Temporary drainage facility for house building construction
By using a submersible pump system controlled by lifting components and liquid level sensors at the construction site, the problem of water accumulation at the construction site that cannot be drained in a timely manner has been solved, realizing automated monitoring and drainage, and ensuring construction safety.
Patent Information
- Application Number
- CN202422698845.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2026-01-09
- Estimated Expiration
- 2034-11-06
AI Technical Summary
During the construction of houses, existing technology cannot automatically monitor and drain water accumulation at the construction site in a timely manner, resulting in excessive foundation settlement and potential safety hazards.
A temporary drainage facility for building construction was designed. It features a protective housing with a built-in submersible pump connected by a lifting assembly, equipped with a liquid level sensor and controller to achieve automated monitoring and drainage, and has an easy-to-disassemble mounting bracket structure.
It enables automated monitoring and timely drainage of water accumulation at the construction site, preventing excessive foundation settlement and improving construction safety.
Smart Images

Figure CN223780929U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to drainage facilities technical field, concretely is a temporary drainage facility for house building construction. BACKGROUND
[0002] In the process of house construction, once there is a lot of precipitation, the whole foundation will be soaked, and after long-term soaking, the foundation settlement may exceed the requirements of the specification, which will cause great hidden dangers in house construction.
[0003] The currently commonly used measures include digging a drainage ditch at the construction site and continuously digging the drainage ditch to extend to communicate with the urban underground drainage system, thereby facilitating rainwater discharge, but the construction process is complex, and a simple pump body is also used in combination with a water pipe to discharge rainwater, but it does not have the function of automatically monitoring drainage and cannot discharge the water in time.
[0004] Therefore, a temporary drainage facility for house building construction is needed to improve the above problems. UTILITY MODEL CONTENTS
[0005] The utility model aims at providing a temporary drainage facility for house building construction to solve the problems in the background art.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical scheme:
[0007] A temporary drainage facility for house building construction comprises a mounting bracket, a lifting assembly is connected to the mounting bracket through bolts, a protection shell is connected to the sliding part of the lifting assembly in a matched and docked manner, the protection shell is hollow inside and has a submersible pump installed therein, a water suction end is fixedly connected to the bottom end of the protection shell, and a liquid level sensor for monitoring the water level is arranged at the bottom of the water suction end; a protective end portion is fixedly connected to the upper end of the protection shell, a lower groove body is formed in the lower end of the protective end portion, the protection shell is inserted into the lower groove body under the drive of the lifting assembly, a controller is installed on one side of the outer portion of the protective end portion, and the controller is electrically connected between the fixed lug and the liquid level sensor.
[0008] As a preferred scheme of the utility model, a receiving groove is formed in the upper end face of the protective end portion and recessed downward, and a through hole is formed in the lower end face of the receiving groove and communicates with the inside of the lower groove body.
[0009] As a preferred scheme of the utility model, a water pipe is connected to the output end of the submersible pump, the water pipe extends to the outside through the through hole, and the water pipe can be coiled and received in the inside of the receiving groove.
[0010] As a preferred scheme of the utility model, the input end of the submersible pump extends to the inside of the water suction end, and a plurality of filter holes are formed in the side edge and the bottom face of the water suction end.
[0011] As the preferred scheme of the utility model, the lifting assembly includes a main rod body, a sliding slot is formed on one side of the main rod body, a lead screw is rotatably connected inside the sliding slot, the upper end of the lead screw extends through the upper end of the main rod body and is fixedly connected with a butt joint end, a sliding block is threadedly connected to the outside of the lead screw, and the sliding block is limitingly and slidably arranged inside the sliding slot.
[0012] As the preferred scheme of the utility model, the main rod body is fixedly connected with a fixed lug on both sides, and a screw hole is formed on the fixed lug.
[0013] As the preferred scheme of the utility model, the mounting bracket includes a top rod, a limiting ring is fixedly connected to one side of the top rod, support rods a are fixedly connected to the lower sides of both ends of the top rod, and a support rod is fixedly connected to the lower end of the side of the limiting ring away from the top rod.
[0014] As the preferred scheme of the utility model, the lower end of each of the support rods and the support rods a is fixedly connected with a fixed plate, and a fixed hole is formed on both sides of each fixed plate.
