Toilet hole plugging structure for old community reconstruction

By using a water-proof sealant and JS waterproof coating to overlap during the renovation of old residential areas, two waterproof layers are formed. Combined with a positioning mechanism to fix the pipes, the leakage problem caused by damage to the waterproof coating when replacing the main pipe is solved, achieving efficient waterproofing and construction safety.

CN223853909UActive Publication Date: 2026-01-30BEIJING REAL ESTATE GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520378830.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-05
Publication Date
2026-01-30
Estimated Expiration
2035-03-05

AI Technical Summary

Technical Problem

In the renovation of old residential buildings, replacing the main pipes can easily damage the original waterproof coating, leading to leakage problems at the junction of the old and new waterproofing, and the construction has a significant impact on residents' lives.

Method used

Water-proof sealant is used to fill the holes and overlap with JS waterproof coating to form two waterproof layers. Combined with a positioning mechanism, the pipe is fixed to ensure that the sealing material does not easily shift before it solidifies.

Benefits of technology

It effectively solves the leakage problem at the junction of new and old waterproof coatings, ensures waterproof effect, reduces the impact of construction on residents' lives, and has higher safety and applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223853909U_ABST
    Figure CN223853909U_ABST
Patent Text Reader

Abstract

The utility model discloses an old community reconstruction toilet hole plugging structure, which relates to the technical field of building construction, and comprises a floor slab, a hanging hole arranged in the floor slab, a pipeline arranged in the hanging hole in a penetrating manner, a hanging hole template fixedly arranged between the bottom of the floor slab and the outer wall of the pipeline, and a plugging mechanism arranged between the hanging hole and the pipeline, original waterproof paint is arranged on the top of the floor slab, a trumpet-shaped slope is arranged on the top of the hanging hole, and a cement paste layer is painted in the hanging hole. A first waterproof layer can be formed through filling of the water-leakage-proof plugging material, a second waterproof layer can be formed through covering and lap joint of the JS waterproof coating and the original waterproof coating, the waterproof problem after the integrity of the original waterproof coating is damaged can be effectively solved, the waterproof effect is guaranteed, the influence on the building environment and the life of residents is small, and the service life of the building is prolonged. And the method has higher safety, is suitable for waterproof construction of local replacement of pipelines in old communities, and has higher pertinence.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building construction technical field especially a kind of old community reconstruction toilet hole plugging structure. BACKGROUND

[0002] With the development of city, many old communities have existed for many years, and the sewer pipes of the communities have a long service life, often facing problems such as aging, wear and tear, and blockage. These problems not only affect the daily life of residents but also may cause environmental pollution. In the reconstruction of old community building, because it is required to replace the main pipe by local demolition, the waterproof treatment after replacement puts higher requirements on the construction party.

[0003] In the reconstruction of old community building, because it is required to replace the main pipe by local demolition, in order to ensure that the new and old waterproof can normally play its use function, the system adopts the leakage repair method combined with "prevention, drainage, interception and plugging". "Prevention" means to prevent water from invading the structure layer by waterproofing the structure of the water leakage part, which also protects the structure. "Drainage" means to directly drain the water leakage by water diversion. In the case of narrow construction surface or for some reason, the water source cannot be cut off from the root, so the drainage system is combined. "Interception" means to cut off the water source within a specified range so that the water does not leak to the surrounding leakage part. "Plugging" means to strengthen the structure of the water leakage part and to waterproof the structure.

[0004] Currently, when replacing the main pipe, the old pipe needs to be disassembled, which may damage the original waterproof coating around the old pipe during disassembly of the old pipe, so that the new and old waterproof joints are prone to leakage in the future. To solve this problem, the present application provides an old community reconstruction toilet hole plugging structure. CONTENT OF THE UTILITY MODEL

[0005] The utility model provides an old community reconstruction toilet hole plugging structure to solve the problems in the prior art, and the specific technical solutions are as follows:

