An automatic pipe cutting and unloading system

By designing an automated pipe cutting and unloading system, and utilizing components such as a transfer table, slide rails, and baffles, the system solves the problem of low efficiency in manual collection after pipe cutting, achieving automated loading and unloading and improving production efficiency and smoothness.

CN224980571UActive Publication Date: 2026-11-17WUHU HUIYING AUTOMATIC EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522462945.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-20
Publication Date
2026-11-17
Estimated Expiration
2035-11-20

AI Technical Summary

Technical Problem

The manual collection and stacking of liquid storage tanks after pipe cutting in the current production process is inefficient, resulting in long downtime waiting for materials during the production process, which affects production efficiency.

Method used

An automatic tube cutting and unloading system was designed, including a transfer table, an inclined slide, a pushing mechanism, a blocking part, and a material handling component. Through the cooperation of the slide and the baffle, the tube is ensured to be fed one by one to prevent material jamming. The tube is controlled by a cylinder to enter the corresponding discharge port, thus realizing automated loading and unloading.

Benefits of technology

It has achieved automated loading and unloading of pipe cutting, prevented material jamming, improved production efficiency, reduced downtime, and enhanced production smoothness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224980571U_ABST
    Figure CN224980571U_ABST
Patent Text Reader

Abstract

This utility model relates to an automatic pipe cutting and unloading system, including a transfer platform connected to a pipe cutting device, at least one aerial conveyor line connected to the transfer platform, and a transfer compartment connected to the end of the aerial conveyor line away from the transfer platform. The transfer platform is equipped with inclined chutes, the outlet of which cooperates with the aerial conveyor line. Pushing mechanisms for tilting the pipes are distributed at the inlet of the chutes, and the chutes are equipped with blocking parts to prevent jamming. A material handling assembly is connected to the chutes or transfer compartment. This utility model uses the chutes, a first baffle, a second baffle, and a third baffle to ensure sequential, single-piece feeding of the pipes, preventing jamming. The utility model also uses a second cylinder and a third cylinder to move a fourth baffle and a fifth baffle, causing the pipes to fall into their corresponding storage compartments, preventing disorderly entry of the pipes and affecting the feeding of the next process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of liquid storage tank production and processing, specifically an automatic pipe cutting and unloading system. Background Technology

[0002] The liquid storage tank body is obtained by cutting pipes to a fixed length. After the pipe body is cut, both ends need to be chamfered. After chamfering, it needs to be transported to the next process for processing. In the current production process, the chamfered pipes are collected manually and stacked. After collection, they are pushed manually to the next process for processing. The production process is inefficient and there are long downtimes waiting for materials. In order to solve the above problems, an automatic pipe cutting and unloading system was designed and developed. Summary of the Invention

[0003] To address the aforementioned technical problems, this utility model proposes an automatic tube cutting and unloading system. The technical solution adopted by this utility model to solve the problem is as follows: An automatic pipe cutting and unloading system includes a transfer platform connected to a pipe cutting device, at least one aerial conveyor line connected to the transfer platform, a transfer compartment connected to the end of the aerial conveyor line away from the transfer platform, and inclined slides provided on the transfer platform, with the slide outlets cooperating with the aerial conveyor line. The slide entrance is equipped with a pushing mechanism to push the cut pipe over, and the slide is provided with a blocking part to prevent material jamming; The slide or transfer chamber is connected to a material handling assembly.

[0004] The pushing mechanism includes a support platform fixed on the transfer platform. The support platform is provided with a baffle plate extending into the slide to block the movement of the cutting pipe. The support platform is also provided with a No. 1 cylinder, which is connected to a push plate.

[0005] The blocking part includes a first baffle plate arranged on both sides of the slide to make the slide into a funnel shape. The first baffle plate is provided with a second baffle plate with a V-shaped cross section to prevent the cut pipe from flying out of the slide. The second baffle plate is connected to a third baffle plate that is inclined towards the high-altitude conveyor line to prevent material jamming on the side near the pushing mechanism.

