Bidirectional water retaining dam for pumped storage power station

CN224931013UActive Publication Date: 2026-11-03YELLOW RIVER ENG CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522685869.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-18
Publication Date
2026-11-03
Estimated Expiration
2035-12-18

AI Technical Summary

Technical Problem

Traditional earth-rock dams cannot safely withstand the bidirectional water retention demand in pumped storage power stations, and there are risks of seepage failure and landslide instability. In addition, the projects are costly, have high foundation requirements, poor adaptability, and present challenges in the disposal of waste generated from reservoir excavation.

Method used

The dam body adopts a drainage system consisting of a main rockfill area, upstream and downstream concrete panels, drainage layers and drainage pipes, and drainage corridors. Combined with the reservoir basin excavation material as the main filling material, a combination of flexible panels and crushed stone body is formed to achieve bidirectional water retention and seepage discharge.

Benefits of technology

It improves the stability and seepage resistance of water-retaining dams, reduces project costs, reduces environmental burden, adapts to complex mountainous terrain, and realizes the resource utilization of excavated materials from reservoir basins.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224931013U_ABST
    Figure CN224931013U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of pumped storage power station two-way water retaining dam, including dam body and the ring warehouse road of pouring in dam body top;Dam body includes the main rockfill area filled by reservoir basin excavation material, still include the upstream transition layer, upstream cushion layer, upstream panel sequentially laid in the upstream of main rockfill area, still include the downstream transition layer, downstream cushion layer and downstream panel sequentially laid in the downstream of main rockfill area and the drainage system filled in the below of main rockfill area.The utility model uses main rockfill area as dam main body, uses concrete panel in the upstream and downstream of main rockfill area, and dam body bottom is filled with drainage layer and drainage flower pipe, drainage corridor constitutes drainage system, improve the stability of two-way water retaining dam, can satisfy two-way water retaining demand.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of pumped storage engineering, and in particular to a bidirectional water-retaining dam for a pumped storage power station. Background Technology

[0002] Pumped-storage hydroelectric power stations, also known as pumped-storage hydroelectric power stations, utilize electricity generated during periods of low electricity demand to pump water into an upper reservoir, and then release the water into a lower reservoir to generate electricity during periods of high electricity demand. During pumping operation, the water level in the upper reservoir continuously rises, while the water level in the lower reservoir (usually a river channel) remains relatively low. During power generation, the water level in the upper reservoir gradually decreases, while the water level in the downstream river channel gradually rises. This means that the frequent and dramatic fluctuations in water levels in both the upper reservoir and the downstream river channel during the operation of a pumped-storage power station often require the reservoir's water-retaining structures (mostly dams) to impound water in both directions, especially for structures located in river channels, canals, tributaries, and mountain passes.

[0003] Traditional earth-rock dams (such as conventional panel dams or core dams) are typically designed for unidirectional water retention. The downstream slope of such dams has weak seepage resistance and structural stability, making them unable to safely withstand reverse water head. This poses a risk of seepage failure (such as piping and soil erosion) and landslide instability. Therefore, traditional unidirectional earth-rock dams are unsuitable for applications requiring bidirectional water retention. For this reason, pumped-storage power stations typically use concrete gravity dams for their bidirectional water-retaining structures. However, these dams have high foundation requirements, are expensive, and have poor adaptability in mountainous terrain. Furthermore, the excavation of the reservoir basin for pumped-storage power stations generates a large amount of excavated soil and rock waste, and how to environmentally and economically dispose of this waste is a significant challenge. Summary of the Invention

