Cover beam construction device

By using a spreader beam, precision-rolled threaded steel, and vertical rods for connection during cap beam construction, combined with a ring beam and adjustable screws, a stable support system is formed, solving the problem of high material consumption in cap beam construction and achieving convenient construction without the need for pre-embedding or drilling.

CN223853180UActive Publication Date: 2026-01-30JIANGMEN GETO NEW MATERIALS TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423314580.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2026-01-30
Estimated Expiration
2034-12-31

AI Technical Summary

Technical Problem

In existing technologies, the construction of the cap beam requires the erection of ground supports, and the spreader beam and the cap beam are not easy to dismantle, resulting in high material consumption.

Method used

A spreader beam is placed on the top of the pier and connected to the vertical rod by a precision-rolled threaded steel bar. A ring beam and an adjustable screw are set to form a stable support system, avoiding pre-embedding or drilling. The load-sharing mechanism and the bracket are used for support.

Benefits of technology

It enables the construction of cap beams without the need for pre-embedding or drilling, meets different slope requirements, has fewer components, is easy to install, and solves the problem of high material consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223853180U_ABST
    Figure CN223853180U_ABST
Patent Text Reader

Abstract

The utility model relates to a cover beam construction device which comprises a beam cover body. The column bodies are arranged at the bottom of the beam cover body and mainly comprise carrying pole beams, brackets, finish rolling deformed steel bars, vertical rods, ring beams and adjusting screw rods; the carrying pole beam is arranged on the pier top and is integrally poured with the cover beam, and the cantilever ends are respectively provided with a finish rolling deformed steel bar which is integrally connected with the vertical rod; two encircling ring beams are arranged on the vertical rods, and two adjustable screw rods are arranged on each vertical rod, so that the stability of the supporting system is ensured; the ring beam exerts force towards the column center, and the adjustable screw exerts force away from the column center. The two components interact with each other, so that the support system is in a stable state; during use, the brackets are arranged on the vertical rods on the two sides, the main beam is placed on the discharge block, the secondary beam and the bottom die template are welded into a whole to be placed on the main beam, and the main beam supports the bottom die according to the slope of the bottom face of the cover beam by adjusting the finish rolling deformed steel bars. And the mounting side die is connected with the bottom die. And binding reinforcing steel bars and pouring concrete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building engineering technology, specifically to a cap beam construction device. Background Technology

[0002] In the construction of bridge cap beams, two clamps, one above the other, can be used to transport the relevant facilities or equipment to the upper part of the pier. In the existing technology, conventional cap beam pouring requires the erection of ground supports, and the beam is not easy to remove from the cap beam. Therefore, the bottom is leveled by using a bottom formwork truss, which consumes a lot of materials.

[0003] For example, the authorized patent document with application number CN202323077259.X discloses a beam construction bracket device, including a mounting box. The mounting box has a circular hole inside. An electric push rod is fixedly connected to the bottom of the inner wall of the circular hole. A rectangular sleeve plate is fixedly connected to the output end of the electric push rod. Rectangular plates are slidably connected to both ends of the rectangular sleeve plate. Two rotating motors are fixedly connected to one side of the outer wall of the rectangular sleeve plate, and the two rotating motors are arranged opposite each other. A lead screw is fixedly connected to the output end of each of the two rotating motors. Two strip-shaped holes are opened on the outer wall of the rectangular sleeve plate near the rotating motors. The advantage of this utility model is that the mounting box is fixed below the supported object by several fixed holes. The electric push rod drives the rectangular sleeve plate to move up and down, raising the rectangular sleeve plate to support the supported object, thus completing the support work of this bracket. The installation method is convenient and the operation is simple, increasing efficiency.

[0004] The aforementioned patent involves leveling the bottom using a bottom formwork truss, which consumes a lot of materials. Therefore, we need to provide a cap beam construction device. Utility Model Content

[0005] The purpose of this utility model is to provide a cap beam construction device, in which a spreader beam is placed on the top of the pier and cast integrally with the cap beam. A precision-rolled threaded steel bar is installed at each cantilever end and connected to the vertical rod to form an integral whole. Two circumferential ring beams are installed on the vertical rods, and two adjustable screws are installed on each vertical rod to ensure the stability of the support system. The ring beams apply force towards the column center, while the adjustable screws apply force away from the column center. The two interact to make the support system stable, thus solving the problems mentioned in the background art.

[0006] To achieve the above objectives, this utility model provides the following technical solution: a cap beam construction device, comprising:

[0007] Beam cover body;

[0008] and several columns set at the bottom of the beam cover body;

[0009] A load-sharing mechanism is installed on the surface of several of the columns;

[0010] The load sharing mechanism comprises a flat beam arranged at the top of the column body, four corners of the surface of the flat beam are provided with fine rolled threaded steels, the surfaces of the four fine rolled threaded steels are provided with vertical rods, the interiors of the four vertical rods are provided with adjusting pieces, and the two sides of the flat beam are fixedly provided with bracket frames, and the bracket frames are fixedly arranged on the surfaces of the vertical rods.

