Power distribution cabinet access line structure of tunnel dust removal vehicle
By introducing a positioning slot and a hoisting installation mechanism into the power distribution cabinet of the tunnel dust removal vehicle, the problem of inconvenient maintenance at high altitudes of the incoming and outgoing line structures has been solved, enabling convenient installation and dust-proof maintenance, and supporting Bluetooth control and mobile phone operation.
Patent Information
- Application Number
- CN202522415436.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-14
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-14
AI Technical Summary
The existing power distribution cabinet of the tunnel dust removal vehicle lacks hoisting and installation capabilities, making inspection and maintenance inconvenient when installed at high altitudes.
A positioning seat with a positioning groove and a hoisting installation mechanism were designed, including a servo motor, worm gear, worm wheel, horizontal shaft and winch. The incoming switch chamber, electricity meter chamber and outgoing chamber are raised and lowered by steel wire rope, which facilitates maintenance. The rubber sealing sleeve prevents dust from entering.
It enables convenient installation and maintenance of high-level access cable structures, prevents dust from entering, improves maintenance efficiency, and supports Bluetooth control and mobile APP operation.
Smart Images

Figure CN224959227U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of power distribution cabinets for dust removal vehicles, and in particular to the power distribution cabinet inlet and outlet line structure for a tunnel dust removal vehicle. Background Technology
[0002] The power distribution cabinet of a tunnel dust removal vehicle typically adopts a modular design for its incoming and outgoing wiring, dividing the cabinet into independent incoming switch compartments, electricity meter compartments, and outgoing wiring compartments. Each area achieves efficient wiring through incoming and outgoing wiring holes in the top and bottom plates.
[0003] However, the existing power distribution cabinets of tunnel dust removal vehicles often lack hoisting and installation capabilities, making it inconvenient to inspect and maintain them when they are installed at a high location.
[0004] Therefore, it is necessary to provide a power distribution cabinet inlet and outlet line structure for a tunnel dust removal vehicle to solve the above-mentioned technical problems. Utility Model Content
[0005] To address the technical problems of existing tunnel dust removal vehicles' power distribution cabinet inlet and outlet wiring structures often lacking hoisting and installation capabilities, and the inconvenience of inspection and maintenance when the inlet and outlet wiring structures are installed at high locations, this utility model provides a power distribution cabinet inlet and outlet wiring structure for tunnel dust removal vehicles.
[0006] The power distribution cabinet inlet and outlet structure of the tunnel dust removal vehicle provided by this utility model includes: a positioning seat with a positioning groove; an inlet switch chamber slidably installed on the positioning groove; an electricity meter chamber fixedly installed at the bottom of the inlet switch chamber; an outlet chamber fixedly installed at the bottom of the electricity meter chamber; a circuit breaker installed on the inner wall of the inlet switch chamber; an electricity meter installed on the inner wall of the electricity meter chamber; an outlet switch installed on the inner wall of the outlet chamber; and a hoisting and installation mechanism provided on the inner wall of the inlet switch chamber for hoisting and installing the inlet and outlet structure.
[0007] Preferably, both the incoming switch chamber and the outgoing chamber are provided with inlet and outlet holes, and the inlet and outlet holes are provided with rubber sealing sleeves.
[0008] Preferably, the top of the incoming line switch chamber is provided with a through opening, and a guide wheel is rotatably installed on the inner wall of the through opening.
[0009] Preferably, the hoisting and installation mechanism includes: a horizontal shaft rotatably mounted on the inner wall of the incoming line switch chamber; a winch fixedly sleeved on the horizontal shaft; a steel wire rope disposed on the winch and fixedly connected to the inner wall of the positioning groove, the guide wheel being tumbledly connected to the steel wire rope; and a drive mechanism mounted on the inner wall of the incoming line switch chamber.
[0010] Preferably, the drive mechanism includes: a servo motor and a connecting plate fixedly mounted on the inner wall of the incoming line switch chamber; a worm gear mounted on the output shaft of the servo motor via a coupling and rotatably connected to the connecting plate; and a worm wheel fixedly sleeved on the horizontal shaft and meshing with the worm gear.
[0011] Preferably, a mounting plate is fixedly installed on the positioning seat, and the mounting plate has mounting holes.
[0012] Preferably, a control module, a battery, and a power adapter are installed on the inner wall of the incoming line switch compartment, and the control module is equipped with a Bluetooth module.