[0006] The beneficial effects of this utility model are: This utility model uses the slide, baffle No. 1, baffle No. 2 and baffle No. 3 to make the cutting tube feed one by one in sequence, preventing material jamming; This utility model uses cylinder No. 2 and cylinder No. 3 to drive baffle No. 4 and baffle No. 5 to make the cutting tube fall into the corresponding discharge port, preventing the cutting tube from entering in a disorderly manner and affecting the feeding of the next process. Attached Figure Description

[0007] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0008] Figure 1 This is a three-dimensional structural diagram of Embodiment 1 of the present utility model; Figure 2 This is a schematic diagram of the three-dimensional structure of the material preparation rack according to Embodiment 1 of this utility model. Figure 1 ; Figure 3 This is a schematic diagram of the three-dimensional structure of the material preparation rack according to Embodiment 1 of this utility model. Figure 2 ; Figure 4 This is a schematic diagram of the three-dimensional structure of the material preparation rack according to Embodiment 1 of this utility model. Figure 3 ; Figure 5 This is a partial three-dimensional structural diagram of the high-altitude conveyor line according to Embodiment 1 of this utility model. Figure 1 ; Figure 6 This is a partial three-dimensional structural diagram of the high-altitude conveyor line according to Embodiment 1 of this utility model. Figure 2 ; Figure 7 This is a three-dimensional structural diagram of the transfer compartment according to Embodiment 1 of this utility model; Figure 8 This is a three-dimensional structural diagram of Embodiment 2 of the present invention. Figure 1 ; Figure 9 This is a three-dimensional structural diagram of Embodiment 2 of the present invention. Figure 2 ; Figure 10 This is a schematic diagram of the three-dimensional structure of the transfer compartment in Embodiment 2 of this utility model. Figure 1 ; Figure 11 This is a schematic diagram of the three-dimensional structure of the adapter platform in Embodiment 2 of this utility model; Figure 12 This is a schematic diagram of the three-dimensional structure of the transfer compartment in Embodiment 2 of this utility model. Figure 2 ; Figure 13 For the present utility model Figure 10 A magnified view of I.

[0009] The diagram shows: 1. Transfer platform; 2. Aerial conveyor line; 3. Transfer compartment; 4. Slide rail; 5. Material rack; 6. Material rack; 7. Material handling compartment; 8. Material handling assembly; 9. Power chain; 10. Support bracket; 11. Unloading plate; 12. Second clearance groove; 13. Extension section; 41. Pushing mechanism; 42. Blocking section; 411. Support platform; 412. Baffle plate; 413. First cylinder; 414. Push plate; 421. First baffle plate. 422. No. 2 baffle; 423. No. 3 baffle; 81. Guide chamber; 82. Door unit; 83. Inlet; 84. Outlet; 821. No. 2 cylinder; 822. No. 3 cylinder; 823. No. 4 baffle; 824. No. 5 baffle; 21. Lifting line; 22. Horizontal line; 23. Drop line; 24. No. 1 auxiliary support; 25. No. 2 auxiliary support; 26. No. 6 baffle; 27. Lifting plate; 28. No. 1 clearance groove. Detailed Implementation

[0010] To enable those skilled in the art to better understand the technical solution of this utility model, the present utility model will be described more clearly and completely below with reference to the accompanying drawings in the embodiments. Of course, the described embodiments are only a part of the present utility model and not all of them. Based on this embodiment, other embodiments obtained by those skilled in the art without creative effort are all within the protection scope of this utility model.

[0011] This utility model includes the following embodiments: Embodiment 1: like Figures 1 to 7 As shown, an automatic pipe cutting and unloading system includes a transfer platform 1 connected to a pipe cutting device, at least one aerial conveyor line 2 connected to the transfer platform 1, a transfer chamber 3 connected to the end of the aerial conveyor line 2 away from the transfer platform 1, and inclined slides 4 provided on the transfer platform 1, the outlet of the slides 4 cooperating with the aerial conveyor line 2. The slide 4 is provided with a pushing mechanism 41 at the entrance to push the cut pipe over, and the slide 4 is provided with a blocking part 42 to prevent material jamming. The slide 4 is connected to the material handling assembly 8.

[0012] The pushing mechanism 41 includes a support platform 411 fixed on the transfer platform 1. The support platform 411 is provided with a baffle plate 412 extending into the slide 4 to block the movement of the cutting pipe. The support platform 411 is also provided with a first cylinder 413, and the first cylinder 413 is connected to a push plate 414.

[0013] The blocking part 42 includes a first baffle 421 disposed on both sides of the slide 4 to make the slide 4 flared out, a second baffle 422 with a V-shaped cross section on the first baffle 421 to prevent the cut pipe from flying out of the slide 4, and a third baffle 423 connected to the side of the second baffle 422 near the pushing mechanism 41 to prevent material jamming by being inclined toward the high-altitude conveyor line 2; Figures 2 to 3 As shown, the slide 4 extends out to the transfer platform 1, with an increased tilt angle to facilitate the cutting of the pipe into the power chain 9. If the cutting speed is too fast, the pipe may easily detach from the slide 4 and collide when entering the power chain 9. The second baffle 422 provides guidance and limits the cutting of the pipe, effectively ensuring the transfer of the pipe. The third baffle 423 prevents two pipes from overlapping and entering the slide 4, causing jamming and blockage of the slide 4. At the same time, the third baffle 423 tilts towards the high-altitude conveyor line 2 to facilitate the return of the pipe to the slide 4.

