A modular cabin floor structure and a decontamination cabin
By incorporating a water trough structure and a hanging ring connection structure into the cabin floor, the problem of insufficient fixing points on the floor was solved, achieving integrated stable equipment fixation and drainage functions, thus improving the operational convenience and safety of the decontamination cabin.
Patent Information
- Application Number
- CN202522087912.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-28
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-09-28
AI Technical Summary
The existing modular shelter floor structure lacks a dedicated anchor point design for fixed operations, which affects the flatness of the floor and the comfort of use when fixing equipment.
A water trough structure is installed in the cabin floor, with the bottom of the trough lower than the floor surface. A lifting ring connection structure is installed inside the trough so that the highest point of the lifting ring connection does not exceed the floor surface, providing a stable equipment fixing point while maintaining the flatness of the floor and drainage function.
It achieves the integrated function of stable equipment fixation and drainage, improves the convenience and safety of operation, ensures smooth personnel passage and convenient cleaning operations, and improves the overall utilization efficiency of the decontamination cabin.
Smart Images

Figure CN224955383U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of modular cabin floor technology, specifically to a modular cabin floor structure and a decontamination cabin. Background Technology
[0002] my country has a huge demand for rapid, efficient, safe and standardized decontamination capabilities in response to large-scale public health events (especially infectious disease outbreaks), and needs the ability to deal with a variety of complex pollutants. Decontamination modular units provide a solution with standardized processes, higher degree of automation, more reasonable spatial layout and more convenient management, and improve the ability to safely collect and treat decontamination wastewater and waste liquid.
[0003] Patent CN211666342U discloses a disinfection and sterilization cabin integrating personnel, vehicle, and environmental disinfection functions. It includes a cabin body comprising a fixed compartment and an extended compartment. The fixed compartment contains a fixed compartment equipment room. The extended compartment includes a fixed compartment panel and an extended compartment panel. When the extended compartment is in the deployed state, the extended base panel forms a disinfection channel, on which a foldable waste bin and a foldable equipment table are installed. The lower fixed compartment panel has a drainage trough connected to a sewage outlet on the inner side of the double doors. The sewage outlet is equipped with a sewage bag for the centralized collection of personnel disinfection wastewater.
[0004] However, in practical applications, equipment usually needs to be secured with straps or additional devices. Conventional floor structures lack anchor point designs specifically for securing the equipment. While directly installing raised rings or hooks on the floor can solve the problem of securing with straps, it can obstruct passage and cleaning operations, affecting the flatness of the floor and the comfort of use. Utility Model Content
[0005] The purpose of this utility model is to overcome the above-mentioned technical deficiencies and propose a modular cabin floor structure and a decontamination cabin, solving the technical problem that the existing floor structure lacks a dedicated anchor point design for fixed operation.
[0006] To achieve the above-mentioned technical objectives, the present invention adopts the following technical solution: In a first aspect, this utility model provides a modular cabin floor structure, including a floor body, a water trough structure, at least one drainage component, and several hanging ring connection structures. The water trough structure includes at least two parallel drainage troughs, the bottom of which is lower than the surface of the floor body. At least one drainage component is connected to the drainage trough for draining water from the drainage trough. Several hanging ring connection structures are respectively spaced inside each of the drainage troughs, and the highest point of each hanging ring connection structure is level with or lower than the surface of the floor body.
[0007] In some embodiments, the floor body includes a finish layer and a structural layer, the finish layer being laid on the structural layer, and the water trough structure being formed by a partial downward recess of the finish layer.
[0008] In some embodiments, the structural layer includes a plurality of cross-bracing support beams.
[0009] In some embodiments, the drainage channel of the water tank structure includes at least two first drainage channels and at least two second drainage channels. The first drainage channels and the second drainage channels extend along the width direction and length direction of the main surface of the floor, respectively, and the first drainage channels and the second drainage channels are interconnected.
[0010] In some embodiments, two of each of the first and second drainage channels are provided, and the first and second drainage channels are located on opposite sides of the width and length directions of the floor body surface, respectively, and the two ends of the two first drainage channels are respectively connected to the two ends of the two second drainage channels.
[0011] In some embodiments, the plurality of lifting ring connection structures include a plurality of first lifting ring connectors, the plurality of first lifting ring connectors being respectively spaced apart inside the first drainage groove and the second drainage groove along the length direction of the first drainage groove and the second drainage groove, and the lifting ring plane of the first lifting ring connector being parallel to the length direction of the first drainage groove or the second drainage groove in which it is located.