[0004] In view of this, this utility model proposes a two-way water-retaining dam for a pumped storage power station.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: The pumped storage power station bidirectional dam of this utility model includes a dam body and a ring road cast on the top of the dam body. The dam body includes a main rockfill area filled with excavated material from the reservoir basin, an upstream transition layer, an upstream cushion layer, and an upstream panel laid sequentially on the upstream side of the main rockfill area, a downstream transition layer, a downstream cushion layer, and a downstream panel laid sequentially on the downstream side of the main rockfill area, and a drainage system filled below the main rockfill area. The drainage system includes a drainage layer and a drainage unit. The drainage unit includes drainage pipes buried at intervals in the drainage layer and a drainage gallery set at the upstream slope foot of the dam body. The drainage pipes are connected to the drainage gallery. The bottom of the downstream panel is connected to a downstream toe plate. A special downstream cushion layer is filled between the downstream toe plate and the downstream cushion layer. The downstream cushion layer is arranged with equal thickness at the top and bottom. The downstream cushion layer expands upstream along the foundation surface. The downstream transition layer is arranged with equal thickness at the top and bottom. The lower part of the downstream cushion layer extends upstream. The drainage layer is laid with equal thickness from downstream to upstream along the foundation surface. The upstream of the drainage layer slopes downward at a certain angle to form an inclined section. The permeable drainage pipe is buried in the inclined section of the drainage layer. An upstream connecting plate is connected to the slope toe of the upstream panel. The upstream panel, upstream connecting plate, downstream panel, and downstream toe plate are all reinforced concrete structures. The upstream subbase is arranged with equal thickness at the top and bottom, and its lower part extends towards the reservoir basin. The upstream connecting plate is laid on the upstream subbase. The downstream cover area and the downstream overlay area are laid sequentially on the downstream panel.

[0006] The beneficial effects are as follows: This utility model uses the main rockfill area as the main body of the dam. Concrete panels are used both upstream and downstream of the main rockfill area, and a drainage system consisting of a drainage layer, drainage pipes, and drainage corridors is constructed at the bottom of the dam body. This improves the stability of the bidirectional water-retaining dam and can meet the bidirectional water-retaining requirements. Specifically: When the reservoir basin is at a high water level, the bidirectional water-retaining dam is in a positive water-retaining state. The upstream panel and the upstream connecting plate work together to stop water ingress. Seepage water enters the drainage layer through the upstream cushion layer and the upstream transition zone, and then flows through the drainage pipes to the drainage corridor for discharge. When the river channel is at a high water level, the bidirectional water-retaining dam is in a reverse water-retaining state. At this time, the seepage prevention system consisting of the downstream panel, the downstream toe plate, and the water-stop curtain prevents water from intruding into the dam body. A small portion of seepage water enters the drainage layer and is finally guided through the drainage pipes to the drainage corridor for discharge, thus improving the stability of the downstream panel.

[0007] In addition, this utility model uses reservoir excavation material as the main filling material, realizing the resource utilization of reservoir excavation material, which not only reduces the engineering cost of pumped storage power stations, but also reduces the environmental burden.

[0008] Furthermore, compared with rigid concrete dams, the combination of double flexible panels and crushed stone main body in this utility model has lower requirements for the foundation and is better adapted to the needs of complex mountainous terrain.

[0009] Preferably, the laying width of the lower enlarged section of the upstream cushion layer, the laying width of the lower enlarged section of the downstream cushion layer, and the laying width of the lower enlarged section of the downstream transition layer are all greater than 3.0m.

[0010] Preferably, the spacing between the drainage pipes is 2.5 to 4.0 m, the drainage pipes are wrapped with geotextile, and the perimeter of the drainage pipes is filled with crushed stone with a particle size of 2 cm to 3 cm; the longitudinal slope of the drainage corridor is 0.1% to ensure that the seepage water flowing into the drainage corridor can be discharged freely.

[0011] Compared with the prior art, the advantages of this utility model are: This utility model uses the main rockfill area as the dam body. Concrete panels are used upstream and downstream of the main rockfill area, and the dam body is internally filled with a drainage system consisting of a drainage layer, drainage pipes, and drainage corridors. This improves the stability of the bidirectional water-retaining dam and meets the requirements for bidirectional water retention. Specifically: When the reservoir basin is at a high water level, it acts as a positive water-retaining structure. The upstream panel and upstream connecting plate work together to stop water ingress. Seepage water passes through the upstream cushion layer and upstream transition zone, then flows through the drainage pipes to the drainage corridors for discharge. When the river channel is at a high water level, it acts as a reverse water-retaining structure. In this case, the seepage prevention system consisting of the downstream panel, downstream toe plate, and water-stop curtain prevents water from intruding into the dam body. A small portion of seepage water enters the drainage layer and is finally guided through the drainage pipes to the drainage corridors for discharge, thus improving the stability of the downstream panel.