[0013] Compared with related technologies, the power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle provided by this utility model has the following advantages: This utility model provides an incoming and outgoing line structure for the power distribution cabinet of a tunnel dust removal vehicle. The circuit breaker extends through cables and inlet / outlet holes to the outside of the incoming switch compartment, connecting to an external power source (such as a generator or mains power). An electricity meter can monitor power consumption, and an outgoing switch allows for quick control of power supply. A hoisting and installation mechanism allows for easy installation and maintenance, especially when the structure is installed at a high location. Rubber sealing sleeves on the inlet / outlet holes prevent dust from entering the incoming or outgoing switch compartment. A guide wheel guides and limits the steel wire rope. A servo motor drives a worm gear, which in turn drives a worm wheel, which in turn drives a horizontal shaft and a winch. The winch winds and unwinds the steel wire rope, controlling the incoming switch. The system lifts and lowers the incoming and outgoing line rooms, including the meter room and the outgoing line room, to hoist and install the incoming and outgoing line structures. When the incoming switch room is inserted into the positioning slot, the installation and positioning of the incoming and outgoing line structures are completed. When maintenance of the incoming and outgoing line structures is required, the incoming switch room, meter room, and outgoing line room are lowered to the ground, making it convenient for staff to perform maintenance on the incoming and outgoing line structures from the ground. The positioning seat can be installed at a high position using a mounting plate with mounting holes and expansion bolts. The servo motor can be powered by a battery, and the power adapter can be connected to a circuit breaker to convert AC power to DC power to charge the battery. The servo motor can be controlled by a control module with a Bluetooth module, allowing staff to operate and control the control module via a mobile APP and Bluetooth. Attached Figure Description
[0014] Figure 1 A schematic diagram of a preferred embodiment of the power distribution cabinet inlet and outlet line structure of the tunnel dust removal vehicle provided by this utility model; Figure 2 for Figure 1 An enlarged schematic diagram of part A shown in the image; Figure 3 for Figure 1 The enlarged schematic diagram of part B shown in the figure.
[0015] The following are the labeling elements in the diagram: 1. Positioning seat; 2. Positioning slot; 3. Incoming switch compartment; 4. Electricity meter compartment; 5. Outgoing compartment; 6. Circuit breaker; 7. Electricity meter; 8. Outgoing switch; 9. Incoming / outgoing hole; 10. Rubber sealing sleeve; 11. Through-hole; 12. Guide wheel; 13. Horizontal shaft; 14. Winch; 15. Wire rope; 16. Servo motor; 17. Connecting plate; 18. Worm gear; 19. Worm wheel; 20. Mounting plate; 21. Mounting hole; 22. Control module; 23. Battery; 24. Power adapter. Detailed Implementation
[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments.
[0017] Please refer to the following: Figure 1-3 ,in, Figure 1 A schematic diagram of a preferred embodiment of the power distribution cabinet inlet and outlet line structure of the tunnel dust removal vehicle provided by this utility model; Figure 2 for Figure 1 An enlarged schematic diagram of part A shown in the image; Figure 3 for Figure 1 The enlarged schematic diagram of part B shown in the figure. The power distribution cabinet of the tunnel dust removal vehicle includes: a positioning seat 1 with a positioning groove 2; an incoming switch chamber 3 slidably installed on the positioning groove 2; an electricity meter chamber 4 fixedly installed at the bottom of the incoming switch chamber 3; an outgoing chamber 5 fixedly installed at the bottom of the electricity meter chamber 4; a circuit breaker 6 installed on the inner wall of the incoming switch chamber 3; an electricity meter 7 installed on the inner wall of the electricity meter chamber 4; an outgoing switch 8 installed on the inner wall of the outgoing chamber 5; and a hoisting and installation mechanism set on the inner wall of the incoming switch chamber 3 for hoisting and installing the incoming and outgoing structure. The circuit breaker 6 extends to the outside of the incoming switch chamber 3 via a cable and through the incoming and outgoing hole 9 to connect to an external power source (such as a generator or mains power). The electricity meter 7 can count the electricity consumption, the outgoing switch 8 can quickly control the power supply, and the hoisting and installation mechanism can hoist and install the incoming and outgoing structure, making it easier to inspect and maintain the incoming and outgoing structure when it is installed at a high position.
[0018] Both the inlet switch chamber 3 and the outlet chamber 5 are provided with inlet and outlet holes 9. A rubber sealing sleeve 10 is provided on the inlet and outlet hole 9. The rubber sealing sleeve 10 on the inlet and outlet hole 9 can prevent dust from entering the inlet switch chamber 3 or the outlet chamber 5 along the inlet and outlet hole 9.
