Positioning identification pile for directly-buried steam pipeline
By combining the fixed mechanism and the marking installation mechanism, the problems of time-consuming and labor-intensive installation and poor stability of steam direct-buried pipeline positioning marker posts are solved, achieving stable positioning and marking protection in harsh environments.
Patent Information
- Application Number
- CN202520109215.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2026-01-02
- Estimated Expiration
- 2035-01-17
AI Technical Summary
The existing positioning marker posts for direct-buried steam pipelines require digging deep pits for installation, which is time-consuming and labor-intensive, and they are prone to tipping over and tilting in strong winds, resulting in poor stability.
The fixed mechanism, including a combination of positioning stakes, base, ground cones, support frame and limiting groove, enhances stability, and the sign is protected by a sealed frame and bird deterrent device.
It improves the stability of the positioning stakes, prevents them from tipping over, protects the signs from corrosion and bird nesting, and facilitates maintenance and operation.
Smart Images

Figure CN223757201U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to positioning identification pile for steam direct -buried pipeline technical field, especially in positioning identification pile for steam direct -buried pipeline. BACKGROUND
[0002] Positioning identification pile for steam direct -buried pipeline is a kind of facilities specially used to mark the position of steam direct -buried pipeline, its primary function is to accurately mark the position of steam direct -buried pipeline, in city construction, road construction, underground pipeline maintenance etc. Scene, staff can quickly determine the trend and burying depth of steam direct -buried pipeline by positioning identification pile, avoid damaging pipeline due to misoperation in construction process, guarantee the safe and stable of steam delivery.
[0003] In prior art, most positioning identification piles are buried underground by separate positioning piles, and it needs to dig deep pit, it is more time-consuming and laborious, and it is easy to occur side overturning and tilting in gale weather, therefore, we provide a kind of positioning identification pile for steam direct -buried pipeline. UTILITY MODEL CONTENT
[0004] The utility model aims at providing a kind of positioning identification pile for steam direct -buried pipeline to solve the problem that most positioning identification piles in the background art are buried underground by separate positioning piles, and it needs to dig deep pit, it is more time-consuming and laborious, and it is easy to occur side overturning and tilting in gale weather.
[0005] To achieve the above object, the utility model provides the following technical scheme: a kind of positioning identification pile for steam direct -buried pipeline, including fixed mechanism, the fixed mechanism includes positioning pile, the positioning pile is connected with first ground spike by base, the positioning pile is connected with second ground spike by support frame and limiting slot, the support frame is connected with fixed bolt and installation sleeve rod by first threaded hole.
[0006] As preferred scheme, the base is screw-mounted at the bottom of positioning pile, and the first ground spike is fixedly installed at the bottom of the base near the edge position.
[0007] As preferred scheme, the limiting slot penetrates the axis of support frame, the positioning pile is inserted in the inside of limiting slot, and the second ground spike is fixedly installed at the bottom of support frame.
[0008] As preferred scheme, the first threaded hole penetrates the bottom of installation sleeve rod and the upper end of support frame, the fixed bolt is screw-connected in the inside of first threaded hole, and the installation sleeve rod is sleeved on the outer wall of positioning pile.
[0009] As a preferred, the upper of the fixed mechanism is provided with a sign mounting mechanism, the sign mounting mechanism comprises a connecting sleeve rod and a bird repelling mounting seat, the connecting sleeve rod is inserted in the upper end of the positioning pile, the upper end of the connecting sleeve rod is fixedly installed with a sealing frame, the side of the sealing frame is provided with a second threaded hole, and a signboard is inserted in the sealing frame, the outer side of the signboard is threadedly connected with a fastening bolt close to the edge, and the fastening bolt is threadedly connected with the second threaded hole.
[0010] As a preferred, the inner shaft of the bird repelling mounting seat is threadedly connected with a connecting bolt, and the connecting bolt is threadedly connected in the inner upper end of the sealing frame.
[0011] As a preferred, the surface of the bird repelling mounting seat is fixedly installed with a support, the upper end of the support is fixedly installed with a spring, and the upper end of the spring is fixedly installed with a bell rod.
[0012] The technical effects and advantages of the utility model are as follows:
[0013] 1. The fixed mechanism is arranged, the positioning pile can be protected by the installation sleeve rod sleeved on the outer wall of the positioning pile, the external harsh environment is effectively isolated, meanwhile, the support frame strengthens the stability of the base, the stress range is significantly expanded, the positioning pile can also be kept steady in the raging wind, the positioning pile is prevented from turning over, in addition, the first and second ground stakes are cooperatively fixed, compared with the traditional mode of relying on digging deep pits to bury the positioning pile, the combined mode greatly improves the overall stability, and more reliable anchoring protection is provided for related facilities.