[0012] In addition, this utility model uses reservoir excavation material as the main filling material to fill the main rockfill area, drainage layer, cushion layer and transition layer, realizing the resource utilization of reservoir excavation material (such as fresh slightly weathered and weakly weathered rocks excavated), which not only reduces the engineering cost of pumped storage power stations, but also reduces the environmental burden.

[0013] Furthermore, compared with rigid concrete dams, the combination of double flexible panels and crushed stone main body in this utility model has lower requirements for the foundation and is better adapted to the needs of complex mountainous terrain. Attached Figure Description

[0014] Figure 1 This is a structural schematic diagram of the bidirectional water-retaining dam described in this utility model. Detailed Implementation

[0015] The embodiments of this utility model will be described in detail below with reference to the accompanying drawings. These embodiments are implemented based on the technical solution of this utility model and provide detailed implementation methods and specific operation processes. However, the protection scope of this utility model is not limited to the following embodiments.

[0016] It should be noted that in the description of this utility model, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations.

[0017] In the description of this utility model, unless otherwise explicitly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0018] like Figure 1 As shown, this utility model proposes a bidirectional dam for a pumped storage power station, including a dam body and a ring road 3 (both the reservoir basin side and the river channel side have wave walls). The dam body includes a drainage layer 5 filled with excavated material from the reservoir basin and a main rockfill area 4. The dam body also includes an upstream transition layer 13, an upstream cushion layer 12, and an upstream panel 11 laid sequentially on the upstream side of the main rockfill area 4. It also includes a downstream transition layer 23, a downstream cushion layer 22, and a downstream panel 21 laid sequentially on the downstream side of the main rockfill area 4. It also includes a drainage system filled below the main rockfill area 4. The drainage system connects the upstream cushion layer 12 and the downstream cushion layer 22 to allow seepage water to be discharged in time, avoiding the reverse water pressure generated by water accumulation from acting on the upstream panel 11 and the downstream panel 21, thereby improving stability.

[0019] Combination Figure 1 It can be seen that the drainage system includes drainage layer 5, which is constructed by layering excavated material from the reservoir basin (drainage layer 5 is composed of graded excavated material from the reservoir basin, and its permeability coefficient is >1×10). -1 The drainage unit consists of a drainage channel 16 (located on the reservoir side, and the drainage channel 16 is a gate-shaped structure) cast on the upstream side of the drainage layer 5 and drainage perforated pipes spaced apart in the inclined section of the drainage layer 5. The drainage perforated pipes are wrapped with geotextile and protected around the perimeter with gravel with a particle size of 2 cm to 3 cm. The bottom of the drainage perforated pipes is inserted into the installation hole of the drainage channel 16. The drainage perforated pipes 15 guide the seepage water to the drainage channel 16. The outlet of the drainage channel 16 is connected to the drainage ditch through a water passage, so as to realize the timely drainage of seepage water and reduce the impact of seepage water on the dam body.

[0020] Combination Figure 1It is known that the bottom of the downstream panel 21 is connected to the downstream toe plate 27 for water-stopping. The riverbed rock strata corresponding to the downstream toe plate 27 are grouted to form a water-stopping curtain 28. The downstream panel 21, the downstream toe plate 27 and the water-stopping curtain 28 are connected to form a seepage prevention system, which improves the seepage prevention performance of the downstream of the dam and minimizes seepage. In addition, the lower part of the downstream panel 21 is successively laid with a downstream cover area 24 (i.e., a fine sand cover area) and a heavy cover area 25. The heavy cover area 25 is made of stone chips. The downstream stone chip layer 25 covers the downstream fine sand layer 24 to prevent the fine sand from being washed away or slipped under the action of water level rise and fall or seepage.

