Modular beam segment demolition transfer system

The modular beam segment dismantling and transportation system utilizes a dismantling platform, transportation dock, and gantry crane system to achieve the segmentation and transportation of large beam segments, solving the problem of difficult transportation after the demolition of old bridges and improving construction efficiency and environmental friendliness.

CN224363215UActive Publication Date: 2026-06-16CCCC SECOND HIGHWAY ENG CO LTD

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Utility models(China)
Current Assignee / Owner
CCCC SECOND HIGHWAY ENG CO LTD
Filing Date
2025-07-01
Publication Date
2026-06-16

AI Technical Summary

Technical Problem

In existing technologies, large sections of old bridges cannot be effectively transported after demolition, and the tonnage of inland waterways is limited, resulting in complex demolition processes that are not environmentally friendly.

Method used

A modular beam segment dismantling and transfer system is adopted, including a dismantling platform, a transfer wharf, and a gantry crane system. Large beam segments are cut and transferred in sections through a sliding device and a gantry crane system.

Benefits of technology

It enables simple segmentation, cutting, and transportation of large beam segments, improving the efficiency of demolition of old bridge main beams. The structure is simple, easy to operate, and environmentally friendly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224363215U_ABST
    Figure CN224363215U_ABST
Patent Text Reader

Abstract

The utility model belongs to bridge superstructure dismantling construction technical field discloses a kind of modularization beam segment dismantling transfer system, and the beam segment dismantling transfer system is arranged in sequence dismantling platform and transfer wharf, and sets up truss crane system along the two sides of dismantling platform and transfer wharf.After old beam of large segment is dismantled and shifts to transfer wharf, and through the sliding device of transfer wharf, the beam segment to be dismantled is shifted to dismantling platform;After static force cutting of the beam segment to be dismantled above dismantling platform, small block beam segment is shifted to transport barge of transfer wharf by truss crane system hoist tool and is handled outside, and the beam segment block cutting and transfer are completed.Modularization beam segment dismantling transfer system is used, realizes large beam segment small block cutting, hoisting and shift, and this method is simple in dismantling construction, and old bridge girder dismantling construction efficiency can be effectively improved.It is simple in structure, reasonable in design, easy to operate, and good in use effect.