[0019] The top of the incoming line switch chamber 3 is provided with a through opening 11, and a guide groove wheel 12 is rotatably installed on the inner wall of the through opening 11. The guide groove wheel 12 can guide and limit the steel wire rope 15.
[0020] The hoisting and installation mechanism includes: a horizontal shaft 13 rotatably mounted on the inner wall of the incoming line switch chamber 3; a winch 14 fixedly sleeved on the horizontal shaft 13; a wire rope 15 mounted on the winch 14 and fixedly connected to the inner wall of the positioning groove 2, with the guide wheel 12 rollingly connected to the wire rope 15; and a drive mechanism mounted on the inner wall of the incoming line switch chamber 3, which drives a worm gear 18 to rotate via a servo motor 16, the worm gear 18 drives a worm wheel 19 to rotate, and the worm wheel 19 drives the horizontal shaft. The rotation of 13 and winch 14, through which the wire rope 15 is wound and unwound by winch 14, controls the lifting and lowering of the incoming switch chamber 3, the electricity meter chamber 4, and the outgoing chamber 5, thereby hoisting and installing the incoming and outgoing line structures. When the incoming switch chamber 3 is inserted into the positioning groove 2, the installation and positioning of the incoming and outgoing line structures are completed. When the incoming and outgoing line structures need to be inspected and maintained, the incoming switch chamber 3, the electricity meter chamber 4, and the outgoing chamber 5 are controlled to descend to the ground, so that the staff can carry out inspection and maintenance of the incoming and outgoing line structures on the ground.
[0021] The drive mechanism includes: a servo motor 16 and a connecting plate 17 fixedly installed on the inner wall of the incoming switch chamber 3. The servo motor 16 is of model ECMA-C20807RS. A worm gear 18 is installed on the output shaft of the servo motor 16 via a coupling and is rotatably connected to the connecting plate 17. A worm wheel 19 is fixedly sleeved on the horizontal shaft 13 and meshes with the worm gear 18. The servo motor 16 drives the worm gear 18 to rotate, the worm gear 18 drives the worm wheel 19 to rotate, and the worm wheel 19 drives the horizontal shaft 13 and the winch 14 to rotate.
[0022] An mounting plate 20 is fixedly installed on the positioning seat 1. The mounting plate 20 has mounting holes 21. The positioning seat 1 can be installed at a high position by using the mounting plate 20 with mounting holes 21 and expansion bolts.
[0023] The inner wall of the incoming switch chamber 3 is equipped with a control module 22, a storage battery 23, and a power adapter 24. The control module 22 is equipped with a Bluetooth module. The storage battery 23 can supply power to the servo motor 16. The power adapter 24 can be connected to the circuit breaker 6 to convert AC power into DC power to charge the storage battery 23. The control module 22 with Bluetooth module can control the servo motor 16, allowing staff to operate and control the control module 22 via a mobile APP and Bluetooth.
[0024] The working principle of the power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle provided by this utility model is as follows: The circuit breaker 6 extends through the cable and through the inlet / outlet hole 9 to the outside of the incoming switch chamber 3 to connect to an external power source (such as a generator or mains power). The electricity consumption can be counted through the energy meter 7. The power supply can be quickly controlled through the outlet switch 8. The rubber sealing sleeve 10 on the inlet / outlet hole 9 can prevent dust from entering the incoming switch chamber 3 or the outlet chamber 5 along the inlet / outlet hole 9. The positioning seat 1 can be installed at a high position by using the mounting plate 20 with mounting holes 21 and expansion bolts. The servo motor 16 drives the worm gear 18 to rotate, the worm gear 18 drives the worm wheel 19 to rotate, and the worm wheel 19 drives the horizontal shaft 13 and the winch 14 to rotate. The winch 14 winds and unwinds the wire rope 15 to control the lifting and lowering of the incoming switch chamber 3, the electricity meter chamber 4 and the outgoing chamber 5, thereby hoisting and installing the incoming and outgoing line structure. When the incoming switch chamber 3 is inserted into the positioning groove 2, the installation and positioning of the incoming and outgoing line structure is completed. When the incoming and outgoing line structure needs to be inspected and maintained, the incoming switch chamber 3, the electricity meter chamber 4 and the outgoing chamber 5 are controlled to descend to the ground, so that the staff can carry out inspection and maintenance of the incoming and outgoing line structure on the ground. The servo motor 16 can be powered by the battery 23. The power adapter 24 can be connected to the circuit breaker 6 to convert AC power into DC power to charge the battery 23. The servo motor 16 can be controlled by the control module 22 with Bluetooth module, so that the staff can use a mobile APP to operate and control the control module 22 through Bluetooth.
