Fabricated aluminum alloy glass curtain wall

The modular design of the prefabricated aluminum alloy glass curtain wall solves the problem of difficult quality control during on-site construction, enabling rapid and stable installation and efficient construction, thus improving construction quality and structural stability.

CN224092793UActive Publication Date: 2026-04-07ZHEJIANG ZHENXIN GLASS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-05-08
Publication Date
2026-04-07

AI Technical Summary

Technical Problem

The on-site construction quality of existing glass curtain walls is difficult to control, is greatly affected by human factors, has a slow construction progress, generates a large amount of scrap material, and has a long construction cycle.

Method used

The modular design involves prefabricating modules such as the outer frame, glass plate, pins, plugs, slots, and mounting bases in the factory, and then fixing the mounting bases on the construction site with expansion bolts. Finally, the pins are inserted and tightened with high-strength bolts to achieve modular installation.

Benefits of technology

It improved the quality and efficiency of construction, reduced the construction period, reduced waste generation, and enhanced the stability and aesthetics of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224092793U_ABST
    Figure CN224092793U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type aluminum alloy glass curtain wall, which relates to the technical field of constructional engineering and comprises an outer frame and a mounting seat, four pins are respectively fixed on two sides of the back of the outer frame, a slot and an insert block are respectively arranged on the pins, the mounting seat is positioned behind the outer frame, and the insert block is arranged on the mounting seat. Fixing holes are formed in the two sides, the upper portion and the lower portion of the back of the mounting base. Through the arrangement of the pins, the mounting seats, the high-strength bolts, the slots and the inserting blocks, the outer frame and the glass plate are processed by factory customization after the size is measured, standardized production can be carried out, the quality is stable, the precision is high, and then the processed outer frame, glass plate, pins and mounting seats are transported to a construction site; the mounting base is fixed to the outer wall of the building through the expansion bolts, then the inserting feet are inserted into the mounting base and fastened through the high-strength bolts, and mounting is easy, convenient and fast. The pins on the plurality of outer frames abut against each other through the slots and the insertion blocks; construction is fast, quality is high, and structural connection is stable.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building engineering, specifically is a kind of fabricated aluminium alloy glass curtain wall. BACKGROUND

[0002] Glass curtain wall has single-layer and double-layer glass two, it is a novel and beautiful architectural wall decoration method, mainly divided into bright frame glass curtain wall, half hidden frame glass curtain wall and hidden frame glass curtain wall etc., and the frame in it is usually made of aluminium alloy material, and the glass plate of glass curtain wall is usually made of super white glass, hollow glass, laminated glass, tempered glass etc.

[0003] The existing glass curtain wall is usually constructed on site, and the aluminium alloy profile is cut into a specified shape by the construction personnel to assemble the vertical column and horizontal frame, and then the glass plate is installed in the aluminium alloy frame for glueing operation and installation of sealing glue. The quality of the actual glass curtain wall after construction is difficult to control, and depends on the technology and experience of the construction personnel. The rework probability is high due to human factors, which affects the construction progress. The workload is large, the construction period is long, and a large amount of leftover materials and waste materials need to be transported to the recycling plant for recycling and treatment. UTILITY MODEL CONTENT

[0004] Therefore, the utility model aims to provide a fabricated aluminium alloy glass curtain wall to solve the technical problems mentioned in the background.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a fabricated aluminium alloy glass curtain wall, comprising an outer frame and a mounting seat, four insertion pins are fixed on the back of the outer frame, and an insertion slot and an insertion block are arranged on the insertion pin, the mounting seat is located behind the outer frame, and a fixing hole is formed on the back of the mounting seat, the top, bottom and both sides of the mounting seat are penetrated by high-strength bolts.

[0006] According to the above technical scheme, the production manufacturer personnel measures the area of glass curtain wall according to drawings or on-site, and then pre-produces glass curtain wall modules integrated with outer frame, glass plate, insertion pin, insertion block, insertion slot and step in the factory, and processes support modules integrated with mounting seat and fixing hole, and produces sealing strips in rolls. After production, it is transported to the construction site, and the construction party purchases high-strength bolts and expansion bolts at the same time. During installation, the construction personnel first fix the mounting seat on the building outer wall through the expansion bolt, and then the construction personnel inserts the four insertion pins included in the glass curtain wall module into the four mounting seats. Each mounting seat can connect at most four insertion pins of the glass curtain wall module, and finally the construction personnel fastens the insertion pin and the mounting seat through the high-strength bolt, which completes the construction operation. The installation is simple, convenient and fast, and after the installation of the glass curtain wall module is completed.