[0006] An old community reconstruction toilet hole plugging structure includes a floor, a hoist hole formed in the floor, a pipe arranged in the hoist hole, a hoist hole formwork fixedly installed between the bottom of the floor and the outer wall of the pipe, and a plugging mechanism arranged between the hoist hole and the pipe. The top of the floor is provided with original waterproof coating. The top of the hoist hole is provided with a trumpet-shaped slope. The hoist hole is coated with a cement slurry layer. Fine stone expanded concrete is poured between the bottom of the hoist hole and the outer wall of the pipe and located inside the cement slurry layer. Water-tight plugging material is filled between the top of the hoist hole and the outer wall of the pipe and located directly above the fine stone expanded concrete. JS waterproof coating is coated on the top surface of the water-tight plugging material and covers and overlaps the top of the original waterproof coating. The top of the floor is provided with a positioning mechanism for positioning the pipe.

[0007] By adopting the technical scheme, the first waterproof layer is formed by filling the water-impermeable plugging material, and the second waterproof layer is formed by covering and overlapping the JS waterproof coating and the original waterproof coating, so that the waterproof problem after the integrity of the original waterproof coating is damaged can be effectively solved, and the waterproof effect is ensured.

[0008] Optionally, the pipe outer wall is detachably provided with a clamp located at the top of the floor, the positioning mechanism comprises a fixed sleeve rod rotatably arranged on both sides of the clamp, a threaded rod threadedly arranged in the fixed sleeve rod, and a top plate rotatably arranged at one end of the threaded rod and abutting against the wall of the bathroom, and two limiting plates are fixedly arranged on both sides of the clamp and abut against the bottom of the fixed sleeve rod.

[0009] By adopting the technical scheme, the position of the pipe can be fixed during plugging and maintenance through the positioning mechanism, so that when the water-impermeable plugging material has not fully solidified, the pipe is prevented from being offset due to external force impact and causing a gap between the plugging material, which is prone to water leakage in later period, so as to ensure the waterproof effect after plugging.

[0010] Optionally, a lubricating cylinder is fixedly arranged at one end of the fixed sleeve rod, the threaded rod is located in the interior of the lubricating cylinder, and an annular oil storage cotton is fixedly arranged in the lubricating cylinder and abuts against the outer wall of the threaded rod.

[0011] By adopting the technical scheme, the annular oil storage cotton can continuously lubricate the threaded rod.

[0012] Optionally, two groups of pressing frames are slidably arranged on both sides of the lubricating cylinder and used for extruding the lubricating oil in the annular oil storage cotton after movement, and one end of the pressing frame penetrates and extends to the exterior of the lubricating cylinder.

[0013] By adopting the technical scheme, when the amount of oil in the annular oil storage cotton is small, the residual oil in the annular oil storage cotton can be pressed out by the pressing frame to lubricate the threaded rod.

[0014] In summary, the utility model has at least one of the following beneficial effects:

[0015] 1. The first waterproof layer is formed by filling the water-impermeable plugging material, the second waterproof layer is formed by covering and overlapping the JS waterproof coating and the original waterproof coating, the waterproof problem after the integrity of the original waterproof coating is damaged can be effectively solved, the waterproof effect is ensured, the influence on the building environment and the life of residents is small, the safety is higher, the utility model is suitable for the waterproof construction of replacing the pipe in the old community in a local area, and has stronger pertinence.

[0016] 2. The positioning of the pipeline by the positioning mechanism can fix the position of the pipeline during plugging and maintenance, avoid the pipeline from being offset due to external force collision when the plugging material such as water-stopping material is not fully solidified, and avoid the gap between the plugging material from being easy to leak water in the later period, thereby ensuring the waterproof effect after plugging, the length of the positioning mechanism can be adjusted through the rotating threaded rod, the positioning mechanism can be folded through the rotating fixing sleeve rod, transportation is facilitated, the threaded rod can be continuously lubricated through the annular oil storage cotton, when the oil amount in the annular oil storage cotton is small, the threaded rod can be lubricated through the oil pressed out from the annular oil storage cotton by the pressing frame, and the utility model discloses are convenient and practical. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 is the internal schematic diagram of the overall structure of the utility model;

[0018] Figure 2 is the top view connection diagram of the pipeline, the clamp, the fixed sleeve rod and the top plate of the utility model;

[0019] Figure 3 is the Figure 1 structure enlarged view in A;

[0020] Figure 4 is the Figure 3 structure enlarged view in B.

