Geomembrane construction laying device

By designing a geomembrane construction and laying device, and utilizing coarse adjustment components, fine adjustment components, and jacking components, automatic laying of geomembrane was achieved, solving the problems of time-consuming and labor-intensive processes in existing technologies and improving construction efficiency.

CN223922151UActive Publication Date: 2026-02-17SHANXI WATER CONSERVANCY CONSTR ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520208897.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-11
Publication Date
2026-02-17
Estimated Expiration
2035-02-11

AI Technical Summary

Technical Problem

The current construction and laying of geomembranes is time-consuming and labor-intensive, requiring multiple workers to push the membrane rolls to roll simultaneously.

Method used

Design a geomembrane construction and laying device, comprising a membrane roll, a movable rod, and a fixed rod. The distance between the movable rod and the fixed rod is adjusted by a coarse adjustment component and a fine adjustment component, and the laying of the membrane roll is assisted by an electric telescopic rod and a lifting component.

Benefits of technology

It enables automated film roll laying under single-person operation, reducing the number of workers, saving time and labor, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223922151U_ABST
    Figure CN223922151U_ABST
Patent Text Reader

Abstract

The utility model discloses a geomembrane construction laying device, which relates to the technical field of geomembrane laying and comprises a membrane roll, a movable rod and a fixed rod. A coarse adjustment assembly is arranged between the movable rod and the fixed rod, and the coarse adjustment assembly is used for adjusting the distance between the movable rod and the fixed rod; fine adjustment assemblies are arranged on the movable rod and the fixed rod; the two sides of the reel are connected with the fine adjustment assemblies on the two sides respectively. The distance between the movable rod and the fixed rod is conveniently, rapidly and roughly adjusted through the rough adjustment assembly, then the distance between the movable rod and the fixed rod is accurately adjusted through the fine adjustment assembly, the rotating shaft and the inserting plate are inserted into the reel, and therefore a worker pulls the device through the movable handle and the fixed handle; the geomembrane on the membrane roll can be laid in a rolling mode along the ground, the geomembrane roll does not need to be manually pushed to roll on the ground, the number of workers is reduced, and time and labor can be effectively saved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to geomembrane laying technical field, concretely is a kind of geomembrane construction laying device. BACKGROUND

[0002] Geomembrane is a kind of waterproof barrier type material with high molecular polymer as basic raw material, used in various civil engineering, environmental protection and water conservancy engineering.

[0003] In prior art, the construction laying of geomembrane is mainly laid by using artificial rolling laying method, in the laying process, the geomembrane roll is rolled on the ground by artificial pushing, since the width of geomembrane is long, multiple workers need to push the roll to roll simultaneously during laying, time-consuming and labor-consuming, therefore, we propose a kind of geomembrane construction laying device. UTILITY MODEL CONTENT

[0004] The utility model aims at providing a kind of geomembrane construction laying device to solve the problems raised in the above background.

[0005] To achieve the above object, the utility model provides the following technical scheme: a kind of geomembrane construction laying device, including, membrane roll, movable rod and fixed rod, the membrane roll is wound on reel;

[0006] Coarse adjustment assembly is arranged between the movable rod and the fixed rod, and the coarse adjustment assembly is used to adjust the distance between the movable rod and the fixed rod;

[0007] Fine adjustment assembly is arranged on the movable rod and the fixed rod;

[0008] The two sides of the reel are connected with two side fine adjustment assemblies respectively;

[0009] Movable handle is arranged on the movable rod, the movable handle is slidably connected on fixed handle, and the fixed handle is arranged on the fixed rod.

[0010] As a preferred scheme of the geomembrane construction laying device of the utility model, the coarse adjustment assembly includes connecting rod arranged on the front and back sides of the movable rod, the connecting rod is arranged in the guide sleeve on the fixed rod in a penetrating manner, screw holes are evenly arranged on the connecting rod, and a bolt connected with one of the screw holes is arranged on the guide sleeve.

[0011] As a preferred scheme of the geomembrane construction laying device of the utility model, the fine adjustment assembly includes electric telescopic rod, two side electric telescopic rods are connected with the movable rod and the fixed rod respectively, mounting plates are arranged on the output ends of the two side electric telescopic rods, a rotating shaft is connected with the mounting plate through bearing, plug plates are arranged around the rotating shaft, and the rotating shaft and the plug plates are inserted on the reel.