[0014] A material preparation rack 5 is provided between the transfer station 1 and the aerial conveyor line 2. The material preparation rack 5 has a material preparation row 6, and the material preparation row 6 has at least one material handling compartment 7 arranged parallel to the width direction of the material preparation rack 5. A material handling assembly 8 is provided on the material preparation rack 5 to control the opening and closing of the corresponding material handling compartment 7. Figure 1 As shown, there are four high-altitude conveyor lines 2, four material handling compartments 7, and the power chain 9 and guide compartment 81 are installed on the material preparation rack 5. The discharge port 84 of the guide compartment 81 is connected to the corresponding material handling compartment 7.

[0015] The material handling assembly 8 includes a power chain 9, with guide chambers 81 distributed above the power chain 9. One end of the guide chamber 81 is an inlet 83, and several outlets 84 are arranged parallel to the direction of movement of the power chain 9 on one side of the guide chamber 81. The guide chamber 81 is equipped with door units 82 arranged parallel to the direction of movement of the power chain 9 to control the cutting pipe from entering the corresponding outlet 84. Figures 2 to 3 As shown, the pipe is vertically conveyed to the slide 4. The baffle plate 412 blocks the movement of the pipe. Then, the first cylinder 413 drives the push plate 414 to push the pipe over. The pipe enters the power chain 9 through the slide 4.

[0016] The door unit 82 includes a second cylinder 821 and a third cylinder 822 disposed on the guide chamber 81 and arranged perpendicularly to each other. The second cylinder 821 is connected to a fourth baffle 823 that blocks the guide chamber 81 so that the cut pipe reaches the corresponding discharge port 84. The third cylinder 822 is connected to a fifth baffle 824 for opening and closing the discharge port 84.

[0017] like Figures 2 to 4As shown, if the pipe needs to enter the first material handling chamber 7, the second cylinder 821 in the door unit 82 that cooperates with the first material handling chamber 7 drives the fourth baffle 823 to descend and block the guide chamber 81. Then the third cylinder 822 drives the fifth baffle 824 to open the discharge port 84 of the corresponding guide chamber 81, and the pipe enters the first material handling chamber 7 through the discharge port 84. If the cut pipe enters the second material handling chamber 7, the fifth baffle 824 in the door unit 82 that cooperates with the first material handling chamber 7 will descend, closing the discharge port 84 connected to the first material handling chamber 7, and the fourth baffle 823 in the door unit 82 will rise; the second cylinder 821 in the door unit 82 that cooperates with the second material handling chamber 7 will drive the fourth baffle 823 to descend and block the guide chamber 81, and then the third cylinder 822 will drive the fifth baffle 824 to open the discharge port 84 corresponding to the second material handling chamber 7, and so on, so that the cut pipe enters the four material handling chambers 7 in sequence.

[0018] The high-altitude conveyor line 2 includes a lifting line 21, a horizontal line 22, and a descent line 23. A first auxiliary support 24 is provided between the lifting line 21 and the horizontal line 22 to allow the pipe to enter the horizontal line 22 from the lifting line 21. A second auxiliary support 25 is provided between the horizontal line 22 and the descent line 23 to allow the pipe to enter the descent line 23 from the horizontal line 22. A sixth baffle 26 is provided on the second auxiliary support 25 to prevent the pipe from detaching from the second auxiliary support 25.

[0019] Each aerial conveyor line 2 is equipped with a lifting plate 27 for lifting the pipe cutter. The end of the material preparation row 6 is provided with a first clearance groove 28 to facilitate the aerial conveyor line 2 to grab the pipe cutter. The first clearance groove 28 is used to avoid the lifting plate 27 so that the lifting plate 27 can smoothly lift the pipe cutter.

[0020] like Figure 1 and Figure 7 As shown, there are four transfer cabins 3. Each transfer cabin 3 is provided with an extension 13 that allows the cut pipe to be separated from the high-altitude conveyor line 2. The extension 13 is distributed on both sides of the two lifting plates 27 to facilitate the interception of the cut pipe.