[0025] Compared with related technologies, the power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle provided by this utility model has the following advantages: This utility model provides an incoming and outgoing line structure for the power distribution cabinet of a tunnel dust removal vehicle. The circuit breaker 6 extends through cables and inlet / outlet holes 9 to the outside of the incoming switch chamber 3, connecting to an external power source (such as a generator or mains power). An energy meter 7 can measure electricity consumption, and an outgoing switch 8 can quickly control the power supply. A hoisting installation mechanism allows for the hoisting and installation of the incoming and outgoing line structure, making maintenance and repair more convenient when the structure is installed at a high location. A rubber sealing sleeve 10 on the inlet / outlet hole 9 prevents dust from entering the incoming switch chamber 3 or the outgoing chamber 5. A guide wheel 12 guides and limits the steel wire rope 15. A servo motor 16 drives the worm gear 18 to rotate, which in turn drives the worm wheel 19. The worm wheel 19 then drives the horizontal shaft 13 and the winch 14 to rotate. The winch 14 winds and unwinds the steel wire rope 15, controlling its movement. The lifting and lowering of the inlet / outlet switch chamber 3, the electricity meter chamber 4, and the outlet chamber 5 allows for the hoisting and installation of the inlet / outlet structure. When the inlet / outlet switch chamber 3 is inserted into the positioning slot 2, the installation and positioning of the inlet / outlet structure is completed. When maintenance of the inlet / outlet structure is required, the inlet / outlet switch chamber 3, the electricity meter chamber 4, and the outlet chamber 5 are lowered to the ground, facilitating maintenance and repair of the inlet / outlet structure from the ground. The positioning seat 1 can be installed at a high position using the mounting plate 20 with mounting holes 21 and expansion bolts. The servo motor 16 can be powered by the battery 23. The power adapter 24 can be connected to the circuit breaker 6 to convert AC power into DC power to charge the battery 23. The servo motor 16 can be controlled by the control module 22 with a Bluetooth module, allowing staff to operate and control the control module 22 via a mobile APP and Bluetooth.
[0026] The above description is merely an embodiment of this utility model and does not limit the patent scope of this utility model. Any equivalent structural or procedural transformations made based on the description and drawings of this utility model, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of this utility model.
Claims
1. A power distribution cabinet wiring structure for a tunnel dust removal vehicle, characterized in that, include: A positioning seat with a positioning groove; An incoming line switch chamber that is slidably mounted on the positioning slot; The electricity meter compartment is fixedly installed at the bottom of the incoming switch compartment; The outgoing cable compartment is fixedly installed at the bottom of the electricity meter compartment; A circuit breaker installed on the inner wall of the incoming line switch chamber; An electricity meter installed on the inner wall of the electricity meter room; An outgoing switch installed on the inner wall of the outgoing room; A hoisting and installation mechanism installed on the inner wall of the incoming switch chamber for hoisting and installing the incoming and outgoing line structures.
2. The power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle according to claim 1, characterized in that, Both the incoming switch chamber and the outgoing chamber are provided with inlet and outlet holes, and rubber sealing sleeves are provided on the inlet and outlet holes.
3. The power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle according to claim 1, characterized in that, The top of the incoming line switch chamber has a through opening, and a guide wheel is rotatably installed on the inner wall of the through opening.
4. The power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle according to claim 3, characterized in that, The hoisting and installation mechanism includes: Rotate the horizontal shaft mounted on the inner wall of the incoming line switch chamber; A winch fixedly mounted on the horizontal shaft; The guide pulley is tumblingly connected to the wire rope, which is mounted on the winch and fixedly connected to the inner wall of the positioning groove. A drive mechanism installed on the inner wall of the incoming line switch chamber.
5. The power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle according to claim 4, characterized in that, The drive mechanism includes: A servo motor and connecting plate are fixedly installed on the inner wall of the incoming line switch chamber; The worm gear is mounted on the output shaft of the servo motor via a coupling and is rotatably connected to the connecting plate. A worm wheel is fixedly sleeved on the horizontal shaft and meshes with the worm.
6. The power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle according to claim 1, characterized in that, A mounting plate is fixedly installed on the positioning seat, and mounting holes are provided on the mounting plate.
7. The power distribution cabinet inlet and outlet wiring structure of the tunnel dust removal vehicle according to claim 1, characterized in that, The inner wall of the incoming line switch compartment is equipped with a control module, a storage battery, and a power adapter. The control module is equipped with a Bluetooth module.