hold the ducts for extended periods, increasing labor intensity and making connections inconvenient.
A high-efficiency HVAC duct was designed, which includes a positioning mechanism comprising a docking component and a locking component. Through the cooperation of a support plate, a load-bearing plate, a connecting plate, and a locking component, the duct is pre-fixed, reducing manual duct lifting operations.
The use of positioning mechanisms reduces the workload of staff, simplifies the duct connection process, and improves installation efficiency.
Smart Images

Figure CN223754901U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of heating high -efficient air pipe, especially a kind of heating high -efficient air pipe. BACKGROUND
[0002] Heating air pipe usually refers to the pipeline system for air delivery and distribution, and the main function of heating air pipe is to deliver treated air to various areas needing temperature adjustment and ventilation, to ensure the comfort and safety of indoor environment.
[0003] The heating air pipe of prior art needs to be hoisted when in use, the boom is installed first, then the bottom of heating air pipe is supported using a hoop, the hoop is connected with the boom, then adjacent heating air pipes are connected and locked.
[0004] But this way needs staff to hold heating air pipe, after the hoop is connected with the boom, heating air pipe is loosened, and staff will hold heating air pipe for a long time, so it is necessary to pre-position adjacent heating air pipes when connecting. TECHNICAL SOLUTION
[0005] The utility model aims at providing a kind of heating high -efficient air pipe to solve the problems in the above background.
[0006] To achieve the above object, the utility model provides the following technical scheme: a kind of heating high -efficient air pipe, comprising:
[0007] First heating pipe body, the side of the first heating pipe body is provided with second heating pipe body;
[0008] Positioning mechanism, the positioning mechanism is located at the top of first heating pipe body, and the positioning mechanism comprises:
[0009] Butting piece, the butting piece is located at the top of first heating pipe body, and the butting piece is used to make first heating pipe body and second heating pipe body relative interface;
[0010] Locking piece, the locking piece is located on butting piece, and the locking piece is used to lock the connecting position of first heating pipe body and second heating pipe body.
[0011] Preferably, the positioning mechanism further comprises:
[0012] First plate body, the first plate body is fixedly connected to the inner wall of first heating pipe body;
[0013] Inserting plate, the inserting plate is fixedly connected to the side of first plate body;
[0014] Second plate body, the second plate body is fixedly connected to the inner wall of second warm pipe body, the side of second plate body is equipped with with the through slot of inserting plate is adapted.
[0015] Preferably, the docking piece comprises:
[0016] Supporting plate, the supporting plate is installed on the top of the second warm pipe body;
[0017] Bearing plate, the bearing plate is fixedly connected to the side of the supporting plate;
[0018] Bearing frame, the bearing frame is installed on the top of the first warm pipe body.
[0019] Preferably, the docking piece further comprises:
[0020] Supporting rod, the supporting rod is fixedly connected to the bottom of the bearing plate and the top end of the inner wall of the bearing frame respectively;
[0021] Connecting plate, the connecting plate is fixedly connected to the side of the bearing frame;
[0022] Mounting groove, the mounting groove is equipped in the side of the bearing plate, and the connecting plate is slidably inserted into the inner cavity of the mounting groove.
[0023] Preferably, the locking piece comprises:
[0024] Positioning column, the positioning column is slidably inserted into the top of the bearing plate;
[0025] Limiting groove, the limiting groove is equipped in the top of the connecting plate, and the positioning column is slidably inserted into the inner cavity of the limiting groove;
[0026] Fixed frame, the fixed frame is fixedly connected to the top of the bearing plate.
[0027] Preferably, the locking piece further comprises:
[0028] Connecting rod, the connecting rod is fixedly connected to the top of the positioning column, and the outer wall of the connecting rod is slidably inserted into the fixed frame;
[0029] Series connection plate, the series connection plate is fixedly connected to the end of the connecting rod;
[0030] Spring, the spring is sleeved on the outside of the connecting rod, one end of the spring is fixedly connected to the top end of the inner wall of the fixed frame, and the other end of the spring is fixedly connected to the positioning column.
[0031] The technical effects and advantages of the utility model are as follows:
[0032] The utility model discloses a support plate, bearing plate, connecting plate, bearing frame, reinforcing member and locking piece's mutual cooperation through utilization, support plate carries out the support to bearing plate, and bearing frame carries out the support to connecting plate, and connecting plate makes bearing plate and bearing frame butt joint, and reinforcing member carries out butt joint to the connection of first warm and the connection of second warm pipe body, and locking piece carries out the relative position limitation to connecting plate and bearing plate, and then is favorable to make first warm and the warm pipe body of second warm pipe body when butt joint, carries out the pre -fixing operation to first warm, and staff need not hold first warm for a long time, to reduce the labor intensity. BRIEF DESCRIPTION OF DRAWINGS
[0033] Fig. 1 It is whole structure schematic diagram of the utility model.
