Novel water quenching device for strip steel galvanization production line
By using a three-roller structure and staggered water spray head design, the problem of uneven strip cooling caused by the water quenching device was solved, achieving uniform cooling and high-quality surface treatment of the strip.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- TIANJIN TIANYUAN SHENGXING ENERGY SAVING ENVIRONMENTAL PROTECTION TECH DEV
- Filing Date
- 2025-06-24
- Publication Date
- 2026-05-22
Smart Images

Figure CN224266327U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of hot-dip galvanizing of aluminum and magnesium strips, and in particular to a water quenching device for a new type of strip galvanizing production line. Background Technology
[0002] In the field of metallurgical technology, the requirements for steel corrosion protection are becoming increasingly stringent, and strip steel coating technology is constantly being improved. The coating has been changed from the original zinc plating to a zinc-aluminum-magnesium coating with higher corrosion resistance. In modern continuous hot-dip galvanizing production lines for strip steel, the water quenching device plays a crucial role in cooling the strip steel after air cooling. In the original units, the water quenching device used a double-sided water spray system, spraying water on the strip steel before it entered the water tank. This resulted in inconsistent cooling rates on the strip steel surface, causing longitudinal color differences in the zinc-aluminum-magnesium coating and affecting the surface uniformity and consistency of the strip steel. Utility Model Content
[0003] This utility model aims to address the shortcomings of existing technologies by providing a novel water quenching device for a strip steel galvanizing production line.
[0004] To achieve the above objectives, this utility model adopts the following technical solution:
[0005] The new strip galvanizing production line water quenching device includes a water quenching tank with two strip water quenching guide rollers installed inside. A bracket is installed on one side of the water quenching tank, and a strip feeding guide roller is installed on the bracket. A strip discharge platform is connected to the other side of the water quenching tank, and a water spraying device is installed on the strip discharge platform.
[0006] Each strip steel water quenching guide roller in the water quenching tank is provided with a fixed seat, and the strip steel water quenching guide roller is rotatably mounted on the fixed seat via a rotating shaft.
[0007] The bracket is equipped with a feeding guide roller mounting seat, and the strip steel water-quenched guide roller is rotatably mounted on the feeding guide roller mounting seat via a rotating shaft.
[0008] The water spraying device includes several spray heads arranged alternately on both sides of the strip steel, and the spray heads are connected to the main water spraying pipe through branch spray pipes.
[0009] The beneficial effects of this utility model are: This utility model adopts a three-roller structure, which uses the strip steel feeding guide roller to guide the strip steel into the water quenching tank, ensuring that the strip steel entering the water quenching tank is cooled evenly, thereby making the strip steel surface free of color difference, which facilitates the subsequent processing of the strip steel and improves the surface quality of the strip steel. Attached Figure Description
[0010] Figure 1 This is a schematic diagram of the structure of this utility model;
[0011] In the diagram: 1-Water quenching tank; 2-Water quenching guide roller for strip steel; 3-Bracket; 4-Strip steel feeding guide roller; 5-Strip steel discharge platform; 6-Water spray device; 7-Fixed seat; 8-Feeding guide roller mounting seat; 9-Drain outlet; 10-Strip steel;
[0012] 61-Sprinkler head; 62-Branch sprinkler pipe; 63-Main sprinkler pipe; 64-Control valve;
[0013] The following will describe in detail the embodiments of this utility model with reference to the accompanying drawings. Detailed Implementation
[0014] The principles and features of this utility model are described below with reference to the accompanying drawings. The embodiments described are for illustrative purposes only and are not intended to limit the scope of this utility model. The utility model is described more specifically in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of this utility model will become clearer from the following description. It should be noted that the drawings are all in a very simplified form and use non-precise proportions, and are only used to facilitate and clarify the illustration of the embodiments of this utility model.
[0015] It should be noted that when a component is described as "fixed to" another component, it can be directly on the other component or may have a component in between. When a component is considered "connected to" another component, it can be directly connected to the other component or may have a component in between. When a component is considered "set on" another component, it can be directly set on the other component or may have a component in between. The terms "vertical," "horizontal," "left," "right," and similar expressions used in this document are for illustrative purposes only.