[0007] Further, the mounting seat outer surface is provided with a square hole, and the length and width of the pin is one fourth of the length and width of the square hole of the mounting seat outer surface.

[0008] By adopting the above technical scheme, each mounting seat can be connected with at most four pins of the glass curtain wall module, thereby increasing the utilization rate of the mounting seat and facilitating subsequent connection of the four glass curtain wall modules to improve stability.

[0009] Further, the pin is detachably connected with the mounting seat through a high-strength bolt.

[0010] By adopting the above technical scheme, the construction personnel inserts the four pins included in the glass curtain wall module into the four mounting seats respectively, at most four pins of the glass curtain wall module can be connected with each mounting seat, and finally the construction personnel fastens the pin with the mounting seat through the high-strength bolt, thereby completing the construction operation, and the installation is simple, convenient and fast.

[0011] Further, the pin block is matched with the pin slot.

[0012] By adopting the above technical scheme, the pins on the plurality of frames are mutually abutted through the pin slot and the pin block, and the force borne by the frame can be evenly distributed to the mounting seat and the surrounding frame through cooperation of the high-strength bolt, thereby improving structural stability.

[0013] Further, the high-strength bolt is provided with four high-strength bolts, and two high-strength bolts are vertically distributed with the other two high-strength bolts.

[0014] By adopting the above technical scheme, the four high-strength bolts are distributed in two horizontal directions and two vertical directions, thereby enabling the four glass curtain wall modules to be connected with each other, so as to distribute the force borne by the frame, thereby improving structural stability.

[0015] Further, the frame is internally connected with two glass plates, and the two glass plates are filled with air or inert gas.

[0016] By adopting the above technical scheme, the hollow glass has good light transmittance, and can increase sound insulation and heat insulation performance of the glass curtain wall, thereby making the indoor air conditioning system more energy-saving.

[0017] Further, the frame, the pin, the mounting seat and the pin block are all made of aluminum alloy material, and the glass plate is made of tempered laminated glass.

[0018] By adopting the above technical scheme, the frame, the pin, the mounting seat and the pin block made of aluminum alloy material have the advantages of light weight and high strength, and the glass plate made of tempered laminated glass material has double layers, that is, high strength, long service life and safety, can avoid harm caused by a large number of fragments falling from a high altitude when the glass plate cracks, and can increase sound insulation, heat insulation and buffering performance.

[0019] Furthermore, steps are provided around the perimeter of the outer frame, and sealing strips are connected inside the steps.

[0020] By adopting the above technical solution and setting the sealing strip, firstly, the joints between multiple glass curtain wall modules can be covered, thereby improving the aesthetics; secondly, the joints between multiple glass curtain wall modules are filled, thereby increasing the sealing performance.

[0021] Furthermore, the sealing strip is made of EPDM rubber.

[0022] By adopting the above technical solutions, the sealing strips made of EPDM rubber material have excellent weather resistance, ozone resistance and water resistance. They can resist ultraviolet rays, wind and rain for a long time, are not easy to age and crack, and have good elasticity and flexibility. They can adapt to the expansion and contraction changes under different ambient temperatures, effectively seal and waterproof, and have good sound insulation and shock absorption effects.

