An ecological retention zone rainwater purification structure

By using a vertical multi-layered composite structure and a horizontal zoned purification design, combined with stepped gabion pretreatment and a serpentine corridor diversion structure, the problem of poor purification in the ecological retention zone was solved, achieving efficient pollutant removal and stable effluent quality, thus meeting the high-efficiency purification requirements of sponge cities.

CN224954464UActive Publication Date: 2026-11-10MENGCAO ECOLOGICAL ENVIRONMENT (GRP) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522407151.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-13
Publication Date
2026-11-10
Estimated Expiration
2035-11-13

AI Technical Summary

Technical Problem

The existing ecological retention zone has poor purification level and cannot meet the requirements of sponge city for deep purification. In addition, it lacks pretreatment energy dissipation structure, which leads to filter media loss and unstable effluent quality.

Method used

It adopts a vertical multi-layer composite structure and a horizontal zoned purification structure, including a planting soil layer, a sandy soil filter layer, a composite matrix layer, a gravel drainage layer and an isolation layer. Combined with a stepped gabion pretreatment structure and a serpentine corridor diversion structure, it is equipped with water quality sensors and circulation pumps to achieve multi-dimensional pollutant removal and intelligent management.

Benefits of technology

It achieves efficient removal of pollutants from multiple dimensions, enhances the structure's impact resistance and rainwater storage capacity, ensures stable and compliant effluent quality, and meets the high-efficiency purification needs of sponge cities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224954464U_ABST
    Figure CN224954464U_ABST
Patent Text Reader

Abstract

This utility model belongs to the field of sponge city technology, and particularly relates to an ecological retention zone rainwater purification structure. Addressing the problems of existing structures' poor rainwater purification, lack of pretreatment and energy dissipation structures, direct impact of rainwater on the purification layer leading to filter media loss and structural damage, and the absence of water quality monitoring and feedback adjustment mechanisms, making it difficult to ensure stable effluent quality, the following solution is proposed: a vertical multi-layer composite structure and a horizontal zoned purification structure. This utility model achieves multi-dimensional pollutant removal through a synergistic design of stepped gabion pretreatment, vertical multi-layer composite purification, and serpentine corridor guidance. The low gabion walls form a stepped drop structure, which can absorb and buffer rainwater, avoiding filter media loss and structural damage caused by direct impact of rainwater on the purification layer in existing technologies. Water quality sensors can monitor the rainwater quality in the collection tank in real time, ensuring stable effluent quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a rainwater purification structure, specifically an ecological retention zone rainwater purification structure, belonging to the field of sponge city technology. Background Technology

[0002] Ecological retention zones are essentially "rainwater treatment gardens" in cities. They primarily treat and store rainwater by mimicking natural methods, making them highly practical facilities in sponge cities. They are typically built in roadside green spaces and along riverbanks, using common materials such as plants, soil, and gravel. With the acceleration of urbanization, rainwater runoff carries new pollutants such as suspended solids (SS), COD, nitrogen and phosphorus nutrients, heavy metals, and pharmaceuticals and personal care products, posing a serious threat to urban water environments. The requirements for rainwater purification facilities in sponge cities have upgraded from "basic purification" to a composite requirement of "high-efficiency purification + stable regulation and storage + intelligent control," and existing ecological retention technologies are not adequately adapted to this need.

[0003] In existing technologies, such as the sunken biological purification and retention zone disclosed in publication number CN107587577A, although it is equipped with a vegetation layer, soil matrix layer, filter layer, water purification layer and water storage layer, and enhances rainwater regulation and storage through the sunken structure, and realizes drainage and flood prevention functions during heavy rainfall through the dry stream, its core is still a conventional layered purification design, with poor purification level, which cannot meet the requirements of "deep purification" for sponge cities. At the same time, the system lacks a pretreatment energy dissipation structure, and rainwater directly impacts the purification layer, which can easily lead to filter material loss and structural damage. Moreover, there is no water quality monitoring and feedback adjustment mechanism, making it difficult to ensure that the effluent water quality is stable and meets the standards. Summary of the Invention

[0004] This invention provides an ecological retention zone rainwater purification structure to address the problem that existing structures are not effective in purifying rainwater and cannot ensure that the effluent water quality consistently meets standards.

[0005] This utility model achieves the above-mentioned objectives through the following technical solution: an ecological retention zone rainwater purification structure, including a foundation, the foundation having a vertical multi-layer composite structure and a horizontal zone purification structure inside, the vertical multi-layer composite structure including, from top to bottom, a planting soil layer, a sandy soil filter layer, a composite matrix layer, a gravel drainage layer and an isolation layer, the horizontal zone purification structure including a stepped gabion pretreatment structure and a serpentine corridor diversion structure.

