Welder and fan integrated wire arranging frame

CN224935299UActive Publication Date: 2026-11-03JINGGONG IND BUILDING SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522282060.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-28
Publication Date
2026-11-03
Estimated Expiration
2035-10-28

AI Technical Summary

Technical Problem

The pipeline management of welding machines and fans is chaotic, the equipment layout is scattered, and it is inconvenient to move and store them, posing safety and maintenance risks and making it difficult to achieve integrated and modular management of the equipment.

Method used

Design an integrated cable management rack for welding machines and fans, including parallel columns, equipment support slots and fan support slots, integrating installation positions and cable routing channels to achieve classified and orderly arrangement of cables and pipes, supporting quick disassembly and relocation.

Benefits of technology

It enables centralized installation of welding machines and fans, orderly management of cables and pipes, improves operational safety and site cleanliness, and supports rapid relocation and 5S management in the workshop.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224935299U_ABST
    Figure CN224935299U_ABST
Patent Text Reader

Abstract

The utility model relates to a kind of welding machine and fan integration wire arranging frame, including 2 mutually parallel uprights, equipment support cross groove and fan support cross groove are set between 2 uprights, fan support cross groove is equipped with the fan rack of installation fan, and support angle steel and round steel link rod are equipped on equipment support cross groove;The upper end of upright is equipped with wire slot, and several wire racks are set at equal intervals on wire slot.The utility model integrates the installation position of welding machine and fan, wire slot etc. in same support structure, realizes the centralized installation of equipment, so that various cable and pipeline are classified and wired, and are orderly arranged, and can be quickly disassembled and moved, improve the safety of operation and the neatness of scene.Overcome the technical defects that current workshop cannot achieve cable placement order, equipment is placed randomly and position changes quickly, cannot achieve orderly management of workshop, can better control workshop own equipment, effectively restricts workshop worker to use equipment randomly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a cable management rack, specifically an integrated cable management rack for welding machines and fans, mainly used for the management of welding machines, fans, etc. in workshops. Background Technology

[0002] In modern industrial production and maintenance, welding machines and fans (such as dust collectors, cooling fans, or air supply fans) are common supporting equipment. Welding machines are used for welding metal components, while fans are often used to improve the working environment, such as removing fumes and harmful gases generated during welding, or providing heat dissipation and cooling for equipment. However, in practical applications, these two types of equipment are usually arranged independently, and their power cables, air pipes, control lines, and other pipelines are often scattered. This situation presents the following problems: 1. Disorganized pipeline management: Welding operations involve various cables and hoses, including: welding machine power cords, grounding wires, welding torch cables; fan power cords, control signal lines; dust removal ducts or air supply hoses; and gas pipes required for gas shielded welding (such as CO2 pipes). If these pipelines are not properly organized, they are prone to tangling and knotting, which not only affects the convenience of operation but may also cause damage or safety accidents due to being stepped on or pulled.

[0003] 2. Dispersed equipment layout and large space occupation: In the traditional mode, welding machines and fans are placed separately and need to be fixed and wired separately, resulting in the equipment occupying a dispersed area, which is not conducive to the efficient use of compact working environments (such as workshop corners and mobile work platforms).

[0004] 3. Inconvenient relocation and storage: In scenarios requiring frequent relocation of work locations, the lack of integrated equipment and cable management systems means that each relocation requires disassembly, reassembly, and reorganization of the cables, which is time-consuming and labor-intensive. 4. Safety and maintenance hazards: Scattered cables are prone to dust accumulation and moisture absorption, increasing the risk of electrical leakage; if fan ducts are placed haphazardly, they may be ignited by high-temperature welding slag, posing a fire hazard. Furthermore, the lack of standardized cable management increases the difficulty of daily inspection and maintenance.

[0005] With increasing demands for safety, cleanliness, and efficiency in industrial settings, equipment integration, modularization, and ergonomic optimization are becoming development trends. Therefore, there is an urgent need in this field for an integrated cable management device that can centrally manage the pipelines of welding machines and fans, is compact in structure, and is easy to move and operate.

[0006] This utility model is thus derived. Utility Model Content

[0007] In view of the above-mentioned technical problems of the existing technology, and in order to better manage workshop 5S and orderly manage proprietary equipment and facilities, the purpose of this utility model is to provide an integrated cable management rack for welding machines and fans. It is mainly used in workshop 5S management to manage welding machines, fans and other equipment, beautify the placement of tools and equipment in the workshop, make the cables placed in an orderly manner, thereby better managing the workshop's proprietary equipment and effectively restricting workshop workers from using the equipment at will.

[0008] To achieve the above objectives, this utility model is implemented through the following technical solution: An integrated cable management rack for welding machines and fans includes two parallel columns. Between the two columns, there is an equipment support cross groove and a fan support cross groove. A fan frame for mounting the fan is provided on the fan support cross groove. Support angle steel and round steel connecting rods are provided on the equipment support cross groove. A cable passage groove is provided at the upper end of the column. Several cable racks are arranged at equal intervals on the cable passage groove.

[0009] A telescopic rod is provided between the fan frame and the fan support cross slot.

[0010] The wind turbine support cross groove has connecting support grooves at both ends, and the connecting support grooves are installed on the column.

[0011] The two ends of the equipment support transverse groove are provided with equipment support longitudinal grooves.

[0012] The bottom of the column is provided with an embedded part, and an anchor rod is provided below the embedded part.

[0013] The cable tray is a grooved cable tray.

[0014] The column is a trough-type column.

[0015] The aforementioned wind turbine support cross groove is located above the equipment support cross groove.

[0016] The fan in question is a cylindrical fan.