[0012] As a preferred scheme of the geomembrane construction laying device, the movable rod and the fixed rod are provided with jacking assemblies.

[0013] As a preferred scheme of the geomembrane construction laying device, the jacking assembly comprises a groove formed in the bottom of the movable rod and the fixed rod, a sliding plate is slidably connected to the groove, a screw rod is connected to the top of the sliding plate through a bearing, the top of the screw rod on both sides penetrates the movable rod and the fixed rod, and the top of the screw rod is provided with a knob.

[0014] As a preferred scheme of the geomembrane construction laying device, the fixed rod is provided with a controller.

[0015] Compared with the prior art, the geomembrane construction laying device has the advantages that:

[0016] 1. The rough adjustment assembly is used for quickly and roughly adjusting the distance between the movable rod and the fixed rod, and the fine adjustment assembly is used for accurately adjusting the distance between the movable rod and the fixed rod, so that the rotating shaft and the inserting plate are inserted into the reel, the worker pulls the device through the movable handle and the fixed handle, the geomembrane on the membrane roll is rolled and laid along the ground, the worker does not need to manually push the geomembrane roll to roll on the ground, the amount of workers is reduced, and time and labor can be effectively saved.

[0017] 2. The jacking assembly is arranged, so that when the rotating shaft and the inserting plate are inserted into the reel on the device, the sliding plate can contact the ground to lift the movable rod and the fixed rod, so that the rotating shaft can be conveniently aligned with the reel for installation. BRIEF DESCRIPTION OF DRAWINGS

[0018] Figure 1 It is a whole structure schematic view of the geomembrane construction laying device.

[0019] Figure 2 It is a guide sleeve and bolt structure schematic view of the geomembrane construction laying device.

[0020] Figure 3 It is a rotating shaft and inserting plate structure schematic view of the geomembrane construction laying device.

[0021] Figure 4 It is a jacking assembly structure schematic view of the geomembrane construction laying device.

[0022] In the figure: 1, film roll; 2, reel; 3, movable rod; 4, fixed rod; 5, connecting rod; 6, screw hole; 7, guide sleeve; 8, bolt; 9, controller; 10, movable handle; 11, fixed handle; 12, electric telescopic rod; 13, mounting plate; 14, rotating shaft; 15, plugboard; 16, groove; 17, sliding plate; 18, screw rod; 19, knob. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0024] As mentioned in the background, in view of the problem of time-consuming and labor-consuming in the prior art, the present application proposes a geomembrane construction and laying device.

[0025] Embodiment 1

[0026] Reference Figures 1 to 4 A geomembrane construction and laying device, comprising a film roll 1, a movable rod 3 and a fixed rod 4, the film roll 1 is wound on a reel 2;

[0027] A coarse adjustment assembly is arranged between the movable rod 3 and the fixed rod 4, and the coarse adjustment assembly is used to adjust the distance between the movable rod 3 and the fixed rod 4;

[0028] A fine adjustment assembly is arranged on each of the movable rod 3 and the fixed rod 4;

[0029] The two sides of the reel 2 are respectively connected with the two fine adjustment assemblies;

[0030] A movable handle 10 is arranged on the movable rod 3, the movable handle 10 is slidingly sleeved on a fixed handle 11, and the fixed handle 11 is arranged on the fixed rod 4; when the distance between the movable rod 3 and the fixed rod 4 is adjusted, the movable handle 10 can move on the fixed handle 11.

[0031] The coarse adjustment assembly comprises connecting rods 5 arranged on the front and rear sides of the movable rod 3, the connecting rods 5 are throughly arranged in guide sleeves 7 arranged on the fixed rod 4, screw holes 6 are uniformly arranged on the connecting rods 5, a bolt 8 connected with one of the screw holes 6 is arranged on the guide sleeve 7, the connecting rods 5 are transversely moved on the guide sleeve 7, so as to adjust the distance between the movable rod 3 and the fixed rod 4, and then the bolt 8 is connected with the screw hole 6 to fix.

[0032] The fine adjustment assembly comprises the electric telescopic rods 12 powered and controlled by the prior art, the two electric telescopic rods 12 are connected with the movable rod 3 and the fixed rod 4 respectively, the output ends of the two electric telescopic rods 12 are provided with the mounting plates 13, the mounting plates 13 are connected with the rotating shafts 14 through bearings, the rotating shafts 14 are provided with the plug plates 15 around, the rotating shafts 14 and the plug plates 15 are plugged on the reel 2, when the reel 2 rotates, the rotating shafts 14 and the plug plates 15 rotate along, the transverse positions of the mounting plates 13 are adjusted by the electric telescopic rods 12.

