Electric box pipeline pre-embedding positioning tool
The electrical box and pipeline pre-embedded positioning tool, composed of L-shaped supports and positioning components, combined with scale stickers and upright supports, solves the error and efficiency problems of traditional manual positioning, and achieves accurate positioning and efficient construction of electrical box and pipeline.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-07
- Publication Date
- 2026-03-20
AI Technical Summary
Traditional manual positioning of electrical boxes for pre-embedded pipes suffers from problems such as large errors, low efficiency, inconsistent standards, high rework rates, and serious material waste, making it difficult to meet the requirements of high efficiency, convenience, and high quality in modern building construction.
The electrical box pipe pre-embedded positioning tool consists of an L-shaped support, positioning parts, and bolts. The support has a movable straight groove, and the positioning parts are fixed by bolts and lock nuts. Accurate measurement is performed in conjunction with scale stickers. The positioning parts have internal rods to provide internal and external support. The materials are angle steel and galvanized pipe scrap. The tool is easy to carry and can be adjusted flexibly.
It achieves precise positioning of electrical boxes and pipelines, reduces errors, improves construction efficiency, reduces labor intensity and material waste, adapts to different construction environments, and meets the requirements of rapid advancement in modern construction.
Smart Images

Figure CN224016837U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the technical field of building tools, and particularly relates to an electric box pipeline pre-burying positioning tool. BACKGROUND
[0002] In the modern construction process, the positioning of the electric box pre-buried pipeline is a crucial link, directly affecting the installation quality and later maintenance of the electrical system. With the progress of building technology and the improvement of construction efficiency requirements, the demand for electric box pre-buried pipeline positioning tools is gradually developing towards convenience, high efficiency and strong adaptability. The construction site situation is complex and variable, from large construction sites to small home decoration, a tool that can quickly and efficiently complete the positioning task and easily move and deploy is needed. However, the traditional manual positioning method has many problems, the main limitations of the traditional method are large errors: manual positioning relies on the experience and skills of workers, which is prone to errors, resulting in inaccurate pre-buried pipeline positions, affecting subsequent construction and maintenance; low efficiency: manual positioning and adjustment take a long time, especially in large projects, the traditional method is inefficient and difficult to meet the requirements of modern construction rapid progress; non-uniform standards: different workers have different operation standards in construction, resulting in uneven construction quality and difficulty in meeting high-standard engineering requirements; high rework rate: low-quality construction due to measurement and positioning errors requires a lot of repair and rework, which not only increases construction costs but also prolongs the construction period; serious material waste: due to inaccurate positioning, additional materials are often needed for repair, increasing construction costs and material waste. These problems not only increase the construction difficulty, but also affect the final construction quality and efficiency. SUMMARY
[0003] In view of the problems existing in the prior art, the utility model provides an electric box pipeline pre-buried positioning tool, which can effectively solve the limitations of traditional manual measurement and positioning methods, significantly improve construction quality and efficiency, reduce labor intensity and material waste, and meet the diversified needs of modern building construction.
[0004] The utility model solves the technical problems by the following scheme: an electric box pipeline pre-buried positioning tool, including support, positioning piece and bolt, the support is L type structure, and a movable straight groove is formed on the vertical surface in the extension direction, the positioning piece is cylindrical structure, and the number is set according to the number of electric box pipeline, a through hole is formed in the upper end of the positioning piece, when the through hole corresponds to the position of the movable straight groove of the support, the top end of the positioning piece abuts on the plane of the support, the bolt is inserted in the through hole, the rear end of the bolt is inserted through the movable straight groove, and a matched lock nut is installed at the tail end of the bolt, and the positioning piece is locked on the support by the cooperation of the lock nut and the bolt.
[0005] Further, a vertical rod is arranged in the positioning member, and a welding nut is welded and fixed on the top of the vertical rod, the welding nut is matched with the bolt, the vertical rod is vertically installed on the bolt through the welding nut, and the vertical rod is longitudinally arranged in the positioning member.
[0006] Further, the support is made of angle steel with a size of 40mm*40mm.
[0007] Further, a scale sticker is horizontally pasted on the front side of the vertical surface of the support.