[0006] As a further embodiment of this utility model: the isolation layer is a permeable geotextile, and the isolation layer is fixedly laid on the inner bottom and inner sidewall of the foundation, the gravel drainage layer is fixedly laid on the surface of the isolation layer, the composite matrix layer is fixedly laid on the surface of the gravel drainage layer, the sandy soil filter layer is fixedly laid on the surface of the composite matrix layer, and the planting soil layer is fixedly laid on the surface of the sandy soil filter layer.

[0007] As a further embodiment of this utility model: the interior of the gravel drainage layer is laid with inclined permeable pipes at equal intervals, the height of the inlet end of the permeable pipe is higher than the height of the outlet end, a water collection trough is opened on the right side surface of the gravel drainage layer, the inlet end of the permeable pipe is sealed with a pipe cap, the outlet end of the permeable pipe extends into the water collection trough, the permeable pipe is a PVC perforated pipe or an HDPE perforated pipe, and the permeable pipe is inclined along the direction from the inlet end to the outlet end of the ecological retention zone.

[0008] As a further embodiment of this utility model: a stepped gabion pretreatment structure is set at the front end of the ecological retention zone. The stepped gabion pretreatment structure includes gabion low walls, which are filled with limestone and zeolite. The gabion low walls form a stepped drop structure. The bottom surface of the gabion low walls is in contact with the composite matrix layer, and the surface of the gabion low walls is flush with the top of the planting soil layer.

[0009] As a further improvement of this utility model: a regulating pool is provided on the left side of the foundation near the low gabion wall, the depth of the regulating pool is lower than the bottom of the low gabion wall, and a connecting hole is provided between the regulating pool and the low gabion wall.

[0010] As a further embodiment of this utility model: the serpentine corridor flow guiding structure includes a flow guiding plate, which is set at the interface between the sandy soil filter layer and the composite matrix layer. The height of the flow guiding plate is consistent with the thickness of the sandy soil filter layer. The bottom of the flow guiding plate is in close contact with the composite matrix layer, and its top is flush with the sandy soil filter layer. Two adjacent flow guiding plates are arranged in a staggered manner to form a serpentine corridor water flow path.

[0011] As a further embodiment of this utility model: a return water pipe and a drainage pipe are fixedly laid on the right side of the foundation, and the bottom ends of the return water pipe and the drainage pipe extend into the water collection tank. A circulation pump is fixedly installed on the surface of the foundation. The inlet end of the return water pipe and the circulation pump are fixedly connected. A water delivery pipe is fixedly connected to the outlet end of the circulation pump. The outlet end of the water delivery pipe extends to the top of the regulating tank. Positioning plates are fixedly fitted at equal intervals on the surface of the water delivery pipe. The positioning plates are fixedly connected to the surface of the foundation. A drainage valve is fixedly installed on the body of the drainage pipe.

[0012] As a further improvement of this utility model: a water quality sensor is installed inside the water collection tank. The water quality sensor is embedded in the top right side of the gravel drainage layer, with half of the structure of the water quality sensor located inside the gravel drainage layer and the other half exposed. The probe of the water quality sensor is oriented in the same direction as the water flow in the gravel drainage layer.

[0013] The beneficial effects of this utility model are: 1. This utility model achieves multi-dimensional pollutant removal through a synergistic design of "stepped gabion pretreatment + vertical multi-layer composite purification + serpentine corridor guidance". Specifically, the limestone and zeolite within the low gabion walls first perform primary filtration of rainwater, removing some suspended solids and heavy metals. The vertical composite matrix layer (containing zeolite, activated carbon, and a modified matrix loaded with δ-MnO2) simultaneously and efficiently removes ammonia nitrogen, organic pollutants, and new pollutants (pharmaceuticals / personal care products) through ion exchange, adsorption, and valence state transformation. The serpentine corridor extends the contact time between rainwater and the matrix and plant roots, enhancing the microbial degradation effect and solving the problems of poor purification levels and inability to handle complex pollutants in existing technologies. 2. In this utility model, the low gabion walls form a stepped drop structure, which can absorb and buffer rainwater, avoiding the loss of filter material and structural damage caused by rainwater directly impacting the purification layer in the prior art; the isolation layer (permeable geotextile) prevents soil particles from clogging the gravel drainage layer, and the inclined permeable pipe and the water collection channel work together to ensure smooth drainage. The regulating pool can temporarily store excess rainwater and return it to the gabion area through the connecting holes, which not only improves the overall impact resistance of the structure, but also strengthens the rainwater regulation capacity, avoids runoff overflow under short-term heavy rainfall, and meets the needs of sponge city for water storage and drainage balance. 3. This utility model, by setting up a water quality sensor, a circulation pump, and a return water pipe, enables real-time monitoring of rainwater quality in the collection tank during use (the probe is oriented in the same direction as the water flow to ensure accurate data). If the water quality does not meet the standards, the rainwater can be returned to the regulating tank via the circulation pump and re-enter the purification process. Rainwater that meets the standards is discharged through the drainage pipe or reused, solving the defects of existing technologies that lack monitoring and feedback mechanisms and have unstable effluent water quality. This achieves intelligent management of purification-monitoring-circulation, ensuring that the effluent water quality is consistently up to standard. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the overall appearance and structure of the present utility model; Figure 2 This is a schematic diagram of the overall paving structure of this utility model. Figure 1 ; Figure 3 This is a schematic diagram of the overall paving structure of this utility model. Figure 2 ; Figure 4 This is a schematic diagram of the overall paving structure of this utility model. Figure 3 ; Figure 5 This is a top view of the overall paving structure of this utility model; Figure 6 This is a schematic diagram of the connection structure of the gabion wall, gravel drainage layer and permeable pipe in this utility model.

