Green building curtain wall connecting piece

The design of the base plate, fixing block, cover plate and connecting plate made of aluminum alloy solves the problem of complicated installation of existing green building curtain wall connectors, realizes rapid installation and disassembly, improves construction efficiency and reduces costs.

CN224412909UActive Publication Date: 2026-06-26ZHONGJING TIANTONG DECORATION ENGINEERING (TIANJIN) CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ZHONGJING TIANTONG DECORATION ENGINEERING (TIANJIN) CO LTD
Filing Date
2025-08-04
Publication Date
2026-06-26

AI Technical Summary

Technical Problem

The installation and disassembly process of existing green building curtain wall connectors is cumbersome, requiring a large number of bolts and tools, resulting in low construction efficiency and high costs.

Method used

The base plate, fixing blocks, cover plate, and connecting plate are made of aluminum alloy and can be quickly connected through a snap-fit ​​structure. Combined with bolt fixing, this simplifies the installation and disassembly process.

Benefits of technology

It enables rapid installation and dismantling of curtain walls, reducing labor costs and time consumption, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224412909U_ABST
    Figure CN224412909U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of green building curtain wall connecting pieces, including bottom plate, fixed block and cover plate, the fixed block is fixed in the top of bottom plate by welding, the cover plate is placed in the top of bottom plate, the four side outer walls of the fixed block are opened with equidistance distribution's first clamping block, the four side outer walls of the fixed block are opened with chamfer, connecting plate is equipped between adjacent fixed block, the two ends outer walls of the connecting plate are fixed with equidistance distribution's second clamping block, the second clamping block and first clamping block are in accord with each other.The utility model passes through the second clamping block of the connecting plate two ends outer wall setting, can be with the first clamping block of the equidistance distribution of fixed block four side outer wall realization accord with each other, only need to push into by connecting plate alignment adjacent fixed block, make second clamping block embed in first clamping block, quickly complete the installation of connecting plate between adjacent fixed block, finally cover plate is installed in the top of fixed block using a bolt, complete installation connecting piece.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of curtain wall installation equipment, specifically to a green building curtain wall connector. Background Technology

[0002] Green building curtain walls are modern building envelope structures that integrate energy-saving, environmental protection, and intelligent technologies. They aim to achieve efficient resource utilization, minimize environmental impact, and optimize the indoor environment. Their core lies in reducing building energy consumption and improving user comfort through innovative materials and intelligent systems.

[0003] In the existing field of green building curtain wall installation, the ease of installation and disassembly of connectors has always been a key factor affecting construction efficiency and maintenance costs.

[0004] Traditional curtain wall connectors require a large number of bolts and screws to fix adjacent fixed components. Bolts are also needed to fix the curtain wall panels and connectors. Construction workers must use wrenches and other tools to tighten them one by one. The process is tedious and time-consuming, increasing labor costs. Disassembling these traditional connectors is also very difficult, requiring a lot of time and effort to remove numerous fasteners, making them inconvenient for installation and disassembly.

[0005] To address the aforementioned issues, we propose a green building curtain wall connector. Utility Model Content

[0006] The purpose of this utility model is to provide a green building curtain wall connector to address the aforementioned shortcomings in the technology.

[0007] To achieve the above objectives, this utility model provides the following technical solution: a green building curtain wall connector, comprising a base plate, a fixing block, and a cover plate. The fixing block is fixed to the top of the base plate by welding, and the cover plate is placed on the top of the base plate. The four outer walls of the fixing block have equidistant first locking blocks, and the four outer walls of the fixing block have chamfered edges. A connecting plate is provided between adjacent fixing blocks, and the outer walls at both ends of the connecting plate are fixed with equidistant second locking blocks, which fit into the first locking blocks.

[0008] Preferably, the outer walls on both sides of the connecting plate are provided with guide grooves.

[0009] Preferably, the bottom of the base plate has settlement positioning holes that are evenly distributed at the four corners, and the inner wall of the settlement positioning holes is equipped with matching bolts.

