Base special for hot oil filling

By designing independent filling pipes and hot oil channels, and using a corrugated groove structure, the problem of pipe blockage caused by solidification in the lip jelly filling system was solved, ensuring the continuity of the filling process and production efficiency.

CN224241329UActive Publication Date: 2026-05-15SHANGHAI YINONG BIO TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANGHAI YINONG BIO TECH CO LTD
Filing Date
2025-07-03
Publication Date
2026-05-15

AI Technical Summary

Technical Problem

Existing lip jelly filling systems are prone to solidification at room temperature, leading to pipeline blockage and affecting filling accuracy and production efficiency.

Method used

It adopts an independent filling pipe and hot oil channel design, which uses hot oil to transfer heat to keep the lip jelly liquid, and combines it with a corrugated groove to improve connection stability and avoid solidification and frequent cleaning.

Benefits of technology

It achieves continuous stability in the filling process, improves production efficiency and stability, and avoids pipeline blockage and downtime for cleaning caused by solidification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224241329U_ABST
    Figure CN224241329U_ABST
Patent Text Reader

Abstract

The utility model discloses a base special for hot oil filling, and belongs to the technical field of lip jelly filling. A base special for hot oil filling comprises a base body. The filling pipe is fixedly connected to the base; the conveying cavity is formed in the base; the oil conveying pipe is fixedly connected to the side wall of the base, and the oil conveying pipe communicates with the conveying cavity; the connecting sealing cavity is formed in the bottom of the base, and the filling pipe is communicated with the connecting sealing cavity; the independent filling pipe and the hot oil channel are arranged in the base, isolated heating of hot oil and lip jelly is achieved through heat transfer of flowing hot oil of the base, the hot oil flows around the filling pipe in the conveying cavity, heat is continuously provided for the lip jelly, the lip jelly is prevented from being solidified in a pipeline, it is ensured that the filling process is continuous and stable, and the production efficiency is improved. Frequent shutdown cleaning is not needed, and the production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of lip jelly filling device, and in particular to a special base for hot oil filling. Background Technology

[0002] In the cosmetics industry, lip jelly products, being solid at room temperature, require heating to achieve a liquid filling process; however, traditional lip jelly filling systems still have certain shortcomings:

[0003] Existing integrated filling machines use an integrated design of container and filling head, and use a single pipeline connection. Because lip jelly is easy to solidify at room temperature, it may cause pipeline blockage and affect filling accuracy. When production is stopped, the lip jelly solidifies in the pipeline, and the pipeline needs to be thoroughly cleaned before restarting, which may affect production efficiency. Utility Model Content

[0004] The purpose of this utility model is to solve the problems mentioned in the background art and to provide a special base for hot oil filling.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] A special base for hot oil filling includes:

[0007] Base;

[0008] The filling tube is fixedly connected to the base;

[0009] The delivery chamber is located on the base.

[0010] An oil delivery pipe is fixedly connected to the side wall of the base, and the oil delivery pipe is connected to the delivery chamber;

[0011] A connecting sealing cavity is provided at the bottom of the base, and the filling tube is connected to the connecting sealing cavity.

[0012] Preferably, a first corrugated groove is formed on the top side wall of the base.

[0013] Preferably, a second corrugated groove is formed on the top side wall of the filling tube.

[0014] Preferably, a third corrugated groove is formed on the side wall of the oil pipeline.

[0015] Preferably, a threaded groove is formed on the inner sidewall of the connecting sealing cavity.

[0016] Preferably, both the filling pipe and the oil delivery pipe are stainless steel pipes.

[0017] Compared with the prior art, this utility model provides a special base for hot oil filling, which has the following advantages:

[0018] All parts not covered in this device are the same as or can be implemented using existing technology. This utility model has an independent filling pipe and hot oil channel inside the base, and achieves isolated heating of hot oil and lip jelly through heat transfer of hot oil flowing in the base. The hot oil flows around the filling pipe in the conveying chamber, continuously providing heat to the lip jelly, preventing it from solidifying in the pipeline, ensuring a continuous and stable filling process, eliminating the need for frequent shutdowns for cleaning, and improving production efficiency.

[0019] Meanwhile, this utility model can effectively improve the connection stability of the hot oil pipe, the lip freezing material pipe and the oil delivery pipe by setting corrugated grooves on the side wall of the base, the filling pipe and the oil delivery pipe, and avoid the pipe from falling off due to vibration or pressure fluctuation, thereby improving production stability. Attached Figure Description

[0020] Figure 1 This utility model provides a structural schematic diagram of a special base for hot oil filling. Figure 1 ;

[0021] Figure 2 This utility model provides a structural schematic diagram of a special base for hot oil filling. Figure 2 ;

[0022] Figure 3 This is a cross-sectional view of a special base for hot oil filling proposed in this utility model.

[0023] In the diagram: 1. Base; 101. First corrugated groove; 102. Conveying chamber; 103. Connecting sealing chamber; 1031. Threaded groove; 2. Filling pipe; 201. Second corrugated groove; 3. Oil delivery pipe; 301. Third corrugated groove. Detailed Implementation

[0024] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.

