A crack repair device for highway construction
By using a dual-branch alternating conveying system and a material blocking mechanism, the problems of unstable material output and easy blockage in existing equipment have been solved, enabling continuous, stable, and dense repair of highway cracks and improving repair effectiveness and efficiency.
Patent Information
- Application Number
- CN202621528396.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-28
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2036-09-28
Smart Images

Figure CN224954950U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of highway crack repair, specifically to a crack repair device for highway construction. Background Technology
[0002] Under long-term vehicle loads, temperature stress, water damage, and freeze-thaw cycles, highway pavements are highly susceptible to developing transverse, longitudinal, and network cracks. If not repaired in time, these cracks will rapidly expand, exacerbating pavement damage. The core of crack repair is to continuously, stably, and evenly inject molten asphalt into the cracks and promptly smooth and shape them. Therefore, heating and insulation, continuous material conveying, stable discharge, and synchronous smoothing become key performance characteristics of the equipment.
[0003] Existing highway crack repair equipment mainly consists of small asphalt crack sealing machines, with relatively fixed structures and operating modes: the whole machine consists of a frame with rollers, a top asphalt heating tank, a bottom single-pipe discharge system, simple valves, and handheld sealing nozzles. Discharge relies on gravity flow or single screw pumping. The discharge pipe is a single-layer straight pipe without insulation. The asphalt cools down quickly inside the pipe, its fluidity drops sharply, and it easily adheres to the pipe wall, causing blockages. This makes cleaning difficult and affects continuous construction.
[0004] In terms of material conveying and control structure, existing equipment adopts a single-channel discharge and valve shut-off mode, relying solely on a single discharge pipe to transport molten asphalt, and controlling the on / off state and flow rate through ball valves, gate valves, or needle valves. When the valve is closed, the discharge is completely interrupted, and when it is open, the flow rate fluctuates greatly due to its own weight, making it impossible to achieve stable and continuous discharge. During the crack filling process, frequent valve opening and closing will cause asphalt to be sprayed out in pulses, resulting in uneven filling inside the crack, local voids, or surface overflow. Utility Model Content
[0005] The technical problem to be solved by this utility model is to overcome the above-mentioned difficulties and provide a crack repair device for highway construction.
[0006] To solve the above-mentioned technical problems, the technical solution provided by this utility model is as follows: A crack repair device for highway construction includes a device support, on which an asphalt heating tank is mounted. The bottom of the asphalt heating tank is connected to a conveying pipe for conveying asphalt. The conveying pipe includes two branch pipes arranged in parallel, and a cover is fitted over both branch pipes. The cover and the two branch pipes are equipped with a conveying mechanism that enables the two branch pipes to convey asphalt alternately, and a blocking mechanism that can cooperate with the conveying mechanism to alternately block the upper and lower ends of the branch pipes.
[0007] As an improvement, the upper and lower ends of the two branch pipes are respectively connected to the connecting pipe and the discharge pipe. The cover includes a shell that is fitted over the two branch pipes and a connecting block between the two shells. The material conveying mechanism includes a pusher block that slides up and down inside the branch pipe. The pusher block is driven by a drive mechanism located inside the connecting block, and the drive mechanism can drive the two pusher blocks to move up and down alternately.
[0008] As an improvement, the connecting block is provided with a groove and the side wall of the connecting block and the branch pipe are provided with a sliding groove. The driving mechanism includes several rotating rollers arranged in the groove. One of the rotating rollers is driven to rotate by a driving device provided on the connecting block. A transmission belt is rolled around the outside of the rotating roller. The top of one side of the transmission belt and the bottom of the other side are fixedly connected to end blocks that slide in the sliding groove. The end blocks are provided with insert rods that are rotatably inserted into the pusher block.
[0009] As an improvement, a through groove is provided on the side end face of the pusher block. The through groove is perpendicular to the axis of the insert rod, and a baffle that blocks the through groove is hinged to the upper end face of the pusher block. A limiting plate is provided on the inner wall of the branch pipe. When the pusher block moves up and down, the limiting plate alternately slides and inserts into the through groove and abuts against the baffle. A cross groove is provided on the side end face of the pusher block at the position of the extension line of the insert rod axis. A guide rod is provided on the inner wall of the branch pipe that alternately slides and inserts into the horizontal and vertical grooves of the cross groove.
[0010] As an improvement, a spiral spring is provided between the insert rod and the pusher block, which is sleeved on the insert rod. The pusher plate moves up so that the limiting plate and the baffle plate abut against each other and drive the pusher plate to rotate. The rotation of the pusher plate increases the elastic potential energy of the spiral spring.
