High-strength building curtain wall easy to assemble

By improving the design of the mounting blocks and mounting rods for building curtain walls, and adopting threaded connections and cross structures, the problems of complexity and uneven load distribution in traditional curtain wall connections have been solved, achieving easy assembly and high-strength construction efficiency and safety.

CN224016577UActive Publication Date: 2026-03-20SHANDONG TIANMAO CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-20
Publication Date
2026-03-20

AI Technical Summary

Technical Problem

Traditional high-strength building curtain wall connectors, which are easy to assemble, have complex designs, leading to complicated construction processes, uneven load distribution, and affecting structural safety and construction efficiency.

Method used

The design incorporates components such as mounting blocks, mounting rods, and locking pins. It improves the flexibility and stability of assembly through threaded connections and cross structures, and enhances connection strength and ease of disassembly through the combination of locking pins and dowels.

Benefits of technology

This technology enables easy assembly of high-strength building curtain walls, improves construction efficiency and structural stability, reduces the risk of stress concentration, and enhances the overall structural safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224016577U_ABST
    Figure CN224016577U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of curtain walls, and discloses an easy-to-assemble high-strength building curtain wall which comprises a wall body, a first mounting block is fixedly mounted on the front side of the top of the wall body, a second mounting block is slidably connected to the top of the first mounting block, and the second mounting block is fixedly mounted on the front side of the top of the wall body. A second mounting rod is mounted on the inner side of the first mounting rod, and mounting grooves are formed in the two ends of the second mounting rod. According to the high-strength building curtain wall easy to assemble, the top of the second mounting block is in threaded connection with a screw rod, the bottom of the screw rod is attached to the top of the first mounting block, a wall body can move up and down on a frame composed of the first mounting blocks to be finely adjusted, and the flexibility is improved; the second mounting blocks can move left and right and are locked through screws, the first mounting rods and the mounting holes form a rectangular frame through bolts, the second mounting rods are arranged in the rectangular frame through a cross structure formed by crossing of the bolts, and the stability of the structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to curtain wall technical field, concretely is a high strength building curtain wall of easy to assemble. BACKGROUND

[0002] The high strength building curtain wall of easy to assemble is an innovative technology considering practicability and aesthetic appearance, meets the high demand of modern building to structural safety and construction efficiency, and it is mainly used for protecting the inside of building from external climate, simultaneously providing the beautiful appearance and good lighting.

[0003] Most of the traditional high strength building curtain wall of easy to assemble have complex connecting piece design, can lead to the complexity increase in the construction process, thereby influence efficiency, and the load transmission of curtain wall can be uneven, thereby leading to the stress concentration of local, influence the safety of overall structure. UTILITY MODEL CONTENT

[0004] (I) the technical problem solved

[0005] In view of the deficiency of prior art, the utility model provides a high strength building curtain wall of easy to assemble to solve the problems in the background art.

[0006] (II) technical scheme

[0007] In order to realize the above-mentioned purpose, the utility model provides the following technical scheme: a high strength building curtain wall of easy to assemble, including wall body and first installation rod, the front side of the top of wall body is fixedly installed with first installation block, the top of first installation block is slidably connected with second installation block, second installation block is fixedly installed at the front side of the top of wall body, the inner side of first installation rod is installed with second installation rod, the both ends of second installation rod are provided with installation slot, the installation slot is connected with the clamping pin in screw thread, the clamping pin includes mounting seat, spring, guide block and pin, only spring between the two mounting seats, the right side of spring is installed with pin, the outer side of pin is slidably connected with guide block.

[0008] Preferably, the top of second installation block is connected with screw rod in screw thread, and the bottom of screw rod is attached to the top of first installation block.

[0009] Preferably, the front side of the bottom of wall body is provided with four first installation rods, and the both ends of four first installation rods are connected to form a rectangular frame through bolt and mounting hole.

[0010] Preferably, the second installation rod has two roots, and the two second installation rods are connected through bolt.

[0011] Preferably, the bottom front side of the wall body is provided with a clamping tongue, the front side of the first mounting rod is provided with a second groove, the second groove penetrates the first mounting rod, and a screw rod is threadedly connected to the inner side of the first mounting rod.

[0012] Preferably, the pin is slidingly connected to the hole in the side surface of the first mounting rod, the front side of the first mounting rod is provided with a first groove, and the first groove is in the same vertical plane as the pin.

[0013] Compared with the prior art, the high-strength building curtain wall easy to assemble has the following beneficial effects: the high-strength building curtain wall easy to assemble, the second mounting block is threadedly connected with a screw rod at the top, the bottom of the screw rod is attached to the top of the first mounting block, the wall body can be moved up and down on the frame composed of the first mounting rod for fine adjustment, flexibility is improved, the second mounting block is slidingly connected to the top of the first mounting block, the second mounting block can be moved left and right and locked by the screw rod, the first mounting rod forms a rectangular frame through bolts and mounting holes, the second mounting rod is crosswise connected through bolts to form a cross structure and is installed in the rectangular frame, the stability of the structure is improved, the mounting groove is threadedly connected with a clamping pin, the pin is clamped in the inner side of the first mounting rod, the stability of the overall structure is improved, the first mounting rod is provided with a first groove in the side surface, the pin can be withdrawn to disassemble the frame, assembly and transportation are facilitated, and flexibility is improved. BRIEF DESCRIPTION OF DRAWINGS

[0014] Figure 1 It is a three-dimensional structure schematic view of the utility model;

[0015] Figure 2 It is a screw rod structure schematic view of the utility model;

[0016] Figure 3 It is an explosion structure schematic view of the first mounting rod of the utility model;

[0017] Figure 4 It is a clamping pin schematic view of the utility model;

[0018] Figure 5 It is a first mounting block structure schematic view of the utility model.