[0015] Compared with the prior art, the utility model has the advantages that:
[0016] The utility model adopts the detachable setting, can separate the mounting bracket from the main body equipment structure, has the characteristics that is convenient to disassemble and install, has the function of monitoring the water storage liquid level, can automatically pump water when the water storage is more, and timely discharges the water storage. BRIEF DESCRIPTION OF DRAWINGS
[0017] Figure 1 It is the first perspective view of the utility model;
[0018] Figure 2 It is the second perspective view of the utility model;
[0019] Figure 3 It is the third perspective view of the utility model;
[0020] Figure 4 It is the fourth perspective view of the utility model;
[0021] Figure 5 It is the fifth perspective view of the utility model;
[0022] Figure 6 It is the schematic view of the bottom bracket in the utility model;
[0023] Figure 7 It is the sectional view of the utility model.
[0024] In the figure: protective shell 1, main rod body 2, protective end 3, controller 4, slider 5, storage groove 6, water pipe 7, docking end 8, water suction end 9, fixing lug 10, sliding groove 11, lead screw 12, lower groove body 13, filter hole 14, liquid level sensor 15, top rod 16, support rod a 17, limiting ring 18, support rod 19, fixing plate 20, submersible pump 21. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.
[0026] In order to facilitate the understanding of the present application, the present application will be described more fully with reference to the related description. Several embodiments of the present application are given. However, the present application can be realized in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.
[0027] It should be noted that when an element is referred to as being "fixedly attached" to another element, it can be directly on the other element or there can be intervening elements. When an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element or intervening elements can be present. As used herein the terms "vertical", "horizontal", "left", "right" and the like are merely used for the purpose of illustration.
[0028] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used in the description of the application herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the application. As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.
[0029] Please refer to Figures 1-7 The present application provides a technical solution:
[0030] Embodiments, please refer to Figures 1-7The utility model provides a kind of temporary drainage facilities for house construction, including installation support, which is connected with lifting assembly by bolt, the sliding part of lifting assembly is matched with the docking of protective shell 1, the inside of protective shell 1 is hollow and is equipped with submersible pump 21, the bottom end of protective shell 1 is fixedly connected with water suction end 9, and the bottom of water suction end 9 is provided with liquid level sensor 15 for monitoring water level;The upper end of protective shell 1 is fixedly connected with protective end 3, and the lower end of protective end 3 is provided with lower groove 13, and protective shell 1 is matched with lower groove 13 under the drive of lifting assembly, and the outside of protective end 3 is equipped with controller 4, and controller 4 is electrically connected between fixed lug 10 and liquid level sensor 15.
[0031] Lifting assembly and installation support are detachably arranged, which can be conveniently installed and detached, facilitating the use of house construction site and having overall lifting function, meeting the needs of different use scenarios, the setting of protective end 3 and protective shell 1 can protect submersible pump 21, compared with bare use, it can avoid the damage of complex environment of house construction site to submersible pump 21, liquid level sensor 15 is used for monitoring water storage, when water storage rises, liquid level sensor 15 detects and generates electrical signal, and submersible pump 21 works through controller 4 to carry out water pumping operation.
[0032] Please refer to Figure 1 、 2 , 3 and 4, the upper end surface of protective end 3 is provided with downward recessed receiving groove 6, and the lower end surface of receiving groove 6 is provided with through hole communicated with the inside of lower groove 13, the output end of submersible pump 21 is connected with water pipe 7, water pipe 7 extends to the outside through the through hole, and water pipe 7 can be coiled and received in the inside of receiving groove 6, the input end of submersible pump 21 extends to the inside of water suction end 9, and the side edge and bottom surface of water suction end 9 are provided with a plurality of filter holes 14.
[0033] Receiving groove 6 can be used for receiving water pipe 7, and the setting of filter hole 14 can partially filter the particulate impurities in water storage to avoid damaging the internal structure of submersible pump 21.