[0011] Preferably, the adjusting piece comprises two mounting plates fixedly arranged in the vertical plate, the interiors of the two mounting plates are threadedly provided with adjusting screws, one end of the adjusting screw is provided with a resisting plate, and the surface of the resisting plate is attached to the surface of the column body.

[0012] Preferably, the surfaces of the four vertical rods are provided with two ring beams.

[0013] Preferably, the top of the two bracket frames is provided with a falling block, and the falling block is arranged as a steel plate.

[0014] Preferably, the top of the beam cover body is provided with a through-penetration pull rod assembly, and the two sides of the beam cover body are provided with adjustable supporting rods.

[0015] Preferably, the two sides of the beam cover body are provided with supporting frames, and the two sides of the beam cover body are provided with side molds.

[0016] Preferably, the adjusting screw is arranged as an M42 screw rod.

[0017] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0018] The utility model discloses a pier column which does not need to be pre-buried or holed, can meet the construction requirement of the bent cap, can meet the requirement of different bent cap bottom surface slope by adjusting the fine rolled threaded steel, has few components, is convenient to install, and solves the problem of needing to set up ground support when pouring the conventional bent cap. BRIEF DESCRIPTION OF DRAWINGS

[0019] Figure 1 It is a three-dimensional schematic view of the adjusting piece of the utility model;

[0020] Figure 2 It is a three-dimensional view of the falling block of the utility model;

[0021] Figure 3 It is a front view of the falling block of the utility model;

[0022] Figure 4 It is a sectional view of the beam cover body of the utility model;

[0023] Figure 5 It is a sectional view of the local mechanism of the utility model.

[0024] In the figure: 1, beam cover body; 2, column; 3, load sharing mechanism; 31, flat beam; 32, finished rolled thread steel; 33, vertical rod; 34, corbel bracket; 30, adjusting part; 301, mounting plate; 302, adjusting screw rod; 303, abutting plate; 4, ring beam; 5, falling block; 6, through rod assembly; 7, adjustable support rod; 8, support frame; 9, side mold. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.

[0026] Please refer to Figures 1-5 The utility model provides a kind of technical scheme: a bent cap construction device, comprising:

[0027] Beam cover body 1;

[0028] And the column 2 of several settings in the bottom of beam cover body 1;

[0029] The surface of column 2 is equipped with load sharing mechanism 3;

[0030] Load sharing mechanism 3 includes the flat beam 31 of setting in the top of column 2, the four corners of the surface of flat beam 31 are equipped with finished rolled thread steel 32, the surface of four finished rolled thread steels 32 is equipped with vertical rod 33, the inside of four vertical rods 33 is equipped with adjusting part 30, both sides of flat beam 31 are fixedly installed with corbel bracket 34, and corbel bracket 34 is fixedly installed on the surface of vertical rod 33.

[0031] Adjusting part 30 includes two mounting plates 301 fixedly installed in the inside of vertical plate, the inside of two mounting plates 301 is equipped with adjusting screw rod 302 in screw, and one end of adjusting screw rod 302 is equipped with abutting plate 303, and the surface of abutting plate 303 is combined with the surface of column 2;

[0032] In the embodiment, the flat beam 31 is placed on the top of the pier and is poured into an integral body with the bent cap. Each cantilever end is provided with a fine rolled threaded steel 32 connected with a vertical rod 33 to form an integral body. In order to ensure the stability of the support system, two ring beam 4 are arranged on the vertical rod 33, and two adjustable screw rods are arranged on each vertical rod 33. The force of the ring beam 4 is applied to the column core, and the force of the adjustable screw rod is applied away from the column core. The two interact with each other to make the support system stable. The length of the bent cap is 46.1m, and the cross-sectional height is 3.6m. A total of 12 pier columns with a diameter of 1.6m are arranged at the bottom to support the bent cap. The center lines of the pier columns are not coincident. No pre-buried or hole is arranged on the pier column. No ground support is arranged, and corbels are arranged on the two vertical rods 33. The falling block 5 is arranged on the corbel. The main beam is placed on the falling block 5. The secondary beam is welded with the bottom mold template to form an integral body and is placed on the main beam. The fine rolled threaded steel 32 is adjusted to support the bottom mold according to the slope of the bottom surface of the bent cap.

[0033] Specifically, in use, the corbel is arranged on the two vertical rods 33. The main beam is placed on the falling block 5. The secondary beam is welded with the bottom mold template to form an integral body and is placed on the main beam. The fine rolled threaded steel 32 is adjusted to support the bottom mold according to the slope of the bottom surface of the bent cap. The side mold 9 is connected with the bottom mold. The steel bars are bound and the concrete is poured.

[0034] The surfaces of the two vertical rods 33 are provided with two ring beams 4.

[0035] Further, the two ring beams 4 are arranged to reinforce and support the four vertical rods 33.

[0036] The top of each of the two corbel brackets 34 is provided with a falling block 5, and the falling block 5 is arranged as a steel plate block.

