Intelligent Dewatering and Deformation Coordination Control Device for Deep Foundation Pit in Water-Rich Soft Soil

By using intelligent control devices to adjust the precipitation rate in real time and constructing a closed-loop water resource utilization system, the problems of water seepage and excessive deformation at the bottom of water-rich soft soil foundation pits were solved, achieving efficient utilization of water resources and reduction of construction costs.

CN224955124UActive Publication Date: 2026-11-10HENAN JIAOTONG GUHUAI EXPRESSWAY CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202620055934.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-01-16
Publication Date
2026-11-10
Estimated Expiration
2036-01-16

AI Technical Summary

Technical Problem

Existing dewatering technologies for foundation pits are difficult to control precisely under water-rich soft soil conditions, leading to water seepage at the bottom of the pit or excessive deformation of the foundation pit, and serious waste of water resources.

Method used

An intelligent precipitation-deformation coordinated control device is adopted, including a deformation monitoring unit, a hydrogeological monitoring unit, and a central control cabinet. It adjusts the precipitation rate in real time and constructs a closed-loop water resource utilization system. The treated wastewater is then used at the construction site.

Benefits of technology

It enables dynamic control of foundation pit deformation and recycling of water resources, reducing construction costs and improving construction safety and resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955124U_ABST
    Figure CN224955124U_ABST
Patent Text Reader

Abstract

This utility model relates to an intelligent dewatering-deformation coordinated control device for deep foundation pits in water-rich soft soil, comprising: a foundation pit, dewatering wells, a deformation monitoring unit, a hydrogeological monitoring unit, and a central control cabinet. The beneficial effects of this utility model are: by arranging displacement and settlement sensors around the foundation pit, soil deformation is monitored in real time; the dewatering status is monitored through water level and flow sensors; the central control cabinet receives monitoring data and feeds back to control the operating power of the water pumps, achieving coordinated dewatering and deformation control; simultaneously, the extracted groundwater, after multi-stage sedimentation and filtration treatment, is used for on-site watering and greening irrigation through a reuse pipeline network; it solves the problems of excessive foundation pit deformation and water waste caused by traditional dewatering methods, achieving safe and green construction of foundation pit projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of geotechnical engineering and foundation pit construction technology, and in particular to an intelligent dewatering-deformation coordinated control device for deep foundation pits in water-rich soft soil. Background Technology

[0002] With the rapid development of transportation infrastructure construction, highway construction is increasingly moving towards areas with complex geological conditions. Deep foundation pit construction in water-rich soft soil conditions presents numerous challenges. Existing foundation pit dewatering technologies mainly suffer from the following problems: First, the control of dewatering is not precise enough. When the foundation pit is excavated to the design bottom elevation, if the water head is too high, it will cause water seepage at the bottom of the pit, damaging the strength of the original soil. If the pumping speed is too fast or too much, it will cause consolidation and settlement of the soil around the foundation pit, resulting in excessive deformation of the foundation pit and even affecting the safety of the surrounding environment. Traditional dewatering methods mostly use manual timed pump switching or constant power pumping, which makes it difficult to dynamically adjust the dewatering rate according to the real-time deformation of the foundation pit.

[0003] Secondly, water resources are wasted in serious ways. In traditional dewatering projects, the extracted groundwater is usually discharged directly into municipal pipe networks or rivers and is not effectively utilized. At the same time, the construction site of the foundation pit often requires a large amount of tap water for roadbed watering and dust suppression, equipment washing and greening irrigation, resulting in a double waste of resources.

[0004] Therefore, there is an urgent need to invent an intelligent dewatering-deformation coordinated control device for deep foundation pits in water-rich soft soil, which can correlate and control dewatering with foundation pit deformation and realize the recycling of water resources. Utility Model Content

[0005] The purpose of this invention is to overcome the shortcomings of the existing technology and provide an intelligent dewatering-deformation coordinated control device for deep foundation pits in water-rich soft soil.

[0006] This intelligent dewatering-deformation coordinated control device for deep foundation pits in water-rich soft soil includes: a foundation pit, dewatering wells, deformation monitoring units, hydrogeological monitoring units, and a central control cabinet. A water-stop curtain is installed around the perimeter of the foundation pit. Dewatering wells are spaced around the perimeter of the pit, each equipped with a water pump. The pump outlets are connected to a drainage network. The drainage network ends in a wastewater treatment plant, whose outlet is connected to a reuse network, which in turn connects to water supply points at the construction site. Deformation monitoring units are located on the ground surface and retaining structure around the foundation pit to collect displacement data of the soil and structure. Hydrogeological monitoring units are located in the dewatering wells and observation wells outside the foundation pit to collect groundwater level and dewatering flow data. The central control cabinet is connected to the water pumps, deformation monitoring units, and hydrogeological monitoring units to receive monitoring data and control the pump operating power.

