A voltage sag / surge test system

By combining an autotransformer and a reactor, and utilizing switch state switching and reactor current limiting, a smooth transition between voltage sags and swells is achieved. This solves the problem that existing equipment cannot simultaneously manage voltage fluctuations, and provides efficient and economical voltage fluctuation suppression and equipment protection.

CN224958044UActive Publication Date: 2026-11-10HUBEI XIANGCHU CHENPENG INTELLIGENT TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522591417.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-05
Publication Date
2026-11-10
Estimated Expiration
2035-12-05

AI Technical Summary

Technical Problem

Existing equipment is difficult to manage voltage dips and swells efficiently and economically at the same time, and energy storage equipment has a short lifespan and lacks a comprehensive management system.

Method used

By combining an autotransformer and a dual-path reactor, a smooth voltage transition is achieved through switching states. The reactor limits the current, forming a closed-loop structure. Combined with mechanical switches and passive components, the current path changes are controlled to simulate voltage sags and swells.

Benefits of technology

It effectively suppresses voltage fluctuations, reduces voltage sags and swells, limits circulating current, has a simple structure, low cost, and long lifespan, and is suitable for immunity testing of electrical equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224958044U_ABST
    Figure CN224958044U_ABST
Patent Text Reader

Abstract

This utility model belongs to the field of power quality management technology and discloses a voltage sag / boost test system, including incoming line switches K1 and K2, bypass switches K3 and K4, reactors L1 and L2, and an autotransformer T. The incoming line switch K1 is connected to the primary winding of the autotransformer, and the incoming line switch K2 is connected to the secondary winding of the autotransformer. The incoming line switch K1 is connected in series with reactor L1, and the incoming line switch K2 is connected in series with reactor L2. The bypass switch K3 is connected in parallel with reactor L1, and the bypass switch K4 is connected in parallel with reactor L2. Reactors L1 and L2 are coupled together. This system can effectively limit circulating current and suppress voltage sags or boosts during power conversion, achieving a smooth voltage transition, ensuring uninterrupted power supply to the load, and has the advantages of simple structure, high reliability, and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of power quality management technology, and in particular relates to a voltage sag / boost test system. Background Technology

[0002] With the rapid development of science and technology, users have increasingly stringent requirements for power supply quality. When the power supply voltage needs to be switched, a voltage dip or rise may occur at the moment of switching. If the voltage value before and after the switch is large, a large circulating current will be formed in the circuit. This will not only damage the power supply itself and shorten its service life, but may also burn out components such as switching equipment and fuses in the circuit, causing power supply failure.

[0003] Currently, the main devices for managing voltage sags are uninterruptible power supplies (UPS) and dynamic voltage restorers (DVRs). UPSs are typically used to protect the entire load, operating online and solving power outages, but they have relatively small capacity, high cost, and high maintenance expenses. DVRs are connected in series between the power grid and the sensitive load, injecting compensating voltage during voltage sags, but their compensation capability is limited by the capacity of their DC-side energy storage unit. For voltage sags, dynamic voltage suppressors (DVRs operate differently during sags than during rises) or series active power filters are typically used. Dynamic voltage suppressors quickly activate braking resistors or other energy-consuming components when they detect a voltage sag, converting excess electrical energy into heat to reduce the voltage. Series active power filters detect harmonics and reactive power components in the power grid and generate a corresponding compensating current to suppress voltage sags, but both types of devices also face energy storage and cost issues. Most existing equipment focuses on addressing single issues, either voltage sags or voltage swells, lacking a system that can efficiently and economically address both voltage sags and swells simultaneously, while also extending the lifespan of energy storage equipment. Utility Model Content

[0004] To address the problems existing in the prior art, this utility model provides a voltage sag / boost test system, including an autotransformer, incoming line switch K1, incoming line switch K2, bypass switch K3, bypass switch K4, reactor L1, and reactor L2;

[0005] The incoming line switch K1 is connected to the primary side line of the autotransformer, and the incoming line switch K2 is connected to the secondary side line of the autotransformer.

[0006] The incoming line switch K1 is connected in series with the reactor L1, and the incoming line switch K2 is connected in series with the reactor L2;

[0007] The bypass switch K3 is connected in parallel across the two ends of the reactor L1, and the bypass switch K4 is connected in parallel across the two ends of the reactor L2.

