Elastic buffering hanging bracket of air conditioner air pipe anti-seismic support

By designing an elastic buffer hanger for the air conditioning duct seismic support, and utilizing the close cooperation of movable rods, buffer springs, and bearing components, the problem that the buffer mechanism in the existing technology cannot adapt to duct expansion is solved, achieving efficient installation and stable operation, and reducing construction difficulty and cost.

CN224049816UActive Publication Date: 2026-03-27SHIJIAZHUANG DINGSHENG TRANSPORTATION CONSTR SUPERVISION CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-05-14
Publication Date
2026-03-27

AI Technical Summary

Technical Problem

The buffer mechanism of the existing air conditioning duct seismic support cannot meet the new seismic requirements when expanding the duct system, and the installation and commissioning process is complicated, increasing the construction difficulty and cost.

Method used

An elastic buffer hanger for air conditioning duct seismic support was designed. It adopts a combination structure of mounting strip, buffer bracket, telescopic bracket and assembly bracket. It achieves buffer protection by using the tight cooperation of movable rod, buffer spring and bearing components, and simplifies the installation process by using easy-to-connect components.

Benefits of technology

It improves the stability and safety of duct installation, simplifies the installation process, enhances the structural strength and flexibility of the support system, adapts to different installation environments and duct weights, and reduces construction difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224049816U_ABST
    Figure CN224049816U_ABST
Patent Text Reader

Abstract

The utility model discloses an elastic buffering hanging bracket of an air conditioner air pipe anti-seismic support, and belongs to the field of air pipe anti-seismic supports, buffering supports are installed at the ends of two installation strips, and the two opposite buffering supports are connected through a first telescopic support and a second telescopic support. A plurality of butt joint hole positions are formed in the end faces of the first telescopic support and the second telescopic support, the two telescopic supports are fixed by inserting bolts into the butt joint hole positions, and the air conditioner air pipe is placed and installed through the first telescopic support. The buffering support comprises a first side frame, a first U-shaped frame and a first bearing piece, and the first U-shaped frame is arranged on the side wall of the first side frame. The stability and the safety of the air conditioner air pipe in installation and operation are ensured. And through the design of the buffering support, the movable rod, the buffering spring and the bearing piece are matched, impact and vibration are absorbed, and protection is provided. The assembly bracket and the telescopic bracket enhance the structural strength and flexibility of the system, and adapt to different mounting environments and air duct weights.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the field of air pipe anti -seismic support, especially in kind of air conditioner air pipe anti -seismic support elastic buffer hanger. BACKGROUND

[0002] Air conditioner air pipe support is a device for supporting, fixing and hoisting air conditioner air pipe, and plays a crucial role in ventilation and air conditioning system. It not only can support and fix the air pipe, but also can ensure the stability and safety of the whole air pipe system. Reasonable support setting can improve the bearing capacity and anti -seismic performance of the system, thereby prolonging its service life. At the same time, the installation quality and spacing setting of the support also directly affect the operation efficiency and energy consumption level of the air pipe system.

[0003] In practical application, air conditioner air pipe anti -seismic support adopts buffer mechanism and can effectively realize anti -seismic installation. This design significantly enhances the stability of the air pipe under natural disasters such as earthquake. However, the design of buffer mechanism is usually optimized according to the specific size and weight of air pipe to ensure the best anti -seismic effect. When the air pipe system needs to be expanded, such as increasing the length or diameter of the air pipe, or changing the layout, the original buffer mechanism may not meet the new anti -seismic demand. This is because the size, shape and material selection of the buffer mechanism are designed based on specific mechanical parameters, and once these parameters change, the effect of the buffer mechanism will be affected.

[0004] In addition, the installation and debugging process of the buffer mechanism is relatively complex, which needs professional technicians to operate. When expanding the air pipe system, it may be necessary to redesign and install the buffer mechanism, which not only increases the construction difficulty and cost, but also may prolong the construction period. INVENTION CONTENTS

[0005] The main purpose of the utility model is to provide a kind of air conditioner air pipe anti -seismic support elastic buffer hanger, can effectively solve the problems raised in background art.