[0015] In the diagram: 1. Foundation; 2. Isolation layer; 3. Gravel drainage layer; 31. Permeable pipe; 32. Water collection trough; 4. Composite matrix layer; 5. Sandy soil filter layer; 6. Planting soil layer; 7. Gabion wall; 8. Regulating pool; 81. Connecting hole; 9. Baffle plate; 10. Circulation pump; 11. Return water pipe; 12. Water supply pipe; 13. Positioning plate; 14. Drainage pipe; 15. Drainage valve; 16. Water quality sensor. Detailed Implementation

[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0017] Example 1 like Figures 1 to 6 As shown, an ecological retention zone rainwater purification structure includes a foundation 1. The foundation 1 has a vertical multi-layer composite structure and a horizontal zone purification structure inside. The vertical multi-layer composite structure includes, from top to bottom, a planting soil layer 6, a sandy soil filter layer 5, a composite matrix layer 4, a gravel drainage layer 3, and an isolation layer 2. The horizontal zone purification structure includes a stepped gabion pretreatment structure and a serpentine corridor diversion structure.

[0018] In this invention, during installation, the foundation 1 is first excavated and cleaned to ensure a flat base. The permeable geotextile is then laid sequentially from the bottom of the foundation 1 pit to the sidewalls, ensuring complete adhesion without wrinkles or leakage. Next, graded gravel is laid on the surface of the isolation layer 2, with inclined permeable pipes 31 embedded simultaneously (inlet end sealed, outlet end facing downwards, slope 0.5%-1%) to ensure smooth drainage. Subsequently, a uniformly mixed composite matrix (containing zeolite, activated carbon, etc.) is laid on the surface of the gravel drainage layer 3, leveled with a scraper according to the designed thickness, and precisely marked on its surface. Mark the installation position of the guide plate 9, and vertically insert the guide plate 9 into the composite matrix layer 4 (insertion depth approximately 50-100mm, ensuring stability). Ensure the top height of the guide plate 9 matches the thickness of the subsequent sandy soil filter layer 5. After confirming that the spacing, overlap, and verticality of the guide plates 9 meet the standards, lay the sandy soil filter layer 5 on the surface of the composite matrix layer 4 (including around the guide plate 9) until it is flush with the top of the guide plate 9. This will ultimately create a stable structure where the composite matrix layer 4 supports the guide plate 9, and the sandy soil filter layer 5 wraps around the lower half of the guide plate 9. After establishing the structural framework, planting soil is laid on the surface of the sandy soil filter layer 5, according to the designed thickness. The top of the soil should be flush with or slightly higher than the pit opening of foundation 1 by 50mm, leaving space for planting. After the vertical structure is stable, a stepped gabion pretreatment structure is assembled at the front end of foundation 1. Finally, a guide plate 9 is installed at the interface between the sandy soil filter layer 5 and the composite matrix layer 4, and fixed in a staggered manner to form a serpentine corridor guide structure. The overall structure has strong stability and avoids interlayer separation. The paving sequence from bottom to top ensures that each layer can rely on the structure of the layer below. The structure is load-bearing, with the isolation layer 2 supporting the gravel layer and the gravel layer supporting the matrix layer. The layers are tightly bonded without gaps, effectively preventing interlayer displacement or filter material loss caused by rainwater erosion. This solves the problem of "upper layer collapse and lower layer blockage" and extends the service life of the overall structure. In daily use, rainwater is first initially intercepted by the planting soil layer 6, then filtered by sandy soil to remove fine impurities, and finally the composite matrix layer 4 removes pollutants in depth. Combined with gravel layer drainage and horizontal structure pretreatment, a "multi-layer synergistic purification" chain is formed to ensure that the effluent water quality meets the standards.