[0008] An electromagnetic coupling relationship is established between reactor L1 and reactor L2.

[0009] Furthermore, the system has two power supply modes and determines the access path by the switch status;

[0010] Under high-voltage power supply conditions, incoming line switch K1 is closed and bypass switch K3 is closed, while incoming line switch K2 is open and bypass switch K4 is open.

[0011] Under low-voltage power supply conditions, incoming line switch K2 is closed and bypass switch K4 is closed, while incoming line switch K1 is open and bypass switch K3 is open.

[0012] Furthermore, the switching between high-voltage and low-voltage power supply is constituted by a sequence of opening and closing the circuit breaker, which includes:

[0013] The first step is to disconnect the bypass switch K3;

[0014] The second step is to close the incoming line switch K2;

[0015] The third step is to disconnect the incoming line switch K1;

[0016] The fourth step is to close the bypass switch K4;

[0017] The reactors L1 and L2 form a closed loop structure by being coupled with opposite terminals.

[0018] Furthermore, reactors L1 and L2 are constructed using either iron-core or air-core reactors.

[0019] The inductance values ​​of L1 and L2 are determined by the system voltage level, short-circuit capacity, and circulating current limiting parameters.

[0020] Furthermore, the incoming line switches K1 and K2, together with the bypass switches K3 and K4, constitute an integrated structure of a vacuum switch, a solid-state switch, or a circuit breaker with an electric drive mechanism.

[0021] The opening and closing actions of each switch are driven by control signals.

[0022] Furthermore, it also includes voltage transformers (PTs), current transformers (CTs), and controllers.

[0023] The PT is used to acquire the voltage on the power supply side and the load side, and the CT is used to acquire the loop current.

[0024] The controller establishes an electrical connection with the PT and CT and outputs a switch drive signal to perform the above-mentioned switch switching steps.

[0025] Based on the above technical solutions and the technical problems solved, the advantages and positive effects of the technical solution to be protected by this utility model are as follows:

[0026] 1. Effectively suppress voltage fluctuations: Through current limiting and sequential control of the reactor, a smooth transition of load voltage is achieved during power switching, significantly reducing the amplitude and duration of voltage sags and swells.

[0027] 2. Limiting circulating current: The reactor effectively limits the current in the "K1-K2" loop, protecting the electrical equipment.

[0028] 3. Simple structure and low cost: Compared with complex power electronic devices, this system mainly uses conventional switches and reactors, which has a simple structure and lower manufacturing and maintenance costs.

[0029] 4. High reliability: Based on mechanical switches and passive components, the solution has strong overload resistance and long service life.

[0030] 5. High testability: This system can not only be used for actual power supply protection, but also simulate different degrees of voltage sag / boost by controlling the switching process, so as to test the immunity of sensitive equipment. Attached Figure Description

[0031] Figure 1 This is a circuit diagram of the voltage sag / boost test system provided in this embodiment of the utility model.

[0032] Figure 2 This is a flowchart illustrating the process of switching from high-voltage power supply to low-voltage power supply in the system provided by this utility model embodiment.

[0033] Figure 3 This is a flowchart illustrating the process of switching from low-voltage power supply to high-voltage power supply in the system provided by this utility model embodiment.

[0034] Figure 4 This is a flowchart of the power switching method for the voltage sag / boost test system provided in this embodiment of the present invention. Detailed Implementation

[0035] To make the objectives, technical solutions, and advantages of this utility model clearer, the following detailed description is provided in conjunction with embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this utility model.

[0036] like Figure 1 As shown in the figure, an embodiment of the present invention provides a voltage sag / boost test system, comprising:

[0037] The system includes incoming line switches K1 and K2, bypass switches K3 and K4, reactors L1 and L2, and an autotransformer T. In this system, incoming line switch K1 is connected to the primary winding of the autotransformer, incoming line switch K2 is connected to the secondary winding of the autotransformer, incoming line switch K1 is connected in series with reactor L1, incoming line switch K2 is connected in series with reactor L2, bypass switch K3 is connected in parallel with reactor L1, bypass switch K4 is connected in parallel with reactor L2, and reactors L1 and L2 are coupled together.