[0034] Please refer to Figure 1 、 2 And 7, lifting assembly includes main rod body 2, one side of main rod body 2 is provided with sliding groove 11, screw rod 12 is rotatably connected in the inside of sliding groove 11, the upper end of screw rod 12 extends to the upper end of main rod body 2 and is fixedly connected with docking end 8, screw rod 12 is screw-connected with sliding block 5 outside, and sliding block 5 is limitingly and slidingly arranged in the inside of sliding groove 11, and the outside of sliding block 5 is fixedly connected with protective shell 1, and the both sides of main rod body 2 are fixedly connected with fixed lug 10, and screw hole is formed in fixed lug 10.
[0035] By the motor or manual drive member outside the interface end 8, the screw rod 12 is rotated, the slider 5 is adjusted in the sliding groove 11, and the protective shell 1 is driven to be lifted.
[0036] Please refer to Figure 1 、 2 and 6, the mounting bracket comprises a top rod 16, one side of the top rod 16 is fixedly connected with a limiting ring 18, both ends of the top rod 16 are fixedly connected with support rods a 17, the lower end of the side of the limiting ring 18 away from the top rod 16 is fixedly connected with a support rod 19, the lower end of the support rod 19 and the two side support rods a 17 are fixedly connected with fixing plates 20, and the two sides of each fixing plate 20 are provided with fixing holes.
[0037] Although the embodiments of the present application have been shown and described, it should be understood by those ordinary skilled in the art that various changes, modifications, replacements and modifications can be made to the embodiments without departing from the principles and spirits of the present application, and the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A temporary drainage facility for housing construction, comprising a mounting support, a lifting assembly being connected to the mounting support by means of bolts, characterized in that: The sliding part of the lifting assembly is matched and docked with a protective shell (1), the inside of the protective shell (1) is hollow and is provided with a submersible pump (21), the bottom end of the protective shell (1) is fixedly connected with a water suction end (9), and the bottom of the water suction end (9) is provided with a liquid level sensor (15) for monitoring the water level; The upper end of the protective shell (1) is fixedly connected with a protective end (3), the lower end of the protective end (3) is provided with a lower groove body (13), the protective shell (1) is matched and inserted with the lower groove body (13) under the driving of the lifting assembly, and the outside of the protective end (3) is provided with a controller (4), and the controller (4) is electrically connected between the fixed lug (10) and the liquid level sensor (15).
2. The temporary drainage facility for building construction according to claim 1, characterized by: The upper end surface of the protective end (3) is provided with a downwardly recessed receiving groove (6), and the lower end surface of the receiving groove (6) is provided with a through hole in communication with the inside of the lower groove body (13).
3. The temporary drainage facility for building construction according to claim 2, characterized by: The output end of the submersible pump (21) is connected with a water pipe (7), the water pipe (7) extends to the outside through the through hole, and the water pipe (7) can be wound and received in the inside of the receiving groove (6).
4. The temporary drainage facility for building construction according to claim 3, characterized by: The input end of the submersible pump (21) extends to the inside of the water suction end (9), and the side edge and the bottom surface of the water suction end (9) are provided with a plurality of filter holes (14).
5. The temporary drainage facility for building construction according to any one of claims 1 to 4, characterized in that: The lifting assembly comprises a main rod body (2), one side of the main rod body (2) is provided with a sliding groove (11), the inside of the sliding groove (11) is rotatably connected with a lead screw (12), the upper end of the lead screw (12) extends to the upper end of the main rod body (2) and is fixedly connected with a docking end (8), the outside of the lead screw (12) is threadedly connected with a sliding block (5), and the sliding block (5) is limitingly and slidably arranged in the inside of the sliding groove (11), and the sliding block (5) is fixedly connected with the outside of the protective shell (1).
6. The temporary drainage facility for building construction according to claim 5, characterized by: The two sides of the main rod body (2) are fixedly connected with fixed lugs (10), and screw holes are formed in the fixed lugs (10).
7. The temporary drainage facility for building construction according to claim 6, characterized by: The mounting bracket comprises a top rod (16), one side of the top rod (16) is fixedly connected with a limiting ring (18), the lower sides of the two ends of the top rod (16) are fixedly connected with support rods a (17), and the lower end of the side of the limiting ring (18) away from the top rod (16) is fixedly connected with a support rod (19).
8. The temporary drainage facility for building construction according to claim 7, characterized by: The lower ends of the support rod (19) and the two support rods a (17) are fixedly connected with fixed plates (20), and the two sides of each fixed plate (20) are provided with fixed holes.