[0037] Specifically, the falling block 5 is composed of steel plates and is welded. It is used for bottom mold demolding. Its height adjustment is simple, and it has high bearing capacity. The fine rolled threaded steel 32 is treated in detail. When the bottom mold is demolded, the bottom mold is lowered with the falling block 5 and then pulled out to the outside.

[0038] The top of the beam cover body 1 is provided with a through-pulling rod assembly 6. The two sides of the beam cover body 1 are provided with adjustable support rods 7.

[0039] The two sides of the beam cover body 1 are provided with support racks 8. The two sides of the beam cover body 1 are provided with side molds 9.

[0040] Among them, according to the project characteristics, the beam body is poured and formed twice, the first pouring is 1.6m; the formwork adopts the mode of side form 9 wrapping bottom form, side form 9 wrapping end form, end form wrapping bottom form; the side form 9 falls on the bottom form, the two side forms 9 are pulled through three pairs of through rods; the upper and lower two pairs of through rods are pulled outside the beam body; the middle one is pulled through the beam body, and the hole needs to be repaired in the later period; the bottom through rod is pulled on the back of the bottom form when encountering the pier column; the main material selection of the formwork: panel: 6mm, rib: square tube 50X100X3, side form 9 back: double-spliced channel steel, bottom form secondary beam double-spliced channel steel.

[0041] The adjusting screw 302 is made of M42 screw rod;

[0042] Specifically, the M42 material contains alloy elements such as cobalt (Co), molybdenum (Mo) and tungsten (W). These elements greatly improve the hardness of the screw rod through solid solution strengthening and dispersion strengthening mechanism. The existence of hard phases (such as tungsten carbide) in the alloy makes the M42 screw rod not easy to be worn when rubbing with other objects, thereby prolonging the service life. The alloy element ratio in the M42 screw rod improves the hardness and thermal hardness while also considering a certain toughness. This makes the M42 screw rod not easy to break when subjected to external force impact, and can stably perform transmission and cutting operations.

[0043] The main components of the device include a pole beam 31, a corbel, a finished threaded steel 32, a vertical rod 33, a ring beam 4, and an adjusting screw 302. The pole beam 31 is placed on the top of the pier and is poured into a whole with the cap beam. Each cantilever end is provided with a finished threaded steel 32 connected with the vertical rod 33 to form a whole. Two ring beams 4 are arranged on the vertical rod 33, and two adjustable screws are arranged on each vertical rod 33 to ensure the stability of the support system. The ring beam 4 exerts force towards the column core, and the adjustable screw exerts force away from the column core. The two interact with each other to make the support system stable. When in use, the corbel is arranged on the two vertical rods 33, the main beam is placed on the falling block 5, the secondary beam is welded with the bottom formwork to form a whole and is placed on the main beam, and the finished threaded steel 32 is adjusted to support the bottom form according to the slope of the cap beam bottom surface. The side form 9 is connected with the bottom form. The concrete can be poured after binding the steel bars.

[0044] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A bent cap construction apparatus, characterized by, Include: Beam cover body (1); And a plurality of columns (2) arranged at the bottom of the beam cover body (1); The surface of a plurality of said column (2) is equipped with load sharing mechanism (3); The load sharing mechanism (3) includes a flat beam (31) arranged at the top of the column (2), the four corners of the surface of the flat beam (31) are equipped with fine rolled threaded steel (32), the surface of four said fine rolled threaded steel (32) is equipped with vertical rod (33), the inside of four said vertical rod (33) is equipped with adjusting part (30), both sides of the flat beam (31) are fixedly installed with corbel bracket (34), the corbel bracket (34) is fixedly installed on the surface of the vertical rod (33).

2. A bent cap construction apparatus as claimed in claim 1, wherein: The adjusting part (30) includes two mounting plates (301) fixedly installed in the vertical plate, the inside of two said mounting plates (301) is screw mounted with adjusting screw (302), and one end of the adjusting screw (302) is equipped with abutment plate (303), the surface of the abutment plate (303) is combined with the surface of the column (2).

3. A bent cap construction apparatus as claimed in claim 2, wherein: The surface of four said vertical rod (33) is provided with two ring beams (4).

4. The bent cap construction apparatus of claim 1, wherein: The top of two said corbel bracket (34) is equipped with spill block (5), the spill block (5) is arranged as a steel plate.

5. The bent cap construction apparatus of claim 1, wherein: The top of the beam cover body (1) is equipped with a through pull rod assembly (6), both sides of the beam cover body (1) are equipped with adjustable support rod (7).

6. A bent cap construction apparatus as claimed in claim 5, wherein: Both sides of the beam cover body (1) are equipped with support frame (8), both sides of the beam cover body (1) are equipped with side mold (9).

7. The bent cap construction apparatus of claim 2, wherein: The adjusting screw (302) is arranged as M42 screw rod.

Citation Information

Patent Citations

  • Bracket device for capping beam construction

    CN221072314U