Lifting platform for beam construction
By using an automatic clamping device and lifting structure in the construction of the cap beam, the problems of long construction period and high cost caused by many loose parts of the support were solved, and the construction platform was lifted and lowered efficiently, improving construction efficiency and safety.
Patent Information
- Application Number
- CN202522032055.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-09-22
AI Technical Summary
Existing methods for constructing girder caps involve numerous disassembled support components and complex installation, resulting in long construction periods, high construction costs, and potential safety hazards.
The system employs a first and second automatic clamping device, spaced apart from top to bottom, combined with an automatic lifting structure. Hydraulic fasteners are used to clamp the outer wall of the bridge pier, enabling the construction platform to be raised and lowered, thus avoiding interference from external cranes.
It simplifies the construction process, shortens the construction period, reduces costs, and improves construction efficiency and safety.
Smart Images

Figure CN224982052U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge construction technology, and in particular to a lifting platform for cap beam construction. Background Technology
[0002] The sites of bridges in mountainous areas are mostly located in high mountain and canyon terrain with frequent undulations. Thin-walled hollow rectangular high pier structures have good ductility and strong bending resistance, and are also technologically advanced and reasonably priced, making them a common choice for bridge construction today.
[0003] Traditionally, the construction of bridge pier cap beams often uses full-span ground scaffolding or through-bars as supports, followed by high-level hoisting of Bailey beams, distribution beams, bottom formwork, and side formwork, and then pouring the concrete.
[0004] The full-span scaffolding method involves erecting scaffolding at the bridge site and pouring bridge concrete on top of it. The through-core steel bar method involves pre-drilling holes in the piers to install corbels, then building scaffolding upwards from the corbels, with ladders extending from the ground and attaching to the piers at intervals. The full-span scaffolding method presents challenges when pier height exceeds 8 meters, including a large construction workload, a high risk of collapse, and low economic efficiency. Furthermore, it places extremely high demands on the foundation; uneven settlement or slippage can affect the quality of the cap beam construction. The through-core steel bar method requires pre-embedded ducts within the piers, which can easily lead to defects in the pier concrete appearance, resulting in high construction safety risks and significant quality hazards. On the other hand, construction units often have high requirements for the appearance of the concrete and discourage leaving holes or pre-embedded corbels in the piers.
[0005] Both of these methods involve relatively loose components, requiring the hoisting of a large number of disassembled parts; they require a dedicated crane for extended periods, and because the parts to be hoisted by the crane are so scattered, the crane occupancy time is long, resulting in a long construction period and high construction costs; and the components are mostly installed at high positions, posing significant safety hazards. Utility Model Content
[0006] To overcome the shortcomings of the existing technology, the technical problem to be solved by this utility model is: how to improve the problem of long construction period and high construction cost caused by the large number of disassembled parts and complex installation of existing construction supports.
[0007] The technical solution adopted by this utility model to solve its technical problem is: The lifting platform for the construction of the cap beam includes a first automatic clamping device and a second automatic clamping device arranged at intervals from top to bottom, with an automatic lifting structure between the first automatic clamping device and the second automatic clamping device; a construction platform is provided at the upper end of the first automatic clamping device.
[0008] Furthermore, the aforementioned first automatic clamping device includes a first frame structure, the first frame structure is provided with a first hydraulic fastener, and the fastening end of the first hydraulic fastener is used to abut against the outer wall of the pier; the aforementioned second automatic clamping device includes a second frame structure, the second frame is provided with a second hydraulic fastener, and the fastening end of the second hydraulic fastener is used to abut against the outer wall of the pier.
[0009] Furthermore, both the first frame structure and the second frame structure include two opposing steel sections for clamping the pier column; a clamping frame is provided at the upper end of the steel section, and the clamping frame and the two steel sections form an integral structure; the inner wall of the clamping frame is provided with the first hydraulic fastener or the second hydraulic fastener; the upper end of the clamping frame of the first frame structure is provided with the automatic lifting structure, and the lifting end of the automatic lifting structure is connected to the lower end of the clamping frame of the second frame structure.