[0023] In summary, the present invention has the following main advantages:

[0024] This utility model utilizes a combination of pins, mounting bases, high-strength bolts, slots, and inserts. After precise measurements, the outer frame and glass panel are custom-made in a factory, enabling standardized production with stable quality and high precision. The finished outer frame, glass panel, pins, and mounting base are then transported to the construction site. The mounting base is first fixed to the building's exterior wall using expansion bolts, followed by inserting the pins into the mounting base and securing them with high-strength bolts. Installation is simple, convenient, and quick. Furthermore, the slots and inserts allow the pins on multiple outer frames to abut against each other, and the high-strength bolts evenly distribute the force on the outer frame to the mounting base and surrounding outer frame, improving structural stability. Construction is fast, of high quality, and the structural connection is stable. Attached Figure Description

[0025] Figure 1 This is a schematic diagram of the back structure of this utility model;

[0026] Figure 2 This is an exploded view of the mounting base of this utility model;

[0027] Figure 3 For the present utility model Figure 2 Enlarged view of the structure at point A in the image;

[0028] Figure 4 This is a schematic diagram of the structure of this utility model;

[0029] Figure 5 This is a side sectional view of the outer frame structure of this utility model;

[0030] Figure 6 This is a schematic diagram of the support structure of this utility model.

[0031] In the diagram: 1. Outer frame; 2. Glass plate; 3. Pin; 4. Mounting base; 5. Fixing hole; 6. High-strength bolt; 7. Slot; 8. Insert; 9. Step; 10. Sealing strip. Detailed Implementation

[0032] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0033] The embodiments of this utility model will be described below based on its overall structure.

[0034] Example 1:

[0035] A type of prefabricated aluminum alloy glass curtain wall, such as Figures 1-6 As shown, the device includes an outer frame 1 and a mounting base 4. Four pins 3 are fixed to both sides of the back of the outer frame 1. Each pin 3 has a slot 7 and a plug 8, with the plug 8 fitting into the slot 7. The mounting base 4 is located behind the outer frame 1. A square hole is formed on the outer surface of the mounting base 4. The length and width of the pins 3 are one-quarter the length and width of the square hole on the outer surface of the mounting base 4. Fixing holes 5 are formed on both sides, the top, and the bottom of the back of the mounting base 4. High-strength bolts 6 penetrate the top, bottom, and sides of the mounting base 4, and the pins 3 are connected to the mounting base 4 via the high-strength bolts 6. For disassembly and connection, four high-strength bolts 6 are provided, with two high-strength bolts 6 perpendicularly distributed to the other two. The construction workers first fix the mounting base 4 to the exterior wall of the building using expansion bolts. Then, the construction workers insert the four pins 3 of the glass curtain wall module into the four mounting bases 4 respectively. Each mounting base 4 can connect up to four pins 3 of the glass curtain wall module. Finally, the construction workers tighten the pins 3 to the mounting base 4 using high-strength bolts 6, thus completing the construction operation. The installation is simple, convenient, and quick. After the glass curtain wall module is installed,

[0036] See Figures 1-5 In the above embodiment, the outer frame 1 is internally connected to two glass plates 2, and the space between the two glass plates 2 is filled with air or inert gas. The glass plates 2 are made of tempered laminated glass. The outer frame 1, the pins 3, the mounting base 4 and the insert 8 are all made of aluminum alloy. The tempered laminated glass plate 2 has two layers, which has the following advantages: first, it has high strength, which extends the service life and safety; second, the lamination can prevent a large number of fragments from falling from a height and causing harm when the glass plate 2 cracks; and third, it increases the sound insulation, heat insulation and cushioning performance.

[0037] Example 2:

[0038] Based on the above embodiment one, the following settings are now implemented to enhance aesthetics and sealing.

[0039] Referring to Figure 1 、 Figure 2 、 Figure 4 And Figure 5 In the above embodiment, the outer frame 1 is provided with a step 9 around the four sides, and a sealing strip 10 is connected inside the step 9, which is made of ethylene-propylene-diene rubber material. Through the setting of the sealing strip 10, on the one hand, the joints between the multiple glass curtain wall modules can be blocked, thereby improving the aesthetic appearance; on the other hand, the joints between the multiple glass curtain wall modules are filled, thereby increasing the sealing performance.