[0006] To achieve the above-mentioned purpose, the technical scheme adopted by the utility model is as follows:

[0007] A kind of air conditioner air pipe anti -seismic support elastic buffer hanger, including installation strip and installation hole site, multiple installation hole sites are distributed on installation strip;

[0008] The end of the two installation strips is equipped with a buffer support, and the two opposite buffer supports are connected by a first telescopic support and a second telescopic support. The end faces of the first telescopic support and the second telescopic support are provided with a plurality of butt joint hole sites. The two telescopic supports are fixed by inserting bolts into the butt joint hole sites, and the first telescopic support is used to place and install the air conditioner air pipe.

[0009] The buffer support includes a first side support, a first U-shaped support and a first bearing piece, a side wall of the first side support is provided with the first U-shaped support, a limiting cavity is arranged in the first side support and the first U-shaped support, the first bearing piece is connected in the limiting cavity, a first movable rod is movably connected to an upper end of the first bearing piece, a buffer spring is sleeved on a rod body of the first movable rod, and buffer protection of the telescopic support is realized through the first movable rod, the buffer spring and the first bearing piece.

[0010] According to the optional scheme of the application, the first side support and the first U-shaped support are fixed through bolts, a limiting strip is arranged in the first side support and the first U-shaped support, the limiting strip is matched with a limiting groove arranged on the first bearing piece, the first bearing piece is limited and connected, and the connecting position is designed to be smooth.

[0011] According to the optional scheme of the application, the first bearing piece and the first movable rod are limited and connected through a T-shaped key and a T-shaped hole, a gap is arranged between the first movable rod and the first U-shaped support, and the gap is limited through double nuts to prevent the first movable rod from falling off, and two annular rings are sleeved on the rod body of the first movable rod, and the buffer spring is welded and fixed on the two annular rings.

[0012] According to the optional scheme of the application, the mounting strip is fixed on the first U-shaped support through bolts, the first telescopic support and the second telescopic support are fixed on the bearing piece through a rotating shaft and a nut, and an anti-skid piece is arranged at the connecting position of the first telescopic support and the second telescopic support.

[0013] According to the optional scheme of the application, the upper end of the first side support is provided with a first protruding part, the lower end of the first side support is provided with a first butt joint support matched with the first protruding part, and the first side support, the first protruding part and the first butt joint support are designed in an integrated mode.

[0014] According to the optional scheme of the application, the buffer support is connected with an assembled support through the first butt joint support, the assembled support includes a second side support, a second U-shaped support and a second bearing piece, the second U-shaped support is mounted on the side wall of the second side support, the second bearing piece is connected between the second side support and the second U-shaped support, a second movable rod is arranged at the upper end of the second bearing piece, and the second movable rod is connected with the first bearing piece through the first U-shaped support.

[0015] According to the optional scheme of the application, the upper end of the second side support is provided with a second protruding part, the lower end of the second side support is provided with a second butt joint support matched with the second protruding part, the second protruding part is inserted into the first butt joint support and then fixed through a first fastener, and a second fastener is connected at the second butt joint support.

[0016] Compared with the prior art, the application has the following beneficial effects:

[0017] They collectively ensure the high stability and safety of the air conditioner duct during installation and operation. The buffer support effectively absorbs external impact and vibration through the close cooperation of movable rods, buffer springs, and bearing parts, providing reliable buffer protection for the air conditioner duct. The addition of the assembly support and telescopic support further enhances the structural strength and flexibility of the entire support system, allowing the support to adapt to different installation environments and duct weights.

[0018] The synergy of these supports simplifies the installation process and improves installation efficiency. The buffer support and assembly support use an integrated design and easily connected components, allowing installers to quickly and accurately assemble and secure them. Meanwhile, the end face of the telescopic support is designed with multiple docking hole positions, which can be securely fixed with bolts, simplifying the installation steps.

[0019] The design of these supports also considers the convenience of maintenance and adjustment. By reserving appropriate gaps and using easily detachable connection methods, installers can easily check and adjust the status of the support to ensure that it always maintains good buffer effect and stability. BRIEF DESCRIPTION OF DRAWINGS

[0020] Figure 1 is a schematic diagram of the overall structure of the present application;

[0021] Figure 2 is a side view of the overall structure of the present application;

[0022] Figure 3 is a top view of the overall structure of the present application;

[0023] Figure 4 is a display diagram of a single set of buffer support, assembly support, mounting strip, and telescopic support of the present application;

[0024] Figure 5 is an exploded view of a single set of buffer support and assembly support of the present application.

