Tenon-and-mortise structure anchoring pressing plate for air shield dam

The air-supported dam anchor plates, produced by cutting steel plates and welding mortise and tenon structures, have solved the problems of long production cycles, unstable quality, and bulky structures, achieving efficient production and high-quality anchor plates suitable for modern water conservancy projects.

CN224982121UActive Publication Date: 2026-11-17HEBEI HENGYANG ENG EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522772245.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-27
Publication Date
2026-11-17
Estimated Expiration
2035-12-27

AI Technical Summary

Technical Problem

The existing anchoring plates for air-supported dams have long production cycles, unstable quality, low dimensional accuracy, and bulky structures, making it difficult to meet the high efficiency and high quality requirements of modern water conservancy projects.

Method used

By using steel plate cutting and processing combined with mortise and tenon structure and welding technology, panel components, pressure plate components and mountain-shaped stiffening plate components are constructed to form a hollow rectangular box-shaped overall structure. The mortise and tenon connection and welding fixation improve production efficiency and structural strength.

Benefits of technology

It shortened the production cycle, improved product dimensional accuracy and quality consistency, achieved lightweight structure and high load-bearing capacity, met tight schedule and customized needs, and reduced material costs and installation difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982121U_ABST
    Figure CN224982121U_ABST
Patent Text Reader

Abstract

This utility model discloses a tenon-and-mortise structure anchoring plate for air-supported dams, belonging to the technical field of hydraulic engineering equipment. The anchoring plate includes a panel assembly, a pressure plate assembly, and a mountain-shaped stiffening plate assembly. The panel assembly and pressure plate assembly each include a first polygonal steel plate and a second polygonal steel plate, arranged parallel to each other and respectively having corresponding first and second rectangular tenon-and-mortise holes. The mountain-shaped stiffening plate assembly includes a first rectangular plate vertically positioned between the two steel plates, with first tooth-shaped protrusions integrally formed at both ends. This utility model solves the problems of long production cycles, unstable quality, and bulky structures of existing cast pressure plates by employing a steel plate cutting and tenon-and-mortise positioning welding process. It has the advantages of high production efficiency, good product quality, lightweight structure, strong load-bearing capacity, and easy assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of water conservancy engineering equipment technology, and in particular to a tenon and mortise structure anchoring pressure plate for air shield dams. Background Technology

[0002] Air-shield dams, a new type of adjustable sluice gate structure, control water levels by filling and draining water or air into the dam bag (or air bladder) to raise and lower the dam body. In the structure of an air-shield dam, the anchor plate is a key load-bearing component for fixing the dam bag. Its function is to evenly and reliably transfer the enormous tensile force generated by the dam bag to the concrete foundation. Therefore, the structural strength, quality stability, and connection reliability of the anchor plate itself directly affect the safe operation of the entire air-shield dam.

[0003] Currently, the anchoring plates for air-supported dams in existing technologies are generally manufactured using a monolithic casting process. This process requires the creation of a mold, into which molten metal is poured, and after cooling, the plate is formed into the desired shape. Although casting can create complex structures, its inherent shortcomings are becoming increasingly apparent in practical applications, especially in water conservancy projects with tight schedules and high customization requirements.

[0004] Specifically, the casting process has a long production cycle, from mold design and manufacturing to pouring, cooling, and sand removal, all of which are time-consuming. Furthermore, internal defects such as porosity, shrinkage cavities, and sand inclusions are easily generated during casting, leading to low yield rates and difficulty in ensuring quality stability. In addition, the dimensional accuracy of castings is relatively low, requiring extensive machining for correction later, which not only increases costs but also further extends production time. These problems make traditional casting pressure plates unsuitable for the high-efficiency, high-quality construction requirements of modern water conservancy projects.

[0005] Therefore, this utility model proposes a tenon and mortise structure anchoring pressure plate for air shield dams to overcome the shortcomings of the prior art. Utility Model Content

[0006] To overcome the above shortcomings, this utility model provides a tenon and mortise structure anchoring plate for air shield dams, aiming to improve the problems that existing anchoring plates for air shield dams are mostly cast parts, which have long production cycles, unstable quality and bulky structures.

[0007] To achieve the above objectives, the present invention adopts the following technical solution: a mortise and tenon structure anchoring pressure plate for air shield dams, comprising: a panel assembly and a pressure plate assembly; and a mountain-shaped stiffening plate assembly.