[0007] Preferably, the deformation monitoring unit includes displacement sensors and settlement sensors located around the foundation pit; the displacement sensors and settlement sensors are arranged at intervals.

[0008] Preferably, the hydrogeological monitoring unit includes a water level sensor, a flow sensor, and an external water level gauge; the water level sensor and flow sensor are installed in the dewatering well, and the external water level gauge is installed in the observation well outside the foundation pit.

[0009] Preferably, the wastewater treatment station includes a primary sedimentation tank, a secondary sedimentation tank, a filtration device, and a clear water tank connected in sequence by pipelines; the drainage network is connected to the inlet of the primary sedimentation tank, and the clear water tank is connected to the reuse network.

[0010] Preferably, the filtration device is filled with a granular filter media layer; an ultraviolet sterilizer and a water quality monitoring probe are fixed in the clear water tank, and the water quality monitoring probe is connected to the central control cabinet.

[0011] Preferably, the reuse pipeline is equipped with an automatic booster pump and a solenoid valve, and the branch pipelines of the reuse pipeline are connected to nozzles.

[0012] Preferably, the wellhead of the dewatering well is equipped with a protective cover; the water pump is suspended inside the dewatering well.

[0013] The beneficial effects of this utility model are: 1) The water pump of this utility model is connected to the drainage pipe network to transport the pumped groundwater to the wastewater treatment station. The wastewater treatment station separates and purifies the turbid groundwater. The purified water enters the clear water tank and is transported to the sprinkler heads or irrigation system at the construction site through the reuse pipe network for roadbed maintenance, dust removal and greening, forming a closed-loop system of "rainwater-drainage-treatment-reuse". This wastewater recycling system converts the foundation pit dewatering into construction water, which significantly improves the water resource utilization rate, reduces construction costs and realizes green and low-carbon construction.

[0014] 2) The displacement sensor and settlement sensor of this utility model are arranged at intervals of 10-20 meters to comprehensively capture deformation data. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the overall structure; Figure 2 This is a flow chart of a wastewater treatment and reuse system.

[0016] Explanation of reference numerals in the attached drawings: 1-Foundation pit; 2-Water-stop curtain; 3-Dewatering well; 4-Water pump; 5-Deformation monitoring unit; 6-Hydrogeological monitoring unit; 7-Central control cabinet; 8-Drainage pipe network; 9-Wastewater treatment station; 91-Primary sedimentation tank; 92-Secondary sedimentation tank; 93-Filtration device; 94-Clear water tank; 95-Ultraviolet sterilizer; 96-Water quality monitoring probe; 10-Reuse pipe network; 101-Automatic booster pump; 102-Solenoid valve; 103-Roadbed sprinkler head; 104-Greening irrigation sprinkler head. Detailed Implementation

[0017] The present invention will be further described below with reference to embodiments. The description of the embodiments below is only for the purpose of helping to understand the present invention. It should be noted that, for those skilled in the art, several modifications can be made to the present invention without departing from the principle of the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0018] As one embodiment, a smart dewatering-deformation coordinated control device for deep foundation pits in water-rich soft soil is proposed, such as... Figure 1 and Figure 2 As shown, it includes: foundation pit 1, dewatering well 3, deformation monitoring unit 5, hydrogeological monitoring unit 6, and central control cabinet 7; A water-stop curtain 2 is installed around the foundation pit 1 to block groundwater from outside the pit; like Figure 1 As shown, dewatering wells 3 are spaced around the perimeter of the foundation pit 1. Water pumps 4 are installed inside the dewatering wells 3, and the outlets of the water pumps 4 are connected to a drainage pipe network 8. The end of the drainage pipe network 8 is connected to a wastewater treatment station 9, and the outlet of the wastewater treatment station 9 is connected to a reuse pipe network 10. The reuse pipe network 10 is connected to water usage points at the construction site, forming a closed-loop system of "dewatering-drainage-treatment-reuse". This wastewater recycling system converts foundation pit dewatering into construction water, significantly improving water resource utilization, reducing construction costs, and achieving green and low-carbon construction. The wellheads of the dewatering wells 3 are equipped with protective covers, and the water pumps 4 are suspended inside the dewatering wells 3. Deformation monitoring unit 5 is arranged on the ground surface and retaining structure around foundation pit 1 to collect displacement data of the soil and structure of foundation pit 1; specifically, as follows: Figure 1 As shown, the deformation monitoring unit 5 includes displacement sensors and settlement sensors installed around the foundation pit 1; the displacement sensors and settlement sensors are arranged at intervals of 10-20 meters to comprehensively capture deformation data 7. Hydrogeological monitoring unit 6 is located in the observation wells outside the dewatering well 3 and the foundation pit 1, and is used to collect groundwater level and precipitation flow data; specifically, such as Figure 1As shown, the hydrogeological monitoring unit 6 includes a water level sensor, a flow sensor, and an external water level gauge; the water level sensor and flow sensor are installed in the dewatering well 3, and the external water level gauge is installed in the observation well outside the foundation pit 1; The central control cabinet 7 is connected to the water pump 4, the deformation monitoring unit 5, and the hydrogeological monitoring unit 6. It is used to receive monitoring data and control the operating power of the water pump 4. Specifically, if the settlement rate around the foundation pit is detected to be too large, the speed of the water pump 4 is automatically reduced to slow down the rate of water level drop, thereby controlling the deformation. The deformation monitoring data and the control of the water pump 4 are directly linked through the central control cabinet 7, which solves the problem of disconnect between traditional precipitation and deformation control. It can dynamically adjust the precipitation strategy in real time according to the deformation of the foundation pit 1 to ensure the stability of the foundation pit 1. It realizes unmanned control of the precipitation process.

