Biological denitrification treatment device

By designing the diversion pipe, connecting pipe, and flange structure, the problem of cumbersome maintenance after the aeration pipe is damaged is solved, and rapid replacement and stable installation without emptying the sewage treatment tank are achieved, thus improving the practicality of the aeration device.

CN224337390UActive Publication Date: 2026-06-09ZIBO BOSHAN CHANGSHUI PURIFICATION EQUIP CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ZIBO BOSHAN CHANGSHUI PURIFICATION EQUIP CO LTD
Filing Date
2025-07-15
Publication Date
2026-06-09

AI Technical Summary

Technical Problem

Existing aeration devices' liftable aeration pipes are prone to damage and cracking after prolonged use, making maintenance cumbersome and impractical.

Method used

The system employs a structure consisting of diversion pipes, connecting pipes, installation pipes, and flanges. The aeration pipes are fixedly connected with bolts and nuts. A maintenance platform and positioning slots are installed inside the wastewater treatment tank to facilitate the replacement and repair of damaged aeration pipes.

Benefits of technology

This allows for the replacement of damaged aeration pipes without emptying the wastewater treatment tank, improving the practicality of the device and the stability and robustness of the aeration pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224337390U_ABST
    Figure CN224337390U_ABST
Patent Text Reader

Abstract

The utility model discloses a biological denitrification treatment device relates to biological denitrification technical field, and the utility model discloses a sewage treatment tank one side fixed mounting has fixed platform, the top surface symmetrical mounting of fixed platform has fixed base, the quantity of fixed base is two, two fixed base between fixed mounting has the shunt pipe, and the installation fixed of multiple connecting pipes is completed through the shunt pipe, under the cooperation of first flange and second flange, through the installation pipe of connecting pipe bottom surface installation multiple fixed pipe completes the installation fixed of corresponding aeration pipeline, through aeration pipeline completes the installation fixed of corresponding liftable aeration pipe, when the liftable aeration pipe of some liftable aeration pipe damage cracking, under the cooperation of repair platform, the repair personnel will damage the aeration pipeline of liftable aeration pipe and take down, take out liftable aeration pipe from the sewage treatment tank, replace new, and liftable aeration pipe can be newly installed, need not empty the sewage treatment tank, improve the practicality of the device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of biological denitrification technology, specifically a biological denitrification treatment device. Background Technology

[0002] Biological denitrification is a commonly used treatment process for wastewater pretreatment. The wastewater to be treated is injected into a designated biological denitrification wastewater treatment tank for ammonia removal treatment. However, the wastewater treatment tank needs to be supplied with oxygen through an aeration device during operation.

[0003] In existing wastewater treatment ponds, the aeration pipes of the aeration devices are mostly laid at the bottom of the pond. The corresponding liftable aeration pipes are then installed through these pipes. However, after prolonged use, the liftable aeration pipes of these existing devices are prone to damage, leading to cracks. This results in a larger aeration volume at the cracked section, affecting the aeration volume of other liftable aeration pipes. Furthermore, maintenance requires emptying the wastewater treatment pond, which is a cumbersome process and makes the devices impractical. Utility Model Content

[0004] To address the problem that existing aeration devices are prone to damage after prolonged operation, leading to cracking of the liftable aeration pipes, cumbersome maintenance, and poor practicality, the purpose of this utility model is to provide a biological denitrification treatment device.

[0005] To solve the above technical problems, the present invention adopts the following technical solution: a biological denitrification treatment device, including a sewage treatment tank, a fixed platform fixedly installed on one side of the sewage treatment tank, two fixed seats symmetrically installed on the top surface of the fixed platform, a diversion pipe fixedly installed between the two fixed seats, a connecting pipe evenly distributed on one side of the surface of the diversion pipe, an installation pipe evenly distributed on the bottom surface of the connecting pipe, an aeration pipe detachably installed below the installation pipe, a first flange fixedly installed at the bottom end of the installation pipe, a second flange fixedly installed at the top end of the aeration pipe, and the first flange and the second flange being fixedly connected by bolts and nuts;

[0006] A liftable aeration pipe is fixedly installed at the end of the aeration pipe away from the second flange. A maintenance platform is fixedly installed in the sewage treatment tank. Positioning sleeves are fixedly installed at both ends of the maintenance platform. Positioning grooves are evenly distributed on both sides of the sewage treatment tank. The positioning sleeves are slidably locked in the positioning grooves.