[0008] Compared with the prior art, the electric box pipeline positioning tool has the advantages that:
[0009] The electric box pipeline positioning tool has the advantages that: the position of the positioning member can be flexibly adjusted through the movable straight groove of the support, the accurate measurement of the scale sticker can ensure that the positioning of the electric box pipeline is more accurate, the error caused by insufficient experience of workers and other factors in manual positioning is avoided, the accuracy of the position of the embedded pipeline is ensured, a solid foundation is provided for subsequent electrical system installation and maintenance, the support is made of common angle steel, the positioning member is processed from the zinc-plated pipeline waste head, the material is easy to obtain and low in cost, the positioning member is easy to carry, the waste at the construction site is utilized, the stability and accuracy of the positioning tool during positioning are further improved through the structure design that the vertical rod is arranged in the positioning member, the insertion of the vertical rod not only provides internal and external support for the pipeline, but also enhances the contact stability between the positioning member and the pipeline, the positioning effect is more reliable, the optional optimization design also increases the flexibility during construction, whether the vertical rod is used to enhance the positioning effect can be selected according to actual construction requirements, the pre-embedding and positioning work of the electric box pipeline can be quickly completed by using the tool, the construction time is greatly shortened, especially in large building construction projects, the overall construction progress can be significantly improved, and the requirement of rapid advancement of modern building construction is met. BRIEF DESCRIPTION OF DRAWINGS
[0010] Figure 1 It is a three-dimensional structure schematic view of the utility model;
[0011] Figure 2 It is a front view structure schematic view of the utility model;
[0012] Figure 3 It is a rear view structure schematic view of the utility model;
[0013] Figure 4 It is an explosion structure schematic view of the utility model;
[0014] Figure 5 It is a positioning member structure schematic view of the utility model.
[0015] In the figure: 1, support; 2, movable straight slot; 3, positioning member; 4, through hole; 5, bolt; 6, locking nut; 7, welding nut; 8, vertical rod; 9, handle; 10, scale sticker. DETAILED DESCRIPTION
[0016] The utility model is further illustrated below in combination with the drawings and examples.
[0017] Please refer to Figures 1-5 The utility model provides a kind of electric box pipeline pre-burying positioning tool technical scheme: EMBODIMENT
[0018] According to Figure 1 , Figure 2 And Figure 3 A kind of electric box pipeline pre-burying positioning tool, mainly including support 1, positioning member 3 and bolt 5, support 1 is L type structure, its vertical plane is penetrated and is set with a movable straight slot 2 along extension direction, positioning member 3 is cylindrical structure, its diameter or inner diameter is determined according to the required pipeline inner diameter or outer diameter size, through hole 4 is penetrated and is set in the upper end of positioning member 3, the position of through hole 4 is determined by measurement, ensure that when through hole 4 and the movable straight slot 2 of support 1 correspond, the top end of positioning member 3 is abutted on the plane of support 1, then bolt 5 is directly inserted through the through hole 4 on positioning member 3 and the movable straight slot 2 of support 1, and the matching locking nut 6 of bolt 5 rear end is installed, positioning member 3 is locked on support 1 by the cooperation of locking nut 6 and bolt 5, the number of positioning member 3 is determined according to the number of pipeline in electric box, and the spacing of adjacent positioning member 3 is determined according to the pipeline pre-burying size and position of finished product electric box, since support 1 is penetrated and is set with a movable straight slot 2, and the position of positioning member 3 is fixed by bolt 5, bolt 5 can move in movable straight slot 2 and be locked by locking nut 6, so the number and fixed position of positioning member 3 on support 1 can be flexibly adjusted, so that positioning tool can be adapted to different electric box pipeline.
[0019] Support 1 is made of 40mm*40mm angle steel, and positioning member 3 is made of on-site galvanized pipeline waste material head, with a length of 70mm, the number thereof is determined according to the number of pipeline in electric box, and the spacing thereof is determined according to the size of finished product electric box, and a handle 9 is welded on the top of the angle steel, the handle 9 is made of discarded reinforcing steel head material, for conveniently carrying electric box pipeline pre-burying positioning tool. A scale sticker 10 is horizontally pasted on the front side of the vertical plane of support 1, and when adjusting the position and spacing of positioning member 3, the positioning position can be directly measured and determined by the scale line on scale sticker 10.
[0020] The electric box pipeline pre-burying positioning tool is light and easy to carry, is suitable for various construction environments, especially can be inserted with the use at the main pre-burying stage, can quickly and accurately complete the positioning of the pre-buried pipeline, reduces the use of on-site measuring instruments, ensures the accuracy and consistency of positioning, reduces errors and rework, and significantly improves the construction speed and efficiency; moreover, the positioning tool has simple structure, the size and number of the positioning member 3 can be flexibly adjusted, has flexibility, can adapt to the needs of different construction sites, can work efficiently whether it is a large construction site or a small home decoration, meanwhile, the manufacturing process of the positioning tool is simple, the manufacturing materials are all commonly used materials or waste materials on the construction site, realizes the recycling of waste materials, and the structure is firm and reliable, can withstand vibration and impact in the construction process, ensures the stability of positioning, can meet the diversified needs of modern building construction, and brings significant technical progress and economic benefits to the building construction industry.