[0011] As an improvement, the material blocking mechanism includes a baffle plate hinged to the upper and lower connection of the two branch pipes. The inner wall of the branch pipe is provided with a limiting block that abuts against the baffle plate. The rotating shaft of the baffle plate passes through the connecting pipe and the end of the rotating shaft is provided with a rotating plate. The end of the rotating plate and the connecting pipe are respectively connected to the two ends of the spring. When the baffle plate rotates, the spring is first compressed and then reset. When the push block in one branch pipe moves upward, the bottom baffle plate rotates to the branch pipe and at the same time the top baffle plate rotates to the other branch pipe.
[0012] As an improvement, the material blocking mechanism includes a rotating rod that is driven to reciprocate by a drive motor mounted on the drive device. Both ends of the rotating rod are provided with through slots, and the end of the rotating plate is provided with a support rod located in the through slot.
[0013] As an improvement, the device support includes a base frame supported by rollers, a vertical rod on the base frame and a barrel rack on the vertical rod, an asphalt heating barrel on the barrel rack, an assembly seat inside the base frame that is fitted over the discharge pipe, the assembly seat and the base frame are connected by a cross, a scraper is provided on the cross on both the front and rear sides of the discharge pipe, the scraper includes a fixing clamp that holds the cross frame rod, and a right-angle plate is provided at the bottom of the fixing frame.
[0014] As an improvement, the asphalt heating tank includes an outer tank and an inner tank inside the outer tank. The bottom of the outer wall of the inner tank is equipped with a vortex-type heater that can heat the asphalt. The bottom of the inner tank is connected to a connecting pipe that passes through the outer tank and is connected to the connecting pipe.
[0015] The advantages of this utility model compared with the prior art are as follows: 1. This device achieves alternating material suction and pushing through the coordinated operation of the material conveying mechanism and the material blocking mechanism. When one side moves upward to suction material, the other side moves downward to discharge material, resulting in seamless switching and uninterrupted material discharge. Combined with the stable extrusion output of the material pushing block, it fundamentally solves the problems of intermittent material discharge and unstable pressure in traditional equipment, enabling asphalt to be continuously and steadily injected into the cracks, resulting in a denser filling and a smoother surface.
[0016] 2. This device covers the outside of the branch pipe with a casing and fills the inside with an insulation layer, which greatly reduces heat loss and keeps the asphalt in a molten and flowing state. At the same time, the pusher blocks move up and down inside the branch pipe, which can automatically scrape off the asphalt adhering to the pipe wall. Combined with the alternating conveying structure, it completely avoids the asphalt cooling and solidifying and blocking the pipe, ensuring long-term continuous maintenance and operation without the need for frequent shutdowns to clean the pipeline.
[0017] 3. This device drives the pusher blocks on both sides to move alternately and at a uniform speed through a transmission belt. The discharge speed and pusher stroke are precisely controllable. With the synchronous reversing and blocking of the material blocking mechanism, a strictly unidirectional material conveying channel is formed, with no material cross-flow or backflow. The amount of filling is uniform and stable, which can be adapted to road cracks of different widths and depths, and the repair accuracy and consistency are significantly improved. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the overall structure of a crack repair device for highway construction according to this utility model.
[0019] Figure 2 This is a schematic diagram showing the overall structure of a crack repair device for highway construction according to this utility model.
[0020] Figure 3 This is a front view schematic diagram of the overall structure of a crack repair device for highway construction according to this utility model.
[0021] Figure 4 This utility model relates to a crack repair device for highway construction. Figure 3 Schematic diagram of the structure in mid-section.
[0022] Figure 5 This is a partial structural schematic diagram of a crack repair device for highway construction according to this utility model.
[0023] Figure 6 This is a partial structural cross-sectional view of a crack repair device for highway construction according to this utility model.
[0024] Figure 7This is a partial structural front view of a crack repair device for highway construction according to this utility model.
[0025] Figure 8 This is a cross-sectional schematic diagram of the material conveying pipe structure of a crack repair device for highway construction according to this utility model.
[0026] Figure 9 This is a schematic diagram of the material conveying mechanism of a crack repair device for highway construction according to this utility model.
[0027] Figure 10 This is a schematic diagram of the scraper structure of a crack repair device for highway construction according to this utility model.
[0028] As shown in the figure: 1. Device support; 101. Barrel frame; 102. Base frame; 103. Assembly base; 104. Cross; 2. Asphalt heating barrel; 201. Outer barrel; 202. Inner barrel; 203. Heater; 3. Material conveying pipe fittings; 301. Connecting pipe; 302. Branch pipe; 303. Discharge pipe; 304. Limiting plate; 305. Guide rod; 306. Limiting block; 307. Slide groove; 4. Cover; 401. Shell; 4 02. Connecting block; 5. Conveying mechanism; 501. Rotary roller; 502. Transmission belt; 503. End block; 504. Insert rod; 505. Scroll spring; 506. Pushing block; 507. Baffle; 508. Cross groove; 6. Material blocking mechanism; 601. Rotating rod; 602. Baffle plate; 603. Rotating plate; 604. Spring; 605. Support rod; 606. Through groove; 7. Scraper; 701. Fixing clamp; 702. Right angle plate. Detailed Implementation
[0029] The present invention will now be described in further detail with reference to the accompanying drawings.