[0007] Preferably, a fixing rod is fixedly installed on one side of the maintenance platform inside the sewage treatment tank, and a uniformly distributed positioning seat is fixedly installed on one side of the fixing rod. A positioning element is fixedly sleeved on the surface of the aeration pipe near the second flange. The positioning element is slidably locked in the positioning seat, and the positioning element and the positioning seat cooperate with each other.

[0008] Compared with the prior art, the beneficial effects of this utility model are as follows:

[0009] 1. In this utility model, multiple connecting pipes are installed and fixed through a diversion pipe. With the cooperation of the first flange and the second flange, multiple installation pipes are installed on the bottom surface of the connecting pipe to complete the installation and fixing of the corresponding aeration pipe. The corresponding liftable aeration pipe is installed and fixed through the aeration pipe. When a liftable aeration pipe is damaged or cracked, with the cooperation of the maintenance platform, the maintenance personnel can remove the aeration pipe corresponding to the damaged liftable aeration pipe, take the liftable aeration pipe out of the sewage treatment tank, replace it with a new liftable aeration pipe and reinstall it. There is no need to empty the sewage treatment tank, which improves the practicality of this device.

[0010] 2. In this utility model, the multiple aeration pipes corresponding to each connecting pipe are installed with the assistance of a fixing rod. With the cooperation of multiple positioning seats installed on one side of the fixing rod and the positioning parts sleeved on one end of the surface of the corresponding aeration pipe, the positioning of the aeration pipe under the installation pipe is completed, which increases the stability and firmness of the aeration pipe after installation. Attached Figure Description

[0011] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a schematic diagram of the overall structure of this utility model.

[0013] Figure 2 This is a cross-sectional view of the internal structure of the wastewater treatment tank of this utility model.

[0014] Figure 3 This utility model Figure 2 Enlarged view of the structure at point A in the middle.

[0015] Figure 4 This is a schematic diagram of the internal structure of the sewage treatment tank of this utility model.

[0016] Figure 5 This utility model Figure 4 Enlarged view of the structure at point B in the middle.

[0017] In the diagram: 1. Wastewater treatment tank; 11. Fixed platform; 12. Fixed seat; 13. Auxiliary platform; 14. Positioning groove; 2. Diversion pipe; 21. Connecting pipe; 22. Installation pipe; 23. First flange; 3. Aeration pipe; 31. Second flange; 32. Liftable aeration pipe; 33. Positioning component; 34. Support seat; 4. Fixed rod; 41. Positioning seat; 42. Limiting groove; 43. Slot; 5. Maintenance platform; 51. Positioning sleeve; 52. Guardrail. Detailed Implementation

[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0019] Example: Figures 1-5 As shown, this utility model provides a biological denitrification treatment device, including a sewage treatment tank 1. A fixed platform 11 is fixedly installed on one side of the sewage treatment tank 1. Two fixed seats 12 are symmetrically installed on the top surface of the fixed platform 11. A diversion pipe 2 is fixedly installed between the two fixed seats 12. A connecting pipe 21 is evenly distributed and fixedly installed on one side of the surface of the diversion pipe 2. An installation pipe 22 is evenly distributed and fixedly installed on the bottom surface of the connecting pipe 21. An aeration pipe 3 is detachably installed below the installation pipe 22. A first flange 23 is fixedly installed at the bottom of the aeration pipe 3, and a second flange 31 is fixedly installed at the top of the aeration pipe 3. The first flange 23 and the second flange 31 are fixedly connected by bolts and nuts. An aeration pipe 32 that can be lifted is fixedly installed at the end of the aeration pipe 3 away from the second flange 31. A maintenance platform 5 that is evenly distributed is fixedly installed inside the sewage treatment tank 1. Positioning sleeves 51 are fixedly installed at both ends of the maintenance platform 5. Positioning grooves 14 that are evenly distributed are opened on both sides inside the sewage treatment tank 1. The positioning sleeves 51 are slidably locked in the positioning grooves 14.