[0021] The drawings are explained as follows: 1, floor; 11, hanging hole; 12, original waterproof coating; 2, pipeline; 3, hanging hole form; 4, cement mortar layer; 41, fine stone expanded concrete; 42, water-stopping material; 43, JS waterproof coating; 5, clamp; 51, fixed sleeve rod; 52, threaded rod; 53, top plate; 54, limiting plate; 6, lubricating cylinder; 61, annular oil storage cotton; 62, oil injection hole; 63, pressing frame. DETAILED DESCRIPTION

[0022] The utility model discloses are further explained in detail as follows: Figures 1-4 The utility model discloses are further explained in detail as follows:

[0023] The utility model discloses an old community reconstruction toilet hole plugging structure, which is characterized by Figure 1 , comprising a floor 1, a hanging hole 11, a pipeline 2, a hanging hole form 3 and a plugging mechanism, the floor 1 is a floor body of the old community reconstruction toilet, the hanging hole 11 is arranged in the floor 1, and the pipeline 2 is arranged in the hanging hole 11.

[0024] The hanging hole form 3 is fixedly installed between the bottom of the floor 1 and the outer wall of the pipeline 2, the hanging hole form 3 can be fixed on the pipeline 2 by using a hoop or supported and fixed by using a wood square, and the hanging hole form 3 can temporarily plug between the bottom of the floor 1 and the pipeline 2, so that the pouring of the plugging material is facilitated.

[0025] With reference to Figure 1 , the top of the floor 1 is provided with the original waterproof coating 12, the top of the hanging hole 11 is provided with a trumpet-shaped slope, the old community bathroom floor before the renovation will leave the original waterproof coating 12, the setting of the slope can make the sealing material faster and more convenient into the hanging hole 11, the trumpet-shaped slope can be 45 degrees, wherein the 45-degree slope (trumpet mouth) of the hanging hole 11 is about 20-30mm high.

[0026] With reference to Figure 1 , the hanging hole 11 is coated with a cement mortar layer 4, the bottom of the hanging hole 11 and the outer wall of the pipeline 2 are poured with fine stone expansive concrete 41 inside the cement mortar layer 4, the cement mortar layer 4 can repair the broken part of the hanging hole 11, the grade of the fine stone expansive concrete 41 can be C15 (slump 120), and the fine stone expansive concrete 41 can fix and fill between the bottom of the hanging hole 11 and the outer wall of the pipeline 2.

[0027] With reference to Figure 1 , the top of the hanging hole 11 and the outer wall of the pipeline 2 are filled with water-tight plugging material 42 located directly above the fine stone expansive concrete 41, the top surface of the water-tight plugging material 42 is coated with JS waterproof coating 43 covering and overlapping the top of the original waterproof coating 12, the JS waterproof coating 43 is also called polymer cement waterproof coating, the first waterproof layer is formed by the filling of the water-tight plugging material 42, and the second waterproof layer is formed by the overlapping of the JS waterproof coating 43 and the original waterproof coating 12, which can effectively solve the waterproof problem after the integrity of the original waterproof coating 12 is damaged, ensure the waterproof effect, and the structure is suitable for local removal and replacement of the waterproof operation of the main pipeline 2.

[0028] With reference to Figures 1-3 , the outer wall of the pipeline 2 is detachably provided with a clamp 5 located on the top of the floor 1, the top of the floor 1 is provided with a positioning mechanism for positioning the pipeline 2, the positioning mechanism comprises a fixed sleeve rod 51 rotatably arranged on both sides of the clamp 5, a threaded rod 52 threadedly arranged in the fixed sleeve rod 51, and a top plate 53 rotatably arranged at one end of the threaded rod 52 and abutting against the wall of the bathroom, a handle is fixedly arranged on the outer wall of one end of the threaded rod 52 for rotating the threaded rod 52 by the worker, a rotating block is fixedly arranged at one end of the threaded rod 52 and rotatably connected in the top plate 53, the rotating block can connect the threaded rod 52 and the top plate 53, the clamp 5 can be fixed on the pipeline 2, which is a disclosed technology and will not be described in detail here, and the clamp 5 can connect the pipeline 2 and the positioning mechanism.