[0021] Example 2: like Figures 8 to 13 As shown, an automatic pipe cutting and unloading system includes a transfer platform 1 connected to a pipe cutting device, at least one aerial conveyor line 2 connected to the transfer platform 1, a transfer chamber 3 connected to the end of the aerial conveyor line 2 away from the transfer platform 1, an inclined slide rail 4 provided on the transfer platform 1, the outlet of the slide rail 4 cooperating with the aerial conveyor line 2, and the aerial conveyor line 2 having one line. The slide 4 is provided with a pushing mechanism 41 at the entrance to push the cut pipe over, and the slide 4 is provided with a blocking part 42 to prevent material jamming. The transfer cabin 3 is provided with an unloading plate 11 that extends into the high-altitude conveyor line 2 for unloading. The unloading plate 11 has an acute angle with the horizontal plane and its tilting direction extends from the transfer cabin 3 to the top of the high-altitude conveyor line 2. The transfer chamber 3 is connected to a material handling assembly 8; such as Figures 8 to 9 As shown, the transfer compartment 3 is provided with four components and is supported by the support bracket 10, and the material handling assembly 8 is installed on the support bracket 10. The high-altitude conveyor line 2 is equipped with a lifting plate 27 for lifting the pipe cutter. The unloading plate 11 is equipped with a second clearance groove 12 to avoid the lifting plate 27, so that the pipe cutter can be smoothly separated from the lifting plate 27 under the action of the unloading plate 11 and enter the power chain 9 through the unloading plate 11.

[0022] The pushing mechanism 41 includes a support platform 411 fixed on the transfer table 1. The support platform 411 has a baffle plate 412 extending into the slide rail 4 to block the pipe cutting movement. The support platform 411 also has a first cylinder 413 connected to a push plate 414. Figures 10 to 11 As shown, the pipe is vertically conveyed to the slide 4. The baffle plate 412 blocks the movement of the pipe. Then, the first cylinder 413 drives the push plate 414 to push the pipe down. The pipe enters the high-altitude conveyor line 2 through the slide 62.

[0023] The blocking part 42 includes a first baffle 421 disposed on both sides of the slide 4 to make the slide 4 flared out, a second baffle 422 with a V-shaped cross section on the first baffle 421 to prevent the cut pipe from flying out of the slide 4, and a third baffle 423 connected to the side of the second baffle 422 near the pushing mechanism 41, which is inclined towards the high-altitude conveyor line 2 to prevent material jamming. Figures 10 to 11 As shown, the slide 4 extends out to the transfer platform 1, with an increased tilt angle to facilitate the cutting of pipes into the high-altitude conveyor line 2. If the cutting speed is too fast, the pipe may detach from the slide 4 and collide when entering the high-altitude conveyor line 2. The second baffle 422 provides guidance and limits the cutting of pipes, effectively ensuring the transfer of pipes. The third baffle 423 prevents two pipes from overlapping and entering the slide 4, causing jamming and blockage of the slide 4. At the same time, the third baffle 423 tilts towards the high-altitude conveyor line 2 to facilitate the return of the pipes to the slide 4.

[0024] The material handling assembly 8 includes a power chain 9, and a guide chamber 81 is distributed above the power chain 9. One end of the guide chamber 81 is an inlet 83. A plurality of outlets 84 are arranged parallel to the movement direction of the power chain 9 on one side of the guide chamber 81. A door unit 82 is provided on the guide chamber 81 and is arranged parallel to the movement direction of the power chain 9 to control the cutting pipe to enter the corresponding outlet 84.

[0025] The door unit 82 includes a second cylinder 821 and a third cylinder 822 disposed on the guide chamber 81 and arranged perpendicularly to each other. The second cylinder 821 is connected to a fourth baffle 823 that blocks the guide chamber 81 so that the cut pipe reaches the corresponding discharge port 84. The third cylinder 822 is connected to a fifth baffle 824 for opening and closing the discharge port 84.

[0026] If the pipe needs to enter the first transfer chamber 3, the second cylinder 821 in the door unit 82 that cooperates with the first transfer chamber 3 drives the fourth baffle 823 to descend. The fourth baffle 823 blocks the guide chamber 81. Then the third cylinder 822 drives the fifth baffle 824 to open the discharge port 84 of the corresponding guide chamber 81. The pipe enters the first transfer chamber 3 through the discharge port 84. If the cut pipe enters the second transfer chamber 3, the fifth baffle 824 in the door unit 82 that cooperates with the first transfer chamber 3 will descend, closing the discharge port 84 connected to the first door unit 82, and the fourth baffle 823 in the door unit 82 will rise; the second cylinder 821 in the door unit 82 that cooperates with the second transfer chamber 3 will drive the fourth baffle 823 to descend and block the guide chamber 81, and then the third cylinder 822 will drive the fifth baffle 824 to open the discharge port 84 corresponding to the second transfer chamber 3, and so on, so that the cut pipe enters the four material handling chambers 7 in sequence.