[0014] 2. The sign mounting mechanism is arranged, the signboard can be isolated from the external harsh environment by the effective protection of the sealing frame, the risk of corrosion is successfully avoided, the difficult problem of post-cleaning caused by the attachment of mosquitoes and insects is solved from the source, under the ingenious cooperation of the support, the spring and the bell rod, the nesting of birds on the positioning sign pile and the shielding of the signboard are effectively prevented, the post-maintenance personnel can be greatly facilitated to quickly and accurately position the sign pile, the maintenance work can be smoothly carried out, and the stable operation and continuous use of the whole system are ensured. ACCURATE DESCRIPTION OF DRAWINGS
[0015] Figure 1 It is a three-dimensional structure schematic view of the utility model;
[0016] Figure 2 It is a partial structure schematic view of the fixed mechanism of the utility model;
[0017] Figure 3 It is an explosion view of the partial structure of the fixed mechanism of the utility model;
[0018] Figure 4Part structure explosion map of the sign mounting mechanism of the utility model,
[0019] Figure 5 Part structure schematic diagram of the sign mounting mechanism of the utility model.
[0020] In the drawing: 1, fixed mechanism;101, positioning pile;102, base;103, first ground stake;104, support frame;105, second ground stake;106, limiting groove;107, first threaded hole;108, mounting sleeve rod;109, fixed bolt;2, sign mounting mechanism;201, connecting sleeve rod;202, sealing frame;203, second threaded hole;204, signboard;205, fastening bolt;206, bird repelling mounting seat;207, connecting bolt;208, support;209, spring;210, bell rod. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0022] Embodiment one:
[0023] Please refer to the drawings of the embodiments of the utility model, Figure 1 - the drawings of the embodiments of the utility model, Figure 3 A positioning sign pile for steam direct-buried pipeline, including fixed mechanism 1, fixed mechanism 1 including positioning pile 101, positioning pile 101 is connected with first ground stake 103 through base 102, positioning pile 101 is connected with second ground stake 105 through support frame 104 and limiting groove 106, support frame 104 is connected with fixed bolt 109 and mounting sleeve rod 108 through first threaded hole 107, base 102 is screwed in the bottom of positioning pile 101, first ground stake 103 is fixedly installed at the edge position at the bottom of base 102, limiting groove 106 penetrates the axis of support frame 104, positioning pile 101 is inserted in the inside of limiting groove 106, second ground stake 105 is fixedly installed at the bottom of support frame 104, first threaded hole 107 penetrates the bottom of mounting sleeve rod 108 and the upper end of support frame 104, fixed bolt 109 is screwed in the inside of first threaded hole 107, and mounting sleeve rod 108 is sleeved on the outer wall of positioning pile 101.
[0024] The first ground peg 103 and the second ground peg 105 are on the edge of the same arc and are alternated with each other, so that the stability of the base 102 is stronger, and the mounting sleeve rod 108 can be directly replaced after being damaged, and the mounting sleeve rod 108 can be engraved with relevant information of the steam direct-buried pipeline, so as to facilitate the staff to check.
[0025] Specifically, the mounting sleeve rod 108 is sleeved on the outer wall of the positioning pile 101 to protect the positioning pile 101 from being damaged by long-term exposure to the external environment, and the base 102 is reinforced by the supporting frame 104 to increase the stress area of the base 102 and effectively resist strong winds and prevent the positioning pile 101 from tipping over. The first ground peg 103 and the second ground peg 105 are fixed, and the stability is stronger than the traditional way of relying on the positioning pile 101 alone.
[0026] Embodiment two:
[0027] Please refer to the accompanying Figure 1 , the accompanying Figure 4 and the accompanying Figure 5 , and on the basis of embodiment one, it is further obtained that the upper part of the fixing mechanism 1 is provided with a sign mounting mechanism 2, the sign mounting mechanism 2 comprises a connecting sleeve rod 201 and a bird repelling mounting seat 206, the connecting sleeve rod 201 is inserted into the upper end of the positioning pile 101, the upper end of the connecting sleeve rod 201 is fixedly installed with a sealing frame 202, the side surface of the sealing frame 202 is provided with a second threaded hole 203, and a signboard 204 is inserted into the inside of the sealing frame 202, the outer side of the signboard 204 is close to the edge and is threadedly connected with a fastening bolt 205, the fastening bolt 205 is threadedly connected with the second threaded hole 203, the inside of the upper end of the sealing frame 202 is threadedly connected with a connecting bolt 207, the connecting bolt 207 is threadedly connected with the inside of the upper end of the sealing frame 202, the surface of the bird repelling mounting seat 206 is fixedly installed with a support 208, the upper end of the support 208 is fixedly installed with a spring 209, and the upper end of the spring 209 is fixedly installed with a bell rod 210.