[0012] In some embodiments, the water tank structure further includes a third drainage channel, which is arranged in parallel between the second drainage channels, and its two ends are respectively connected to the first drainage channel.
[0013] In some embodiments, the plurality of lifting ring connection structures further include a plurality of second lifting ring connectors, which are sequentially and spaced apart inside the third drainage channel along the length direction of the third drainage channel, and the lifting ring planes of the plurality of second lifting ring connectors are respectively parallel or perpendicular to the length direction of the third drainage channel.
[0014] In some embodiments, both the first and second lifting ring connectors include a fixed lifting ring, a connecting screw, and a pre-tightening lock. One end of the connecting screw is fixedly connected to the fixed lifting ring, and the other end passes through the bottom of the water tank structure and is threadedly engaged with the pre-tightening lock.
[0015] Secondly, this utility model also provides a decontamination cabin, including the cabin floor structure as described in any of the above.
[0016] Compared with existing technologies, the modular floor structure and decontamination cabin provided by this utility model integrate drainage and equipment fixing functions by setting up a floor main body, a water trough structure, at least one row of drainage components, and several lifting ring connection structures. The structure fully utilizes the three-dimensional space of the drainage trough, ensuring that the highest point of the lifting ring connection does not exceed the floor surface. This guarantees smooth passage for personnel and vehicles and convenience of cleaning operations, while also providing stable and reliable equipment strap fixing points for rapid equipment installation and replacement, improving operational convenience. This structure resolves the contradiction between equipment fixing and drainage concealment without affecting the flatness of the floor surface, improving the overall efficiency and adaptability of the decontamination cabin. Furthermore, this modular floor structure has advantages such as simple structure, convenient installation, and strong practicality, and can be widely used in various decontamination cabins, improving the efficiency and safety of decontamination operations. Attached Figure Description
[0017] Figure 1 This is a three-dimensional structural diagram of the modular cabin floor structure and the decontamination cabin provided in this embodiment of the utility model; Figure 2 This is a schematic diagram of the three-dimensional structure of the cabin floor structure and the bottom structure of the decontamination cabin provided in this embodiment of the utility model; Figure 3 This is a top view structural diagram of the modular cabin floor structure and the decontamination cabin provided in this embodiment of the utility model; Figure 4 This is a cross-sectional structural diagram of the installation of the cabin floor structure and the lifting ring connection structure of the decontamination cabin provided in this embodiment of the utility model; Figure 5 This is a cross-sectional structural diagram of the cabin floor structure and the drainage pipe installation of the decontamination cabin provided in this embodiment of the utility model.
[0018] Explanation of reference numerals in the attached figures: 1. Flooring main body; 11. Finishing layer; 12. Structural layer; 121. Supporting beam; 2. Water tank structure; 21. First drainage tank; 22. Second drainage tank; 23. Third drainage tank; 3. Drainage fittings; 31. Drainage pipe; 4. Lifting ring connection structure; 41. First lifting ring connector; 411. Fixed lifting ring; 412. Connecting screw; 413. Pre-tightening lock; 42. Second lifting ring connector. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present utility model and are not intended to limit the present utility model.
[0020] To address the technical problem of the lack of anchor points specifically designed for fixed operations in floor structures, this utility model provides a modular floor structure and a decontamination modular unit. It makes full use of the three-dimensional space of the drainage channel, ensuring that the highest point of the lifting ring connector does not exceed the floor surface. This not only guarantees the smooth passage of personnel and vehicles and the convenience of cleaning operations, but also provides stable and reliable equipment strap fixing points, allowing for rapid equipment installation and replacement and improving the convenience of personnel operation.
[0021] Please see Figure 1 In a first aspect, embodiments of this application provide a modular cabin floor structure, including a floor body 1, a water trough structure 2, at least one drainage component 3, and a plurality of lifting ring connection structures 4. The water trough structure 2 includes at least two parallel drainage troughs, the bottom of which is lower than the surface of the floor body 1. At least one drainage component 3 is connected to the drainage trough for draining water from the drainage trough. The plurality of lifting ring connection structures 4 are respectively spaced inside each drainage trough, and the highest point of the lifting ring connection structure 4 is level with or lower than the surface of the floor body 1.