[0010] Furthermore, both the first hydraulic fastener and the second hydraulic fastener include a plurality of first hydraulic telescopic rods spaced apart from each other in the clamping frame, with the first hydraulic telescopic rods oriented axially in the horizontal direction; the telescopic end of the first hydraulic telescopic rod is connected to a friction pad, and the end of the friction pad away from the first hydraulic telescopic rod is used to abut against the outer wall of the pier column.
[0011] Furthermore, the clamping frame includes two opposing first beams and two opposing second beams. The two first beams correspond to and are parallel to the two corresponding steel sections. The corresponding first beams are fixedly mounted on the upper end of the steel sections. The second beams are perpendicular to the first beams and the steel sections. Positioning elements are provided at both ends of the steel sections, and fasteners are provided between the positioning elements and the second beams.
[0012] Furthermore, the aforementioned automatic lifting structure includes a second hydraulic telescopic rod fixedly installed on the upper end of the aforementioned first automatic clamping device, wherein the telescopic end of the aforementioned second hydraulic telescopic rod extends vertically upward and is fixedly connected to the aforementioned second automatic clamping device.
[0013] Furthermore, a reinforcing structure is provided between the aforementioned second automatic clamping device and the aforementioned construction platform.
[0014] Furthermore, the aforementioned reinforcement structure includes multiple vertical support columns and multiple diagonal support columns, with both ends of the aforementioned vertical support columns and diagonal support columns being fixedly connected to the upper end of the aforementioned second automatic clamping device and the lower end of the aforementioned construction platform, respectively.
[0015] Furthermore, the aforementioned construction platform includes a main beam truss and tie beam trusses, which together form a mesh-like platform.
[0016] Furthermore, protective railings are installed around the aforementioned construction platform.
[0017] The beneficial effects of this utility model are: The first automatic clamping device first clamps the pier column, and the second automatic clamping device releases the pier column. The automatic lifting structure is then controlled to lift the second automatic clamping device upward. When the second automatic clamping device reaches its limit position, it clamps the pier column again and releases the first automatic clamping device. The automatic lifting structure then retracts, and the second automatic clamping device pulls the first automatic retraction device upward. By alternately clamping and releasing the first and second automatic clamping devices, the entire construction platform can continuously move up and down. Moreover, the entire structure is relatively simple, requires no external crane, and the lifting process does not require disassembly and installation. This can effectively improve construction efficiency, shorten the construction period, and thus reduce costs. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the main view of this utility model; Figure 2 This is a three-dimensional structural diagram of the present invention; Figure 3 This is a schematic diagram of the structure of the first or second automatic clamping device of this utility model; The diagram is labeled as follows: 1-Automatic lifting structure, 2-First automatic clamping device, 3-Coiled support column, 4-Guardrail, 5-Structured steel, 6-Main beam truss, 7-Vertical support column, 8-Positioning component, 9-Fastener, 10-Pier column, 11-Cap beam, 12-Tie truss, 13-Connecting plate, 14-High-strength bolt, 15-Second beam, 16-Channel steel, 17-Second hydraulic telescopic rod, 18-Clamping frame, 19-Reinforcing plate, 20-Second automatic clamping device, 21-Friction pad, 22-First beam, 23-First hydraulic telescopic rod, 24-Mounting base. Detailed Implementation
[0019] The present invention will be further described below with reference to the accompanying drawings.
[0020] like Figures 1-3 As shown in the figure, this application embodiment proposes a lifting platform for cap beam construction, including a first automatic clamping device 2 and a second automatic clamping device 20 arranged at intervals from top to bottom, with an automatic lifting structure 1 provided between the first automatic clamping device 2 and the second automatic clamping device 20; a construction platform is provided at the upper end of the first automatic clamping device 2.
