Anchoring front anchor chamber, spreader saddle support pier cast-in-place support frame
By adopting a combined steel load-bearing beam and steel pipe column for the pre-anchoring chamber and the cast-in-place support frame for the cable saddle pier, the problem of difficult construction of traditional full-span scaffolding was solved, and efficient and stable construction of the pre-anchoring chamber for suspension bridges was achieved.
CN224548957UActive Publication Date: 2026-07-24CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- CHINA RAILWAY 11TH BUREAU GRP CORP LTD
- Filing Date
- 2025-06-06
- Publication Date
- 2026-07-24
Smart Images

Figure CN224548957U_ABST
Abstract
The utility model discloses an anchor before anchor chamber, scatter the saddle support pier cast-in-situ support frame, including by a set of steel pipe stand and horizontal support fixed composition's main support frame, the top of main support frame is provided with the shaped steel bearing beam through the welding mode, and the shaped steel bearing beam includes first inclined bearing beam, second bearing crossbeam and third inclined bearing beam, and the bottom of steel pipe stand and third inclined bearing beam is equipped with the column foot preformed part, and the bottom of first inclined bearing beam is equipped with side wall preformed part, and first inclined bearing beam, second bearing crossbeam and third inclined bearing beam are laid with distribution beam and square wood from below to above in proper order. The utility model provides an anchor before anchor chamber, scatter the saddle support pier cast-in-situ support frame, discards traditional full -house support structure, adopts combined type shaped steel bearing beam, and the angle is adjusted to be consistent with the anchor before anchor chamber, scatter the saddle support pier lower surface when erecting construction, and the structure is simple, and easy to set up, is favorable for improving construction efficiency, shortens the period of construction.