[0022] In this device, the water tank structure 2 not only facilitates the collection and discharge of decontamination wastewater, but also provides a stable fixing point for the hanging ring connection structure 4 inside the drainage tank. This can be used to bind and secure various equipment, eliminating the need for additional raised hanging rings or hooks on the floor, thus maintaining the flatness of the floor and the comfort of use. During decontamination operations, the equipment can be quickly connected to the hanging rings hidden in the drainage tank via straps, effectively preventing the equipment from tipping over or shifting, significantly improving operational safety. At the same time, the drainage tank functions properly, allowing liquid to drain smoothly from the bottom of the tank, preventing water accumulation on the floor.
[0023] Preferably, please refer to Figure 1 and Figure 2 In some embodiments, the floor body 1 is composed of a decorative layer 11 and a structural layer 12. The decorative layer 11 is laid on the structural layer 12. The sink structure 2 is formed by a partial downward recess of the decorative layer 11, so that the sink structure 2 is integrally formed with the floor body 1. It is made of 304 stainless steel, which enhances the overall strength and stability of the floor.
[0024] For further information on the overall strength and stability of the floor, please refer to [link / reference]. Figure 1 and Figure 2In some possible embodiments, the structural layer 12 includes a number of crisscrossing support beams 121, which are hollow tube structures or plate structures, in order to reduce the overall weight while maintaining good load-bearing capacity.
[0025] To ensure excellent drainage performance, please refer to [link / reference needed]. Figure 1 and Figure 3 In some possible embodiments, the drainage channel of the sink structure 2 includes at least two first drainage channels 21 and at least two second drainage channels 22, and the plurality of lifting ring connection structures 4 includes a plurality of first lifting ring connectors 41. At least two first drainage channels 21 extend side-by-side along the width direction of the floor body 1 surface, and at least two second drainage channels 22 extend side-by-side along the length direction of the floor body 1 surface. The first drainage channels 21 and second drainage channels 22 are interconnected, and the drainage component 3 is connected to the first drainage channels 21, allowing water in the sink structure 2 to flow smoothly from the first drainage channels 21 into the second drainage channels 22, and then be discharged via the drainage component 3. Several first lifting ring connectors 41 are respectively arranged at intervals inside the first drainage groove 21 and the second drainage groove 22 along the length direction of the first drainage groove 21 and the second drainage groove 22. The lifting ring plane of the first lifting ring connector 41 is parallel to the length direction of the first drainage groove 21 or the second drainage groove 22 in which it is located. The multiple first lifting ring connectors 41 in the two first drainage grooves 21 are respectively arranged correspondingly, and the multiple first lifting ring connectors 41 in the two second drainage grooves 22 are also respectively arranged correspondingly.
[0026] When equipment needs to be secured, the equipment can be firmly bound to the corresponding first lifting ring connector 41 inside the parallel first drainage trough 21 or the parallel second drainage trough 22 using straps. This provides a stable fixing force and prevents the equipment from shaking or shifting during operation. Simultaneously, the water tank structure 2 forms a crisscrossing grid drainage system, ensuring that the washing and disinfection wastewater can be evenly and quickly distributed into each drainage trough, improving drainage efficiency.
[0027] Preferably, please refer to Figure 1 and Figure 3In this embodiment, two first drainage channels 21 and two second drainage channels 22 are provided. A third drainage channel 23 is also formed on the surface layer 11 of the floor body 1. The two first drainage channels 21 are located on opposite sides of the width direction of the floor body 1, and the two second drainage channels 22 are located on opposite sides of the length direction of the floor body 1. The two ends of the first drainage channels are connected to the two ends of the second drainage channels 22. The third drainage channel 23 is arranged parallel between the second drainage channels 22, located in the middle of the floor body 1, coinciding with the center line of the floor body 1, and the two ends of the third drainage channel 23 are connected to the first drainage channels 21. The setting of the third drainage channel 23 further optimizes the drainage path, so that wastewater can be more evenly distributed in all directions, reducing the risk of local water accumulation and improving the drainage efficiency and effect of the entire floor structure. At the same time, the interconnection between the third drainage channel 23, the first drainage channel 21, and the second drainage channel 22 forms a complete drainage network, ensuring that wastewater can be quickly and smoothly guided to the drainage component 3 and discharged, effectively maintaining the dryness and cleanliness of the environment inside the cabin.