[0030] Combined with appendix Figure 1 Appendix Figure 2 Appendix Figure 3 Appendix Figure 5 Appendix Figure 10 As shown: A crack repair device for highway construction includes a device support 1. An asphalt heating tank 2 is provided on the device support 1. The bottom of the asphalt heating tank 2 is connected to a material conveying pipe 3 that can convey asphalt. The material conveying pipe 3 includes two branch pipes 302 arranged in parallel. A cover 4 is provided on both sides of the two branch pipes 302. A material conveying mechanism 5 that enables the two branch pipes 302 to convey asphalt alternately is provided inside the cover 4 and the two branch pipes 302. A material blocking mechanism 6 that can cooperate with the material conveying mechanism 5 to alternately block the upper and lower ends of the branch pipes 302. A scraper 7 is provided on the cross 104 on both sides of the discharge pipe 303.
[0031] The upper and lower ends of the two branch pipes 302 are respectively connected to the connecting pipe 301 and the discharge pipe 303. The device support 1 includes a bottom frame 102 supported by rollers. A vertical rod is provided on the bottom frame 102 and a barrel rack 101 is provided on the vertical rod. The asphalt heating barrel 2 is located on the barrel rack 101. An assembly seat 103 is provided inside the bottom frame 102 and is sleeved on the discharge pipe 303. The assembly seat 103 and the bottom frame 102 are connected by a cross 104.
[0032] The scraper 7 includes a fixing clip 701 that is held in place on the cross 104 frame, and a right-angle plate 702 is provided at the bottom of the fixing frame.
[0033] This highway construction crack repair device uses the device support 1 as a mobile load-bearing foundation. The asphalt for road repair is heated and kept at a constant temperature by the asphalt heating tank 2 to ensure that the asphalt is always in the best melting and flowing state. The material conveying mechanism 5 realizes the alternating discharge of material from the two branch pipes 302, and works in conjunction with the material blocking mechanism 6 to synchronously reverse and block, forming a continuous and uninterrupted constant pressure asphalt output. This completely solves the industry pain points of traditional asphalt crack sealing machines, such as intermittent material discharge, unstable pressure, easy cooling and blockage, and incomplete crack sealing. After the molten asphalt is precisely injected into the road crack through the discharge pipe 303, the scrapers 7 on both sides of the discharge port complete the smoothing and finishing of the asphalt filling. The device can complete the entire process of filling and finishing in one pass, which greatly improves the work efficiency, repair quality and construction continuity of highway crack repair. It is perfectly adapted to the repair of various cracks such as transverse, longitudinal and mesh cracks in asphalt and cement pavement.
[0034] The device support 1 is the main body for the mobile support and installation of the entire device. It includes a rectangular base frame 102 with wheels at the bottom. An operating handle is welded to one side of the base frame 102 to facilitate the operator to push the device along the road crack. High-strength vertical rods are welded vertically to the four corners of the upper surface of the base frame 102. A barrel frame 101 is horizontally fixed on the vertical rods to support the asphalt heating barrel 2. A circular mounting seat 103 is fixed to the center of the base frame 102 by bolts. The mounting seat 103 is coaxially sleeved on the outside of the discharge pipe 303. The outer wall of the mounting seat 103 and the inner wall of the base frame 102 are rigidly welded together by a cross-shaped cross 104. The four support rods of the cross 104 are divided into front and rear groups for installing scraper parts 7.
[0035] The wear-resistant rubber rollers at the bottom of the base frame 102 support the entire device to move smoothly on the road surface. The operator pushes the device along the crack to be repaired at a uniform speed by pushing the handle, ensuring that the central discharge pipe 303 is always aligned with the center of the crack, avoiding displacement of the filling position. The barrel frame 101 provides a high-level installation reference for the asphalt heating barrel 2, so that the discharge port of the asphalt heating barrel 2 is higher than the conveying pipe 3, allowing the molten asphalt to flow into the conveying pipe 3 with the assistance of its own gravity. The central mounting seat 103 forms a rigid connection structure with the base frame 102 through the cross 104, providing radial limit for the discharge pipe 303, preventing radial shaking of the discharge pipe 303 during the movement of the device, and ensuring the accuracy of the filling position. At the same time, the cross 104 provides a stable installation reference for the scrapers 7 on the front and rear sides, so that the relative position of the scrapers 7 and the discharge pipe 303 is always fixed, ensuring that after the discharge pipe 303 fills the crack, the scrapers 7 can immediately scrape and smooth the asphalt, avoiding the problem of poor edge finishing caused by premature cooling and solidification of the asphalt.