[0016] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0017] The present invention will be further described below with reference to the accompanying drawings and embodiments:
[0018] like Figure 1 As shown, the new strip galvanizing production line water quenching device includes a water quenching tank 1, strip water quenching guide roller 2, bracket 3, strip feeding guide roller 4, strip discharge platform 5, water spraying device 6, fixed seat 7, feeding guide roller mounting seat 8, and drain port 9.
[0019] The lower end of the side wall of the water quenching tank 1 is provided with a drain port 9.
[0020] Two strip steel water quenching guide rollers 2 are installed in the water quenching tank 1. Each strip steel water quenching guide roller 2 is provided with a fixed seat 7 in the water quenching tank 1. The strip steel water quenching guide roller 2 is rotatably mounted on the fixed seat 7 via a rotating shaft.
[0021] The lowest point of the strip steel water-quenching guide roller 2 is lower than the water surface height in the water-quenching tank 1.
[0022] A bracket 3 is installed on one side of the water quenching tank 1. A strip steel feeding guide roller 4 is installed on the bracket 3. A feeding guide roller mounting seat 8 is provided on the bracket 3. The strip steel water quenching guide roller 2 is rotatably mounted on the feeding guide roller mounting seat 8 via a rotating shaft.
[0023] The other side of the water quenching tank 1 is connected to a strip steel discharge platform 5, and the strip steel discharge platform 5 is equipped with a water spraying device 6.
[0024] The water spraying device 6 includes several water spray heads 61 arranged alternately on both sides of the strip steel 10. The water spray heads 61 are connected to the main water spray pipe 63 through branch water spray pipes 62.
[0025] A control valve 64 is provided on the branch water spray pipe 62.
[0026] This utility model adopts a three-roller structure, which uses the strip steel feeding guide roller 4 to guide the strip steel 10 into the water quenching tank 1, ensuring that the strip steel 10 cools evenly in the water quenching tank 1, thereby making the surface of the strip steel 10 free of color difference, which facilitates the subsequent processing of the strip steel 10 and improves the surface quality of the strip steel 10.
[0027] The present invention has been described above with reference to the accompanying drawings. Obviously, the specific implementation of the present invention is not limited to the above-described manner. Any improvements made using the inventive concept and technical solution of the present invention, or direct application to other situations without modification, are all within the protection scope of the present invention.
Claims
1. A new type of water quenching device for strip steel galvanizing production line, characterized in that, It includes a water quenching tank (1), two strip steel water quenching guide rollers (2) are installed in the water quenching tank (1), a bracket (3) is installed on one side of the water quenching tank (1), a strip steel feeding guide roller (4) is installed on the bracket (3), and a strip steel discharge platform (5) is connected to the other side of the water quenching tank (1), and a water spraying device (6) is provided on the strip steel discharge platform (5).
2. The water quenching device for the novel strip steel galvanizing production line according to claim 1, characterized in that, Each strip steel water quenching guide roller (2) in the water quenching tank (1) is provided with a fixed seat (7), and the strip steel water quenching guide roller (2) is rotatably mounted on the fixed seat (7) via a rotating shaft.
3. The water quenching device for the novel strip steel galvanizing production line according to claim 2, characterized in that, The bottom of the strip steel water quenching guide roller (2) is lower than the water surface height in the water quenching tank (1).
4. The water quenching device for the novel strip steel galvanizing production line according to claim 3, characterized in that, The bracket (3) is provided with a feeding guide roller mounting seat (8), and the strip steel water quenching guide roller (2) is rotatably mounted on the feeding guide roller mounting seat (8) via a rotating shaft.
5. The water quenching device for the novel strip steel galvanizing production line according to claim 4, characterized in that, The lower end of the side wall of the water quenching tank (1) is provided with a drain port (9).
6. The water quenching device for a novel strip steel galvanizing production line according to claim 5, characterized in that, The water spraying device (6) includes several water spray heads (61) arranged alternately on both sides of the strip steel (10), and the water spray heads (61) are connected to the main water spray pipe (63) through branch water spray pipes (62).
7. The water quenching device for a novel strip steel galvanizing production line according to claim 6, characterized in that, A control valve (64) is provided on the branch water spray pipe (62).