[0028] Further, please refer to Figure 1 and Figure 3 In some possible embodiments, the plurality of lifting ring connection structures 4 further include a plurality of second lifting ring connectors 42. These second lifting ring connectors 42 are sequentially spaced along the length of the third drainage channel 23 inside the third drainage channel 23. Some of the second lifting ring connectors 42 have their lifting ring planes parallel to the length of the third drainage channel 23 and correspond to the first lifting ring connectors 41 within the second drainage channel 22. Other second lifting ring connectors 42 have their lifting ring planes perpendicular to the length of the third drainage channel 23, forming a cross-fixed structure with the first lifting ring connectors 41 within the first drainage channel 21 or the second drainage channel 22. This ensures that the equipment receives stable support in a direction perpendicular or parallel to the third drainage channel 23 during binding, further enhancing the stability and safety of the equipment fixation.
[0029] Please see Figure 3 and Figure 4 In one possible embodiment, both the first lifting ring connector 41 and the second lifting ring connector 42 include a fixed lifting ring 411, a connecting screw 412, and a pre-tightening lock 413. The fixed lifting ring 411 is located inside the water tank and can be a circular, triangular, or square ring to accommodate the binding requirements of different equipment. One end of the connecting screw 412 is fixedly connected to the fixed lifting ring 411, and the other end extends through the water tank to the bottom of the floor body 1, where it is threaded into the pre-tightening lock 413. By rotating the pre-tightening lock 413, the connecting screw 412 can be securely locked onto the floor body 1, ensuring the stability and reliability of the lifting ring connection structure 4 during use.
[0030] To prevent water leakage from the connection between the hanging ring connector and the floor, in some possible embodiments, a waterproof sealing ring is provided at the penetration point between the connecting screw 412 and the water tank. The waterproof sealing ring is made of an elastic material, such as rubber or silicone, which can effectively prevent water from seeping through the connection gap, thus ensuring the sealing and waterproof performance of the water tank structure 2.
[0031] It should be noted that, in this scheme, the lifting ring plane is defined as the average plane determined by the maximum outer contour of the annular portion of the lifting ring connector (i.e., the fixed lifting ring 411). The lifting ring plane of some lifting ring connectors is set parallel to the length direction of the drainage trough, allowing the lifting ring to extend along the long side of the drainage trough. This ensures smooth force transmission during fixing and maximizes the saving of space in the width direction of the drainage trough, facilitating the flow of washing and disinfection wastewater within the drainage trough.
[0032] Of course, the layout of the water tank structure 2 and the specific form of the lifting ring connector are not limited to these in other possible embodiments, and can be designed and adjusted in various ways according to actual needs. For example, in some specific application scenarios, it may be necessary to increase the number of drainage tanks or adjust their layout to accommodate the discharge requirements of wastewater with larger flow rates or specific shapes. In this case, the number of the first drainage tank 21, the second drainage tank 22, or the third drainage tank 23 can be increased accordingly, while maintaining the connectivity between the tanks to ensure that the wastewater can flow smoothly and be discharged effectively. In addition, the lifting ring connector can also directly adopt a lifting ring structure, which is fixed to the water tank of the floor body 1 by welding.
[0033] Please see Figures 1 to 5 In some possible embodiments, the drainage component 3 includes two drain pipes 31, which are respectively spaced apart on one side of the floor body 1. One end of each drain pipe 31 extends to the bottom of the floor body 1 and is connected to the bottom of both ends of one of the first drainage channels 21. The other end of the drain pipe 31 extends out of the floor body 1 to drain the water in the drainage channel.
[0034] Secondly, this application also provides a decontamination cabin, including the cabin floor structure as described in any of the above embodiments.
[0035] To better understand this utility model, the following is combined with... Figures 1 to 5 The technical solution of this utility model is described in detail as follows: During decontamination operations, the equipment to be decontaminated is secured to the lifting ring connection structure 4 of the modular shelter floor structure using straps, followed by cleaning and disinfection. Wastewater generated during the decontamination process flows into the water tank structure 2 and is collected through drainage channels. Because the water tank structure 2 is equipped with crisscrossing drainage channels, the wastewater can be quickly and evenly distributed into each drainage channel, effectively avoiding localized water accumulation. The wastewater is finally discharged outside the modular shelter through the drain pipe 31.