[0036] Combined with appendix Figure 1 Appendix Figure 2 Appendix Figure 3 Appendix Figure 4 As shown: The asphalt heating tank 2 includes an outer tank 201, an inner tank 202 is provided inside the outer tank 201, a vortex heater 203 that can heat the asphalt is provided at the bottom of the outer wall of the inner tank 202, and a connecting pipe that passes through the outer tank 201 and is connected to the connecting pipe 301 at the bottom of the inner tank 202.
[0037] The asphalt heating tank 2 is the main heating and storage body for repaired asphalt, including a double-layered outer tank 201 and an inner tank 202. High-density aluminum silicate insulation cotton is filled between the outer tank 201 and the inner tank 202. A spiral heater 203 is tightly wound and installed on the bottom of the outer wall of the inner tank 202, and is equipped with an intelligent digital display temperature controller to accurately control the heating temperature. A discharge pipe is connected to the center of the bottom of the inner tank 202. The pipe passes vertically through the bottom of the outer tank 201 and is sealed with the connecting pipe 301 of the conveying pipe fitting 3 through a flange. In practice, a high-temperature resistant manual ball valve can be installed on the connecting pipe to control the flow of asphalt. The top of the inner tank 202 is provided with a feeding port with a sealed cover. The sealed cover has a vent hole to prevent positive pressure from being generated inside the tank.
[0038] working methods Before crack repair work, the hot-melted modified road repair asphalt is added into the inner bucket 202 through the top feeding port, the sealing cap is tightened, and the vortex heater 203 is started. The heating temperature is set by the intelligent temperature controller. The heater 203 heats the asphalt in the inner bucket 202 evenly throughout the entire area. The temperature controller monitors the asphalt temperature in real time and keeps the asphalt temperature stably controlled within the optimal construction temperature range, ensuring that the asphalt is always in a good molten flow state and preventing the asphalt from cooling and solidifying and clogging the delivery pipeline. The heat insulation cotton between the outer bucket 201 and the inner bucket 202 can effectively reduce heat loss, which not only reduces heating energy consumption, but also prevents the surface temperature of the outer bucket 201 from being too high and burning the operators, thus improving the safety of the operation. During operation, the manual ball valve on the connecting pipe is opened, and the constant-temperature asphalt in the inner barrel 202 flows continuously into the connecting pipe 301 below under the action of gravity, providing a continuous and stable supply of asphalt to the conveying pipe fitting 3; the vortex heater 203 is arranged in close contact with the bottom of the inner barrel 202, with a large heating area and uniform temperature rise, which can avoid local asphalt overheating and carbonization, ensure the asphalt's bonding performance and repair life, and at the same time prevent carbonized particles from clogging the conveying pipeline.
[0039] Combined with appendix Figure 1 Appendix Figure 3 Appendix Figure 4 Appendix Figure 5 Appendix Figure 8 Appendix Figure 9 As shown: The cover 4 includes a housing 401 that is respectively fitted over the two branch pipes 302 and a connecting block 402 disposed between the two housings 401. The material conveying mechanism 5 includes a pusher block 506 that slides up and down inside the branch pipe 302. The pusher block 506 is driven by a drive mechanism disposed inside the connecting block 402, and the drive mechanism can drive the two pusher blocks 506 to move up and down alternately.
[0040] The connecting block 402 has a groove, and both the connecting block 402 and the branch pipe 302 have sliding grooves 307 on their side walls. The driving mechanism includes several rotating rollers 501 arranged in the groove. One of the rotating rollers 501 is driven to rotate by a driving device on the connecting block 402. A transmission belt 502 is rolled around the outside of the rotating roller 501. The top of one side and the bottom of the other side of the transmission belt 502 are fixedly connected to end blocks 503 that slide in the sliding grooves 307. The end blocks 503 are provided with insert rods 504 that are rotatably inserted into the pusher block 506.
[0041] A through groove 606 is provided on the side end face of the pusher block 506. The through groove 606 is perpendicular to the axis of the insert rod 504, and a baffle 507 is hinged to the upper end face of the pusher block 506 to block the through groove 606. A limiting plate 304 is provided on the inner wall of the branch pipe 302. When the pusher block moves up and down, the limiting plate 304 alternately slides and inserts into the through groove 606 and abuts against the baffle 507. A cross groove 508 is provided on the side end face of the pusher block 506 at the position of the extension line of the axis of the insert rod 504. A guide rod 305 is provided on the inner wall of the branch pipe 302 to alternately slide and insert into the horizontal groove and vertical groove of the cross groove 508.