[0033] The movable rod 3 and the fixed rod 4 are provided with the jacking assemblies.

[0034] The jacking assembly comprises the grooves 16 opened in the bottoms of the movable rod 3 and the fixed rod 4, the sliding plates 17 are slidably connected on the grooves 16, the top portions of the sliding plates 17 are connected with the screw rods 18 through bearings, the top portions of the two screw rods 18 are respectively penetrated through the movable rod 3 and the fixed rod 4, and the top portions of the screw rods 18 are provided with the knobs 19, rotating the knobs 19, so that the screw rods 18 rotate downwards, the sliding plates 17 can slide on the grooves 16, so that the movable rod 3 and the fixed rod 4 can be jacked up.

[0035] Embodiment 2

[0036] Refer to Figure 1 In order to facilitate control, the controller 9 is arranged on the fixed rod 4.

[0037] The rest of the structures are the same as those in embodiment 1.

[0038] The movable rod 3 and the fixed rod 4 are placed on the ground, then the sliding plates 17 are moved downwards, so that the movable rod 3 and the fixed rod 4 are jacked up, at this time, the film roll 1 is placed between the two rotating shafts 14, so that the rotating shafts 14 are the same height as the reel 2;

[0039] Then the distance between the movable rod 3 and the fixed rod 4 is coarsely adjusted, so that the rotating shafts 14 are close to the reel 2, then the mounting plates 13 are moved by the electric telescopic rods 12, so that the rotating shafts 14 and the plug plates 15 are plugged into the reel 2, the assembly of the film roll 1 and the device is completed, finally the sliding plates 17 are retracted upwards, at this time, the device is pulled by the movable handle 10 and the fixed handle 11, so that the film roll 1 rotates along the ground, so that the geomembrane rolls and lays along the ground.

[0040] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and spirits of the utility model, the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A geomembrane construction laying device, characterized by: The utility model relates to a film roll (1), movable rod (3) and fixed rod (4), the film roll (1) is wound on the reel (2), The movable rod (3) and fixed rod (4) are provided with a coarse adjustment component, and the coarse adjustment component is used for adjusting the distance between the movable rod (3) and the fixed rod (4), The movable rod (3) and the fixed rod (4) are provided with fine adjustment components, The two sides of the reel (2) are connected with two fine adjustment components respectively, The movable rod (3) is provided with a movable handle (10), the movable handle (10) is sleeved on the fixed handle (11) in sliding mode, and the fixed handle (11) is arranged on the fixed rod (4). The coarse adjustment component includes connecting rods (5) arranged on the front and rear sides of the movable rod (3), the connecting rods (5) are arranged in the guide sleeve (7) on the fixed rod (4) in penetrating mode, the connecting rods (5) are uniformly provided with screw holes (6), and the guide sleeve (7) is provided with a bolt (8) connected with one of the screw holes (6).

2. A geomembrane construction laying device according to claim 1, characterized in that: The fine adjustment component includes electric telescopic rods (12), the two electric telescopic rods (12) are connected with the movable rod (3) and the fixed rod (4) respectively, the output ends of the two electric telescopic rods (12) are provided with mounting plates (13), the mounting plates (13) are connected with rotating shafts (14) through bearings, the rotating shafts (14) are provided with plug-in plates (15) around, and the rotating shafts (14) and the plug-in plates (15) are inserted into the reel (2).

3. A geomembrane construction laying device according to claim 1, characterized in that: The movable rod (3) and the fixed rod (4) are provided with jacking assemblies.

4. The geomembrane construction and laying apparatus according to claim 1, characterized in that: The jacking assembly includes recesses (16) formed in the bottom of the movable rod (3) and the fixed rod (4), the recesses (16) are connected with sliding plates (17) in sliding mode, the top of the sliding plate (17) is connected with a screw rod (18) through a bearing, the top of the two screw rods (18) penetrates the movable rod (3) and the fixed rod (4) respectively, and the top of the screw rod (18) is provided with a knob (19).

5. A geomembrane construction laying device according to claim 4, characterised in that: The fixed rod (4) is provided with a controller (9).

6. A geomembrane construction laying device according to claim 1, characterized in that: ​