[0019] Furthermore, the isolation layer 2 is a permeable geotextile, and the isolation layer 2 is fixedly laid on the inner bottom and inner sidewall of the foundation 1. The gravel drainage layer 3 is fixedly laid on the surface of the isolation layer 2, and the thickness of the gravel drainage layer 3 is 200-300mm. The composite matrix layer 4 is fixedly laid on the surface of the gravel drainage layer 3, and the thickness of the composite matrix layer 4 is 300-400mm. The sandy soil filter layer 5 is fixedly laid on the surface of the composite matrix layer 4, and the thickness of the sandy soil filter layer 5 is 100-150mm. The planting soil layer 6 is fixedly laid on the surface of the sandy soil filter layer 5, and the thickness of the planting soil layer 6 is 400-600mm.

[0020] The uppermost planting soil layer 6 is thick enough to provide ample space for plant roots to extend and stabilize soil temperature and humidity. The sandy soil filter layer 5 can intercept soil impurities and prevent blockage of the lower channels. Combined with the gravel drainage layer 3, it can quickly drain excess water and prevent root rot caused by water accumulation from the root. The bottom isolation layer 2 can isolate impurities such as gravel and salt in the foundation 1 to prevent contamination of the upper composite matrix layer 4 and planting soil layer 6. It can also fit tightly against the inner bottom and inner sidewall of the foundation 1 to reduce the displacement of the upper soil layer and extend the life of the overall structure.

[0021] Furthermore, the gravel drainage layer 3 is provided with inclined permeable pipes 31 at equal intervals inside. The height of the inlet end of the permeable pipe 31 is higher than the height of the outlet end. A water collection trough 32 is provided on the right side surface of the gravel drainage layer 3. The inlet end of the permeable pipe 31 is sealed with a pipe cap, and the outlet end of the permeable pipe 31 extends into the water collection trough 32.

[0022] During use, rainwater falls to the top layer of planting soil 6. Soil particles and plant roots physically intercept large particles (such as fallen leaves, dust, and silt) in the rainwater. Simultaneously, the adsorption effect of the plant roots preliminarily adsorbs some organic pollutants, reducing the burden on subsequent filtration layers. Rainwater from planting soil 6 infiltrates into the sandy soil filter layer 5. The fine particles of the sandy soil form dense filtration channels, trapping fine silt and suspended particles in the rainwater. At the same time, some microorganisms can grow in the sand layer, preliminarily degrading small amounts of organic matter, nitrogen, phosphorus, and other nutrients in the rainwater, further purifying the water. The rainwater then continues to infiltrate into the composite matrix layer 4. The porous structure of the matrix can adsorb residual micro-pollutants in the rainwater (such as some heavy metal ions and soluble organic matter), while buffering the water flow speed to prevent excessive erosion that could clog the lower drainage layer, thus ensuring the stability of the purification effect. Finally, the purified rainwater permeates into the gravel drainage layer 3. The gaps between the gravel collect the water and guide it to the inclined permeable pipe 31. The permeable pipe 31 uses its slope to quickly guide the purified water into the collection tank 32, achieving centralized collection or discharge of the purified water. Furthermore, the sealed design at the inlet end of the permeable pipe 31 can prevent gravel from entering the pipe and causing blockage.

[0023] Furthermore, the stepped gabion pretreatment structure is set at the front end of the ecological retention zone. The stepped gabion pretreatment structure includes gabion low walls 7, which are filled with limestone and zeolite. The gabion low walls 7 form a stepped drop structure. The bottom surface of the gabion low walls 7 is in contact with the composite matrix layer 4, and the surface of the gabion low walls 7 is flush with the top of the planting soil layer 6.