[0038] The system provided in this embodiment of the utility model has the following two steady-state operation modes:

[0039] Mode 1, high voltage operation: incoming line switch K1 and bypass switch K3 are closed, incoming line switch K2 and bypass switch K4 are open, current flows through K1 and K3 to supply power to the load, and L1 is short-circuited;

[0040] Mode 2, low-voltage operation: incoming line switch K2 and bypass switch K4 are closed, incoming line switch K1 and bypass switch K3 are open, current flows through K2 and K4 to supply power to the load, and L2 is short-circuited.

[0041] The voltage sag / boost test system described in this embodiment of the invention uses a combination of an autotransformer and dual reactors to achieve steady-state operation and switching of the tested equipment at different voltage levels, and can be used to simulate power quality disturbances such as voltage sags and boosts. The system input has two power supply branches, providing different voltages to the load via the primary winding of K1-L1-T and the secondary winding of K2-L2-T, respectively. L1 and L2 are coupling reactors. When one circuit is operating, the reactor winding can be short-circuited via a bypass switch, minimizing the impedance of that circuit and ensuring that the steady-state output voltage is not affected by the reactor. During mode switching, different switch combinations are switched to change the current path, which, in conjunction with the autotransformer, adjusts the output voltage to increase or decrease.

[0042] In high-voltage operation mode, K1 and K3 are closed, and the current bypasses the main magnetic circuit of L1. The winding is short-circuited by the bypass, which is equivalent to low-impedance direct supply, providing a high-voltage steady-state power supply to the load side. Meanwhile, on the other side, K2 and K4 are open, and L2 does not participate in power supply. In low-voltage operation mode, K2 and K4 are closed, and the current supplies power through the secondary side of the autotransformer. The bypass switch shorts L2, forming a low-impedance direct supply, and the output voltage decreases. By rapidly switching between the two modes, voltage drops or rises can be achieved in milliseconds. Simultaneously, the coupling reactor limits the inrush current during switching, improving test safety and simulation realism. The system has a simple structure, rapid switching, and can handle voltage disturbances of various amplitudes, making it suitable for power stability testing of equipment such as motors, frequency converters, and UPS.

[0043] The system provided in this embodiment of the utility model also has the following switching transition process:

[0044] like Figure 2 As shown, the power supply is switched from high voltage to low voltage:

[0045] Step 1: Disconnect the bypass switch K3 to allow the reactor L1 to be connected in series with the high-voltage power supply circuit;

[0046] Step 2: Close the incoming line switch K2 to connect reactor L2 in series with the low-voltage power supply circuit. At this time, the opposite terminals of reactors L1 and L2 in the "K1-K2" loop are connected. The total inductance of the loop is the sum of the self-inductance of the two reactors plus twice the mutual inductance coefficient. The loop inductance increases, which effectively suppresses the loop current.

[0047] Step 3: Disconnect the incoming line switch K1 to cut off the power supply to the high-voltage side;

[0048] Step 4: Close the bypass switch K4, short-circuit reactor L2, and the system enters mode two operation;

[0049] like Figure 3 As shown, the power supply is switched from low voltage to high voltage:

[0050] Step 1: Disconnect the bypass switch K4 to allow the reactor L2 to be connected in series in the low-voltage power supply circuit;

[0051] Step 2: Close the incoming line switch K1 to connect reactor L1 in series with the high-voltage power supply circuit. At this time, the opposite terminals of reactors L1 and L2 in the "K1-K2" loop are connected. The total inductance of the loop is the sum of the self-inductance of the two reactors plus twice the mutual inductance coefficient. The loop inductance increases, which effectively suppresses the loop current.

[0052] Step 3: Disconnect the incoming line switch K2 to cut off the power supply to the low-voltage side;

[0053] Step 4: Close the bypass switch K3, short-circuit the reactor L1, and the system enters mode one operation.

[0054] The embodiments of this utility model provide that the reactors L1 and L2 are air-core reactors or iron-core reactors, and their inductance values ​​are calculated and determined according to the system voltage level, short-circuit capacity and allowable circulating current value.

