Mounting and assembling type platform for high-speed rail bridge pier hanging basket

By designing a prefabricated platform for installing suspended scaffolds on high-speed railway bridge piers, the problem of poor installation quality of suspended scaffolds when there is no standing platform was solved, thereby improving the construction environment and enhancing safety.

CN223922016UActive Publication Date: 2026-02-17THE QINGDAO ENG CO LTD OF CHINA RAILWAY NO 10 ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520535098.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-25
Publication Date
2026-02-17
Estimated Expiration
2035-03-25

AI Technical Summary

Technical Problem

During bridge pier construction, the installation of suspended scaffolds requires working at heights without a standing platform, resulting in poor installation quality. Furthermore, the heavy weight of the steel suspended scaffold supports increases the difficulty of construction and safety risks.

Method used

Design a prefabricated platform for installing suspended scaffolds on high-speed railway bridge piers, including a platform, pulley assembly, support frame and winch. The pulley assembly is installed on the platform for easy movement, the counterweight box on the support frame is used to increase stability, and protective railings are set at the edges to ensure construction safety.

Benefits of technology

It improves the stability and safety of suspended platform installation, reduces construction difficulty and safety risks, and ensures improved construction environment and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223922016U_ABST
    Figure CN223922016U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of measurement and metering, in particular to a high-speed rail bridge pier hanging basket installation assembly type platform which comprises a pedal arranged around a bridge pier, a pulley assembly is installed on the side, close to the bridge pier, of the pedal, two supporting frames are symmetrically placed at the upper end of the bridge pier, and winches are installed at the two ends of each supporting frame. The free end of a steel wire rope arranged on the winch is connected with the pedal. The hanging basket support solves the problems that in the previous hanging basket installation process, high-altitude operation usually needs to be carried out under the condition that no standing platform exists, and meanwhile the steel hanging basket support is large in dead weight, so that the installation quality is poor easily.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to bridge pier accessory structure technical field, concretely is a kind of high-speed rail bridge pier basket installation assembly type platform. BACKGROUND

[0002] After bridge construction is completed and railway normal operation, pier top support is periodically checked and maintained, since railway bridge pier is generally higher, and there is no space for maintenance personnel to stand on the pier top, so high-speed rail bridge pier basket is installed after bridge construction is completed to provide inspection and repair space. In order to ensure the installation quality of the railway bridge pier inspection basket, the direction of the basket support needs to be correctly set through strict control, so that the support is completely attached to the bridge pier, the anchoring bolt needs to be installed to the required depth on the bridge pier pre-buried sleeve, and the welding quality needs to be guaranteed. During the installation of the basket in the past, high-altitude work is usually required without a standing platform, and the steel basket support is heavy in weight, so it is easy to cause poor installation quality. SUMMARY

[0003] The utility model aims at providing a kind of high-speed rail bridge pier basket installation assembly type platform, solve the problem that the installation quality is poor in the installation process of the basket in the past, high-altitude work is usually required without a standing platform, and the steel basket support is heavy in weight, so it is easy to cause poor installation quality.

[0004] To achieve the above object, the utility model provides the following technical scheme: a kind of high-speed rail bridge pier basket installation assembly type platform, including the footboard being set around pier, pulley assembly is installed on the side of the footboard close to the pier, two support frames are placed symmetrically on the upper end of the pier, hoist is installed at the two ends of the support frame, and the free end of the steel wire rope provided on the hoist is connected with the footboard.

[0005] With the above structure design, the assembly type platform is closed around the pier body, and a protective fence is provided at the edge, so that the working space is large, the stability is good, the safety measures are in place, the height of the pier is not limited, the construction environment is improved, and the construction difficulty and safety risk of high-altitude work are reduced.

[0006] Preferably, the pulley assembly includes two installation boxes fixedly connected symmetrically on one side of the footboard, a sliding rod is fixedly connected vertically in the installation box, a sliding support is symmetrically and slidably connected on the sliding rod, the sliding support extends out of the installation box and is rotatably connected with a push rod, both the push rods are rotatably connected to a support, a roller is rotatably connected between the two supports, a tension spring is sleeved on the sliding rod, and both ends of the tension spring are fixedly connected with the sliding support.

[0007] With the above scheme design, since the bridge pier facade has an arc, the tension spring can control the roller to always contact the bridge pier sidewall, thereby avoiding large shaking of the platform body, and improving the stability and smoothness of platform lifting.

[0008] Preferably, two pulley assemblies are symmetrically installed on the inner side of the pedal, and the roller abuts against the sidewall of the bridge pier.

[0009] With the above scheme design, the setting of the roller can prevent the pedal from colliding with the bridge pier, and also protects the fence to a certain extent.

[0010] Preferably, a counterweight box is arranged at the middle position of the upper end of the support frame.

[0011] With the above structure design, the counterweight box arranged on the support frame ensures the stability of the support frame, and prevents the support frame from overturning due to unbalanced stress when the two ends of the support frame are cantilevered.

[0012] Preferably, fences are arranged on the inner and outer sides of the pedal.

