A platform for operating a ladder cage

By designing a column cage operating platform, the problem of space limitations in traditional construction platforms was solved, enabling efficient and safe construction of column reinforcement binding, steel formwork installation, and concrete pouring, and adapting to the construction needs of columns of different sizes.

CN224549582UActive Publication Date: 2026-07-24CHINA RAILWAY CONSTR ENG GRP FOURTH CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA RAILWAY CONSTR ENG GRP FOURTH CONSTR CO LTD
Filing Date
2025-10-14
Publication Date
2026-07-24

AI Technical Summary

Technical Problem

Traditional construction platforms have limited space when installing steel formwork, resulting in low installation efficiency and unstable quality, and construction workers have to crouch down to operate.

Method used

Design a column-mounted ladder cage operating platform, including a frame, protective fence, walkway support plate and flip-up plate. The flip-up plate can be flipped to expand the construction space, provide a stable working plane and safety protection, and adapt to the needs of different construction stages.

Benefits of technology

It improves the efficiency and quality of column reinforcement binding, steel formwork installation and concrete pouring, ensures construction safety and precision, and adapts to the construction needs of columns of different sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224549582U_ABST
    Figure CN224549582U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of stand column ladder cage operation platform, it is related to building construction technology field, including ladder cage, walkway bearing plate ladder cage has frame and is installed in the frame four around protective fence, walkway bearing plate frame inner space is used for longitudinally placing stand column reinforcement, walkway bearing plate walkway bearing plate is equipped with multiple, multiple walkway bearing plate is installed in the frame inner four around side wall, and sequentially distribute up and down, walkway bearing plate walkway bearing plate center is equipped with opening, walkway bearing plate opening inner four around side wall rotationally arranged with flap, four around multiple flap between leave construction space that is sleeved in the outside of stand column reinforcement.The utility model sets up stereoscopic ladder cage structure, when stand column reinforcement binding construction, flap is put down, construction personnel stand on flap and carry out construction, when steel mould installation construction and concrete pouring construction, flap is turned up and collected, steel mould is hoisted from upper portion, construction personnel stand in walkway position and carry out installation reinforcement, sufficient space is left for steel mould installation, improve construction efficiency.
Need to check novelty before this filing date? Find Prior Art