[0034] Fig. 2 It is first warm and the front cross section structure schematic diagram of the utility model body place.
[0035] Fig. 3 It is connecting plate place front cross section structure schematic diagram of the utility model.
[0036] In the drawing: 1, first warm and the pipe body of second warm pipe body, 3, positioning mechanism, 31, support plate, 32, bearing plate, 33, bearing frame, 34, first board body, 35, inserts the board, 36, second board body, 37, connecting plate, 38, positioning column, 39, fixed frame, 310, connecting rod, 311, spring, 312, series connection board. DETAILED DESCRIPTION
[0037] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model, and obviously, the described embodiments only are a part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by the person skilled in the art without making creative labor belong to the range of protection of the utility model.
[0038] The utility model provides a kind of warm and efficient air pipe as shown in Figs. 1-3
[0039] Embodiment one
[0040] The utility model provides a first warm and open pipe body 1 and positioning mechanism 3, first warm and open pipe body 1's side is provided with second warm and open pipe body 2, positioning mechanism 3 is located first warm and open pipe body 1's top, and positioning mechanism 3 includes the butt joint piece and locking piece, butt joint piece is located first warm and open pipe body 1's top, and butt joint piece is used for making first warm and open pipe body 1 and second warm and open pipe body 2 relative butt joint, locking piece is located butt joint piece, and locking piece is used for locking first warm and open pipe body 1 and second warm and open pipe body 2's connecting position, when using, first, make second warm and open pipe body 2 install through the hoop and the suspender, after installing, make first warm and open pipe body 1 directly drive carrier frame 33 to move, make carrier frame 33 drive connecting plate 37 and with the bearing plate 32 interpenetration, simultaneously, interpenetration plate 35 and second plate body 36 interpenetration, positioning column 38 under the action of spring 311, after moving, with the limiting slot on connecting plate 37 interpenetration, to lock connecting plate 37 and bearing plate 32, realize the pre-fixing of first warm and open pipe body 1, then install the hoop to first warm and open pipe body 1 and make first warm and open pipe body 1 and second warm and open pipe body 2 fastening operation can.
[0041] Further, positioning mechanism 3 also includes first plate body 34, interpenetration plate 35 and second plate body 36, first plate body 34 is favorable to support interpenetration plate 35, interpenetration plate 35 is favorable to be connected with second plate body 36, further favorable to make the connection of first warm and open pipe body 1 and second warm and open pipe body 2 positioning reinforcement, first plate body 34 is fixedly connected to the inner wall of first warm and open pipe body 1, interpenetration plate 35 is fixedly connected to the side of first plate body 34, second plate body 36 is fixedly connected to the inner wall of second warm and open pipe body 2, and the side of second plate body 36 is provided with through groove matched with interpenetration plate 35.
[0042] Specifically, the butt joint piece includes a support plate 31, a bearing plate 32 and a carrier frame 33, the support plate 31 is favorable to support the bearing plate 32, the bearing plate 32 is favorable to interpenetrate with the connecting plate 37 to be positioned and connected with the carrier frame 33, and the carrier frame 33 is in an L shape and is favorable to support the connecting plate 37, the support plate 31 is installed on the top of the second warm and open pipe body 2, the bearing plate 32 is fixedly connected to the side of the support plate 31, and the carrier frame 33 is installed on the top of the first warm and open pipe body 1.
[0043] Specifically, the butt joint piece further includes a support rod, a connecting plate 37 and a mounting groove, the support rod is favorable to bottom support the bearing plate 32 and the carrier frame 33, the connecting plate 37 is favorable to make the carrier frame 33 and the support plate 31 interpenetrate, further favorable to interpenetrate and position the connection of the first warm and open pipe body 1 and the second warm and open pipe body 2, and favorable to traction operation of the second warm and open pipe body 2, the support rod is fixedly connected to the bottom and the top end of the inner wall of the bearing plate 32 and the carrier frame 33 respectively, the connecting plate 37 is fixedly connected to the side of the carrier frame 33, the mounting groove is provided on the side of the bearing plate 32, and the connecting plate 37 is slidably connected with the inner cavity of the mounting groove.
