Steel column connecting joint and prefabricated building

CN224692842UActive Publication Date: 2026-08-28POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522021356.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-19
Publication Date
2026-08-28
Estimated Expiration
2035-09-19

AI Technical Summary

Technical Problem

然而,在实际吊装作业中,由于吊装设备精度有限、现场环境因素影响以及操作误差等原因,上钢柱难以实现与下钢柱的完全精准对位

Benefits of technology

本申请中的钢柱连接节点包括了第一连接件和第二连接件,通过定位榫头与第二钢箍的插接配合,能够在吊装下落过程中引导上方的第一柱体与下方的第二柱体精准对位,有效克服了传统方法中因肉眼观测和吊机操作误差导致的轴线错位问题,大幅减少了高空调整次数和作业时间,显著提升了吊装效率和安装效率。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224692842U_ABST
    Figure CN224692842U_ABST
Patent Text Reader

Abstract

The application relates to a steel column connecting joint and a prefabricated building, and the steel column connecting joint comprises a first connecting piece and a second connecting piece. The first connecting piece comprises a first steel hoop and a positioning tenon, the first steel hoop is fixedly connected with a first column body, the positioning tenon is fixedly arranged on the inner wall of the first steel hoop, and the positioning tenon is partially exposed to the outside of the first steel hoop. The second connecting piece comprises a second steel hoop and an inner lining barge, the second steel hoop is fixedly connected with a second column body, the inner lining barge is fixedly arranged on the inner wall of the second steel hoop, and the inner lining barge has a preset distance from the opening end of the second steel hoop. In the connecting state, the first connecting piece is located above the second connecting piece, the positioning tenon is at least partially inserted into the second steel hoop, and the end of the positioning tenon abuts against the inner lining barge. The steel column connecting joint can effectively guide the accurate alignment of the upper steel column and the lower steel column, is convenient for on-site assembly, and thus the installation quality and the installation efficiency are improved.
Need to check novelty before this filing date? Find Prior Art