[0021] Combination Figure 1 It can be seen that a downstream special cushion layer 26 (preferably made of graded material excavated from the reservoir basin, with a permeability coefficient ≥1×10⁻⁶ after compaction) is filled between the downstream toe slab 27 and the downstream cushion layer 22. -2 ~1×10 -3 cm / s (preferably ≥1×10) -2 The downstream cushion layer 22 is laid with equal thickness at both ends, and its lower part extends upstream on the foundation surface. The downstream transition layer 23 is laid with equal thickness at both ends, and its lower part extends upstream on the upstream cushion layer. The downstream of the drainage layer 5 sinks and is laid on the downstream transition layer 23, so that the downstream special cushion layer 26, the downstream cushion layer 22 and the downstream transition layer 23 above the river bedrock are finally connected to the drainage layer 5, which helps with drainage.

[0022] Combination Figure 1 It can be seen that the upstream of the drainage layer 5 extends downward at a certain slope to the drainage corridor 16, and the drainage pipes 15 are buried intermittently in the inclined section of the drainage layer 5; the bottom of the downstream side of the main riprap area 4 is laid on the lower part of the drainage layer 5, and the main riprap area 4 is filled on the drainage layer 5; the lower part of the upstream cushion layer 12 extends towards the reservoir basin, and the upstream connecting plate 14 is poured at the slope foot of the upstream panel 11. The upstream connecting plate 14 is located on the upstream cushion layer 12, and the upstream cushion layer 12 is connected to the drainage layer 5 through the upstream transition layer 13, so that the seepage water flows through the drainage layer 5 and the drainage pipes 15 to the drainage corridor 16.

[0023] The upstream panel 11, upstream connecting plate 14, downstream panel 21 and downstream toe plate 27 of this utility model are all reinforced concrete structures. Other structural layers and the main rockfill area 4 are preferably made of reservoir excavated material graded by means of the reservoir excavated material. This not only realizes the resource utilization of reservoir excavated material and reduces the environmental burden, but also reduces the project cost.

[0024] During construction, both the upstream panel 11 and the downstream panel 21 have vertical joints, and these joints are staggered. The spacing of the joints can be flexibly adjusted according to the terrain. If the terrain is gentle, the spacing can be controlled between 8-16m; if the slope is steep, the spacing can be appropriately reduced. This allows both the upstream panel 11 and the downstream panel 21 to adapt to dam deformation, thereby reducing the flexural stress of the panels. The flexible panels of this invention, combined with the dam body constructed of crushed stone, improve seismic performance and better adapt to the needs of complex mountainous terrain.

[0025] In actual construction, the upstream cushion layer 12, downstream cushion layer 22, and downstream special cushion layer 26 are constructed by compacting graded crushed stone, with crushed stone particles smaller than 5mm accounting for 35-55%. The preferred permeability coefficient after compaction is ≥1×10⁻⁶. -2 The flow rate (cm / s) ensures that both the subbase and the special subbase have good internal permeability stability and low compressibility, preventing water accumulation within the subbase from acting back onto the upstream panel 11 and the downstream panel 21, thus protecting the panels from damage. Furthermore, the horizontal filling width of the downstream subbase 22, the upstream subbase 12, and the downstream transition layer 13 is all greater than 3.0m.

[0026] In actual construction, the upstream transition layer 13 and the downstream transition layer 23 are composed of graded material excavated from the reservoir basin, with a maximum crushed stone size of 300mm, a porosity of ≤22%, and a permeability coefficient of 1×10⁻⁶. -1 ~1×10 -2 The thickness of the upstream transition layer 13 and the downstream transition layer 23 is 40 cm / s, giving the transition layer of this invention good free drainage performance and low compressibility. In addition, the downstream transition layer 23 has a horizontal filling area with a width of ≥3 m; the overall thickness of the upstream transition layer 13 and the downstream transition layer 23 is controlled at 40 cm.

[0027] In actual construction, both the main rockfill zone 4 and the drainage layer 5 are composed of graded material excavated from the reservoir basin. The main rockfill zone 4, as the main structure bearing and transmitting water load, has a minimum of 20% crushed stone with a particle size less than 5mm and a minimum of 5% crushed stone with a particle size less than 0.075mm during filling. After compaction, the porosity of the main rockfill zone 4 is ≤25%, and the permeability coefficient is >1×10⁻⁶. -1 cm / s; Drainage layer 5 serves as a drainage strip connecting upstream panel 11 and downstream panel 21. During filling, the proportion of crushed stone with a particle size less than 5mm should not exceed 20%, and the proportion of crushed stone with a particle size less than 0.075mm should be ≤5%; The thickness after compaction should be greater than or equal to 3 m, the porosity ≤25%, and the permeability coefficient >1×10 -1 cm / s.