[0020] The positioning sleeves 51 installed at both ends of the maintenance platform 5, in conjunction with the corresponding positioning grooves 14, complete the installation and positioning of the maintenance platform 5 in the sewage treatment tank 1. Each maintenance platform 5 corresponds to an aeration pipe 3 installed below a connecting pipe 21. The two fixing seats 12 installed on the top surface of the fixing platform 11 complete the installation and fixing of the diversion pipe 2. The diversion pipe 2 completes the installation and fixing of multiple connecting pipes 21. With the cooperation of the first flange 23 and the second flange 31, multiple installation pipes 22 are installed on the bottom surface of the connecting pipe 21 to complete the installation and fixing of the corresponding aeration pipe 3. The aeration pipe 3 completes the installation and fixing of the corresponding liftable aeration pipe 32. When a liftable aeration pipe 32 is damaged or cracked, with the cooperation of the maintenance platform 5, the maintenance personnel remove the aeration pipe 3 corresponding to the damaged liftable aeration pipe 32, take the liftable aeration pipe 32 out of the sewage treatment tank 1, replace it with a new liftable aeration pipe 32, and reinstall it.

[0021] A fixing rod 4 is fixedly installed on one side of the maintenance platform 5 inside the sewage treatment tank 1. A positioning seat 41 is evenly distributed on one side of the fixing rod 4. A positioning element 33 is fixedly sleeved on the end of the surface of the aeration pipe 3 near the second flange 31. The positioning element 33 is slidably locked in the positioning seat 41. The positioning element 33 and the positioning seat 41 cooperate with each other. Multiple aeration pipes 3 below each connecting pipe 21 are installed with the assistance of a fixing rod 4. With the cooperation of multiple positioning seats 41 installed on one side of the fixing rod 4 and the positioning element 33 sleeved on one end of the surface of the corresponding aeration pipe 3, the positioning of the aeration pipe 3 below the installation pipe 22 is completed, which facilitates the connection and fixation of the installation pipe 22 and the aeration pipe 3 through the first flange 23 and the second flange 31.

[0022] A limiting groove 42 is provided on the top surface of the positioning seat 41, and the positioning component 33 is slidably locked in the limiting groove 42. The positioning component 33 is locked and positioned by the limiting groove 42 on the top surface of the positioning seat 41, and at the same time, the aeration pipe 3 is accurately locked into the support seat 34. A slot 43 is provided on one side of the bottom surface of the limiting groove 42, and the aeration pipe 3 is slidably locked in the slot 43. The corresponding aeration pipe 3 is locked and positioned by the slot 43.

[0023] An auxiliary platform 13 is fixedly installed on the side of the sewage treatment tank 1 away from the fixed platform 11. The auxiliary platform 13 works in conjunction with the maintenance platform 5. The auxiliary platform 13 facilitates maintenance personnel to descend to the corresponding maintenance platform 5 to perform their work. Evenly distributed support seats 34 are fixedly installed on the bottom surface of the sewage treatment tank 1. The aeration pipe 3 is slidably locked in the support seat 34. The evenly distributed support seats 34 installed on the bottom surface of the sewage treatment tank 1 complete the support and positioning work of the corresponding aeration pipe 3. A guardrail 52 is fixedly installed on one side of the maintenance platform 5. The guardrail 52 works in conjunction with the maintenance platform 5. The guardrail 52 completes the protection work of the corresponding maintenance platform 5 and protects the maintenance personnel.