[0055] This utility model embodiment provides switches K1, K2, K3, and K4 as fast vacuum switches, solid-state switches, or circuit breakers with electric operating mechanisms, whose opening and closing times can be controlled in the millisecond range.

[0056] This utility model embodiment also includes a voltage transformer (PT), a current transformer (CT), and a controller; the PT and CT are used to detect the power supply voltage, load voltage, and circuit current; the controller receives the detection signals and automatically controls the opening and closing sequence and timing of each switch according to preset logic.

[0057] like Figure 4As shown, this utility model embodiment provides a power switching method for a voltage sag / boost test system, including:

[0058] S101, during the switching process, by successively putting in two reactors, the system goes through a transition phase of "the high-voltage side and the low-voltage side are connected in parallel through reactors";

[0059] S102 utilizes the current-limiting effect of the reactor to suppress circulating current and controls the switching timing to ensure a smooth transition of the load voltage, effectively suppressing voltage dips or swells.

[0060] like Figure 1 As shown, the present invention provides a voltage sag / boost test system, which mainly includes a power supply S, an autotransformer T, a load Z, and a switching circuit composed of switches K1, K2, K3, K4 and reactors L1, L2.

[0061] In the initial state (Mode 1), the system is powered by the high-voltage side: K1 and K3 are closed, and K2 and K4 are open. The current path is S→K1→K3→Z. At this time, L1 is short-circuited by K3 and does not function.

[0062] When it is necessary to switch from high-voltage power supply to low-voltage power supply, the control system operates in the following sequence:

[0063] Step 1, Equipment Inspection: Check whether the contacts of incoming line switches K1 and K2, and bypass switches K3 and K4 are clean and free of oxidation, and whether the wiring terminals are secure; check reactors L1 and L2 to confirm that there are no short circuits or open circuit faults; check that the load Z wiring is correct and there is no risk of short circuit to ground.

[0064] Step 2, Initial state confirmation: Confirm that K1 and K3 are in the closed state and K2 and K4 are in the open state by measuring with the control unit or multimeter;

[0065] Step 3, put the reactor into operation and connect it to the low-voltage side: disconnect the bypass switch K3, at this time the reactor L1 is put into use. Close the incoming line switch K2, at this time the reactor L2 is put into use. Since the reactors L1 and L2 are coupled to each other and their opposite terminals are connected, the inductance of the "K1-K2" loop is greatly increased, which can effectively reduce the loop current.

[0066] Step 4, disconnect the high-voltage side and close the bypass switch: disconnect the incoming line switch K1. At this time, the load is fully powered by the low-voltage side. Close the bypass switch K4 and short-circuit L2. The system enters steady-state operation mode two, which can realize the switching from high-voltage power supply to low-voltage power supply.

[0067] The process of switching from low-voltage power supply back to high-voltage power supply is symmetrical to this.

[0068] The parameter design of reactors L1 and L2 is crucial. It is necessary to ensure that the circulating current is limited to the safe range of the equipment during the switching process, and that their voltage drop does not cause the load-side voltage to exceed the allowable sag / boost range (e.g., ±10%).

[0069] Example 1: Laboratory Three-Phase 380V Voltage Sag Test System

[0070] This embodiment provides a voltage sag / boost test system based on a three-phase 380V low-voltage power supply system. Its structure includes two sets of coupled reactors L1 and L2, each with a rated capacity of 10kVA, a coupling coefficient of 0.95, and a self-inductance of 10mH, using an iron core structure. The incoming line switches K1 and K2, and the bypass switches K3 and K4 are all fast vacuum switches with a switching time of less than 5ms. The autotransformer T outputs a voltage range of 0–380V, and ±20% voltage variation can be achieved by adjusting the taps. The controller, by detecting the PT and CT signals, precisely controls the switching sequence of K1–K4 during the experiment, achieving a voltage sag from 380V to 304V, completing the switching within 100ms with a smooth waveform and no overshoot.

[0071] During operation, when the system is in high-voltage mode, K1 and K3 are closed, and the load receives the rated voltage. When a voltage sag needs to be simulated, the controller sequentially performs operations such as opening K3, closing K2, opening K1, and closing K4. L1 and L2 form a coupling to suppress circulating current, and the voltage smoothly transitions to low-voltage mode. Comparison of waveform records shows that the current rise rate di / dt decreases by 40% during the switching period. The system can accurately reproduce the characteristics of grid voltage sags, which is used to verify the disturbance rejection performance of electrical equipment.

