An integrated casting structure of imitation stone insulation steel mesh and related components

By using an integrated structure of imitation stone insulation steel mesh and related components, the problem of long construction cycle and complicated process of insulation exterior walls in existing technologies has been solved, realizing the simultaneous completion of insulation and decoration and improving construction efficiency.

CN224591715UActive Publication Date: 2026-08-04HENAN WANGXUN BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521954873.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-11
Publication Date
2026-08-04
Estimated Expiration
2035-09-11

AI Technical Summary

Technical Problem

The existing construction cycle for insulated exterior walls is long and the process is cumbersome, making it impossible to efficiently integrate insulation and decoration.

Method used

An integrated structure is constructed using imitation stone insulation steel mesh and related components. First, an imitation stone insulation layer is installed on the outside of the concrete layer and connected to the steel mesh via connecting rods to form an integrated structure. Then, concrete is poured.

Benefits of technology

Reduce construction processes, shorten construction period, improve construction efficiency, and achieve simultaneous completion of insulation and decoration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224591715U_ABST
    Figure CN224591715U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of building construction technology, and more specifically, to an integrated structure for casting imitation stone insulation steel mesh and related components. The structure includes an imitation stone insulation layer, a concrete layer, and connecting rods. The imitation stone insulation layer is placed on the outside of the concrete layer before it is poured. A steel mesh is placed inside the concrete layer on the side furthest from the imitation stone insulation layer. The connecting rods penetrate the imitation stone insulation layer and the concrete layer, and are connected at both ends to the imitation stone insulation layer and the steel mesh, respectively. This integrated structure for casting imitation stone insulation steel mesh and related components places the imitation stone insulation layer outside the concrete layer to be poured, connects the imitation stone insulation layer to the steel mesh via connecting rods, and then erects a formwork to pour concrete, thus forming an integrated structure of the wall body and the outer layer. Compared with the existing technology of first pouring the concrete wall, then applying the insulation material, and finally constructing the exterior wall finish, this method reduces the construction process and effectively shortens the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, and more specifically, to an integrated structure for casting imitation stone insulation steel mesh and related components. Background Technology

[0002] Imitation stone slabs are an exterior wall decoration material, commonly used for building facades, and resemble real stone in appearance. The advantages of this material include its realistic appearance, durable texture, relative lightness, and ease of installation. Imitation stone slabs can mimic the textures and colors of various types of stone, while offering better waterproofing and durability. They often incorporate insulation material and are installed on the exterior of building walls, combining aesthetics and thermal insulation.

[0003] The existing construction methods for insulated exterior walls involve first pouring concrete walls, then applying insulation materials, and finally applying the exterior wall finish. This process is lengthy and complicated. Utility Model Content

[0004] This utility model aims to overcome the problems of long construction cycle and complicated process of existing thermal insulation exterior walls, and provides an integrated structure for casting imitation stone thermal insulation steel mesh and related components that can solve the above problems.

[0005] An integrated structure for casting imitation stone insulation steel mesh and related components includes an imitation stone insulation layer, a concrete layer, and connecting rods; the imitation stone insulation layer is set on the outside of the concrete layer before the concrete layer is poured, and a steel mesh is set on the side of the concrete layer away from the imitation stone insulation layer; the connecting rods pass through the imitation stone insulation layer and the concrete layer, and are connected to the imitation stone insulation layer and the steel mesh at both ends respectively.

[0006] Furthermore, the imitation stone insulation layer includes several imitation stone insulation boards arranged in a longitudinal and transverse manner, and the connecting rods are provided between adjacent imitation stone insulation boards.

[0007] Furthermore, the connecting rod includes a rod body, a first clamping plate, a second clamping plate, and a snap-fit ​​component; the first clamping plate and the second clamping plate are sequentially fixed to one end of the rod body, and the first clamping plate and the second clamping plate are perpendicular to the rod body, and the first clamping plate and the second clamping plate are clamped to the inner and outer sides of the imitation stone insulation layer; the snap-fit ​​component is fixed to the other end of the rod body, and the snap-fit ​​component is snapped to the steel mesh.

[0008] Furthermore, the second clamping plate is fixedly sleeved on the outside of the rod body, and the length of the second clamping plate is greater than the length of the first clamping plate.

[0009] Furthermore, the first and second clamping plates are square or rectangular in structure, and the rod is connected to the middle of the first and second clamping plates.

[0010] Furthermore, the snap-fit ​​component has a U-shaped structure, and the middle part of the snap-fit ​​component is fixedly connected to the rod body.

[0011] Furthermore, the rod body is made of steel pipe, and the first clamping plate, the second clamping plate, and the fastener are all made of steel plate, and the first clamping plate, the second clamping plate, and the fastener are all welded to the rod body.

[0012] Furthermore, the imitation stone insulation board includes an imitation stone board and an insulation board, with the insulation board fixed to the inner side of the imitation stone board.