[0042] A spiral spring 505 is provided between the insert rod 504 and the pusher block 506, which is sleeved outside the insert rod 504. The pusher plate moves up so that the limiting plate 304 abuts against the baffle 507 and drives the pusher plate to rotate through the abutment. The rotation of the pusher plate increases the elastic potential energy of the spiral spring 505.
[0043] The conveying pipe 3 is the main body of the channel for alternating asphalt conveying, including a top horizontally arranged connecting pipe 301, two parallel vertically arranged branch pipes 302, and a bottom horizontally arranged discharge pipe 303. The connecting pipe 301 is sealed and connected to the top of the two branch pipes 302 respectively, and the discharge pipe 303 is sealed and connected to the bottom of the two branch pipes 302 respectively. A vertical limiting plate 304 is welded to one side of the inner wall of each branch pipe 302. The width of the limiting plate 304 is adapted to the width of the through groove 606 of the pusher block 506. A guide rod 305 is welded to the inner wall of the other side. The end of the guide rod 305 is rounded and chamfered. Limiting blocks 306 are welded to the inner walls of the upper and lower ends of each branch pipe 302 to limit the maximum rotation angle of the baffle plate 602. Vertical sliding grooves 307 are opened on the side walls of the branch pipe 302 and the connecting block 402 to allow the end block 503 of the conveying mechanism 5 to slide up and down. The cover 4 includes a shell 401 that is respectively fitted outside the two branch pipes 302, and a connecting block 402 integrally formed between the two shells 401. A closed groove is opened inside the connecting block 402 for installing the transmission components of the conveying mechanism 5. A heat insulation layer is filled between the shell 401 and the branch pipe 302.
[0044] The drive mechanism is the core drive mechanism for alternating material conveying via dual branch pipes 302. It includes multiple rotating rollers 501 rotatably mounted in the transmission groove of the connecting block 402. One of the active rotating rollers 501 is driven to rotate by a reduction drive device on the side wall of the connecting block 402. All rotating rollers 501 are collectively fitted with an annular anti-slip transmission belt 502. End blocks 503 are fixed to the top left side and bottom right side of the transmission belt 502 by bolts. The two end blocks 503 are respectively embedded in the connecting block 402. 2. It can slide vertically up and down in the groove 307 on the side wall of the branch pipe 302; each end block 503 is fixedly connected to a horizontal insert rod 504 on the side facing the branch pipe 302. The end of the insert rod 504 is rotatably inserted into the center hole of the pusher block 506 through the bearing. A spiral spring 505 is sleeved between the insert rod 504 and the pusher block 506. The inner end of the spiral spring 505 is fixedly connected to the outer wall of the insert rod 504, and the outer end is fixedly connected to the inner wall of the center hole of the pusher block 506. The pusher block 506 has a cylindrical structure with an arc-shaped outer wall and two high-temperature resistant fluororubber sealing rings embedded therein. It fits tightly with the inner wall of the branch pipe 302 to form a dynamic seal. The side end face of the pusher block 506 has a through groove 606 perpendicular to the axis of the insert rod 504. The upper end face of the pusher block 506 is hinged with a baffle 507 that can completely block the through groove 606 by a pin. The side end face of the pusher block 506 also has a cross groove 508. The center of the cross groove 508 coincides with the axis of the insert rod 504. The guide rod 305 on the inner wall of the branch pipe 302 can alternately slide and insert into the horizontal and vertical grooves of the cross groove 508.
[0045] The top center of the connecting pipe 301 is sealed and connected to the connecting pipe of the asphalt heating tank 2. After the molten asphalt flows into the connecting pipe 301, it can enter the left and right branch pipes 302 respectively. The two branch pipes 302 alternately complete the pushing action through the pushing block 506 of the conveying mechanism 5. When the pushing block 506 in the left branch pipe 302 moves upward, the molten asphalt flows from the connecting pipe 301 into the branch pipe 302. At the same time, the pushing block 506 in the right branch pipe 302 moves downward, pressurizing the asphalt in the branch pipe 302 into the bottom discharge pipe 303. The reverse is also true. Through the alternating work of suction and pushing of the two branch pipes 302, the continuous and uninterrupted asphalt output of the discharge pipe 303 is achieved. When the pusher block 506 moves up and down, the limiting plate 304 on the inner wall of the branch pipe 302 alternately cooperates with the through groove 606 and the baffle 507 of the pusher block 506 to realize the rotation and positioning of the pusher block 506. The guide rod 305 alternately cooperates with the cross groove 508 of the pusher block 506 to provide precise vertical guidance for the up and down movement of the pusher block 506, while limiting the radial rotation of the pusher block 506 to ensure the straightness of the up and down movement of the pusher block 506. The limiting blocks 306 at both ends of the branch pipe 302 can precisely limit the maximum rotation angle of the baffle plate 602, ensuring that the baffle plate 602 can completely block the channel of the corresponding branch pipe 302 after rotating into position, without leakage or crossflow; the shell 401 of the cover 4 is wrapped around the outside of the branch pipe 302, and the internal heat insulation layer can reduce the heat loss of the asphalt in the branch pipe 302, prevent the asphalt from cooling and solidifying, and at the same time play a protective role. The connecting block 402 provides a closed installation space for the transmission components of the conveying mechanism 5.