[0021] The first automatic clamping device 2 and the second automatic clamping device 20 can be two sets of fixed supports spaced apart. They can be electrically or hydraulically driven to lock or release relative to the pier column 10, ensuring alternating lifting and lowering. The automatic lifting structure 1 can be an electric lifting rod or a scissor frame structure, which can fix the first automatic clamping device 2 and the second automatic clamping device 20 at both ends to achieve the lifting and lowering function. The hydraulic device is controlled by ground personnel and equipped with real-time pressure detection to monitor the pressure of the clamping device in real time, avoiding insufficient clamping force or incomplete release when releasing due to insufficient pressure.
[0022] First, it should be stated that the first automatic clamping device 2 clamps the pier column 10, and the second automatic clamping device 20 releases the pier column 10. The automatic lifting structure 1 is then controlled to lift the second automatic clamping device 20 upward. When the second automatic clamping device 20 reaches its limit position, it clamps the pier column 10 again and releases the first automatic clamping device 2. The automatic lifting structure 1 then retracts, and the second automatic clamping device 20 pulls the first automatic retraction device upward. By alternating between clamping and releasing the first and second automatic clamping devices 20, the entire construction platform can continuously move upward and downward. Moreover, the entire structure is relatively simple, requires no external crane, and the lifting process does not require disassembly or installation. This effectively improves construction efficiency, shortens the construction period, and reduces costs.
[0023] Specifically, the aforementioned first automatic clamping device 2 includes a first frame structure, which is equipped with a first hydraulic fastener, the fastening end of which is used to abut against the outer wall of the pier; the aforementioned second automatic clamping device 20 includes a second frame structure, which is equipped with a second hydraulic fastener, the fastening end of which is used to abut against the outer wall of the pier. In other words, the locking and unlocking operations between the first and second frame structures and the pier 10 are achieved through the first and second hydraulic fasteners, and the hydraulic fastening structure has the advantages of high stability and large clamping load. In this embodiment, the pier 10 is generally rectangular, therefore both the first and second frame structures are rectangular frames surrounding the pier 10.
[0024] Furthermore, both the first and second frame structures include two opposing steel sections 5, which are used to clamp the pier column 10. A clamping frame 18 is provided at the upper end of each steel section 5, and the clamping frame 18 and the two steel sections 5 form an integral structure. The inner wall of the clamping frame 18 is provided with either a first or second hydraulic fastener. An automatic lifting structure 1 is provided at the upper end of the clamping frame 18 of the first frame structure, and the lifting end of the automatic lifting structure 1 is connected to the lower end of the clamping frame 18 of the second frame structure. The steel sections 5 possess high strength, forming a skeleton support base that is not easily deformed or broken under heavy pressure, thus improving stability and safety. Specifically, it consists of two channel steels 16, with a steel section 5 connecting plate 13 welded to the bottom, leaving a 5-10cm gap in the middle for easy installation of the clamping frame 18.
[0025] The clamping frame 18 is a rectangular frame adapted to the shape and size of the pier column 10. The inner wall of the clamping frame 18 with the first frame structure is provided with a first hydraulic fastener, and the inner wall of the clamping frame 18 with the second frame structure is provided with a second hydraulic fastener. Both the first and second hydraulic fasteners apply a clamping force in a direction perpendicular to the outer wall of the pier column 10. A reinforcing plate 19 is provided at the upper end of the clamping frame 18 with the first frame structure. The upper end of the reinforcing plate 19 is fixedly connected to the bottom end of the automatic lifting structure 1 to ensure connection stability.