[0013] Furthermore, the connecting surface between the imitation stone panel and the insulation board is a non-smooth, rough surface, and the imitation stone panel and the insulation board are connected by an adhesive method.

[0014] Compared with the prior art, the beneficial effects of this utility model are: The integrated stone-like insulation steel mesh and related components of this utility model are constructed by placing the stone-like insulation layer outside the concrete layer to be poured before pouring the main concrete layer. A steel mesh is then installed inside the concrete layer, away from the stone-like insulation layer, as a support. Connecting rods connect the stone-like insulation layer to the steel mesh. Formwork is then erected and concrete is poured, forming an integrated structure of the main wall and its outer layer. Compared to existing technologies that involve pouring the concrete wall first, then applying the insulation material, and finally completing the exterior wall finish, this method reduces the construction process and effectively shortens the construction period. Attached Figure Description

[0015] The accompanying drawings are provided to further illustrate the present invention and form part of the specification. They are used together with the embodiments of the present invention to explain the present invention, but do not constitute a limitation thereof. In the drawings: Figure 1 This is a front view of the integrated casting structure of the imitation stone insulation steel mesh and related components in this embodiment of the utility model.

[0016] Figure 2 This is a top sectional view of the integrated cast structure of the imitation stone insulation steel mesh and related components in this embodiment of the utility model.

[0017] Figure 3 This is a side sectional view of the integrated casting structure of the imitation stone insulation steel mesh and related components in the embodiment of this utility model.

[0018] Figure 4 This is a schematic diagram of the connecting rod in an embodiment of the present invention.

[0019] Figure 5 This is a schematic diagram of the steel mesh structure in an embodiment of this utility model.

[0020] In the diagram: 1. Concrete layer; 2. Connecting rod; 201. Rod body; 202. First clamping plate; 203. Second clamping plate; 204. Clip-on piece; 3. Steel mesh; 4. Imitation stone panel; 5. Insulation board. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model. Example

[0022] like Figure 1 As shown, the integrated structure of the imitation stone insulation steel mesh and related components in this embodiment includes an imitation stone insulation layer, a concrete layer 1, and connecting rods 2. The imitation stone insulation layer is installed on the outside of the concrete layer 1 before the concrete layer 1 is poured, and a steel mesh 3 is installed inside the concrete layer 1 on the side away from the imitation stone insulation layer. The connecting rods 2 pass through the imitation stone insulation layer and the concrete layer 1, and are connected at both ends to the imitation stone insulation layer and the steel mesh 3, respectively.

[0023] In this embodiment, the imitation stone insulation steel mesh and related components are cast in an integrated structure. Before pouring the main concrete layer 1 of the wall, the imitation stone insulation layer is placed outside the concrete layer 1 to be poured. A steel mesh 3 is placed inside the concrete layer 1, away from the imitation stone insulation layer, as a support. The imitation stone insulation layer and the steel mesh 3 are connected by connecting rods 2. Then, a formwork is erected and concrete is poured, thus forming an integrated structure of the main wall and the outer layer. Compared with the existing technology of first pouring the concrete wall, then applying the insulation material, and finally constructing the exterior wall finish, this method reduces the construction process and effectively shortens the construction period.

[0024] In this embodiment, the stone-like insulation layer is composed of several stone-like insulation boards arranged longitudinally and transversely, with connecting rods 2 provided between adjacent stone-like insulation boards. Specifically, the stone-like insulation board consists of a stone-like slab 4 and an insulation board 5, with the insulation board 5 fixed to the inner side of the stone-like slab 4. Preferably, the connecting surface between the stone-like slab 4 and the insulation board 5 is a non-smooth, rough surface, and the stone-like slab 4 and the insulation board 5 are connected by an adhesive method.

[0025] The imitation stone insulation board is produced in the factory before the imitation stone insulation layer is laid. The imitation stone board and the insulation board 5 are glued together in the factory to form an imitation stone insulation board that integrates aesthetics and insulation. During construction, the imitation stone insulation board is directly installed on the outside of the concrete layer 1 that is about to be poured, thus saving the existing process of installing the insulation layer and the decorative layer separately, effectively saving construction time.

[0026] In this embodiment, the connecting rod 2 includes a rod body 201, a first clamping plate 202, a second clamping plate 203, and a snap-fit ​​component 204. The first clamping plate 202 and the second clamping plate 203 are sequentially fixed to one end of the rod body 201, and both the first clamping plate 202 and the second clamping plate 203 are perpendicular to the rod body 201. The first clamping plate 202 and the second clamping plate 203 are clamped to the inner and outer sides of the imitation stone insulation layer. The snap-fit ​​component 204 is fixed to the circumference of the other end of the rod body 201, and the snap-fit ​​component 204 is snapped into the steel mesh 3.