[0010] Preferably, a first fixing hole is opened at the top center of the cover plate, and a second fixing hole is opened at the top center of the fixing block. The inner walls of the first fixing hole and the second fixing hole are equipped with matching bolts.

[0011] Preferably, the bottom outer wall of the cover plate has a groove, and the inner wall of the groove fits into the top outer wall of the fixing block.

[0012] Preferably, the base plate, fixing block, cover plate and connecting plate are all made of aluminum alloy.

[0013] The technical effects and advantages provided by this utility model in the above technical solution are as follows:

[0014] The second locking blocks on the outer walls of both ends of the connecting plate can be matched with the first locking blocks evenly distributed on the four outer walls of the fixing block. Simply align the connecting plate with the adjacent fixing block and push it in, so that the second locking block is embedded in the first locking block, and the installation of the connecting plate between the adjacent fixing blocks can be completed quickly. Finally, the cover plate is installed on the top of the fixing block with a bolt to complete the installation of the connector. Conversely, simply remove the bolt from the top of the cover plate and remove the connecting plate from between the adjacent fixing blocks. This facilitates the installation and disassembly of the curtain wall and is easy to use. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this utility model. For those skilled in the art, other drawings can be obtained based on these drawings.

[0016] Figure 1 This is a three-dimensional structural diagram of a green building curtain wall connector according to the present invention;

[0017] Figure 2 This is a schematic diagram of the base plate structure of a green building curtain wall connector according to the present invention;

[0018] Figure 3 This is a schematic diagram of the cover plate structure of a green building curtain wall connector according to the present invention;

[0019] Figure 4 This is a schematic diagram of the connecting plate structure of a green building curtain wall connector according to this utility model.

[0020] Explanation of reference numerals in the attached figures:

[0021] 1. Base plate, 2. Fixing block, 3. Cover plate, 4. Connecting plate, 5. Settlement positioning hole, 6. First locking block, 7. Second locking block, 8. Guide groove, 9. Embedded groove, 10. First fixing hole, 11. Second fixing hole. Detailed Implementation

[0022] The following drawings will disclose several embodiments of this utility model. For clarity, many physical details will be described in the following description. However, it should be understood that these physical details should not be used to limit this utility model. That is, in some embodiments of this utility model, these physical details are not essential. In addition, for the sake of simplicity, some conventional structures and components will be shown in the drawings in a simple schematic manner.

[0023] Furthermore, in this utility model, the use of terms such as "first" and "second" is for descriptive purposes only and does not specifically refer to any order or sequence, nor is it intended to limit the utility model. They are merely used to distinguish components or operations described with the same technical terms and should not be construed as indicating or implying their relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the technical solutions of various embodiments can be combined with each other, but only if they are feasible for those skilled in the art. If a combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this utility model.

[0024] Example 1

[0025] Refer to the instruction manual appendix Figure 1-4 A green building curtain wall connector includes a base plate 1, a fixing block 2, a cover plate 3 and a connecting plate 4. The base plate 1, fixing block 2, cover plate 3 and connecting plate 4 are all made of aluminum alloy. Settlement positioning holes 5 are evenly distributed at the four corners of the bottom of the base plate 1. The inner wall of the settlement positioning holes 5 is equipped with matching bolts to facilitate fixing the present invention to the building wall.

[0026] Example 2

[0027] Based on Embodiment 1, the connecting plate 4 is placed between adjacent fixed blocks 2. The four outer walls of the fixed blocks 2 have first locking blocks 6 distributed at equal intervals, and the four outer walls of the fixed blocks 2 have chamfers. The outer walls at both ends of the connecting plate 4 are fixed with second locking blocks 7 distributed at equal intervals. The second locking blocks 7 fit with the first locking blocks 6. The connecting plate 4 is installed between adjacent fixed blocks 2 through the fitting action of the second locking blocks 7 and the first locking blocks 6, realizing the lateral connection between the fixed blocks 2. Guide grooves 8 are opened on the outer walls on both sides of the connecting plate 4. The guide grooves 8 can play a guiding role when installing the curtain wall panel, which facilitates the installation and positioning of the curtain wall panel.