[0021] In specific use, the electric box pipeline pre-burying positioning tool is first made by using a 40*40 angle steel as a support 1 of the positioning tool, welding a reinforcing material head to make a handle 9 of the positioning tool, selecting a waste head of a galvanized pipeline with a length of 70mm (the diameter or inner diameter of the head is determined according to the required inner diameter or outer diameter of the pipeline) as a positioning member 3 of the positioning tool, drilling a through hole 4 on the positioning member 3 at a specified distance from the end, then inserting a bolt 5 in the through hole 4 and inserting through a movable straight slot 2 of the support 1, installing the positioning member 3 on the support 1, adjusting the position of the positioning member 3 on the support 1, and finally locking the position of the positioning member 3 by installing a locking nut on the bolt 5, and the positioning tool is completed.
[0022] Then, the top ends of the electric box pipelines are respectively inserted into the corresponding positioning members 3 of the positioning tool, and the electric box pipelines are positioned by the positioning tool. Embodiment
[0023] On the basis of the first embodiment, the same parts of the present embodiment and the first embodiment will not be described again, and the different parts are as follows: as shown in Figure 4 and Figure 5 In order to improve the stability of the positioning tool during positioning, a vertical rod 8 is arranged in the positioning member 3, the diameter of the vertical rod 8 is smaller than the inner diameter of the electric box pipeline, the top end of the vertical rod 8 is welded and fixed with a welded nut 7, the welded nut 7 is matched with the bolt 5, the vertical rod 8 can be installed on the bolt 5 through the welded nut 7 and is located at the inner center position of the positioning member 3.
[0024] In specific use, the utility model discloses a kind of electrical box pipeline pre-burying positioning tools, when installing positioning piece 3 on support 1, first, vertical rod 8 is inserted into positioning piece 3 so that welding nut 7 is corresponding with the position of through-hole 4, and vertical rod 8 is kept at the central position of positioning piece 3 (the position of vertical rod 8 has slight deviation here, and it does not affect its effect), then bolt 5 is inserted in through-hole 4, and bolt 5 will cooperate with welding nut 7 in the process of insertion, by screwing bolt 5, welding nut 7 is gradually moved on bolt 5, to ensure that vertical rod 8 is at the center of positioning piece 3, after bolt head is abutted on positioning piece 3, the assembly structure formed by positioning piece 3, bolt 5 and vertical rod 8 is integrally installed on support 1 and is fixed by locking nut 6, i.e. the installation work of positioning piece 3 can be completed;When positioning electrical box pipeline using positioning tool, vertical rod 8 is inserted into pipeline, and positioning piece 3 is inserted outside pipeline, vertical rod 8 and positioning piece 3 provide supporting and positioning effect inside and outside pipeline, to further improve the stability and accuracy of positioning tool when positioning.
[0025] The above is only preferred embodiment of the utility model, and does not limit the utility model, and any modification, equivalent replacement and improvement made within the spirit and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. A tool for pre-embedding and positioning electrical box pipes, characterized in that: The device includes a support (1), a positioning element (3), and a bolt (5). The support (1) is an L-shaped structure with a movable straight groove (2) extending along its vertical direction. The positioning element (3) is a cylindrical structure, and its number is set according to the number of electrical box pipes. A through hole (4) is opened through the upper end of the positioning element (3). When the through hole (4) corresponds to the movable straight groove (2) of the support (1), the top of the positioning element (3) abuts against the plane of the support (1). A bolt (5) is inserted into the through hole (4). The rear end of the bolt (5) passes through the movable straight groove (2), and a matching locking nut (6) is installed at the tail end of the bolt (5). The positioning element (3) is locked on the support (1) by the cooperation of the locking nut (6) and the bolt (5).
2. The electrical box conduit pre-embedded positioning tool according to claim 1, characterized in that: A vertical rod (8) is provided in the center of the positioning component (3). A welding nut (7) is welded and fixed to the top of the vertical rod (8). The welding nut (7) is adapted to the bolt (5). The vertical rod (8) is vertically installed on the bolt (5) through the welding nut (7) and is longitudinally located in the positioning component (3).
3. The electrical box conduit pre-embedding positioning tool according to claim 1, characterized in that: The support (1) is a 40mm*40mm angle steel.
4. The electrical box conduit pre-embedded positioning tool according to claim 1, characterized in that: A scale sticker (10) is horizontally affixed to the front side of the support (1).