[0044] Specifically, the locking piece comprises a positioning column 38, a limiting groove and a fixing frame 39, the positioning column 38 is arranged in a trapezoidal shape, the positioning column 38 is beneficial to limit the relative position of the connecting plate 37 and the bearing plate 32, thereby being beneficial to connect and fix the first heating and ventilation pipe body 1 and the second heating and ventilation pipe body 2, to pre-fix, to install the second heating and ventilation pipe body 2 with a clamp and to perform the fastening operation of the first heating and ventilation pipe body 1 and the second heating and ventilation pipe body 2, the fixing frame 39 is beneficial to support the deformation of the spring 311, and is also beneficial to vertically guide and support the sliding of the connecting rod 310, the positioning column 38 is slidingly inserted into the top of the bearing plate 32, the limiting groove is arranged on the top of the connecting plate 37, the positioning column 38 is slidingly inserted into the inner cavity of the limiting groove, and the fixing frame 39 is fixedly connected to the top of the bearing plate 32.
[0045] Embodiment two
[0046] On the basis of the first embodiment, the locking piece further comprises a connecting rod 310, a series connection plate 312 and a spring 311, the connecting rod 310 is beneficial to pull the positioning column 38 to move, thereby facilitating the traction operation of the positioning column 38, the series connection plate 312 is beneficial to simultaneously connect multiple connecting rods 310 in the same row in series, and the spring 311 is beneficial to push the positioning column 38 to move, thereby facilitating the positioning column 38 to return to the original position after movement, facilitating the repeated operation of the positioning column 38, the connecting rod 310 is fixedly connected to the top of the positioning column 38, the outer wall of the connecting rod 310 is slidingly inserted into the fixing frame 39, the series connection plate 312 is fixedly connected to the end of the connecting rod 310, the spring 311 is sleeved outside the connecting rod 310, one end of the spring 311 is fixedly connected to the top end of the inner wall of the fixing frame 39, and the other end of the spring 311 is fixedly connected to the positioning column 38.
[0047] Finally, it should be noted that: the above only describes the preferred embodiments of the present application, and is not intended to limit the present application, although the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for some technical features, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A heating, ventilation, and high-efficiency duct, comprising: The utility model relates to a first warm pipe body (1), the side of first warm pipe body (1) is provided with second warm pipe body (2); Positioning mechanism (3) is located at the top of first warm pipe body (1), and the positioning mechanism (3) includes: The butt joint piece is located at the top of first warm pipe body (1), and the butt joint piece is used to make first warm pipe body (1) and second warm pipe body (2) relative butt joint; Locking piece is located on butt joint piece, and the locking piece is used to lock the connecting position of first warm pipe body (1) and second warm pipe body (2). The positioning mechanism (3) further includes:
2. A high efficiency air duct according to claim 1, wherein, First plate body (34) is fixedly connected to the inner wall of first warm pipe body (1); The through plate (35) is fixedly connected to the side of first plate body (34); Second plate body (36) is fixedly connected to the inner wall of second warm pipe body (2), and the side of second plate body (36) is provided with a through slot matched with the through plate (35). The butt joint piece includes:
3. The high efficiency air duct according to claim 1, wherein, Supporting plate (31) is installed on the top of second warm pipe body (2); The bearing plate (32) is fixedly connected to the side of supporting plate (31); The bearing frame (33) is installed on the top of first warm pipe body (1). The butt joint piece further includes:
4. A high efficiency air duct according to claim 3, wherein The support rod is fixedly connected to the bottom and the top end of the inner wall of bearing plate (32) and bearing frame (33) respectively; The connecting plate (37) is fixedly connected to the side of bearing frame (33); The mounting groove is provided in the side of bearing plate (32), and the connecting plate (37) is slidably connected with the inner cavity of the mounting groove. The locking piece includes:
5. A high efficiency air duct according to claim 4, wherein, The positioning column (38) is slidably connected to the top of bearing plate (32); The limiting groove is provided in the top of connecting plate (37), and the positioning column (38) is slidably connected with the inner cavity of the limiting groove; The fixed frame (39) is fixedly connected to the top of bearing plate (32). The locking piece further includes:
6. A high efficiency air duct according to claim 5, wherein, The connecting rod (310) is fixedly connected to the top of positioning column (38), and the outer wall of connecting rod (310) is slidably connected with fixed frame (39); The series connection plate (312) is fixedly connected to the end of connecting rod (310); The spring (311) is sleeved on the outside of connecting rod (310), one end of spring (311) is fixedly connected with the top end of the inner wall of fixed frame (39), and the other end of spring (311) is fixedly connected with positioning column (38).