[0025] In the figure: 1, mounting strip; 2, buffer support; 21, first side frame; 22, first U-shaped frame; 23, first protruding part; 24, first docking frame; 25, first fastener; 26, first movable rod; 27, buffer spring; 28, first bearing part; 3, assembly support; 31, second side frame; 32, second U-shaped frame; 33, second protruding part; 34, second docking frame; 35, second fastener; 36, second movable rod; 37, second bearing part; 4, mounting hole; 5, first telescopic support; 6, docking hole; 7, second telescopic support. DETAILED DESCRIPTION

[0026] In order to make the technical means, creation features, purposes and effects of the utility model easy to understand, the utility model is further described below in combination with specific embodiments.

[0027] As shown in the figure, an air conditioner air pipe anti-seismic support elastic buffer hanger, it includes a plurality of equidistant distribution on the mounting strip 1 mounting hole 4. Figure 1 Figure 5 This design not only ensures the stability of the structure, but also facilitates installation and maintenance.

[0028] At both ends of the mounting strip 1, the buffer support 2 is installed, and the two opposite buffer supports 2 are connected through the first telescopic support 5 and the second telescopic support 7.

[0029] The buffer support 2 is also ingenious in structure, which is composed of a first side frame 21, a first U-shaped frame 22 and a first bearing 28.

[0030] In order to further enhance the stability and reliability of the structure, the first side frame 21 and the first U-shaped frame 22 are fixed together by bolts, and the two frame bodies are provided with limiting strips which are matched with the limiting grooves on the first bearing 28, so as to realize the limiting connection of the first bearing 28.

[0031] Between the first bearing 28 and the first movable rod 26, the limiting connection is realized through the T-shaped key and the T-shaped hole.

[0032] ​The mounting strip 1 is fixed on the first U-shaped frame 22 by bolts, and the first telescopic support 5 and the second telescopic support 7 are fixed on the bearing member by a rotating shaft and a nut. Anti-skid pieces are designed at the connection parts to prevent sliding and ensure the stability of the connection.

[0033] A first protruding part 23 is designed at the upper end of the first side frame 21, and a first butt joint frame 24 matching the first protruding part 23 is designed at the lower end of the first side frame 21. The first side frame 21, the first protruding part 23 and the first butt joint frame 24 are designed in an integrated manner, which not only simplifies the assembly process, but also improves the overall structural strength.

[0034] The buffer support 2 is connected and assembled with the assembling support 3 through the first butt joint frame 24. The assembling support 3 includes a second side frame 31, a second U-shaped frame 32 and a second bearing member 37. The second U-shaped frame 32 is installed on the side wall of the second side frame 31, and the second bearing member 37 is connected between the second U-shaped frame 32. The upper end of the second bearing member 37 is provided with a second movable rod 36, and the second movable rod 36 is connected with the first bearing member 28 by penetrating the first U-shaped frame 22. This connection mode ensures the flexibility and stability of the support.

[0035] The upper end of the second side frame 31 is provided with a second protruding part 33, and the lower end is provided with a second butt joint frame 34 matching the second protruding part 33. The second protruding part 33 is inserted into the first butt joint frame 24 and fixed by the first fastener 25. The second butt joint frame 34 is connected with the second fastener 35, which not only ensures the firmness of the connection, but also makes the whole anti-seismic support system more complete and reliable.

[0036] The mounting strip 1 is fixed at the predetermined position by bolts. The buffer support 2 is installed at both ends of the mounting strip 1. The first side frame 21 and the first U-shaped frame 22 are fixed together by bolts. It is ensured that the limiting strip is matched with the limiting groove to realize the limiting connection of the first bearing member 28. The first telescopic support 5 and the second telescopic support 7 are fixed on the bearing member by a rotating shaft and a nut. The bolt is inserted into the end face of the first telescopic support 5 and fixed on the first side frame 21. The stability of the connection is ensured by the anti-skid piece. The first protruding part 23 is inserted into the first butt joint frame 24. The first protruding part 23 and the first butt joint frame 24 are fixed by the first fastener 25. The second protruding part 33 is inserted into the first butt joint frame 24 and fixed by the first fastener 25. The second fastener 35 is connected at the second butt joint frame 34 to ensure the firmness of the connection.

[0037] The air conditioner duct is placed on the first telescopic support 5. It is ensured that the duct is installed stably and there is no loosening phenomenon. It is checked whether all connection parts are firm to ensure that there is no loosening. The movable rod and the spring of the buffer support 2 are adjusted to ensure their flexibility and buffering effect. It is confirmed that all components are installed correctly and the system runs stably. The performance of the air conditioner duct anti-seismic support elastic buffering hanger is checked by trial operation.