[0027] The high-altitude conveyor line 2 includes a lifting line 21, a horizontal line 22, and a descent line 23. A first auxiliary support 24 is provided between the lifting line 21 and the horizontal line 22 to allow the pipe to enter the horizontal line 22 from the lifting line 21. A second auxiliary support 25 is provided between the horizontal line 22 and the descent line 23 to allow the pipe to enter the descent line 23 from the horizontal line 22. A sixth baffle 26 is provided on the second auxiliary support 25 to prevent the pipe from detaching from the second auxiliary support 25.

[0028] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claimed utility model. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A pipe cutting automatic feeding and unloading system, characterized in that: It includes a transfer platform (1) connected to the pipe cutting equipment, at least one high-altitude conveyor line (2) connected to the transfer platform (1), the high-altitude conveyor line (2) is connected to a transfer cabin (3) at one end away from the transfer platform (1), the transfer platform (1) is provided with inclined slides (4), and the outlet of the slides (4) is matched with the high-altitude conveyor line (2). The slide (4) has a pushing mechanism (41) at the entrance to push the cut pipe over, and the slide (4) is provided with a blocking part (42) to prevent material jamming. The slide (4) or transfer compartment (3) is connected to the material handling assembly (8).

2. The automatic pipe cutting, loading and unloading system according to claim 1, characterized in that: The pushing mechanism (41) includes a support platform (411) fixed on the transfer platform (1). The support platform (411) is provided with a baffle plate (412) extending into the slide (4) to block the movement of the cutting tube. The support platform (411) is also provided with a first cylinder (413), and the first cylinder (413) is connected to a push plate (414).

3. The automatic pipe cutting, loading and unloading system according to claim 2, characterized in that: The blocking part (42) includes a first baffle (421) arranged on both sides of the slide (4) to make the slide (4) flared. The first baffle (421) is provided with a second baffle (422) with a V-shaped cross section to prevent the cut pipe from flying out of the slide (4). The second baffle (422) is connected to a third baffle (423) on the side near the pushing mechanism (41) to be inclined towards the high-altitude conveyor line (2) to prevent material jamming.

4. The automatic pipe loading and unloading system according to claim 1, characterized in that: A material preparation rack (5) is provided between the transfer station (1) and the high-altitude conveyor line (2). A material preparation row (6) is provided on the material preparation rack (5). At least one material handling compartment (7) is provided on the material preparation row (6) and is arranged parallel to the width direction of the material preparation rack (5). The material handling component (8) is provided on the material preparation rack (5) to control the opening and closing of the corresponding material handling compartment (7).

5. The automatic pipe loading and unloading system according to claim 1, characterized in that: The material handling assembly (8) includes a power chain (9), and a guide chamber (81) is distributed above the power chain (9). One end of the guide chamber (81) is an inlet (83). A number of outlets (84) are arranged parallel to the direction of movement of the power chain (9) on one side of the guide chamber (81). A door unit (82) is provided on the guide chamber (81) and arranged parallel to the direction of movement of the power chain (9) to control the cutting pipe to enter the corresponding outlet (84).

6. The automatic pipe cutting, loading and unloading system according to claim 5, characterized in that: The door unit (82) includes a second cylinder (821) and a third cylinder (822) arranged on the guide chamber (81) and perpendicular to each other. The second cylinder (821) is connected to a fourth baffle (823) that blocks the guide chamber (81) so that the cut pipe reaches the corresponding discharge port (84). The third cylinder (822) is connected to a fifth baffle (824) for opening and closing the discharge port (84).

7. The automatic pipe loading and unloading system according to claim 5, characterized in that: The transfer compartment (3) is equipped with a discharge plate (11) that extends into the high-altitude conveyor line (2) to assist in unloading.

8. The automatic pipe loading and unloading system according to claim 1, characterized in that: The high-altitude conveyor line (2) includes a lifting line (21), a horizontal line (22) and a descent line (23). A first auxiliary support (24) is provided between the lifting line (21) and the horizontal line (22) to allow the pipe to enter the horizontal line (22) from the lifting line (21). A second auxiliary support (25) is provided between the horizontal line (22) and the descent line (23) to allow the pipe to enter the descent line (23) from the horizontal line (22). A sixth baffle (26) is provided on the second auxiliary support (25) to prevent the pipe from detaching from the second auxiliary support (25).