Quick connecting structure for fabricated bridge construction

The structural design, which combines a positioning plate and a threaded sleeve, solves the problem of slow connection speed between the cap beam and the pier in the construction of prefabricated bridges, achieving a fast and stable connection effect.

CN224314052UActive Publication Date: 2026-06-02DALIAN VOCATIONAL & TECHNICAL COLLEGE (DALIAN OPEN UNIVERSITY)

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
DALIAN VOCATIONAL & TECHNICAL COLLEGE (DALIAN OPEN UNIVERSITY)
Filing Date
2025-07-06
Publication Date
2026-06-02

AI Technical Summary

Technical Problem

In the construction of prefabricated bridges, the temporary connection between the cap beam and the pier is difficult to position and connect quickly, resulting in a slow connection speed that cannot meet the needs of rapid construction.

Method used

The structure adopts a combination of positioning plate and threaded sleeve. The positioning plate is inserted into the positioning hole to achieve initial positioning, and the threaded engagement of the fixing screw and the threaded sleeve achieves vertical fastening. Grout is injected and reinforced through the guide pipe and grouting hole.

Benefits of technology

It enables rapid, precise, and stable connection between the cap beam and the pier, improving the efficiency and speed of temporary construction of prefabricated bridges and meeting the needs of rapid construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224314052U_ABST
    Figure CN224314052U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick connecting structure for assembly type bridge construction, concretely relates to bridge construction field, including bent cap, the lower part of bent cap is equipped with pier, the outer surface of pier is equipped with two locating plates, the outer surface of bent cap is equipped with two locating holes, and the top of two locating plates respectively extends to the inside of two locating holes, and the bottom surface of two bent caps is equipped with two groups of reserved holes, and the upper surface of pier is fixedly connected with two groups of steel sleeve, and the top of two groups of steel sleeve all extends to the inside of reserved hole. The utility model discloses, through the setting of two locating plates, and with the cooperation of two locating holes outside bent cap, can make bent cap and pier connect, make two locating plate top insert corresponding locating hole inside, primarily limit horizontal relative position, conveniently with bent cap bottom surface reserved hole accurate sleeve setting at the top of steel sleeve, can make butt joint process more smooth, has improved the connecting efficiency of bridge temporary construction.
Need to check novelty before this filing date? Find Prior Art