[0028] The front and back sides of the sealing frame 202 are transparent materials, so that the outside can see the inside of the signboard 204, the signboard 204 can be replaced in a detachable manner, the connecting sleeve rod 201 is sleeved on the outer wall of the positioning pile 101, the connection between the two is extremely fast, and the connecting sleeve rod 201 cannot be taken off by manpower, the spring 209 and the bell rod 210 make birds unable to stand on the connecting sleeve rod 201, and the sound emitted scares away the birds.
[0029] Specific, can be protected by sealing frame 202 signboard 204, to avoid signboard 204 is corroded, while preventing mosquitoes attached to signboard 204 on the later stage can not be cleaned, through the cooperation of support 208, spring 209 and bell rod 210, can prevent birds on the positioning identification pile nest home caused by signboard 204 is blocked problem occurs, facilitate the later maintenance personnel find positioning identification pile for maintenance operation.
[0030] The utility model discloses a positioning identification pile for steam direct-buried pipeline, first, the base 102 is placed in the inside of support frame 104, makes both axis coincides, then the positioning pile 101 is connected in the base 102 through the limiting slot 106, subsequently the installation sleeve rod 108 is sleeved on the outer wall of positioning pile 101, makes the bottom first threaded hole 107 of installation sleeve rod 108 and the first threaded hole 107 on support frame 104 coincide, tightens the fixed bolt 109 in the first threaded hole 107, subsequently the first ground cone 103 and the second ground cone 105 are staked in the ground, and the base 102 and support frame 104 are buried in the ground, and through the tool cooperation, the connecting sleeve rod 201 is tightly sleeved on the outer wall of installation sleeve rod 108, then signboard 204 is inserted in sealing frame 202, tightens fastening bolt 205, finally the bird repelling mounting seat 206 is installed in the upper end of sealing frame 202 through connecting bolt 207, and through spring 209 and bell rod 210, birds are repelled, and it is guaranteed that signboard 204 will not be blocked by birds nest.
[0031] Finally, it should be noted that: the above only for preferred embodiment of the utility model has been described, and does not limit the utility model, although the utility model is described in detail with reference to the foregoing embodiments, for the person skilled in the art, it still can modify the technical scheme recorded in the foregoing each embodiment, or equivalent replacement to part of technical features, any modification, equivalent replacement, improvement etc. that is made within the spirit and principles of the utility model, should be included in the protection scope of the utility model.
Claims
1. A positioning marker post for a direct-buried steam pipeline, comprising a fixing mechanism (1), characterized in that: The fixing mechanism (1) includes a positioning pile (101), the positioning pile (101) is connected to a first grounding cone (103) through a base (102), the positioning pile (101) is connected to a second grounding cone (105) through a support frame (104) and a limiting groove (106), and the support frame (104) is connected to a fixing bolt (109) and an installation sleeve (108) through a first threaded hole (107).
2. The positioning marker post for a direct-buried steam pipeline according to claim 1, characterized in that: The base (102) is threaded onto the bottom of the positioning pile (101), and the first ground cone (103) is fixedly installed on the bottom of the base (102) near the edge.
3. A positioning marker post for a direct-buried steam pipeline according to claim 2, characterized in that: The limiting groove (106) passes through the axis of the support frame (104), the positioning pile (101) is inserted into the inside of the limiting groove (106), and the second ground cone (105) is fixedly installed at the bottom of the support frame (104).
4. A positioning marker post for a steam direct-buried pipeline according to claim 3, characterized in that: The first threaded hole (107) passes through the bottom of the mounting sleeve (108) and the upper end of the support frame (104). The fixing bolt (109) is threaded into the inside of the first threaded hole (107). The mounting sleeve (108) is sleeved on the outer wall of the positioning pile (101).
5. A positioning marker post for a steam direct-buried pipeline according to claim 1, characterized in that: A marking installation mechanism (2) is provided above the fixing mechanism (1). The marking installation mechanism (2) includes a connecting sleeve (201) and a bird deterrent mounting base (206). The connecting sleeve (201) is inserted into the upper end of the positioning stake (101). A sealing frame (202) is fixedly installed on the upper end of the connecting sleeve (201). A second threaded hole (203) is opened on the side of the sealing frame (202), and a marking plate (204) is inserted inside it. Fastening bolts (205) are threadedly connected to the outer edge of the marking plate (204). The fastening bolts (205) are threadedly connected to the second threaded hole (203).
6. A positioning marker post for a steam direct-buried pipeline according to claim 5, characterized in that: The bird deterrent mounting base (206) has a connecting bolt (207) threaded at its inner shaft center, and the connecting bolt (207) is threaded inside the upper end of the sealing frame (202).
7. A positioning marker post for a direct-buried steam pipeline according to claim 6, characterized in that: A bracket (208) is fixedly installed on the surface of the bird deterrent mounting base (206), a spring (209) is fixedly installed on the upper end of the bracket (208), and a bell rod (210) is fixedly installed on the upper end of the spring (209).