[0024] Working principle: The positioning sleeves 51 installed at both ends of the maintenance platform 5 cooperate with the corresponding positioning grooves 14 to complete the installation and positioning of the maintenance platform 5 in the sewage treatment tank 1. Each maintenance platform 5 corresponds to an aeration pipe 3 installed below a connecting pipe 21. The two fixing seats 12 installed on the top surface of the fixing platform 11 complete the installation and fixing of the diversion pipe 2. The diversion pipe 2 completes the installation and fixing of multiple connecting pipes 21. With the cooperation of the first flange 23 and the second flange 31, multiple installation pipes 22 are installed on the bottom surface of the connecting pipe 21 to complete the installation and fixing of the corresponding aeration pipe 3. The aeration pipe 3 completes the installation and fixing of the corresponding liftable aeration pipe 32. When a liftable aeration pipe 32 is damaged or cracked, with the cooperation of the maintenance platform 5, the maintenance personnel remove the aeration pipe 3 corresponding to the damaged liftable aeration pipe 32, take the liftable aeration pipe 32 out of the sewage treatment tank 1, replace it with a new liftable aeration pipe 32 and reinstall it.

[0025] Each connecting pipe 21 has multiple aeration pipes 3 below it, which are assisted in installation by a fixing rod 4. Multiple positioning seats 41 installed on one side of the fixing rod 4 cooperate with the positioning parts 33 sleeved on one end of the surface of the corresponding aeration pipe 3 to complete the positioning of the aeration pipe 3 below the installation pipe 22, so as to facilitate the connection and fixation of the installation pipe 22 and the aeration pipe 3 through the first flange 23 and the second flange 31.

[0026] Obviously, those skilled in the art can make various modifications and variations to this utility model without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this utility model and their equivalents, this utility model also intends to include these modifications and variations.

Claims

1. A biological denitrification treatment device, comprising a wastewater treatment tank (1), characterized in that: A fixed platform (11) is fixedly installed on one side of the sewage treatment tank (1). A fixed seat (12) is symmetrically installed on the top surface of the fixed platform (11). There are two fixed seats (12). A diversion pipe (2) is fixedly installed between the two fixed seats (12). A connecting pipe (21) is fixedly installed on one side of the surface of the diversion pipe (2). An installation pipe (22) is fixedly installed on the bottom surface of the connecting pipe (21). An aeration pipe (3) is detachably installed below the installation pipe (22). A first flange (23) is fixedly installed at the bottom end of the installation pipe (22). A second flange (31) is fixedly installed at the top end of the aeration pipe (3). The first flange (23) and the second flange (31) are fixedly connected by bolts and nuts. The aeration pipe (3) is fixedly installed with a liftable aeration pipe (32) at one end away from the second flange (31). The sewage treatment tank (1) is fixedly installed with uniformly distributed maintenance platforms (5). Both ends of the maintenance platform (5) are fixedly installed with positioning sleeves (51). Both sides of the sewage treatment tank (1) are provided with uniformly distributed positioning grooves (14). The positioning sleeves (51) are slidably locked in the positioning grooves (14).

2. The biological denitrification treatment device as described in claim 1, characterized in that, A fixing rod (4) is fixedly installed on one side of the maintenance platform (5) inside the sewage treatment tank (1). A positioning seat (41) is evenly distributed on one side of the fixing rod (4). A positioning element (33) is fixedly sleeved on one end of the surface of the aeration pipe (3) near the second flange (31). The positioning element (33) is slidably locked in the positioning seat (41). The positioning element (33) and the positioning seat (41) cooperate with each other.

3. The biological denitrification treatment device as described in claim 2, characterized in that, The top surface of the positioning seat (41) has a limiting groove (42), and the positioning component (33) is slidably engaged in the limiting groove (42).

4. The biological denitrification treatment device as described in claim 3, characterized in that, A slot (43) is provided on one side of the bottom surface of the limiting groove (42), and the aeration pipe (3) is slidably locked in the slot (43).

5. The biological denitrification treatment device as described in claim 1, characterized in that, An auxiliary platform (13) is fixedly installed on the side of the sewage treatment tank (1) away from the fixed platform (11), and the auxiliary platform (13) cooperates with the maintenance platform (5).

6. The biological denitrification treatment device as described in claim 1, characterized in that, The bottom surface of the sewage treatment tank (1) is fixedly equipped with evenly distributed support seats (34), and the aeration pipe (3) is slidably locked in the support seats (34).

7. The biological denitrification treatment device as described in claim 1, characterized in that, A guardrail (52) is fixedly installed on one side of the maintenance platform (5), and the guardrail (52) cooperates with the maintenance platform (5).