[0072] Example 2: Automatic Testing Device for 6kV Medium Voltage Voltage Surge / Sag

[0073] This embodiment provides a voltage sag / boost test system for a 6kV medium-voltage system, suitable for performance verification of substation relay protection and power quality testing equipment. The system uses two air-core coupled reactors L1 and L2, each with a self-inductance of 60mH, a coupling coefficient of 0.9, and a rated current of 200A. The incoming line switches K1 and K2, and the bypass switches K3 and K4 are electrically operated circuit breakers, with a solid-state control module enabling rapid switching within 5ms. The autotransformer T is an oil-immersed structure with a voltage regulation range of ±30%. The PT and CT sampling signals are input to an industrial control computer, where a digital control algorithm calculates the timing sequence of each switch operation.

[0074] When the system switches from low-voltage to high-voltage mode, the controller first disconnects K4, allowing L2 to be connected in series in the low-voltage circuit. Then, K1 is closed to form a coupling loop between the opposite terminals of L1 and L2. The peak transient circulating current is only 15% of the rated current. Subsequently, K2 is disconnected and K3 is closed, short-circuiting L1 to enter steady-state operation. Test results show that the system can complete the voltage sag process in milliseconds, with a controlled voltage rise rate, meeting the requirements of GB / T 12326 "Power Quality Voltage Sags, Short Interruptions and Voltage Fluctuations" standard. It can be used for voltage fluctuation resistance performance testing and standardized verification of medium-voltage equipment.

[0075] The above description is only a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any modifications, equivalent substitutions and improvements made by those skilled in the art within the technical scope disclosed in this utility model, and within the spirit and principles of this utility model, should be included within the protection scope of this utility model.

Claims

1. A voltage sag or swell test system, characterized in that, Includes an autotransformer, incoming line switch K1, incoming line switch K2, bypass switch K3, bypass switch K4, reactor L1, and reactor L2. The incoming line switch K1 is connected to the primary side line of the autotransformer, and the incoming line switch K2 is connected to the secondary side line of the autotransformer. The incoming line switch K1 is connected in series with the reactor L1, and the incoming line switch K2 is connected in series with the reactor L2; The bypass switch K3 is connected in parallel across the two ends of the reactor L1, and the bypass switch K4 is connected in parallel across the two ends of the reactor L2; An electromagnetic coupling relationship is established between reactor L1 and reactor L2.

2. The system according to claim 1, characterized in that, The system has two power supply modes and determines the access path by the switch status. Under high-voltage power supply conditions, incoming line switch K1 is closed and bypass switch K3 is closed, while incoming line switch K2 is open and bypass switch K4 is open. Under low-voltage power supply conditions, incoming line switch K2 is closed and bypass switch K4 is closed, while incoming line switch K1 is open and bypass switch K3 is open.

3. The system according to claim 1, characterized in that, The switching between high-voltage and low-voltage power supply is constituted by a sequence of opening and closing switches, which includes: The first step is to disconnect the bypass switch K3; The second step is to close the incoming line switch K2; The third step is to disconnect the incoming line switch K1; The fourth step is to close the bypass switch K4; The reactors L1 and L2 form a closed loop structure by being coupled with opposite terminals.

4. The system according to claim 1, characterized in that, The reactors L1 and L2 are constructed from either iron-core or air-core reactors. The inductance values ​​of L1 and L2 are determined by the system voltage level, short-circuit capacity, and circulating current limiting parameters.

5. The system according to claim 1, characterized in that, The incoming line switches K1 and K2, together with the bypass switches K3 and K4, form an integrated structure of a vacuum switch, a solid-state switch, or a circuit breaker with an electric drive mechanism. The opening and closing actions of each switch are driven by control signals.

6. The system according to claim 1, characterized in that, It also includes voltage transformers (PTs), current transformers (CTs), and controllers. The PT is used to acquire the voltage on the power supply side and the load side, and the CT is used to acquire the loop current. The controller establishes an electrical connection with the PT and CT and outputs a switch drive signal to execute the switch switching step in claim 2 or claim 3.