[0024] The stepped gabion pretreatment structure added at the front end of the ecological retention zone can form a synergistic effect of "pretreatment + deep purification" with the original multi-layered paving structure. The bottom surface of the gabion wall 7 is in contact with the composite matrix layer 4, and the surface is flush with the top of the planting soil layer 6. This ensures a seamless connection with the original structure and allows rainwater to flow through the gabions in an orderly manner through the stepped drop design. The limestone filling inside can adjust the pH value of rainwater through chemical reaction, neutralizing the erosion of subsequent soil layers by acidic rainwater, while zeolite adsorbs ammonia nitrogen and heavy metals in rainwater with its porous structure. The system intercepts some pollutants such as ions in advance, reducing the purification burden on the planting soil layer 6 and the sandy soil filter layer 5. At the same time, the stepped drop structure can slow down the runoff speed and energy of rainwater, preventing rapid water flow from eroding the planting soil layer 6 and causing soil loss. Meanwhile, the gabion low walls 7 can serve as the "first line of defense" of the ecological retention zone, filtering out large particles of impurities (such as dead branches and gravel) first, making it easier for rainwater entering the multi-layer system to be purified, further improving the overall rainwater treatment efficiency, and also giving the front end of the retention zone a certain degree of landscape and erosion resistance.

[0025] It should be noted that: generally, native plants with strong stress resistance and well-developed root systems (such as Napier grass, iris, etc.) are planted on the surface of the planting soil layer 6 to absorb pollutants and maintain the infiltration rate.

[0026] The serpentine corridor flow guiding structure includes a flow guiding plate 9, which is set at the interface between the sandy soil filter layer 5 and the composite matrix layer 4. The height of the flow guiding plate 9 is the same as the thickness of the sandy soil filter layer 5. The bottom of the flow guiding plate 9 is in close contact with the composite matrix layer 4, and its top is flush with the sandy soil filter layer 5. Two adjacent flow guiding plates 9 are arranged in a staggered manner to form a serpentine corridor water flow path.

[0027] During the treatment process, the precise integration of the serpentine corridor diversion structure with the sandy soil filter layer 5 and the composite matrix layer 4 further optimizes the infiltration and purification path of rainwater in the soil layer. The diversion plate 9 is precisely positioned at the interface between the sandy soil filter layer 5 and the composite matrix layer 4, with its height consistent with the thickness of the sandy soil filter layer 5 and its bottom tightly attached to the composite matrix layer 4. This not only avoids damaging the original soil structure but also creates a stable diversion space based on the interface between the two layers. The staggered arrangement of adjacent diversion plates 9 directly forms the serpentine corridor water flow path, forcibly altering the flow of rainwater. The serpentine path significantly extends the residence time of rainwater in the sandy soil filter layer 5 and the composite matrix layer 4. On the one hand, it allows the sandy soil filter layer 5 more time to trap fine impurities, and the composite matrix layer 4 can more fully adsorb pollutants, further improving the purification effect. On the other hand, it slows down the infiltration rate of rainwater, preventing a large amount of rainwater from rushing into the gravel drainage layer 3 in a short time and causing drainage pressure. At the same time, it allows the composite matrix layer 4 to more fully absorb and store some rainwater, enhancing the water retention capacity of the entire retention zone and providing continuous water supply for the growth of plants in the upper planting soil layer 6.

[0028] It should be noted that the serpentine path formed by the guide plate 9 forces rainwater to flow slowly at the interface between the sandy soil filter layer 5 and the composite matrix layer 4, significantly extending the rainwater retention time. This allows the composite matrix layer 4 more time to absorb and store rainwater, rather than rapidly infiltrating into the gravel drainage layer 3. At the same time, the sandy soil filter layer 5 also retains more water in its pores due to the slower water flow. Furthermore, the composite matrix layer 4 and the sandy soil filter layer 5 are in close contact, and the sandy soil filter layer 5 is directly connected to the upper planting soil layer 6. When the planting soil layer 6 becomes dry due to plant transpiration and water evaporation, based on the "soil water potential difference" (dry soil layers actively absorb water from moist soil layers), the rainwater stored in the composite matrix layer 4 and the sandy soil filter layer 5 will slowly infiltrate upwards into the planting soil layer 6, continuously replenishing water for the plant roots and preventing the planting soil layer 6 from drying out quickly, thus achieving a continuous water supply effect.

[0029] Example 2 Improvements based on Example 1: Furthermore, a return water pipe 11 and a drainage pipe 14 are fixedly laid on the right side of the foundation 1, with the bottom ends of both the return water pipe 11 and the drainage pipe 14 extending into the water collection tank 32. A circulation pump 10 is fixedly installed on the surface of the foundation 1. The inlet end of the return water pipe 11 and the circulation pump 10 are fixedly connected. A water supply pipe 12 is fixedly connected to the outlet end of the circulation pump 10. The outlet end of the water supply pipe 12 extends above the regulating tank 8. Positioning plates 13 are fixedly sleeved at equal intervals on the surface of the water supply pipe 12. The positioning plates 13 are fixedly connected to the surface of the foundation 1. A drainage valve 15 is fixedly installed on the body of the drainage pipe 14.