[0026] Both the first hydraulic fastener and the second hydraulic fastener include multiple first hydraulic telescopic rods 23 spaced apart from each other in the clamping frame 18. The first hydraulic telescopic rods 23 are axially oriented horizontally. The telescopic ends of the first hydraulic telescopic rods 23 are connected to abutment plates. A friction pad 21 is provided at the end of the abutment plate facing the pier 10. The end of the friction pad 21 away from the first hydraulic telescopic rods 23 is used to abut against the outer wall of the pier 10. The multiple first telescopic rods are evenly spaced in a rectangular distribution on the inner wall of the clamping frame 18. The friction pads 21 corresponding to the same clamping frame 18 include four pieces, corresponding to the four inner walls of the clamping frame 18 respectively. Each friction pad 21 is connected by multiple first hydraulic telescopic rods 23, and the multiple first hydraulic telescopic rods 23 are driven by the same hydraulic drive system to achieve synchronous operation. The friction pads 21 should be sufficiently rough to ensure sufficient friction between the friction pads 21 and the pier, which can support the stable installation of the cap beam 11 construction platform and the normal pouring of the cap beam 11 formwork and concrete.
[0027] The clamping frame 18 includes two opposing first beams 22 and two opposing second beams 15. The two first beams 22 correspond to and are parallel to the two corresponding steel sections 5. The corresponding first beams 22 are fixedly mounted on the upper end of the steel sections 5. The second beams 15 are perpendicular to the first beams 22 and the steel sections 5. Positioning members 8 are provided at both ends of the steel sections 5. Fasteners 9 are provided between the positioning members 8 and the second beams 15. Two first beams 22 and two second beams 15 form a rectangular clamping frame 18. The first beams 22 are arranged parallel to the upper end of the steel section 5. The same side end of the two opposing first beams 22 is connected to the end of a second beam 15. The connection between the first beams 22 and the second beams 15 is detachable, specifically a bolted connection structure. The steel section 5 is longer than the first beams 22. The positioning member 8 includes a connecting plate 13 connected to the end of the steel section 5. The fastener 9 includes a high-strength bolt 14 threaded on the connecting plate 13. The end of the high-strength bolt 14 away from the connecting plate 13 is connected to... The second beam 15 on the corresponding side is specifically provided with a mounting seat 24 at the position corresponding to the high-strength bolt 14, so as to achieve a fixed fit with the high-strength bolt 14; and the upper end of the steel section 5 is provided with multiple positioning holes at intervals. The connecting plate 13 is provided with a bolt structure that is threaded with the positioning block, so as to adjust the position of the connecting plate 13 at the upper end of the steel section 5. After the position of the connecting plate 13 is adjusted, it is fixedly connected to the second beam 15 by the high-strength bolt 14, thereby fixing the second beam 15, thereby adjusting the distance between the side of the clamping device and the pier column 10, so as to achieve the purpose of adapting to the construction of the cap beam 11 of different sized pier columns 10.
[0028] For the automatic lifting structure 1, the automatic lifting structure 1 includes a second hydraulic telescopic rod 17 fixedly installed on the upper end of the first automatic clamping device 2. The telescopic end of the second hydraulic telescopic rod 17 extends vertically upward and is fixedly connected to the second automatic clamping device 20. The second hydraulic telescopic rod 17 is a plurality of rods evenly spaced on the clamping frame 18 to ensure uniform load distribution and improve stability.
[0029] To further enhance the stability of the device, a reinforcement structure is provided between the second automatic clamping device 20 and the construction platform. Specifically, the reinforcement structure includes multiple vertical support columns 7 and multiple diagonal support columns 3. The two ends of the vertical support columns 7 and the diagonal support columns 3 are respectively fixedly connected to the upper end of the second automatic clamping device 20 and the lower end of the construction platform. Specifically, since the length and width of the construction platform are larger than those of the second automatic clamping device 20, the vertical support columns 7 are used to support the overlapping position of the construction platform and the second automatic clamping device 20. The bottom end of the diagonal support column 3 is located at the outer end of the second automatic clamping device 20, and the top end is connected to the lower outer end of the construction platform, forming a diagonal support structure to ensure the support stability of the construction platform.
[0030] The aforementioned construction platform includes a main beam truss 6 and tie beam trusses 12, which form a mesh-like platform. This mesh-like connection ensures the construction platform has sufficient strength to bear sufficiently heavy loads, guaranteeing construction safety. Furthermore, protective railings 4 are installed around the perimeter of the construction platform to further enhance construction safety.