[0027] Specifically, the first clamping plate 202 and the second clamping plate 203 are square or rectangular in structure. The first clamping plate 202 is fixed to the end face of the rod 201, and the second clamping plate 203 is sleeved on the outside of the rod 201. The rod 201 is connected to the middle of the first clamping plate 202 and the second clamping plate 203, and the length of the first clamping plate 202 is less than the length of the second clamping plate 203. The snap-fit ​​component 204 is U-shaped, and the middle of the snap-fit ​​component 204 is fixedly connected to the rod 201. The slot formed by the U-shaped structure of the snap-fit ​​component 204 faces away from the rod 201.

[0028] When the connecting rod 2 is located between the upper and lower imitation stone insulation panels, the upper parts of the first clamping plate 202 and the second clamping plate 203 are clamped to the inner and outer sides of the bottom of the imitation stone insulation panel located above the connecting rod 2, and the lower parts of the first clamping plate 202 and the second clamping plate 203 are clamped to the inner and outer sides of the top of the imitation stone insulation panel located below the connecting rod 2. The snap-fit ​​component 204 is located above or below the rod body 201, and part of the reinforcing bars of the steel mesh 3 are snapped into the snap-fit ​​component.

[0029] When the connecting rod 2 is positioned between the left and right imitation stone insulation panels, the left parts of the first clamping plate 202 and the second clamping plate 203 are clamped to the inner and outer sides of the right edge of the imitation stone insulation panel located on the left side of the connecting rod 2, and the right parts of the first clamping plate 202 and the second clamping plate 203 are clamped to the inner and outer sides of the left edge of the imitation stone insulation panel located on the right side of the connecting rod 2. The snap-fit ​​component 204 is located on the left or right side of the rod body 201, and part of the reinforcing bars of the steel mesh 3 are snapped into the snap-fit ​​component.

[0030] Multiple connecting rods 2 are arranged between adjacent imitation stone insulation boards arranged in a longitudinal and transverse manner, and the snap fasteners 204 are arranged in different directions, so as to fix the relative position of the imitation stone insulation layer and the steel mesh 3.

[0031] In this embodiment, the steel mesh 3 is made of steel bars. The pole 201 is made of steel pipe, and the first clamping plate 202, the second clamping plate 203 and the snap fastener 204 are all made of steel plate, and the first clamping plate 202, the second clamping plate 203 and the snap fastener 204 are all welded to the pole 201.

[0032] Finally, it should be noted that the above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A stone-like thermal insulation steel mesh and related components integrally cast structure, characterized in that, It includes a stone-like insulation layer, a concrete layer (1), and connecting rods (2); The imitation stone insulation layer is set on the outside of the concrete layer (1) before the concrete layer (1) is poured, and a steel mesh (3) is set on the side of the concrete layer (1) away from the imitation stone insulation layer. The connecting rod (2) passes through the imitation stone insulation layer and the concrete layer (1), and its two ends are respectively connected to the imitation stone insulation layer and the steel mesh (3).

2. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 1, characterized in that, The imitation stone insulation layer includes several imitation stone insulation boards arranged in a longitudinal and transverse manner, and the connecting rod (2) is provided between adjacent imitation stone insulation boards.

3. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 1 or 2, characterized in that, The connecting rod (2) includes a rod body (201), a first clamping plate (202), a second clamping plate (203), and a snap-fit ​​component (204); The first clamping plate (202) and the second clamping plate (203) are fixed to one end of the rod (201) in sequence, and the first clamping plate (202) and the second clamping plate (203) are perpendicular to the rod (201). The first clamping plate (202) and the second clamping plate (203) are clamped on the inner and outer sides of the imitation stone insulation layer. The snap-fit ​​component (204) is fixed to the other end of the rod (201) and snaps into the steel mesh (3).

4. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 3, characterized in that, The second clamping plate (203) is fixedly sleeved on the outside of the rod (201), and the length of the second clamping plate (203) is greater than the length of the first clamping plate (202).

5. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 4, characterized in that, The first clamping plate (202) and the second clamping plate (203) are square or rectangular in structure, and the rod (201) is connected to the middle of the first clamping plate (202) and the second clamping plate (203).

6. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 3, characterized in that, The snap-fit ​​component (204) has a U-shaped structure, and the middle part of the snap-fit ​​component (204) is fixedly connected to the rod body (201).

7. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 3, characterized in that, The rod body (201) is made of steel pipe, and the first clamping plate (202), the second clamping plate (203) and the snap fastener (204) are all made of steel plate, and the first clamping plate (202), the second clamping plate (203) and the snap fastener (204) are all welded to the rod body (201).

8. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 2, characterized in that, The imitation stone insulation board includes an imitation stone board (4) and an insulation board (5), with the insulation board (5) fixed to the inside of the imitation stone board (4).

9. The integrated cast-in-place structure of the imitation stone insulation steel mesh and related components according to claim 8, characterized in that, The connecting surface between the imitation stone slab (4) and the insulation board (5) is a non-smooth, rough surface, and the imitation stone slab (4) and the insulation board (5) are connected by an adhesive method.