[0046] The speed reduction drive device drives the active rotating roller 501 to rotate at a constant speed, which in turn drives the transmission belt 502 to rotate cyclically along all the rotating rollers 501. The end blocks 503 on both sides of the transmission belt 502 move synchronously with the transmission belt 502. When the left end block 503 moves upward, the right end block 503 moves downward synchronously, which in turn drives the pusher blocks 506 in the left and right branch pipes 302 to move up and down alternately through the insertion rod 504. When the pusher block 506 moves upward within the branch pipe 302, the limiting plate 304 on the inner wall of the branch pipe 302 first abuts against the baffle 507 on the upper end face of the pusher block 506. The baffle 507 cannot open the through slot 606 downward. The limiting plate 304 pushes the pusher block 506 to rotate 90 degrees around the insert rod 504 through the baffle 507. During the rotation, the spiral spring 505 is tightened, storing elastic potential energy. After the pusher block 506 rotates to its position, the transverse groove of the cross groove 508 on its side end face and the support... The guide rods 305 on the inner wall of the pipe 302 are fully aligned and inserted into the transverse groove, providing precise vertical guidance for the upward movement of the pusher block 506. At this time, the through groove 606 of the pusher block 506 is fully aligned with the limiting plate 304, and the limiting plate 304 can pass through the through groove 606 without obstruction. The pusher block 506 moves upward smoothly, and molten asphalt flows into the branch pipe 302 from the connecting pipe 301. At the same time, the top opening of the branch pipe 302 is opened and the bottom opening is closed, so asphalt can be stored. When the pusher block 506 moves upward to the top of the branch pipe 302, the guide rod 305 completely disengages from the vertical groove of the cross groove 508, and the spiral spring 505 releases the stored elastic potential energy, driving the pusher block 506 to rotate in the opposite direction and reset, so that the horizontal groove of the cross groove 508 is aligned with the guide rod 305. When the drive belt 502 drives the pusher block 506 to move downward, the limiting plate 304 passes through the through groove 606, and the baffle 507 automatically opens upward under the action of the limiting plate 304, without obstructing the through groove 606 from passing through the limiting plate 304. The guide rod 305 is inserted into the vertical groove of the cross groove 508 to provide vertical guidance for the downward movement of the pusher block 506. The pusher block 506 moves downward smoothly, pressing the asphalt in the branch pipe 302 into the bottom discharge pipe 303 with constant pressure, thus realizing high-pressure crack sealing.
[0047] Combined with appendix Figure 1 Appendix Figure 2 Appendix Figure 3 Appendix Figure 4 Appendix Figure 6 Appendix Figure 7 Appendix Figure 8 As shown: The material blocking mechanism 6 includes a baffle plate 602 hinged to the upper and lower connection of two branch pipes 302. The inner wall of the branch pipe 302 is provided with a limiting block 306 that abuts against the baffle plate 602. The rotating shaft of the baffle plate 602 passes through the connecting pipe 301 and the end of the rotating shaft is provided with a rotating plate 603. The end of the rotating plate 603 and the connecting pipe 301 are respectively connected to the two ends of the spring 604. When the baffle plate 602 rotates, the spring 604 is first compressed and then reset. When the pusher block 506 in one branch pipe 302 moves upward, the bottom baffle plate 602 rotates to the branch pipe 302 and at the same time the top baffle plate 602 rotates to the other branch pipe 302.
[0048] The material blocking mechanism 6 includes a rotating rod 601 that is driven to reciprocate by a drive motor mounted on a drive device. Both ends of the rotating rod 601 are provided with through slots 606, and the end of the rotating plate 603 is provided with a support rod 605 located in the through slots 606.
[0049] The material blocking mechanism 6 is a synchronous sealing mechanism for alternating material conveying by two branch pipes 302. It includes baffle plates 602 that are respectively hinged at the connection between the connecting pipe 301 and the two branch pipes 302, and at the connection between the discharge pipe 303 and the two branch pipes 302. The rotating shafts of the upper and lower baffle plates 602 pass horizontally through the side walls of the connecting pipe 301 and the discharge pipe 303, respectively. The outer ends of the rotating shafts are fixed with rotating plates 603. The ends of the rotating plates 603 are connected to the outer walls of the connecting pipe 301 / discharge pipe 303 with return springs 604. A drive motor is also fixed on the output shaft of the drive device. The output end of the drive motor is fixed with a reciprocating rotating rod 601. Both ends of the rotating rod 601 are provided with long strip-shaped through slots 606. The ends of the upper and lower rotating plates 603 are vertically fixed with support rods 605. The support rods 605 are embedded in the through slots 606 of the rotating rod 601 and can slide freely along the inner wall of the through slots 606.