[0038] The above embodiments are only used to illustrate the technical solutions of the present application, and are not intended to limit the present application; although the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that the technical solutions recorded in the foregoing embodiments can still be modified, or some technical features therein can be replaced by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. An air conditioner duct anti-seismic support elastic buffer hanger, comprising a mounting strip (1) and mounting hole positions (4), a plurality of the mounting hole positions (4) are distributed on the mounting strip (1), characterized in that: The end of the two mounting bars (1) is provided with a buffer support (2), and the two opposite buffer supports (2) are connected through a first telescopic support (5) and a second telescopic support (7). The first telescopic support (5) and the second telescopic support (7) are provided with a plurality of butt joint hole positions (6) on the end face, the two telescopic supports are fixed by inserting bolts into the butt joint hole positions (6), and the first telescopic support (5) is used for placing and mounting an air conditioner air pipe. The buffer support (2) comprises a first side frame (21), a first U-shaped frame (22) and a first bearing member (28). The side wall of the first side frame (21) is provided with the first U-shaped frame (22), and the first side frame (21) and the first U-shaped frame (22) are provided with a limiting cavity in the frame. The limiting cavity is connected with the first bearing member (28). The upper end of the first bearing member (28) is movably connected with a first movable rod (26), and the rod body of the first movable rod (26) is sleeved with a buffer spring (27). The first movable rod (26), the buffer spring (27) and the first bearing member (28) are used for buffering protection of the telescopic support.

2. The elastic buffering hanger of the air conditioner duct anti-seismic support according to claim 1, characterized in that: The first side frame (21) and the first U-shaped frame (22) are fixed by bolts, and the first side frame (21) and the first U-shaped frame (22) are provided with a limiting strip in the frame. The limiting strip is matched with a limiting groove formed on the first bearing member (28), so that the first bearing member (28) is limitingly connected, and the connection portions thereof are designed to be smooth.

3. The elastic buffering hanger of the air conditioner duct anti-seismic support according to claim 2, characterized in that: The first bearing member (28) and the first movable rod (26) are limitingly connected through a T-shaped key and a T-shaped hole. There is a gap between the first movable rod (26) and the first U-shaped frame (22), and the gap is limited by double nuts to prevent the first movable rod (26) from falling off. The rod body of the first movable rod (26) is sleeved with two annular rings, and the buffer spring (27) is welded and fixed on the two annular rings.

4. The elastic buffering hanger of the air conditioner duct anti-seismic support according to claim 3, characterized in that: The mounting bar (1) is fixed on the first U-shaped frame (22) by bolts. The first telescopic support (5) and the second telescopic support (7) are fixed on the bearing member by a rotating shaft and a nut. The connection portions of the first telescopic support (5) and the second telescopic support (7) are provided with anti-skid pieces.

5. The elastic buffering hanger of the air conditioner duct anti-seismic support according to claim 1 or 4, characterized in that: The upper end of the first side frame (21) is provided with a first protruding portion (23), and the lower end of the first side frame (21) is provided with a first butt joint frame (24) matched with the first protruding portion (23). The first side frame (21), the first protruding portion (23) and the first butt joint frame (24) are designed in an integrated manner.

6. The elastic buffering hanger of the air conditioner duct anti-seismic support according to claim 5, characterized in that: The buffer support (2) is connected with an assembly support (3) through the first butt joint frame (24). The assembly support (3) comprises a second side frame (31), a second U-shaped frame (32) and a second bearing member (37). The second side frame (31) is provided with the second U-shaped frame (32) on the side wall. The second side frame (31) and the second U-shaped frame (32) are connected with the second bearing member (37). The upper end of the second bearing member (37) is provided with a second movable rod (36), and the second movable rod (36) penetrates through the first U-shaped frame (22) and is connected with the first bearing member (28).

7. The elastic buffering hanger of the air conditioner duct anti-seismic support according to claim 6, characterized in that: The upper end of the second side frame (31) is provided with a second protruding part (33), and the lower end of the second side frame (31) is provided with a second docking frame (34) matched with the second protruding part (33), the second protruding part (33) is inserted into the first docking frame (24) and fixed through the first fastener (25), and the second docking frame (34) is connected with the second fastener (35).