[0030] Furthermore, a water quality sensor 16 is installed inside the water collection tank 32. The water quality sensor 16 is embedded in the top right side of the gravel drainage layer 3, with half of the structure of the water quality sensor 16 located inside the gravel drainage layer 3 and the other half exposed. The probe of the water quality sensor 16 is oriented in the same direction as the water flow inside the gravel drainage layer 3.

[0031] Furthermore, a regulating pool 8 is provided on the left side of the foundation 1 near the gabion wall 7. The depth of the regulating pool 8 is lower than the bottom of the gabion wall 7, and a connecting hole 81 is provided between the regulating pool 8 and the gabion wall 7.

[0032] The water quality sensor 16 (half inside the layer and half exposed, with the probe facing the direction of water flow) is embedded in the top right side of the gravel drainage layer 3. It can accurately capture the water quality status of rainwater in the collection tank 32. Its probe directly contacts the purified water flowing from the gravel drainage layer 3 into the collection tank 32, and detects key indicators such as suspended solids, nitrogen and phosphorus content, and heavy metals in the water in real time to determine whether the water quality meets the standards for external discharge (such as connection to municipal pipe network or natural water network). When the water quality sensor 16 detects that the rainwater quality in the collection tank 32 meets the standards, there is no need to start the circulation pump 10. Just open the drain valve 15 on the drainage pipe 14, and the qualified purified water in the collection tank 32 will be directly discharged to the external water network (such as municipal rainwater pipe network or surrounding rivers) through the drainage pipe 14, so as to achieve compliant discharge and avoid water waste. When the water quality sensor 16 detects that the water quality does not meet the standards (such as pollutant residue exceeding the discharge standards), the drain valve 15 is closed and the circulation pump 10 on the surface of the foundation 1 is started. The circulation pump 10 draws the substandard rainwater from the collection tank 32 through the return water pipe 11 connected to the inlet end, and then transports it to the regulating tank 8 for storage through the water pipe 12. The regulating tank 8 is lower than the bottom of the gabion wall 7 and is connected to the gabion wall 7 through the connecting hole 81. The stored substandard rainwater can flow back to the gabion wall 7 at the front end of the ecological retention zone through the connecting hole 81, and together with the newly entered rainwater, it goes through the complete purification process of "gabion pretreatment → planting soil layer 6 interception → sandy soil filter layer 5 fine filtration → composite matrix layer 4 adsorption" until the water quality meets the standards before being discharged or reused.