[0050] working methods The drive motor drives the rotating rod 601 to reciprocate. The rotating rod 601 drives the upper and lower rotating plates 603 to rotate synchronously through the support rods 605 in the through slots 606 at both ends. This, in turn, drives the upper and lower baffle plates 602 to rotate synchronously in opposite directions. The spring 604 is first compressed during the rotation of the baffle plate 602, storing elastic potential energy. When the baffle plate 602 rotates to a vertical position, the spring 604 releases its elastic force, pushing the baffle plate 602 to press tightly against the limiting block 306 on the inner wall of the branch pipe 302, ensuring that the baffle plate 602 is tightly sealed without gaps. When the pusher block 506 in the left branch pipe 302 moves upward, the rotating rod 601 drives the top baffle plate 602 to rotate to the top opening of the right branch pipe 302, completely blocking the top channel of the right branch pipe 302. At the same time, the bottom baffle plate 602 rotates to the bottom opening of the left branch pipe 302, completely blocking the bottom channel of the left branch pipe 302. This ensures that when the left branch pipe 302 sucks material, the molten asphalt can only enter the left branch pipe 302 from the connecting pipe 301 and will not flow back from the bottom discharge pipe 303. At the same time, when the right branch pipe 302 pushes material, the asphalt can only be discharged from the bottom discharge pipe 303 and will not flow back from the top connecting pipe 301, forming a one-way conveying path. When the pusher block 506 in the right branch pipe 302 moves upward to suck up material, the rotating rod 601 drives the baffle plate 602 to rotate in the opposite direction. The top baffle plate 602 blocks the top of the left branch pipe 302, and the bottom baffle plate 602 blocks the bottom of the right branch pipe 302, completing the reversal and sealing. The reversal action of the material blocking mechanism 6 requires the pusher block 506 of the conveying mechanism 5 to move in advance. Through the electric control linkage between the drive motor and the drive device of the conveying mechanism 5, it is ensured that the corresponding channel of the branch pipe 302 is accurately sealed during the suction and pushing process, with no leakage and no crossflow.
[0051] When implementing the road construction crack repair device, asphalt is first added to the inner barrel 202 of the asphalt heating barrel 2, and the vortex heater 203 is started to heat the asphalt at a constant temperature until it melts and flows. The bottom frame 102 of the device support 1 is pushed to move at a constant speed along the road crack so that the discharge pipe 303 is aligned with the center of the crack. Start the drive mechanism on the connecting block 402, drive the rotating roller 501 and the transmission belt 502 to rotate in a cycle, so that the end blocks 503 on both sides of the transmission belt 502 drive the push blocks 506 in the two branch pipes 302 to move up and down alternately through the insertion rod 504. The drive motor of the blocking mechanism 6 drives the rotating rod 601 to swing back and forth. Through the rotating plate 603 and the spring 604, the upper and lower baffle plates 602 are driven to reverse and block, so that when one branch pipe 302 moves up to suck up material, the top opening opens and the bottom opening closes. When the other branch pipe 302 moves down to push the material, the bottom opening opens and the top opening closes. When the pushing block 506 moves up, the limiting plate 304 and the baffle 507 abut against each other, causing the pushing block 506 to rotate and tighten the spiral spring 505. The guide rod 305 cooperates with the cross groove 508 to provide guidance. When it moves down, the limiting plate 304 passes through the through groove 606 and the baffle 507 opens automatically, pressing the asphalt smoothly into the discharge pipe 303 to achieve continuous constant pressure grouting. After the asphalt is filled, it is then scraped smooth and finished by the right-angle plate 702 of the scraper 7 on the cross 104, completing the crack repair work. The entire process does not require stopping the machine, achieving continuous, stable and dense highway crack repair.
[0052] The present invention and its embodiments have been described above. This description is not restrictive, and the accompanying drawings are only one embodiment of the present invention; the actual structure is not limited thereto. In conclusion, if those skilled in the art are inspired by this description and design similar structures and embodiments without departing from the inventive spirit of the present invention, such designs should fall within the protection scope of the present invention.
Claims
1. A crack repair device for highway construction, comprising a device support (1), characterized in that: The device support (1) is provided with an asphalt heating tank (2). The bottom of the asphalt heating tank (2) is connected to a conveying pipe (3) that can convey asphalt. The conveying pipe (3) includes two branch pipes (302) arranged in parallel. The two branch pipes (302) are covered with a cover (4). The cover (4) and the two branch pipes (302) are provided with a conveying mechanism (5) that enables the two branch pipes (302) to convey asphalt alternately, and a blocking mechanism (6) that can cooperate with the conveying mechanism (5) to alternately block the upper and lower ends of the branch pipes (302).