[0028] Example 3

[0029] Based on Embodiment 1, the cover plate 3 is placed on top of the base plate 1. The bottom outer wall of the cover plate 3 has a groove 9. The inner wall of the groove 9 fits with the top outer wall of the fixing block 2. The cover plate 3 covers the fixing block 2, and the connection stability between the cover plate 3 and the fixing block 2 is enhanced by the cooperation between the groove 9 and the fixing block 2. A first fixing hole 10 is opened at the top center of the cover plate 3, and a second fixing hole 11 is opened at the top center of the fixing block 2. The inner walls of the first fixing hole 10 and the second fixing hole 11 are equipped with matching bolts. By passing the bolts through the first fixing hole 10 and the second fixing hole 11 and tightening them, the cover plate 3 is fixed on the fixing block 2.

[0030] Working principle of this utility model:

[0031] Refer to the instruction manual appendix Figure 1-4 When using this utility model, firstly, the base plate 1 is fixed to the predetermined installation position on the exterior wall of the building using the matching bolts provided in the four corner settlement positioning holes 5 at its bottom. A level or other tools are used for calibration to avoid tilting or unevenness affecting subsequent installation. The connecting plate 4 is engaged with the first locking blocks 6 on the four sides of the fixing block 2 via the second locking blocks 7 on both ends of its outer wall. The connecting plate 4 is installed between adjacent fixing blocks 2. Next, the curtain wall panels are installed. According to the size and specifications of the curtain wall panels, the curtain wall panels are pushed along the guide grooves 8 on both sides of the connecting plate 4 using the guide grooves 8. The curtain wall panels are installed sequentially in this way. Finally, the cover plate 3 is placed on top of the fixing block 2, so that the groove 9 on the bottom outer wall of the cover plate 3 engages with the top outer wall of the fixing block 2. The first fixing hole 10 at the top center of the cover plate 3 aligns with the second fixing hole 11 at the top center of the fixing block 2. Matching bolts are passed through these two fixing holes and tightened to fix the cover plate 3 onto the fixing block 2.

[0032] The foregoing description only illustrates certain exemplary embodiments of the present invention. Undoubtedly, those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A green building curtain wall connecting piece, comprising a bottom plate (1), a fixing block (2) and a cover plate (3), the fixing block (2) is fixed on the top of the bottom plate (1) by welding, and the cover plate (3) is placed on the top of the bottom plate (1), characterized in that: The four outer walls of the fixing block (2) are provided with first locking blocks (6) distributed at equal intervals. The four outer walls of the fixing block (2) are chamfered. A connecting plate (4) is provided between adjacent fixing blocks (2). The outer walls of the two ends of the connecting plate (4) are fixed with second locking blocks (7) distributed at equal intervals. The second locking blocks (7) fit into the first locking blocks (6).

2. A green building curtain wall connecting piece according to claim 1, characterized in that: The connecting plate (4) has guide grooves (8) on both outer walls.

3. The green building curtain wall connecting piece according to claim 1, characterized in that: The bottom of the base plate (1) has four equally spaced settlement positioning holes (5) at its four corners, and the inner wall of the settlement positioning holes (5) is fitted with matching bolts.

4. The green building curtain wall connecting piece according to claim 1, characterized in that: The cover plate (3) has a first fixing hole (10) at the top center position, and the fixing block (2) has a second fixing hole (11) at the top center position. The inner walls of the first fixing hole (10) and the second fixing hole (11) are equipped with matching bolts.

5. The green building curtain wall connecting piece according to claim 1, characterized in that: The bottom outer wall of the cover plate (3) has a groove (9), and the inner wall of the groove (9) fits into the top outer wall of the fixing block (2).

6. A green building curtain wall connecting piece according to claim 1, characterized in that: The base plate (1), fixing block (2), cover plate (3) and connecting plate (4) are all made of aluminum alloy.