[0013] With the above structure design, the protective fence is arranged on the edge, the working space is large, the stability is good, the safety measures are in place, and the safety of the construction personnel is ensured.

[0014] Compared with the prior art, the utility model has the beneficial effects that:

[0015] 1. The assembled platform is designed to be closed around the pier body, the protective fence is arranged on the edge, the working space is large, the stability is good, the safety measures are in place, the construction environment is improved, the construction difficulty and safety risk of high-altitude work are reduced, and the pier height is not limited.

[0016] 2. Since the bridge pier facade has an arc, the tension spring can control the roller to always contact the bridge pier sidewall, thereby avoiding large shaking of the platform body, and improving the stability and smoothness of platform lifting, and the construction personnel are more stable when installing the basket, and the installation quality and efficiency of the basket are effectively improved. BRIEF DESCRIPTION OF DRAWINGS

[0017] Fig. 1 is a side view of the utility model;

[0018] Fig. 2 is a top view of the utility model;

[0019] Fig. 3 is a schematic view of the internal structure of the pulley assembly of the utility model. DETAILED DESCRIPTION

[0020] With reference to the drawings of the embodiments of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described, obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the present application.

[0021] Please refer to Figs. 1 to 3 The utility model provides a technical scheme: a high -speed railway pier basket installation assembly type platform, including the setting footboard 1 around pier 3, footboard 1 as the table surface of operation platform, footboard 1 is spliced by two C character shape steel sheets, the edge of footboard 1 is welded with channel steel and is reinforced, footboard 1 is installed with pulley assembly 7 on the side close to pier 3, two support frames 4 are placed on the upper end of pier 3 symmetrically, hoist 6 is installed at both ends of support frame 4, hoist 6 is fixed on support frame 4 using fastener, the free end of steel wire rope set on hoist 6 is connected with footboard 1. The device is provided with four hoists 6, and the lifting points of the hoists 6 are symmetrically distributed on the footboard 1, so that the platform can be smoothly lifted.

[0022] The pulley assembly 7 includes two installation boxes 701 fixedly connected symmetrically on one side of the footboard 1, a sliding rod 702 is fixedly connected vertically in the installation box 701, sliding supports 703 are symmetrically and slidably connected to the sliding rod 702, the sliding supports 703 extend out of the installation box 701 and are rotatably connected with push rods 705, the two push rods 705 are rotatably connected to a bracket 706, a roller 707 is rotatably connected between the two brackets 706, a tension spring 704 is sleeved on the sliding rod 702, and both ends of the tension spring 704 are fixedly connected with the sliding supports 703. The tension spring 704 is always in a stretched state, and pulling the two sliding supports 703 closer to each other makes the roller 707 always contact the side wall of the pier 3.

[0023] The pulley assembly 7 is symmetrically installed on the inner side of the footboard 1, and the roller 707 abuts against the side wall of the pier 3.

[0024] The counterweight box 5 is arranged at the middle position of the upper end of the support frame 4. The counterweight box 5 arranged on the support frame 4 ensures the stability of the support frame 4 and prevents the support frame 4 from overturning due to unbalanced stress when the two ends of the support frame 4 are cantilevered.

[0025] The footboard 1 is provided with railings 2 on both inner and outer sides. The protective railings 2 are arranged at the edges, the working space is large, the stability is good, the safety measures are in place, and the safety of the construction personnel is ensured.

[0026] Contents not described in detail in this specification are existing technologies known to those skilled in the art. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A high-speed railway pier hanging basket installation assembly type platform, characterized in that: The utility model provides a bridge deck (1) is arranged around pier (3), the pulley assembly (7) is installed to the side of bridge deck (1) near pier (3), two support frames (4) are placed on the upper end of pier (3) symmetry, hoist (6) is installed to the both ends of support frame (4), and the free end of steel wire rope arranged on hoist (6) is connected with bridge deck (1).

2. The assembly platform for mounting the high-speed railway bridge pier hanging basket according to claim 1, characterized in that: The pulley assembly (7) includes two installation boxes (701) fixedly connected on one side of the bridge deck (1) symmetrically, a sliding rod (702) is fixedly connected in the installation box (701) vertically, a sliding support (703) is symmetrically and slidably connected on the sliding rod (702), the sliding support (703) extends out of the installation box (701) and is rotatably connected with a push rod (705), the two push rods (705) are rotatably connected on a support (706), a roller (707) is rotatably connected between the two supports (706), a tension spring (704) is sleeved on the sliding rod (702), and the two ends of the tension spring (704) are fixedly connected with the sliding support (703).

3. The assembly platform for mounting the high-speed railway bridge pier hanging basket according to claim 2, characterized in that: The pulley assembly (7) is symmetrically installed on the inner side of the bridge deck (1), and the roller (707) abuts against the side wall of the pier (3).

4. The assembly platform for mounting the high-speed railway bridge pier hanging basket according to claim 1, characterized in that: A counterweight box (5) is arranged at the middle position of the upper end of the support frame (4).