[0033] Working principle: When used in rainwater purification structures, the foundation 1 is first excavated and cleaned to remove gravel and debris, ensuring a flat base for subsequent paving. Then, the permeable geotextile (isolation layer 2) is laid from the bottom of the foundation 1 pit to the side wall, ensuring that the fabric completely adheres to the inner wall of the foundation 1 without wrinkles or leakage, forming a comprehensive isolation barrier of "bottom layer + side wall". Graded gravel is then laid on the surface of the isolation layer 2, with a thickness controlled at 200-300mm. Simultaneously, a permeable pipe 31 is embedded in an inclined state (the inlet end is sealed with a pipe cap, and the outlet end is lower, with a slope of 0.5%-1%), ensuring that the outlet end of the permeable pipe 31 extends into the pre-set water collection channel 32 on the right side of the gravel drainage layer 3, ensuring smooth drainage. Then, spread the uniformly mixed composite matrix (containing zeolite, activated carbon, etc.) on the surface of the gravel drainage layer 3, with a thickness of 300-400mm, and level it with a scraper according to the designed thickness. Then, accurately mark the installation position of the guide plate 9 on the surface of the matrix layer, and vertically insert the guide plate 9 into the composite matrix layer 4 (insertion depth 50-100mm to ensure stability), so that the top height of the guide plate 9 is consistent with the thickness (100-150mm) of the subsequent sandy soil filter layer 5. Next, sandy soil is laid on the surface of the composite matrix layer 4 (including around the guide plate 9) until it is flush with the top of the guide plate 9, thus forming a stable structure in which the composite matrix layer 4 supports the guide plate 9 and the sandy soil filter layer 5 wraps the lower half of the guide plate 9, avoiding the separation between layers. Then, planting soil with a thickness of 400-600mm is laid on the surface of the sandy soil filter layer 5, with the top flush with or slightly higher than the pit opening of the foundation 1 by 50mm, leaving space for planting plants. Next, a stepped gabion pretreatment structure is assembled at the front end of the ecological retention zone. The low gabion wall 7 filled with limestone and zeolite is fixed to ensure that its bottom surface is in contact with the composite matrix layer 4 and its surface is flush with the top of the planting soil layer 6. Finally, the serpentine corridor guide structure is checked and reinforced to confirm that the adjacent guide plates 9 are arranged in a "left-right staggered" manner to form a serpentine water flow path. A return water pipe 11 and a drainage pipe 14 (both extending to the bottom of the collection trough 32) are laid on the right side of the foundation 1. A circulation pump 10 is fixed on the surface of the foundation 1 (the inlet end is connected to the return water pipe 11, and the outlet end is connected to the water supply pipe 12). A positioning plate 13 is fitted onto the surface of the water supply pipe 12 and fixed to the foundation 1. A drainage valve 15 is installed on the drainage pipe 14. A water quality sensor 16 is embedded in the collection trough 32 (half inside the gravel drainage layer 3 and half exposed, with the probe facing the direction of water flow). At the same time, an regulating pool 8 (deeper than the bottom of the gabion wall 7) is excavated on the left side of the foundation 1 near the gabion wall 7, and a connecting hole 81 is opened between the two. Finally, after the planting soil has stabilized, plant native plants with strong resistance and well-developed root systems (such as foxtail grass, iris, etc.) on its surface. When treating rainwater, the rainwater first enters the low gabion wall 7 at the front end of the ecological retention zone. The limestone inside the gabion adjusts the pH value of the rainwater through chemical reaction, neutralizing the erosion of subsequent soil layers by acidic rainwater. Zeolite adsorbs ammonia nitrogen and heavy metal ions in the rainwater with its porous structure, while intercepting large particles such as dead branches and gravel. The stepped drop structure slows down the runoff speed of rainwater, preventing rapid water flow from washing away the planting soil layer 6 and causing soil loss. Most of the pre-treated rainwater seeps into the top layer of planting soil 6, where soil particles and plant roots physically intercept impurities such as fallen leaves, dust, and silt. Plant roots also adsorb some organic pollutants, reducing the purification burden on subsequent filtration layers and stabilizing soil temperature and humidity, thus providing an environment for plant growth. A small portion of rainwater seeps directly into the sandy soil filter layer 5 below, and together with the rainwater treated by the planting soil layer 6, it seeps into the sandy soil filter layer 5. The fine sandy soil particles form dense filter channels, which intercept the fine silt and suspended particles in the rainwater. The microorganisms that grow in the sand layer initially degrade the organic matter, nitrogen, phosphorus and other nutrients in the rainwater, further improving the water quality. In addition, the serpentine corridor formed by the guide plate 9 forces the rainwater to flow slowly, prolonging the filtration time and improving the filtration effect. The treated rainwater continues to infiltrate into the composite matrix layer 4. The porous structure of the matrix (zeolite, activated carbon, etc.) deeply adsorbs the heavy metal ions and soluble organic matter remaining in the rainwater. At the same time, the matrix layer buffers the water flow rate, preventing the gravel drainage layer 3 from being blocked due to excessive scouring. The serpentine corridor extends the rainwater retention time, allowing the matrix to more fully adsorb pollutants and simultaneously store some rainwater. The purified rainwater permeates into the gravel drainage layer 3. The gaps between the gravel particles collect the water and guide it to the inclined permeable pipe 31. The permeable pipe 31 uses its slope (high at the inlet end and low at the outlet end) to quickly guide the rainwater into the collection tank 32, realizing the centralized collection of purified water. The inlet end of the permeable pipe 31 is sealed to prevent gravel from entering the pipe and causing blockage. The water quality sensor 16 inside the water collection tank 32 detects indicators such as suspended solids, nitrogen and phosphorus content, and heavy metals in rainwater in real time to determine whether the water quality meets the standards. If the water quality meets the standards, the circulation pump 10 is turned off and the drainage valve 15 is opened. The qualified rainwater is directly discharged into the external water network (municipal pipe network, natural river) through the drainage pipe 14 to achieve compliant discharge. If the water quality does not meet the standards, close the drain valve 15, start the circulation pump 10, and draw the substandard rainwater from the collection tank 32 through the return water pipe 11. Then, transport the substandard rainwater to the regulating tank 8 for storage through the water conveying pipe 12 (positioning plate 13 to prevent pipe displacement). Subsequently, the substandard rainwater flows back to the gabion wall 7 through the connecting hole 81 and undergoes the "pretreatment → multi-layer purification" process again with the newly entered rainwater until the water quality meets the standards and is discharged or used to irrigate the plants in the planting soil layer 6. Through the synergistic effect of gabion pretreatment and four-layer vertical purification, rainwater undergoes multiple rounds of interception, filtration, and adsorption, effectively removing pollutants such as large particles, heavy metals, and organic matter. Coupled with the real-time monitoring and diversion design of water quality sensor 16, only rainwater that meets the standards is discharged, avoiding pollution of the external water network by unpurified rainwater, which meets environmental protection requirements.