[0025] Example 1:

[0026] Reference Figures 1-3 A special base for hot oil filling, comprising:

[0027] Base 1;

[0028] The filling tube 2 is fixedly connected to the base 1;

[0029] The conveying cavity 102 is formed on the base 1;

[0030] The oil delivery pipe 3 is fixedly connected to the side wall of the base 1, and the oil delivery pipe 3 is connected to the delivery chamber 102.

[0031] The connecting sealing cavity 103 is located at the bottom of the base 1, and the filling tube 2 is connected to the connecting sealing cavity 103.

[0032] Reference Figures 1-3 Before use, connect the base 1 to the hot oil pipe and connect the conveying chamber 102 on the base 1 to the hot oil pipe. At this time, the filling pipe 2 is connected to the lip jelly material pipe; then connect the filling head to the base 1.

[0033] Reference Figures 1-3 During use, the hot oil pipe delivers hot oil to the delivery chamber 102. Since the delivery chamber 102 is connected to the oil pipe 3, the hot oil entering the delivery chamber 102 will be delivered through the oil pipe 3. The hot oil flows around the filling pipe 2 in the delivery chamber 102 and the heat energy is conducted through the stainless steel material of the base 1 to continuously heat the lip jelly in the filling pipe 2 and maintain the liquid fluidity of the lip jelly.

[0034] During filling, the lip jelly material enters from the top of the filling pipe 2 through the lip jelly material pipe and flows downward under the action of gravity or pumping. It is then sprayed out through the filling head connected to the bottom of the filling pipe 2 to complete the filling. During the filling process, hot oil continuously circulates in the conveying chamber 102 and provides heat to the lip jelly in the filling pipe 2 through the wall of the base 1 to prevent the lip jelly from solidifying in the pipeline and ensure that the filling process is continuous and stable.

[0035] A first corrugated groove 101 is provided on the top side wall of the base 1.

[0036] Reference Figure 1 , Figure 2 When the base 1 is connected to the hot oil pipe, the first corrugated groove 101 on the top side wall of the base 1 is inserted into the hot oil pipe, thereby increasing the connection friction between the base 1 and the hot oil pipe and thus improving the stability of the hot oil pipe connected to the base 1.

[0037] A second corrugated groove 201 is provided on the top side wall of the filling tube 2.

[0038] Reference Figure 1 , Figure 2 When the filling tube 2 is connected to the lip jelly material tube, the end of the filling tube 2 with the second corrugated groove 201 opened on the top side wall will be inserted into the lip jelly material tube, thereby increasing the connection friction between the filling tube 2 and the lip jelly material tube, and thus improving the connection stability between the filling tube 2 and the lip jelly material tube.

[0039] A third corrugated groove 301 is provided on the side wall of the oil pipeline 3.

[0040] Reference Figure 1 , Figure 2When the oil pipe 3 is connected to the hot oil pipe, the end of the oil pipe 3 with the third corrugated groove 301 is inserted into the hot oil pipe through the third corrugated groove 301 on the side wall of the oil pipe 3. This can increase the connection friction between the oil pipe 3 and the hot oil pipe, thereby improving the connection stability between the oil pipe 3 and the hot oil pipe.

[0041] A threaded groove 1031 is provided on the inner wall of the connecting sealing cavity 103.

[0042] Reference Figure 2 , Figure 3 By connecting the threaded groove 1031 on the inner side wall of the sealing cavity 103, it is easy to connect the base 1 to the filling head. When the base 1 is connected to the filling head, the filling head and the inner top wall of the sealing cavity 103 abut against each other, thereby preventing the filling tube 2 from leaking out through the connection gap between the filling head and the base 1 during the filling process, thus improving the filling effect.

[0043] Both the filling pipe 2 and the oil delivery pipe 3 are stainless steel pipes, and the base 1 is also a stainless steel base.

[0044] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and inventive concept of the present utility model, should be included within the protection scope of the present utility model.

Claims

1. A special base for hot oil filling, characterized in that, include: Base (1); The filling tube (2) is fixedly connected to the base (1); The conveying chamber (102) is located on the base (1); The oil pipeline (3) is fixedly connected to the side wall of the base (1), and the oil pipeline (3) is connected to the delivery chamber (102); A connecting sealing cavity (103) is provided at the bottom of the base (1), and the filling tube (2) is connected to the connecting sealing cavity (103).

2. The special base for hot oil filling according to claim 1, characterized in that, The base (1) has a first corrugated groove (101) on its top side wall.

3. The special base for hot oil filling according to claim 1, characterized in that, The filling tube (2) has a second corrugated groove (201) on its top side wall.

4. The special base for hot oil filling according to claim 1, characterized in that, The oil pipeline (3) has a third corrugated groove (301) on its side wall.

5. A special base for hot oil filling according to claim 1, characterized in that, A threaded groove (1031) is provided on the inner wall of the connecting sealing cavity (103).

6. A special base for hot oil filling according to claim 1, characterized in that, Both the filling pipe (2) and the oil delivery pipe (3) are stainless steel pipes.