[0017] The beneficial effects of this utility model are as follows: This utility model relates to an integrated cable management rack for welding machines and fans. By integrating the installation positions and cable trays of the welding machine and fan into a single support structure, it achieves centralized installation of the equipment. This allows for the categorized and orderly arrangement of various cables and pipes, and enables rapid disassembly and relocation, improving operational safety and site cleanliness. This utility model primarily addresses the management of welding machines and fans in workshop 5S management, beautifying the placement of tools and equipment in the workshop. It overcomes the current technical shortcomings of workshops where cables cannot be placed in an orderly manner, equipment is placed haphazardly, and its location changes rapidly, hindering orderly workshop management. It provides better control over workshop equipment and effectively restricts workers from using equipment indiscriminately. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the structure of this utility model; Among them, 1 is a hook-and-groove cable frame, 2 is a cable trough, 3 is a connecting support trough, 4 is a trough column, 5 is a longitudinal support trough for equipment, 6 is a transverse support trough for equipment, 7 is an embedded part, 8 is an anchor rod, 9 is a supporting angle steel, 10 is a round steel connecting rod, 11 is a transverse support trough for fan, 12 is a telescopic rod, 13 is a fan frame, and 14 is a fan. Detailed Implementation

[0019] The present invention will be further described below with reference to specific embodiments, but the scope of protection of the present invention is not limited thereto.

[0020] like Figure 1 As shown, the integrated cable management frame for welding machines and fans of this utility model includes two parallel columns, each a channel-type column 4, which serves as the supporting column for the cable passage 2 and is connected to the embedded part 7 of the base. The cable passage 2 is located at the upper end of the channel-type column 4, where the welding machine's lead-out cables are centrally led out. Several cable holders, each a grooved cable holder 1, are evenly spaced on the cable passage 2. If the welding machine's cables are too long, they can be wrapped and hooked onto the grooved cable holder 1 to prevent them from touching the ground. The bottom of the channel-type column 4 has an embedded part 7, which serves as a connecting component for the anchor rod 8, ensuring an effective overall force transmission path. The anchor rod 8 is located below the embedded part 7, primarily bearing and transmitting the total weight of the upper frame and the welding machine, and is in direct contact with the ground.

[0021] Furthermore, in this invention, a cross groove for equipment support 6 and a cross groove for fan support 11 are provided between the two trough-type columns 4, with the cross groove for fan support 11 located above the cross groove for equipment support 6. The fan support transverse groove 6 is used to support the overall weight of the fan 14 and connects with the connecting support groove 3 to transfer the load. The connecting support groove 3 is located at both ends of the fan support transverse groove 11 and is installed on the groove column 4. The two groove columns 4 serve as left and right connecting supports and can also serve as fixing grooves for fixing the fan support transverse groove 11. The equipment support transverse groove 6 mainly serves as the main component for supporting the weight of the welding machine. A cable pass-through groove is opened on the equipment support transverse groove 6, through which the cable from the rear or front of the welding machine is introduced. The two ends of the equipment support transverse groove 6 are provided with equipment support longitudinal grooves 5, which connect the front and rear equipment support transverse grooves 6 and play a fixing role. The equipment support transverse groove 6 is provided with support angle steel 9 and round steel connecting rod 10. The support angle steel 9 is a component that directly contacts the welding machine, so that the equipment support transverse groove 6 can better bear the weight of the welding machine. The round steel connecting rod 10 serves as a stable connection between the front and rear equipment support transverse grooves 6 in the middle section. A fan frame 13 is provided on the fan support cross groove 11 to mount the fan 14. This frame serves as the fixed frame for the entire fan and is connected to the telescopic rod 12 as a whole. The fan 14 is a cylindrical fan, mainly used in industrial applications. The telescopic rod 12 is located between the fan frame 13 and the fan support cross groove 11, allowing for vertical adjustment of the fan 14's height, which is then fixed with a pin.

[0022] This utility model integrates the installation positions of the welding machine and fan 14, cable trays, etc., into the same bracket structure, achieving centralized installation of equipment. This allows for the categorized and orderly arrangement of various cables and pipes, and enables rapid disassembly and relocation, improving operational safety and site cleanliness. This utility model primarily addresses the management of welding machines, fans, etc., in workshop 5S management, beautifying the placement of workshop tools and equipment. It overcomes the current technical shortcomings of workshops where cables cannot be placed in an orderly manner, equipment is placed haphazardly, and its location changes rapidly, hindering orderly workshop management. It enables better control of workshop equipment and effectively restricts workers from using equipment arbitrarily.

[0023] The above embodiments are only used to explain the inventive concept of this utility model, and are not intended to limit the protection of this utility model. Any non-substantial modifications made to this utility model using this concept should fall within the protection scope of this utility model.

Claims

1. A cable management rack integrating a welding machine and a fan, characterized in that: It includes two parallel columns, with an equipment support cross groove and a fan support cross groove between the two columns. The fan support cross groove is equipped with a fan frame for installing the fan, and the equipment support cross groove is equipped with supporting angle steel and round steel connecting rods. The upper end of the column is provided with a cable tray, and several cable frames are arranged at equal intervals on the cable tray.

2. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: A telescopic rod is provided between the fan frame and the fan support cross slot.

3. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The wind turbine support cross groove has connecting support grooves at both ends, and the connecting support grooves are installed on the column.

4. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The two ends of the equipment support transverse groove are provided with equipment support longitudinal grooves.

5. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The bottom of the column is provided with an embedded part, and an anchor rod is provided below the embedded part.

6. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The cable tray is a grooved cable tray.

7. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The column is a trough-type column.

8. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The aforementioned wind turbine support cross groove is located above the equipment support cross groove.

9. The integrated cable management rack for welding machine and fan as described in claim 1, characterized in that: The fan in question is a cylindrical fan.