[0008] The panel assembly includes a first polygonal steel plate with a first rectangular tenon-and-mortise hole; the pressure plate assembly includes a second polygonal steel plate, which is arranged parallel to one side of the first polygonal steel plate, and the second polygonal steel plate has a second rectangular tenon-and-mortise hole corresponding to the first rectangular tenon-and-mortise hole.

[0009] Furthermore, the mountain-shaped rib plate assembly includes a first rectangular plate vertically disposed between the first polygonal steel plate and the second polygonal steel plate. The two ends of the first rectangular plate are integrally formed with first tooth-shaped protrusions. The first tooth-shaped protrusions are respectively inserted into the first rectangular mortise and tenon holes and the second rectangular mortise and tenon holes to form a mortise and tenon connection. The first rectangular plate is fixedly connected to the first polygonal steel plate and the second polygonal steel plate by welding.

[0010] Preferably, the first polygonal steel plate is further provided with a first elliptical mounting hole.

[0011] Preferably, the second polygonal steel plate is further provided with a second elliptical mounting hole corresponding to the position of the first elliptical mounting hole.

[0012] Preferably, the first elliptical mounting holes are symmetrically distributed on both sides of the first rectangular tenon hole; the second elliptical mounting holes are symmetrically distributed on both sides of the second rectangular tenon hole.

[0013] Preferably, the first tooth-shaped protrusion is integrally formed on the upper and lower ends of the first rectangular plate.

[0014] Preferably, the mortise and tenon structure anchoring pressure plate for the air shield dam further includes a sealing plate assembly, which is fixedly connected to the end of the pressure plate assembly and is used to close the space enclosed by the first rectangular plate, the first polygonal steel plate and the second polygonal steel plate.

[0015] Preferably, the stop seal assembly includes a second rectangular plate, and a second toothed protrusion is integrally formed on one side of the second rectangular plate.

[0016] Preferably, the second toothed protrusion is inserted into the second rectangular mortise and tenon hole, and the second rectangular plate and the second polygonal steel plate are fixedly connected by welding.

[0017] This utility model has the following beneficial effects:

[0018] 1. This utility model solves the problems of long production cycle, unstable quality and large dimensional deviation caused by casting anchor plates in the prior art by using steel plate cutting and processing and mortise and tenon structure positioning and welding fixation. It achieves the technical effect of shortening the production cycle and improving the product dimensional accuracy and quality consistency, and can better meet the needs of projects with tight schedules and high degree of customization.

[0019] 2. This utility model solves the problems of heavy and low material utilization of existing cast pressure plate structures by welding the panel assembly, pressure plate assembly and mountain-shaped rib plate assembly into a hollow rectangular box-shaped integral structure. It achieves the technical effects of lightweight structure, strong load-bearing capacity and excellent bending and torsional resistance, saves material costs and facilitates transportation and on-site installation. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the installation of a tenon and mortise structure anchoring pressure plate for an air shield dam proposed in this utility model;

[0021] Figure 2 This is a side view of a mortise and tenon structure anchoring pressure plate for an air shield dam proposed in this utility model;

[0022] Figure 3 This is a schematic diagram of a pressure plate assembly for a mortise and tenon structure anchoring pressure plate for an air shield dam, as proposed in this utility model.

[0023] Figure 4 This is a schematic diagram of a panel assembly for a mortise and tenon structure anchoring pressure plate for an air shield dam, as proposed in this utility model.

[0024] Figure 5 This is a schematic diagram of the pressure plate assembly of a mortise and tenon structure anchoring pressure plate for an air shield dam proposed in this utility model.

[0025] Figure 6 This is a schematic diagram of the pressure plate assembly of a mortise and tenon structure anchoring pressure plate for an air shield dam proposed in this utility model.

[0026] Figure 7 A schematic diagram of a mountain-shaped stiffening plate assembly for a mortise and tenon structure anchoring pressure plate for an air shield dam, as proposed in this utility model.

[0027] Figure 8 A schematic diagram of a mountain-shaped stiffening plate assembly for a mortise and tenon structure anchoring pressure plate for an air shield dam, as proposed in this utility model.

[0028] Figure 9 This is a schematic diagram of a sealing plate assembly for a mortise and tenon structure anchoring pressure plate for an air shield dam, as proposed in this utility model.