[0031] In summary, this application proposes a lifting platform for cap beam construction, and a square clamp structure to solve the construction problem of cap beam 11 for rectangular piers in existing building structures, and realize the lifting and lowering of the cap beam 11 construction platform. The structure is simple and easy to construct, and can solve the drawbacks of excessive manpower and material investment in the existing full-span scaffolding method, providing a stable construction platform for cap beam 11 construction, with great practicality and safety.
Claims
1. A lifting platform for beam construction, characterized in that, It includes a first automatic clamping device (2) and a second automatic clamping device (20) arranged at intervals from top to bottom, with an automatic lifting structure (1) between the first automatic clamping device (2) and the second automatic clamping device (20); and a construction platform is provided at the upper end of the first automatic clamping device (2).
2. The lifting platform for cap beam construction according to claim 1, characterized in that, The first automatic clamping device (2) includes a first frame structure, the first frame structure is provided with a first hydraulic fastener, and the fastening end of the first hydraulic fastener is used to abut against the outer wall of the pier; the second automatic clamping device (20) includes a second frame structure, the second frame structure is provided with a second hydraulic fastener, and the fastening end of the second hydraulic fastener is used to abut against the outer wall of the pier.
3. The lifting platform for cap beam construction according to claim 2, characterized in that, Both the first frame structure and the second frame structure include two opposing steel sections (5), which are used to clamp the pier column (10); a clamping frame (18) is provided at the upper end of the steel section (5), and the clamping frame (18) and the two steel sections (5) form an integral structure; the inner wall of the clamping frame (18) is provided with the first hydraulic fastener or the second hydraulic fastener; the automatic lifting structure (1) is provided at the upper end of the clamping frame (18) of the first frame structure, and the lifting end of the automatic lifting structure (1) is connected to the lower end of the clamping frame (18) of the second frame structure.
4. The lifting platform for cap beam construction according to claim 3, characterized in that, Both the first hydraulic fastener and the second hydraulic fastener include a plurality of first hydraulic telescopic rods (23) spaced apart from the clamping frame (18), the first hydraulic telescopic rods (23) are axially oriented in the horizontal direction; the telescopic end of the first hydraulic telescopic rod (23) is connected to a friction pad (21), and the end of the friction pad (21) away from the first hydraulic telescopic rod (23) is used to abut against the outer wall of the pier (10).
5. The lifting platform for cap beam construction according to claim 3, characterized in that, The clamping frame (18) includes two opposing first beams (22) and two opposing second beams (15). The two first beams (22) correspond to and are parallel to the two corresponding steel sections (5). The corresponding first beams (22) are fixedly mounted on the upper end of the steel section (5). The second beams (15) are perpendicular to the first beams (22) and the steel section (5). Positioning members (8) are provided at both ends of the steel section (5). Fasteners (9) are provided between the positioning members (8) and the second beams (15).
6. The lifting platform for cap beam construction according to claim 1, characterized in that, The automatic lifting structure (1) includes a second hydraulic telescopic rod (17) fixedly installed on the upper end of the first automatic clamping device (2), and the telescopic end of the second hydraulic telescopic rod (17) extends vertically upward and is fixedly connected to the second automatic clamping device (20).
7. The lifting platform for cap beam construction according to claim 1, characterized in that, A reinforcement structure is provided between the second automatic clamping device (20) and the construction platform.
8. The lifting platform for cap beam construction according to claim 7, characterized in that, The reinforcement structure includes multiple vertical support columns (7) and multiple diagonal support columns (3). The two ends of the vertical support columns (7) and the diagonal support columns (3) are respectively fixedly connected to the upper end of the second automatic clamping device (20) and the lower end of the construction platform.
9. The lifting platform for cap beam construction according to claim 1, characterized in that, The construction platform includes a main beam truss (6) and a tie truss (12), which together form a mesh-like platform.
10. The lifting platform for cap beam construction according to claim 9, characterized in that, The construction platform is equipped with guardrails (4) around its perimeter.