[0019] In the drawing: 1, wall body; 2, first mounting rod; 3, bolt; 4, second mounting rod; 5, first groove; 6, screw rod; 7, clamping tongue; 8, clamping pin; 9, first mounting block; 10, mounting hole; 11, second groove; 12, mounting groove; 13, mounting seat; 14, spring; 15, guide block; 16, pin; 17, second mounting block. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0021] As shown in Figures 1-4 The utility model provides a kind of high-strength building curtain wall of easy assembly, including wall 1 and first mounting rod 2, the front side of the top of wall 1 is fixedly installed with first mounting block 9, first mounting block 9 top is slidably connected with second mounting block 17, second mounting block 17 is fixedly installed at the front side of the top of wall 1, second mounting rod 4 is installed in the inner side of first mounting rod 2, installation slot 12 is opened in the both ends of second mounting rod 4, installation slot 12 is screw-connected with catch pin 8, catch pin 8 includes mounting seat 13, spring 14, guide block 15 and pin 16, only spring 14 is between two mounting seats 13, pin 16 is installed on the right side of spring 14, guide block 15 is slidably connected with the outside of pin 16.

[0022] Further, the top of second mounting block 17 is screw-connected with screw rod 6, and the bottom of screw rod 6 is attached to the top of first mounting block 9.

[0023] Specifically, screw rod 6 can move second mounting block 17 up and down for fine adjustment, improving overall flexibility.

[0024] Further, the bottom front side of wall 1 is provided with four first mounting rods 2, and the two ends of the four first mounting rods 2 are connected end to end to form a rectangular frame through bolts 3 and mounting holes 10.

[0025] Specifically, first mounting rod 2 is installed through bolt 3, facilitating transportation and storage.

[0026] Further, second mounting rod 4 has two roots, and the two roots of second mounting rod 4 are connected by bolts 3.

[0027] Specifically, the cross-shaped frame structure can effectively disperse load and provide additional stiffness and stability.

[0028] Further, the bottom front side of wall 1 is provided with catch 7, the front side of first mounting rod 2 is provided with second groove 11, second groove 11 penetrates first mounting rod 2, and screw rod 6 is screw-connected inside first mounting rod 2.

[0029] Specifically, catch 7 is slidably connected inside second groove 11 and locked by screw rod 6, improving overall stability.

[0030] Furthermore, the pin 16 is slidably connected in the hole on the side of the first mounting rod 2, and a first groove 5 is provided on the front side of the first mounting rod 2. The first groove 5 and the pin 16 are located on the same vertical plane.

[0031] Specifically, the pin 16 can improve the connection strength between the first mounting rod 2 and the second mounting rod 4. The pin 16 can be retracted through the first groove 5 to disassemble the frame and improve flexibility.

[0032] Working principle: First, a second mounting block 17 is installed on the top of the inner side of the wall 1. A screw rod 6 is threadedly connected to the top of the second mounting block 17. The second mounting block 17 is slidably connected to the top of the first mounting block 9, allowing the second mounting block 17 to move up and down slightly and be locked by the screw rod 6. Second, the first mounting block 9 is installed on the outside of the first mounting rod 2. The first mounting rod 2 forms a rectangular frame with bolts 3 and mounting holes 10. The second mounting rod 4 is installed in the rectangular frame with a cross structure formed by bolts 3, improving stability. Finally, mounting grooves 12 are opened at both ends of the second mounting rod 4. A locking pin 8 is threadedly connected to the mounting groove 12. The locking pin 8 is engaged with the inside of the first mounting rod 2, improving overall stability. A first groove 5 is opened on the side of the first mounting rod 2. The first groove 5 can retract the pin 16 to remove the frame, improving flexibility.

[0033] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A high-strength building curtain wall that is easy to assemble, comprising a wall (1) and a first mounting rod (2), characterized in that: A first mounting block (9) is fixedly installed on the front side of the top of the wall (1). A second mounting block (17) is slidably connected to the top of the first mounting block (9). The second mounting block (17) is fixedly installed on the front side of the top of the wall (1). A second mounting rod (4) is installed inside the first mounting rod (2). Mounting grooves (12) are provided at both ends of the second mounting rod (4). The mounting grooves (12) are threadedly connected to a locking pin (8). The locking pin (8) includes a mounting seat (13), a spring (14), a guide block (15), and a pin (16). There is only a spring (14) between the two mounting seats (13). A pin (16) is installed on the right side of the spring (14). A guide block (15) is slidably connected to the outside of the pin (16).

2. The high-strength building curtain wall that is easy to assemble according to claim 1, characterized in that: The top of the second mounting block (17) is threaded with a screw (6), the bottom of which is in contact with the top of the first mounting block (9).

3. The high-strength building curtain wall that is easy to assemble according to claim 1, characterized in that: The bottom front side of the wall (1) is provided with four first mounting rods (2), and the two ends of the four first mounting rods (2) are connected end to end by bolts (3) and mounting holes (10) to form a rectangular frame.

4. The high-strength building curtain wall that is easy to assemble according to claim 1, characterized in that: There are two second mounting rods (4), which are connected to each other by bolts (3).

5. A high-strength building curtain wall that is easy to assemble according to claim 1, characterized in that: The bottom front side of the wall (1) is equipped with a latch (7), and the front side of the first mounting rod (2) is provided with a second groove (11), the second groove (11) passes through the first mounting rod (2), and the inner side of the first mounting rod (2) is threaded with a screw (6).

6. A high-strength building curtain wall that is easy to assemble according to claim 1, characterized in that: The pin (16) is slidably connected in the hole on the side of the first mounting rod (2). The first mounting rod (2) has a first groove (5) on its front side. The first groove (5) and the pin (16) are located on the same vertical plane.