[0034] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0035] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims

1. An ecological retention zone rainwater purification structure, comprising a foundation (1), characterized in that: The foundation (1) is provided with a vertical multi-layer composite structure and a horizontal zone purification structure. The vertical multi-layer composite structure includes, from top to bottom, a planting soil layer (6), a sandy soil filter layer (5), a composite matrix layer (4), a gravel drainage layer (3), and an isolation layer (2). The horizontal zone purification structure includes a stepped gabion pretreatment structure and a serpentine corridor diversion structure.

2. The ecological retention zone rainwater purification structure according to claim 1, characterized in that: The isolation layer (2) is a permeable geotextile, and the isolation layer (2) is fixedly laid on the inner bottom and inner sidewall of the foundation (1). The gravel drainage layer (3) is fixedly laid on the surface of the isolation layer (2). The composite matrix layer (4) is fixedly laid on the surface of the gravel drainage layer (3). The sandy soil filter layer (5) is fixedly laid on the surface of the composite matrix layer (4). The planting soil layer (6) is fixedly laid on the surface of the sandy soil filter layer (5).

3. The ecological retention zone rainwater purification structure according to claim 2, characterized in that: The gravel drainage layer (3) is provided with inclined permeable pipes (31) at equal intervals inside. The height of the inlet end of the permeable pipe (31) is higher than the height of the outlet end. A water collection trough (32) is provided on the right side surface of the gravel drainage layer (3). The inlet end of the permeable pipe (31) is sealed with a pipe cap. The outlet end of the permeable pipe (31) extends into the water collection trough (32).

4. The ecological retention zone rainwater purification structure according to claim 1, characterized in that: The stepped gabion pretreatment structure is set at the front end of the ecological retention zone. The stepped gabion pretreatment structure includes gabion low walls (7), which are filled with limestone and zeolite. The gabion low walls (7) form a stepped drop structure. The bottom surface of the gabion low walls (7) is in contact with the composite matrix layer (4), and the surface of the gabion low walls (7) is flush with the top of the planting soil layer (6).

5. The ecological retention zone rainwater purification structure according to claim 4, characterized in that: An regulating pool (8) is provided on the left side of the foundation (1) near the gabion wall (7). The depth of the regulating pool (8) is lower than the bottom of the gabion wall (7). A connecting hole (81) is provided between the regulating pool (8) and the gabion wall (7).

6. The ecological retention zone rainwater purification structure according to claim 1, characterized in that: The serpentine corridor flow guiding structure includes a flow guiding plate (9), which is set at the interface between the sandy soil filter layer (5) and the composite matrix layer (4). The height of the flow guiding plate (9) is the same as the thickness of the sandy soil filter layer (5). The bottom of the flow guiding plate (9) is in close contact with the composite matrix layer (4), and its top is flush with the sandy soil filter layer (5). Two adjacent flow guiding plates (9) are arranged in a staggered manner to form a serpentine corridor water flow path.

7. The ecological retention zone rainwater purification structure according to claim 4, characterized in that: A return water pipe (11) and a drainage pipe (14) are fixedly laid on the right side of the foundation (1). The bottom ends of the return water pipe (11) and the drainage pipe (14) extend into the water collection tank (32). A circulation pump (10) is fixedly installed on the surface of the foundation (1). The inlet ends of the return water pipe (11) and the circulation pump (10) are fixedly connected. A water conveying pipe (12) is fixedly connected to the outlet end of the circulation pump (10). The outlet end of the water conveying pipe (12) extends above the regulating tank (8). Positioning plates (13) are fixedly sleeved at equal intervals on the surface of the water conveying pipe (12). The positioning plates (13) are fixedly connected to the surface of the foundation (1). A drainage valve (15) is fixedly installed on the body of the drainage pipe (14).

8. The ecological retention zone rainwater purification structure according to claim 3, characterized in that: A water quality sensor (16) is installed inside the water collection tank (32). The water quality sensor (16) is embedded in the top right side of the gravel drainage layer (3), and half of the structure of the water quality sensor (16) is located inside the gravel drainage layer (3) while the other half is exposed. The probe of the water quality sensor (16) is oriented in the same direction as the water flow in the gravel drainage layer (3).

Citation Information

Patent Citations

  • Sinking biological purification retention belt

    CN107587577A