[0029] The length of the positioning mechanism can be adjusted by rotating the threaded rod 52, so that the length-adjusted positioning mechanism can abut against the wall of the bathroom through the top plate 53, thereby positioning and fixing the pipeline 2, so that the pipeline 2 is not easy to move during plugging and maintenance.

[0030] With reference to Figures 1-3 The two limiting plates 54 are arranged on the two sides of the clasp 5 and abut against the bottom of the fixed sleeve rod 51, and the limiting plate 54 can limit the fixed sleeve rod 51 to limit the rotating angle and range of the fixed sleeve rod 51; the positioning mechanism composed of the fixed sleeve rod 51 and the like can rotate on the clasp 5; when the positioning mechanism is rotated to be horizontal, the limiting of the limiting plate 54 can make the positioning mechanism stably abut against the wall of the bathroom; when the positioning mechanism is rotated to be vertical, the overall length of the clasp 5 and the positioning mechanism can be reduced, so that the positioning mechanism can be folded to facilitate transportation.

[0031] With reference to Figures 2-4 One end of the fixed sleeve rod 51 is fixedly provided with a lubricating cylinder 6, the threaded rod 52 is located in the interior of the lubricating cylinder 6, the lubricating cylinder 6 is fixedly provided with an annular oil storage cotton 61 abutting against the outer wall of the threaded rod 52 in the interior, and an oil injection hole 62 for injecting lubricating oil into the annular oil storage cotton 61 is formed in one side of the lubricating cylinder 6; the staff can inject oil into the annular oil storage cotton 61 through the oil injection hole 62; the annular oil storage cotton 61 abutting against the outer side of the threaded rod 52 can continuously lubricate the threaded rod 52; and the annular oil storage cotton 61 has an oil absorption effect, so that the injected lubricating oil is not easy to drip out of the lubricating cylinder 6 to contaminate other components.

[0032] With reference to Figures 2-4 Two groups of pressing frames 63 for extruding the lubricating oil in the annular oil storage cotton 61 after moving are slidably arranged on the two sides of the lubricating cylinder 6; one end of the pressing frame 63 penetrates and extends to the outside of the lubricating cylinder 6; the pressing frame 63 is composed of a semicircular ring abutting against the annular oil storage cotton 61 and a circular rod fixedly arranged on one side of the semicircular ring; and one end of the circular rod of the pressing frame 63 penetrates and extends to the outside of the lubricating cylinder 6, so that when the oil amount in the annular oil storage cotton 61 is small, the residual oil in the annular oil storage cotton 61 can be pressed out to lubricate the threaded rod 52 by pressing the pressing frame 63, and the waste of lubricating oil is reduced.

[0033] The implementation principle of the old community reconstruction bathroom hole plugging structure in the embodiment of the utility model is as follows:

[0034] When operating, first, a 45-degree slope (horn mouth) is chiseled around the top of the hanging hole 11 of the floor slab 1 by using a tool, then the 45-degree slope (horn mouth) is cleaned and washed with clean water, then the hanging hole formwork 3 is installed between the bottom of the floor slab 1 and the outer wall of the pipeline 2, and the hanging hole formwork 3 is supported firmly by using a wooden square or a hoop, then the pipeline 2 is positioned and fixed by using the positioning mechanism;

[0035] Then, 1:1 cement paste is brushed around the hanging hole 11 before pouring, the 1:1 cement paste is brushed densely to form a cement paste layer 4, C15 fine stone expansive concrete 41 (slump degree 120) is used to pour about half (less than half) of the height, the remaining amount is filled and compacted by using water leakage blocking material 42, and after completion, maintenance is carried out, and the maintenance time is not less than 24 hours;