[0040] The implementation principle of the utility model is as follows: first, the personnel of the manufacturer measure the area of the glass curtain wall according to the drawings or on-site, then the glass curtain wall module of the outer frame 1, the glass plate 2, the pin 3, the plug 8, the slot 7 and the step 9 are pre-produced in the factory, and the support module of the mounting seat 4 and the fixing hole 5 is also produced, and the sealing strip 10 is produced in a roll. After production, it is transported to the construction site, and the high-strength bolt 6 and the expansion bolt are purchased by the construction party;

[0041] When installing, the construction personnel first fix the mounting seat 4 on the building outer wall through the expansion bolt, then the construction personnel inserts the four pins 3 included in the glass curtain wall module into the four mounting seats 4 respectively, and each mounting seat 4 can connect at most four pins 3 of the glass curtain wall module, and finally the construction personnel fastens the pin 3 and the mounting seat 4 through the high-strength bolt 6, thereby completing the construction operation. The installation is simple, convenient and fast. After the glass curtain wall module is installed, the construction personnel applies glue in the step 9 and on the surface of the sealing strip 10, then the construction personnel inserts the sealing strip 10 into the step 9. Through the setting of the sealing strip 10, on the one hand, the joints between the multiple glass curtain wall modules can be blocked, thereby improving the aesthetic appearance; on the other hand, the joints between the multiple glass curtain wall modules are filled, thereby increasing the sealing performance.

[0042] After the construction is completed, the pins 3 on the multiple outer frames 1 are mutually resisted through the slot 7 and the plug 8, and the high-strength bolt 6 can uniformly distribute the force received by the outer frame 1 to the mounting seat 4 and the surrounding outer frame 1, thereby improving the structural stability. The outer frame 1, the pin 3, the mounting seat 4 and the plug 8 made of aluminum alloy material have the advantages of light weight and high strength, and the glass plate 2 made of tempered laminated glass material has double layers. On the one hand, the strength is high, the service life and safety are prolonged, on the other hand, the laminated glass can avoid the harm caused by a large number of fragments falling from high altitude when the glass plate 2 cracks, and on the third hand, the sound insulation, heat insulation and buffering performance are increased.

[0043] It should be noted that the mounting seat at the corner can be Figure 6 other styles of mounting seat 4.

[0044] Although the embodiments of the utility model have been shown and described, the specific embodiments are only the explanation of the utility model, and are not the limitation of the utility model, and the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable way, and the person skilled in the art can make the modification, replacement and change of the embodiments without the creative contribution after reading the specification without departing from the principles and the purpose of the utility model, but as long as in the claim range of the utility model, it is protected by the patent law.

Claims

1. A prefabricated aluminum alloy glass curtain wall, comprising an outer frame (1) and a mounting base (4), characterized in that: Four pins (3) are fixed on both sides of the back of the outer frame (1), and slots (7) and plugs (8) are provided on the pins (3). The mounting base (4) is located behind the outer frame (1), and fixing holes (5) are provided on both sides, the top and bottom of the back of the mounting base (4). High-strength bolts (6) pass through the top, bottom and sides of the mounting base (4).

2. The prefabricated aluminum alloy glass curtain wall according to claim 1, characterized in that: The mounting base (4) has a square hole on its outer surface, and the length and width of the pin (3) are one-quarter of the length and width of the square hole on the outer surface of the mounting base (4).

3. The prefabricated aluminum alloy glass curtain wall according to claim 2, characterized in that: The pin (3) is detachably connected to the mounting base (4) by a high-strength bolt (6).

4. The prefabricated aluminum alloy glass curtain wall according to claim 1, characterized in that: The insert (8) is adapted to the slot (7).

5. The prefabricated aluminum alloy glass curtain wall according to claim 3, characterized in that: Four high-strength bolts (6) are provided, and two of the high-strength bolts (6) are perpendicular to the other two high-strength bolts (6).

6. The prefabricated aluminum alloy glass curtain wall according to claim 1, characterized in that: The outer frame (1) is internally connected to two glass plates (2), and the space between the two glass plates (2) is filled with air or inert gas.

7. The prefabricated aluminum alloy glass curtain wall according to claim 6, characterized in that: The outer frame (1), pins (3), mounting base (4) and insert (8) are all made of aluminum alloy, and the glass plate (2) is made of tempered laminated glass.

8. The prefabricated aluminum alloy glass curtain wall according to claim 6, characterized in that: The outer frame (1) is provided with steps (9) on all four sides, and a sealing strip (10) is connected inside the steps (9).

9. The prefabricated aluminum alloy glass curtain wall according to claim 8, characterized in that: The sealing strip (10) is made of EPDM rubber.