[0028] The construction process of the bidirectional dam of the pumped storage power station described in this utility model is as follows: The first step is to excavate the dam foundation, reservoir basin, and river channel according to the design requirements. After excavation, the downstream toe slab 27 is poured on the bedrock of the river channel (copper waterstops are installed at the joints between the downstream toe slabs 27). The drainage gallery 16 (with construction joints) is constructed on the reservoir basin side. When pouring the drainage gallery 16, drainage pipes 15 are pre-embedded at intervals in the drainage gallery 16. The drainage gallery 16 is a gate-shaped structure with a longitudinal slope of 0.1%, allowing seepage water flowing into the drainage gallery 16 to drain freely. The dam project is usually equipped with a water passage and a drainage ditch connected to the water passage. The outlet of the drainage gallery 16 is connected to the water passage, allowing seepage water flowing into the drainage gallery 16 to be discharged into the downstream river channel through the water passage and drainage ditch. The second step involves filling a special downstream cushion layer 26 on the riverbed rock, and filling a drainage layer 5 and a main rockfill area 4 from bottom to top on the riverbed rock, dam foundation, and reservoir basin side. During filling, an upstream transition layer 13 and an upstream cushion layer 12 are simultaneously filled on the upstream side of the main rockfill area 4 and on the downstream side of the main rockfill area 4. A downstream transition layer 23 and a downstream cushion layer 22 are simultaneously filled on the downstream side of the main rockfill area 4. That is, the upstream cushion layer 12, the upstream transition layer 13, the main rockfill area 4, the downstream cushion layer 22, and the downstream transition layer 23 of this utility model are filled on the same level. Since the downstream cushion layer 22, downstream transition layer 23, and drainage layer 5 all have horizontal filling sections, the downstream cushion layer 22 and downstream transition layer 23 are first filled from bottom to top on the riverbed bedrock before filling the drainage layer 5. The filling width of each is greater than 3.0m. Then, the drainage layer 5 is filled on the downstream transition layer 23. The drainage layer is filled with equal thickness from downstream to upstream on the dam foundation. The upstream of the drainage layer slopes downward at a certain angle to form an inclined section. When filling the inclined section, geotextile is wrapped around the drainage pipe 15 and the drainage pipe 15 is supported and protected with crushed stone. Similarly, the upstream cushion layer 12 has a horizontal filling section. When filling the upstream transition layer 13 on the reservoir basin side, a horizontal filling section should be laid. Then, the upstream cushion layer 12, upstream transition layer 13, main rockfill area 4, downstream cushion layer 22, and downstream transition layer 23 are filled simultaneously from the dam baseline to ensure uniform settlement of the dam body and avoid lateral compression. The third step is to enter the settlement period after the dam body is filled (the settlement period is determined according to the specifications); during the settlement process, curtain grouting is carried out in the bedrock of the river channel below the downstream toe plate 27 to form a water-stopping curtain 28. The water-stopping curtain 28, the downstream toe plate 27 and the downstream panel 21 are combined to form a seepage prevention body to improve the seepage prevention performance on the downstream side. Fourth, after the dam body settlement is completed, the upstream and downstream slopes are trimmed and shaped respectively. The downstream panel 21 is poured on the downstream slope, and copper waterstops are installed at the joints of the downstream panel 21 (it can be one waterstop or two waterstops, with polyurethane material filling between the two copper waterstops). The downstream panel 21 and the downstream toe plate 27 are poured on the upstream slope, and copper waterstops are installed at the joints of the downstream panel 21 (it can be one waterstop or two waterstops, with polyurethane material filling between the two copper waterstops). In actual construction, the upstream panel 11, downstream panel 21, upstream connecting plate 14 and downstream toe plate 27 of this utility model are all reinforced concrete structures. The steel reinforcement configuration in the upstream connecting plate 14 is the same as that in the upstream panel 11, and the steel reinforcement configuration in the downstream toe plate 27 is the same as that in the downstream panel 21. Fifth step, lay downstream fine sand layer 24 and downstream stone slag layer 25 on downstream panel 21 in sequence.