[0036] After the maintenance is completed, no leakage is checked, and then the water-proofing material 42 is used to level, the interface around is compacted, then the JS waterproof paint 43 is brushed, the newly brushed JS waterproof paint 43 is overlapped on the original waterproof paint 12, the overlap is not less than 100mm, the new and old materials are closely connected without gap, so that the waterproof effect is best;

[0037] The first waterproof layer is formed by the water-proofing material 42, and the second waterproof layer is formed by the JS waterproof paint 43 and the original waterproof paint 12, so that the waterproof problem after the integrity of the original waterproof paint 12 is damaged can be effectively solved, the waterproof effect is ensured, the influence on the building environment and the resident life is small, the safety is higher, the waterproof construction of the old community is suitable for the partial replacement of the pipeline 2, and the stronger pertinence is obtained.

[0038] The above only describes the preferred embodiments of the utility model, and is not used for limiting the utility model, although the utility model is described in detail by referring to the foregoing embodiments, the technical scheme recorded in the foregoing embodiments can be modified or the equivalent replacement of part of the technical features is still possible for the person skilled in the art. Any modification, equivalent replacement, improvement and the like within the spirit and principle of the utility model should be included in the protection scope of the utility model.

Claims

1. An old cell renovation toilet hole plugging structure, comprising a floor (1), a hanging hole (11) opened in the floor (1), a pipeline (2) passing through the hanging hole (11), a hanging hole formwork (3) fixedly installed between the bottom of the floor (1) and the outer wall of the pipeline (2), and a plugging mechanism arranged between the hanging hole (11) and the pipeline (2), wherein the top of the floor (1) is provided with original waterproof paint (12), characterized in that: a trumpet-shaped slope is arranged at the top of the hanging hole (11), a cement paste layer (4) is coated in the hanging hole (11), fine stone expanded concrete (41) is poured between the bottom of the hanging hole (11) and the outer wall of the pipeline (2) and located inside the cement paste layer (4), water-impermeable plugging material (42) is filled between the top of the hanging hole (11) and the outer wall of the pipeline (2) and located directly above the fine stone expanded concrete (41), JS waterproof paint (43) is coated on the top surface of the water-impermeable plugging material (42) and covers and overlaps the top of the original waterproof paint (12), and the top of the floor (1) is provided with a positioning mechanism for positioning the pipeline (2). The outer wall of the pipeline (2) is detachably provided with a clamp (5) located at the top of the floor (1).

2. The old cell reconstruction toilet hole plugging structure according to claim 1, characterized in that: The positioning mechanism comprises fixed sleeve rods (51) rotatably arranged on both sides of the clamp (5), threaded rods (52) threadedly arranged in the fixed sleeve rods (51), and a top plate (53) rotatably arranged at one end of the threaded rods (52) and abutting against the wall of the toilet.

3. The old cell reconstruction toilet hole plugging structure according to claim 2, characterized in that: Two limiting plates (54) are fixedly arranged on both sides of the clamp (5) and abut against the bottom of the fixed sleeve rods (51).

4. The old cell reconstruction toilet hole plugging structure according to claim 3, characterized in that: One end of the fixed sleeve rods (51) is fixedly provided with a lubricating cylinder (6), and the threaded rods (52) are located inside the lubricating cylinder (6).

5. The old cell reconstruction toilet hole plugging structure according to claim 4, characterized in that: An annular oil storage cotton (61) is fixedly arranged in the lubricating cylinder (6) and abuts against the outer wall of the threaded rods (52).

6. The old cell reconstruction toilet hole plugging structure according to claim 5, characterized in that: An oil injection hole (62) is formed in one side of the lubricating cylinder (6) and used for injecting lubricating oil into the annular oil storage cotton (61).

7. The old cell reconstruction toilet hole plugging structure according to claim 6, characterized in that: Two groups of pressing frames (63) are slidably arranged on both sides of the lubricating cylinder (6) and used for extruding the lubricating oil in the annular oil storage cotton (61) after moving, and one end of the pressing frames (63) penetrates and extends to the outside of the lubricating cylinder (6).

8. The old cell reconstruction toilet hole plugging structure according to claim 7, characterized in that: ​