2. The crack repair device for highway construction according to claim 1, characterized in that: The upper and lower ends of the two branch pipes (302) are connected to the connecting pipe (301) and the discharge pipe (303) respectively. The cover (4) includes a shell (401) that is fitted over the two branch pipes (302) and a connecting block (402) between the two shells (401). The conveying mechanism (5) includes a pusher block (506) that slides up and down inside the branch pipe (302). The pusher block (506) is driven by a drive mechanism located inside the connecting block (402), and the drive mechanism can drive the two pusher blocks (506) to move up and down alternately.
3. The crack repair device for highway construction according to claim 2, characterized in that: The connecting block (402) has a groove and the side walls of the connecting block (402) and the branch pipe (302) are provided with sliding grooves (307). The driving mechanism includes several rotating rollers (501) arranged in the groove. One of the rotating rollers (501) is driven to rotate by a driving device on the connecting block (402). A transmission belt (502) is rolled around the outside of the rotating roller (501). The top of one side and the bottom of the other side of the transmission belt (502) are fixedly connected to an end block (503) that slides in the sliding groove (307). The end block (503) is provided with a rod (504) that is rotatably inserted into the pusher block (506).
4. The crack repair device for highway construction according to claim 3, characterized in that: A through groove (606) is provided on the side end face of the pusher block (506). The through groove (606) is perpendicular to the axis of the insert rod (504), and a baffle (507) is hinged to the upper end face of the pusher block (506) to block the through groove (606). A limiting plate (304) is provided on the inner wall of the branch pipe (302). When the pusher block moves up and down, the limiting plate (304) alternately slides and inserts into the through groove (606) and abuts against the baffle (507). A cross groove (508) is provided on the side end face of the pusher block (506) at the position of the extension line of the axis of the insert rod (504). A guide rod (305) is provided on the inner wall of the branch pipe (302) to alternately slide and insert into the horizontal and vertical grooves of the cross groove (508).
5. The crack repair device for highway construction according to claim 4, characterized in that: A spiral spring (505) is provided between the insert rod (504) and the pusher block (506), which is sleeved outside the insert rod (504). The pusher plate moves up so that the limiting plate (304) abuts against the baffle (507) and drives the pusher plate to rotate through the abutment. The rotation of the pusher plate increases the elastic potential energy of the spiral spring (505).
6. The crack repair device for highway construction according to claim 2, characterized in that: The material blocking mechanism (6) includes a baffle plate (602) hinged to the upper and lower connection of two branch pipes (302). The inner wall of the branch pipe (302) is provided with a limiting block (306) that abuts against the baffle plate (602). The rotating shaft of the baffle plate (602) passes through the connecting pipe (301) and the end of the rotating shaft is provided with a rotating plate (603). The end of the rotating plate (603) and the connecting pipe (301) are respectively connected to the two ends of the spring (604). When the baffle plate (602) rotates, the spring (604) is first compressed and then reset. When the pusher block (506) in one branch pipe (302) moves up, the bottom baffle plate (602) rotates to the branch pipe (302) and at the same time the top baffle plate (602) rotates to the other branch pipe (302).
7. The crack repair device for highway construction according to claim 6, characterized in that: The material blocking mechanism (6) includes a rotating rod (601) that is driven to reciprocate by a drive motor on the drive device. Both ends of the rotating rod (601) are provided with through grooves (606), and the end of the rotating plate (603) is provided with a support rod (605) in the through groove (606).
8. The crack repair device for highway construction according to claim 2, characterized in that: The device support (1) includes a base frame (102) supported by rollers. A vertical rod is provided on the base frame (102) and a barrel rack (101) is provided on the vertical rod. The asphalt heating barrel (2) is provided on the barrel rack (101). An assembly seat (103) is provided inside the base frame (102) and sleeved outside the discharge pipe (303). The assembly seat (103) and the base frame (102) are connected by a cross (104). The cross (104) is provided with scrapers (7) located on the front and rear sides of the discharge pipe (303). The scraper (7) includes a fixing clamp (701) clamped on the cross (104) frame rod. A right angle plate (702) is provided at the bottom of the fixing frame.
9. The crack repair device for highway construction according to claim 2, characterized in that: The asphalt heating tank (2) includes an outer tank (201), an inner tank (202) is provided inside the outer tank (201), a vortex heater (203) that can heat asphalt is provided at the bottom of the outer wall of the inner tank (202), and a connecting pipe that passes through the outer tank (201) and is connected to the connecting pipe (301) is provided at the bottom of the inner tank (202).