[0036] This utility model integrates drainage and equipment securing functions by setting up a floor body 1, a water trough structure 2, at least one drainage component 3, and several lifting ring connection structures 4. The structure fully utilizes the three-dimensional space of the drainage trough, ensuring that the highest point of the lifting ring connection components does not exceed the floor surface. This guarantees smooth passage for personnel and vehicles and convenient cleaning operations, while providing stable and reliable equipment strap fixing points for rapid equipment installation and replacement, improving operational convenience. This structure resolves the conflict between equipment securing and drainage concealment without affecting the flatness of the floor surface, improving the overall efficiency and adaptability of the decontamination cabin. Furthermore, this cabin floor structure has advantages such as simple structure, convenient installation, and strong practicality, and can be widely used in various decontamination cabins, improving the efficiency and safety of decontamination operations.
[0037] In the description of this application, it should be noted that the terms "upper" and "lower," etc., indicating the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application. Unless otherwise expressly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication between two elements. For those skilled in the art, the specific meaning of the above terms in this application can be understood according to the specific circumstances.
[0038] It should be noted that in this application, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0039] The specific embodiments of this utility model described above do not constitute a limitation on the scope of protection of this utility model. Any other corresponding changes and modifications made based on the technical concept of this utility model should be included within the scope of protection of the claims of this utility model.
Claims
1. A modular cabin floor structure, characterized in that, include: Floor main body; The water tank structure includes at least two parallel drainage channels, the bottom of which is lower than the surface of the floor body; At least one drainage component, connected to the drainage channel, is used to drain water from the drainage channel; and A plurality of hanging ring connection structures are provided, which are respectively arranged at intervals inside each of the drainage channels, and the highest point of each hanging ring connection structure is level with or lower than the surface of the floor body.
2. The modular shelter floor structure according to claim 1, characterized in that, The floor body includes a surface layer and a structural layer. The surface layer is laid on the structural layer, and the water tank structure is formed by a partial downward recess of the surface layer.
3. The modular shelter floor structure according to claim 2, characterized in that, The structural layer includes several crisscrossing support beams.
4. The modular shelter floor structure according to claim 1, characterized in that, The drainage channel of the water trough structure includes at least two first drainage channels and at least two second drainage channels. The first drainage channels and the second drainage channels extend along the width direction and length direction of the main surface of the floor, respectively, and the first drainage channels and the second drainage channels are interconnected.
5. The modular shelter floor structure according to claim 4, characterized in that, Two drainage channels are provided for both the first and second drainage channels, and the first and second drainage channels are located on opposite sides of the width and length directions of the main surface of the floor, respectively. The two ends of the two first drainage channels are respectively connected to the two ends of the two second drainage channels.
6. The modular shelter floor structure according to claim 5, characterized in that, The plurality of said lifting ring connection structures include a plurality of first lifting ring connectors, which are respectively arranged at intervals inside the first drainage groove and the second drainage groove along the length direction of the first drainage groove and the second drainage groove, and the lifting ring plane of the first lifting ring connector is parallel to the length direction of the first drainage groove or the second drainage groove in which it is located.
7. The modular shelter floor structure according to claim 6, characterized in that, The water tank structure also includes a third drainage trough, which is arranged in parallel between the second drainage troughs, and its two ends are respectively connected to the first drainage trough.
8. The modular shelter floor structure according to claim 7, characterized in that, The plurality of lifting ring connection structures further include a plurality of second lifting ring connectors, which are arranged sequentially and at intervals inside the third drainage channel along the length direction of the third drainage channel. The lifting ring planes of the plurality of second lifting ring connectors are respectively parallel or perpendicular to the length direction of the third drainage channel.
9. The modular shelter floor structure according to claim 8, characterized in that, Both the first and second lifting ring connectors include a fixed lifting ring, a connecting screw, and a pre-tightening lock. One end of the connecting screw is fixedly connected to the fixed lifting ring, and the other end passes through the bottom of the water tank structure and is threadedly engaged with the pre-tightening lock.
10. A decontamination cabin, characterized in that, Includes the modular housing floor structure as described in any one of claims 1-9.
Citation Information
Patent Citations
Epidemic prevention decontamination shelter integrating personnel, vehicle and environment epidemic prevention decontamination functions
CN211666342U