[0029] Legend:

[0030] 1. Panel assembly; 101. First polygonal steel plate; 102. First rectangular tenon hole; 103. First elliptical mounting hole; 2. Pressure plate assembly; 201. Second polygonal steel plate; 202. Second rectangular tenon hole; 203. Second elliptical mounting hole; 3. Mountain-shaped rib plate assembly; 301. First rectangular plate; 302. First toothed protrusion; 4. Sealing plate assembly; 401. Second rectangular plate; 402. Second toothed protrusion. Detailed Implementation

[0031] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0032] Reference Figures 1-9 One embodiment of this utility model is a mortise and tenon structure anchoring pressure plate for air shield dams, including a panel assembly 1, a pressure plate assembly 2, and a mountain-shaped stiffening plate assembly 3 that connects the panel assembly 1 and the pressure plate assembly 2 into one unit. The panel assembly 1, the pressure plate assembly 2, and the mountain-shaped stiffening plate assembly 3 together constitute a hollow rectangular box-shaped load-bearing structure.

[0033] Specifically, the panel assembly 1 includes a first polygonal steel plate 101, on which a first rectangular tenon hole 102 is provided; the pressure plate assembly 2 includes a second polygonal steel plate 201, which is arranged parallel to the side of the first polygonal steel plate 101 away from the airbag, and the second polygonal steel plate 201 has a second rectangular tenon hole 202 corresponding to the position of the first rectangular tenon hole 102.

[0034] The mountain-shaped rib plate assembly 3, serving as the core connecting and supporting component, includes a first rectangular plate 301. The first rectangular plate 301 is vertically positioned between the first polygonal steel plate 101 and the second polygonal steel plate 201. Both ends of the first rectangular plate 301 are integrally formed with first toothed protrusions 302 serving as tenon structures. One of the first toothed protrusions 302 is horizontally inserted into the first rectangular mortise and tenon hole 102 of the first polygonal steel plate 101, while the other end of the first toothed protrusion 302 is correspondingly horizontally inserted into the second rectangular mortise and tenon hole of the second polygonal steel plate 201. Inside the hole 202, the first toothed protrusion 302 engages with the first rectangular tenon hole 102 and the second rectangular tenon hole 202 to form a tightly interlocking tenon-and-mortise connection. This tenon-and-mortise connection provides a precise positioning basis for the subsequent welding process. After the tenon-and-mortise positioning is completed, the contact parts between the first rectangular plate 301 and the first polygonal steel plate 101, as well as the contact parts between the first rectangular plate 301 and the second polygonal steel plate 201, are fixedly connected by welding, thereby integrating the three independent components into a high-strength and high-rigidity whole.

[0035] The sealing plate assembly 4 includes a second rectangular plate 401, on one side of which a second toothed protrusion 402, serving as a tenon structure, is integrally formed. The sealing plate assembly 4 is installed at the end of the pressure plate assembly 2 by a fixed connection. Specifically, during installation, the second toothed protrusion 402 of the second rectangular plate 401 is inserted into the second rectangular mortise and tenon hole 202 of the second polygonal steel plate 201 to achieve initial positioning and engagement. Subsequently, the contact surfaces of the second rectangular plate 401 and the second polygonal steel plate 201 are fixedly connected by welding. The function of the sealing plate assembly 4 is to close one end of the rectangular box-shaped structure formed by the first rectangular plate 301, the first polygonal steel plate 101, and the second polygonal steel plate 201, thereby forming a more complete and closed box-shaped structure. This structure can effectively prevent external debris from entering the interior of the pressure plate and further improve the torsional stiffness of the entire anchoring pressure plate.

[0036] In a preferred embodiment, to facilitate the installation and fixation of the entire anchoring plate on the air shield dam foundation, a first elliptical mounting hole 103 is also provided on the first polygonal steel plate 101. Correspondingly, a second elliptical mounting hole 203 is also provided on the second polygonal steel plate 201 in the area corresponding to the position of the first elliptical mounting hole 103. During installation, the anchor bolts can pass through the first elliptical mounting hole 103 and the second elliptical mounting hole 203 in sequence, thereby firmly anchoring the entire anchoring plate to the concrete foundation.

[0037] As a further optimization of the mounting hole layout, the first elliptical mounting hole 103 is symmetrically distributed on both sides of the first rectangular tenon hole 102. Similarly, the second elliptical mounting hole 203 is also symmetrically distributed on both sides of the second rectangular tenon hole 202. This symmetrical layout helps to distribute the installation force evenly, ensuring that the anchor plate is subjected to more balanced force when bearing the airbag tension, thus improving the stability and reliability of the anchor.

[0038] As a preferred embodiment of the specific form of the mountain-shaped rib plate assembly 3, the first toothed protrusion 302 is integrally formed on the upper and lower ends of the first rectangular plate 301. This symmetrical structural design allows the mountain-shaped rib plate assembly 3 to be installed without distinguishing the direction, simplifying the assembly process and improving production efficiency.