[0019] like Figure 2 As shown, the wastewater treatment plant 9 includes a primary sedimentation tank 91, a secondary sedimentation tank 92, a filtration device 93, and a clear water tank 94, which are connected in sequence by pipelines; the drainage network 8 is connected to the inlet of the primary sedimentation tank 91, and the clear water tank 94 is connected to the reuse network 10; the filtration device 93 is filled with a granular filter media layer; an ultraviolet sterilizer 95 and a water quality monitoring probe 96 are fixed in the clear water tank 94, and the water quality monitoring probe 96 is connected to the central control cabinet 7; specifically, the groundwater pumped by the water pump 4 is discharged through the drainage network 92. Water from the water pipe network 8 enters the wastewater treatment station 9. The wastewater treatment station 9 is designed as a "sedimentation tank + filtration device" structure. Groundwater first enters the primary sedimentation tank 91 and the secondary sedimentation tank 92 to remove large and small particles of silt. The retention time is not less than 2 hours. The supernatant then enters the filtration device 93. The filtration device 93 is filled with a granular filter media layer, which is either a quartz sand filter media layer or an activated carbon filter media layer. The filtration rate is controlled at 5-10 m / h to remove residual impurities. The treated water flows into the clear water tank 94.

[0020] like Figure 1 and Figure 2 As shown, the pipeline of the reuse pipeline network 10 is equipped with an automatic booster pump 101 and a solenoid valve 102. The branch pipelines of the reuse pipeline network 10 are connected to nozzles. Specifically, the clear water tank 94 is connected to the reuse pipeline network 10, which extends to the construction site and is connected to nozzles, which are roadbed sprinkler nozzles 103 or greening irrigation nozzles 104. When dust suppression or maintenance is required at the construction site, the booster pump on the reuse pipeline network 10 is turned on, and the treated foundation pit dewatering water is used for the operation, realizing the closed-loop utilization of water resources.

Claims

1. An intelligent dewatering-deformation co-regulation device for deep foundation pit of water-rich soft soil, characterized in that, The application relates to a construction site water recycling system. The deformation monitoring unit comprises displacement sensors and settlement sensors arranged at the periphery of the foundation pit.

2. The water-rich soft soil deep foundation pit intelligent dewatering-deformation collaborative regulation device according to claim 1, characterized in that, The hydrogeological monitoring unit comprises water level sensors, flow sensors and peripheral water level gauges; the water level sensors and the flow sensors are installed in the dewatering wells, and the peripheral water level gauges are installed in the observation wells outside the foundation pit.

3. The device according to claim 1, wherein, The wastewater treatment station comprises a primary sedimentation tank, a secondary sedimentation tank, a filtering device and a clean water tank which are sequentially connected through pipelines; the drainage pipe network is connected with the water inlet of the primary sedimentation tank, and the clean water tank is connected with the recycling pipe network.

4. The water-rich soft soil deep foundation pit intelligent dewatering-deformation co-regulation device according to claim 1, characterized in that, The filtering device is internally filled with a granular filter layer; the clean water tank is fixed with an ultraviolet sterilizer and a water quality monitoring probe, and the water quality monitoring probe is connected with the central control cabinet.

5. The water-rich soft soil deep foundation pit intelligent dewatering-deformation co-regulation device according to claim 4, characterized in that, The pipeline of the recycling pipe network is provided with an automatic pressure pump and an electromagnetic valve, and the branch pipeline of the recycling pipe network is connected with a spray head at the end.

6. The water-rich soft soil deep foundation pit intelligent dewatering-deformation co-regulation device according to claim 1, characterized in that, The wellhead of the dewatering well is provided with a protective cover plate; and the water pump is hung in the dewatering well.

7. The water-rich soft soil deep foundation pit intelligent dewatering-deformation co-regulation device according to claim 1, characterized in that, ​