[0029] This utility model uses a drainage layer 5 filled with crushed stone and a main rockfill area 4 as the main body of the dam. Concrete panels are used upstream and downstream of the main rockfill area 4. The dam body is filled with a drainage system consisting of a drainage layer 5, drainage pipes 15, and drainage corridors 16, which improves the stability of the two-way water-retaining dam and can meet the two-way water-retaining requirements.

[0030] When the reservoir basin is at a high water level, the bidirectional water-retaining dam described in this utility model is in the positive water-retaining position. The upstream panel 11 and the upstream connecting plate 14 are combined to stop the water. The seepage water passes through the upstream cushion layer 12 area and the upstream transition area to the drainage layer 5, and then flows through the drainage flower pipe 15 to the drainage gallery 16, and is discharged to the downstream river channel through the water tunnel and drainage ditch. When the river is at a high water level, the bidirectional dam of this invention acts as a reverse dam. The anti-seepage system consisting of the downstream panel 21, the downstream toe plate 27, and the water-stop curtain 28 prevents water from intruding into the dam body. A small portion of the seepage water enters the drainage layer 5 through the downstream cushion layer and the downstream transition layer, and is then guided by the drainage pipe 15 in the drainage layer 5 to the drainage gallery 16 to achieve the discharge of the seepage water and improve the stability of the downstream panel 21.

[0031] This invention uses reservoir excavation material as the main filling material, realizing the resource utilization of reservoir excavation material, which not only reduces the engineering cost of pumped storage power stations, but also reduces the environmental burden.

[0032] Finally, the above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still make modifications to the technical solutions described in the foregoing embodiments without creative effort, or make equivalent substitutions for some of the technical features. Therefore, any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A bidirectional dam for a pumped storage power station, characterized in that: The pumped storage power station's bidirectional dam includes the dam body and a ring road cast on top of the dam body; The dam body includes a main rockfill area filled with excavated material from the reservoir basin, an upstream transition layer, an upstream cushion layer, and an upstream face sheet laid sequentially upstream of the main rockfill area, a downstream transition layer, a downstream cushion layer, and a downstream face sheet laid sequentially downstream of the main rockfill area, and a drainage system filled below the main rockfill area. The drainage system includes a drainage layer and drainage units. The drainage units include drainage pipes intermittently buried in the drainage layer and drainage galleries set at the upstream slope toe of the dam body. The drainage pipes are connected to the drainage galleries. The bottom of the downstream panel is connected to a downstream toe plate. A special downstream cushion layer is filled between the downstream toe plate and the downstream cushion layer. The downstream cushion layer is arranged with equal thickness at the top and bottom. The downstream cushion layer expands upstream along the foundation surface. The downstream transition layer is arranged with equal thickness at the top and bottom. The lower part of the downstream cushion layer extends upstream. The drainage layer is laid with equal thickness from downstream to upstream along the foundation surface. The upstream of the drainage layer slopes downward to form an inclined section, and the drainage pipe is buried in the inclined section of the drainage layer. An upstream connecting plate is connected to the slope toe of the upstream panel. The upstream panel, upstream connecting plate, downstream panel, and downstream toe plate are all reinforced concrete structures. The upstream subbase is arranged with equal thickness at the top and bottom, and its lower part extends towards the reservoir basin. The upstream connecting plate is laid on the upstream subbase. The downstream cover area and the downstream overlay area are laid sequentially on the downstream panel.

2. The bidirectional dam of the pumped storage power station according to claim 1, characterized in that: The laying width of the lower enlarged section of the upstream subbase and the laying width of the lower enlarged section of the downstream subbase are both greater than 3.0m; the laying width of the lower enlarged section of the downstream transition layer is greater than 3.0m.

3. The bidirectional dam of the pumped storage power station according to claim 1, characterized in that: The drainage pipes are spaced 2.5 to 4.0 m apart, and are wrapped with geotextile. The perimeter of the drainage pipes is filled with gravel with a particle size of 2 cm to 3 cm. The longitudinal slope of the drainage corridor is 0.1%.