[0039] Working principle: In the manufacturing process, the panel assembly 1, pressure plate assembly 2, mountain-shaped rib plate assembly 3 and stop seal plate assembly 4 are first prepared by high-precision processing methods such as laser cutting. Compared with traditional casting, this steel plate processing method greatly shortens the production cycle and ensures the high consistency and accuracy of the dimensions of each component.

[0040] During assembly, the first rectangular plate 301 of the mountain-shaped rib plate assembly 3 is vertically placed between the first polygonal steel plate 101 and the second polygonal steel plate 201 placed in parallel. The first toothed protrusions 302 at both ends of the first rectangular plate 301 are respectively inserted into the first rectangular mortise and tenon holes 102 of the first polygonal steel plate 101 and the second rectangular mortise and tenon holes 202 of the second polygonal steel plate 201. This mortise and tenon structure provides a self-positioning assembly frame for the entire anchoring pressure plate, ensuring that each component has a precise spatial position before welding, thereby solving the quality fluctuation problem caused by inaccurate positioning in traditional processes.

[0041] After completing the mortise and tenon positioning, all contact gaps are welded to fuse the separated plates into a whole hollow rectangular box-shaped structure. This structure utilizes the mechanical principles of box beams, possessing extremely high bending and torsional stiffness. At the same time, compared to solid castings of equivalent strength, the weight is significantly reduced, achieving lightweight and efficient load-bearing capacity. Finally, the stop-sealing plate assembly 4 is installed at the end of the structure in the same manner, further enhancing the overall sealing and structural strength.

Claims

1. A tenon-and-mortise anchoring plate for a pneumatic shield dam, comprising: Panel assembly (1), the panel assembly (1) includes a first polygonal steel plate (101) with a first rectangular mortise and tenon hole (102). The pressure plate assembly (2) includes a second polygonal steel plate (201), which is arranged parallel to one side of the first polygonal steel plate (101), and the second polygonal steel plate (201) is provided with a second rectangular mortise and tenon hole (202) corresponding to the first rectangular mortise and tenon hole (102). Its features are, The mortise and tenon structure anchor plate for the air shield dam also includes a mountain-shaped stiffening plate assembly (3), which includes a first rectangular plate (301) and is vertically disposed between the first polygonal steel plate (101) and the second polygonal steel plate (201). The first rectangular plate (301) has a first toothed protrusion (302) integrally formed at both ends. The first toothed protrusion (302) is inserted into the first rectangular mortise and tenon hole (102) and the second rectangular mortise and tenon hole (202) respectively to form a mortise and tenon connection. The contact parts of the first rectangular plate (301) with the first polygonal steel plate (101) and the second polygonal steel plate (201) are fixedly connected by welding.

2. A mortise and tenon structure anchor plate for air shield dam according to claim 1, characterized in that, The first polygonal steel plate (101) is also provided with a first elliptical mounting hole (103).

3. The mortise and tenon structure anchor plate for air shield dam according to claim 2, characterized in that, The second polygonal steel plate (201) is also provided with a second elliptical mounting hole (203) corresponding to the position of the first elliptical mounting hole (103).

4. The mortise and tenon structure anchor plate for air shield dam according to claim 3, characterized in that, The first elliptical mounting holes (103) are symmetrically distributed on both sides of the first rectangular mortise and tenon hole (102); the second elliptical mounting holes (203) are symmetrically distributed on both sides of the second rectangular mortise and tenon hole (202).

5. The mortise and tenon structure anchor plate for air shield dam according to claim 1, characterized in that, The first toothed protrusion (302) is integrally formed on the upper and lower ends of the first rectangular plate (301).

6. The mortise and tenon structure anchor plate for air shield dam according to claim 1, characterized in that, It also includes a stop-sealing plate assembly (4), which is fixedly connected to the end of the pressure plate assembly (2) to close the space enclosed by the first rectangular plate (301), the first polygonal steel plate (101) and the second polygonal steel plate (201).

7. A mortise and tenon structure anchor plate for air shield dam according to claim 6, characterized in that, The stop seal plate assembly (4) includes a second rectangular plate (401), and a second toothed protrusion (402) is integrally formed on one side of the second rectangular plate (401).

8. The mortise and tenon structure anchor plate for air shield dam according to claim 7, characterized in that, The second toothed protrusion (402) is inserted into the second rectangular mortise and tenon hole (202), and the second rectangular plate (401) and the second polygonal steel plate (201) are fixedly connected by welding.