A concrete pouring material conveying pipe
By using the insertion and mating of the connector tube and connector sleeve, the insertion and mating of the protrusion and the slot, and the clamping effect of the clamp, combined with the sealing design of the rubber gasket and the reinforcement of the braided mesh, the problem of the loose connection of the conveying pipe was solved, and the sealing performance and strength were improved, ensuring the smooth delivery of concrete and construction safety.
Patent Information
- Application Number
- CN202522309418.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-31
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-10-31
AI Technical Summary
The existing concrete pouring pipes are not securely connected, resulting in poor sealing, easy leakage, and affecting construction quality and safety.
The connection stability and sealing performance are enhanced by using the insertion and mating of the connector tube and connector sleeve, the insertion and mating of the protrusion and the slot, and the clamping effect of the clamp, combined with the sealing design of the rubber gasket. The strength is also improved by setting the braided mesh and reinforcing wire in the conveying pipe body.
This achieves a secure connection between the conveying pipes, preventing concrete leakage, improving conveying efficiency and reliability, ensuring a clean and safe construction site, and extending the service life of the conveying pipes.
Smart Images

Figure CN224983720U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of material conveying pipeline technology, and in particular to a material conveying pipe for concrete pouring. Background Technology
[0002] In the field of construction engineering, concrete pouring is a crucial construction process, and the performance of the material conveying pipe, as a key piece of equipment for concrete transportation, directly affects the quality of concrete pouring and construction efficiency.
[0003] To ensure the smooth delivery of concrete to the pouring surface, multiple delivery pipes are typically connected. Traditional concrete pouring delivery pipes usually employ simple flange or sleeve connections. While flange connections offer some strength, their sealing performance is often poor. During concrete delivery, due to the high pressure, leakage can easily occur through gaps in the flange connections, resulting in concrete waste, pollution of the construction site, increased cleanup workload, and potentially endangering worker safety. Sleeve connections, on the other hand, suffer from insecure connections. Under prolonged use or high pressure, the sleeve can loosen, causing the delivery pipe to separate, interrupting concrete delivery, and severely impacting construction progress. Therefore, this application provides a concrete pouring delivery pipe to meet these requirements. Utility Model Content
[0004] The technical problem to be solved by this utility model is to provide a concrete pouring conveying pipe to solve the problem of insufficient connection and sealing of existing concrete pouring conveying pipes.
[0005] To solve the above-mentioned technical problems, this utility model provides the following technical solution: A concrete pouring conveying pipe includes a conveying pipe body, a connector sleeve provided at one end of the conveying pipe body, a first flange provided at the end of the connector sleeve, a second flange provided at the other end of the conveying pipe body, a connector insert provided at the end face of the second flange away from the conveying pipe body, the connector insert and the connector sleeve being inserted into each other, and a clamp is detachably fitted on the first flange and the second flange.
[0006] Optionally, the connector sleeve is provided with an inner tube, which is connected to the material conveying pipe body. A slot is formed between the inner tube and the inner wall of the connector sleeve. The connector tube is connected to the material conveying pipe body and can be inserted into the slot.
[0007] Optionally, rubber pads are provided on the inner peripheral wall of the connector tube and the outer peripheral wall of the inner tube to ensure that the connector tube fits tightly with the connector sleeve and the inner tube when inserted into the slot.
[0008] Optionally, the second flange has a protrusion on the side facing the connector tube, and multiple protrusions are evenly arranged around the connector tube. The first flange has a number of slots equal to the number of protrusions, and the protrusions are engaged with the slots.
[0009] Optionally, a groove is provided on the inner wall of the clamp, and after the connector tube is inserted into the slot, the first flange and the second flange are attached to each other and embedded in the groove.
[0010] Optionally, the clamp is symmetrically divided into two sections, with one end of each section hinged together and the other end of each section provided with a second lug. A second connecting bolt is threaded between a pair of second lugs.
[0011] Optionally, the conveying pipe is fitted with multiple clamps, and the distance between two adjacent clamps is one-tenth of the overall length of the conveying pipe.
[0012] Optionally, the buckle has a break, and both ends of the break are provided with first lugs, and a first connecting bolt is threaded between a pair of first lugs.
[0013] Optionally, the material of the conveying pipe body is rubber, and the material of the joint sleeve, the first flange, the second flange, the joint insert, the clamp, the inner insert, and the clamp is metal.
[0014] Optionally, the inner wall of the conveying pipe is provided with a woven mesh and multiple reinforcing wires, which are distributed along the length of the conveying pipe.
[0015] Compared with the prior art, this utility model has at least the following beneficial effects: In the above solution, a firm connection between multiple conveying pipes is achieved through the insertion and matching of the connector tube and the connector sleeve, the insertion and matching of the protrusion and the slot, and the clamping effect of the clamp. This effectively prevents concrete from leaking from the connection point during the conveying process, improving the efficiency and reliability of concrete conveying. Furthermore, rubber pads are installed on the inner circumferential wall of the connector tube and the outer circumferential wall of the inner tube. When the connector tube is inserted into the slot, the rubber pads can make the two fit tightly together, forming a good sealing effect, further preventing concrete leakage and ensuring the cleanliness and safety of the construction site.
[0016] The conveying pipe is reinforced with a braided mesh and multiple reinforcing wires inside its wall, which enhances its strength and tensile properties. This allows it to withstand the high pressure generated during concrete conveying, making it less prone to breakage and extending its service life. Attached Figure Description
[0017] The accompanying drawings, which are incorporated herein and form part of the specification, illustrate embodiments of the present invention and, together with the specification, further serve to explain the principles of the present invention and enable those skilled in the art to implement and use the present invention.
[0018] Figure 1 This is a schematic diagram of the material conveying pipe body of this utility model; Figure 2 This is a schematic diagram of the structure at both ends of the material conveying pipe of this utility model; Figure 3 This is a schematic diagram of the cross-sectional structure of the material conveying pipe of this utility model; Figure 4 This is a schematic diagram of the structure of the clamp of this utility model; Figure 5 This is a schematic diagram of the structure of the two material conveying pipes of this utility model being joined together; Figure 6 This is a schematic diagram of the structure of the first flange and the second flange of this utility model being joined together; Figure 7 This is a schematic diagram of the structure of the clamp of this utility model.
[0019] Figure label: 1. Material conveying pipe body; 2. Connector sleeve; 3. First flange; 4. Second flange; 5. Connector insert; 6. Clamp; 7. Inner insert; 8. Slot; 9. Rubber gasket; 10. Protrusion; 11. Slot; 12. Braided mesh; 13. Reinforcing wire; 14. First lug; 15. First connecting bolt; 16. Clamp; 17. Groove; 18. Second lug; 19. Second connecting bolt.
[0020] As shown in the figure, specific structures and devices are marked in the figure to clearly illustrate the structure of the embodiment of this utility model. However, this is only for illustrative purposes and is not intended to limit this utility model to this specific structure, device and environment. Those skilled in the art can adjust or modify these devices and environments according to specific needs. Detailed Implementation
[0021] The following is a detailed description of a concrete pouring conveying pipe provided by this utility model, in conjunction with the accompanying drawings and specific embodiments. It should be noted that, to make the embodiments more detailed, the following embodiments are the best and preferred embodiments; for some known technologies, those skilled in the art can also use other alternative methods to implement the invention. Furthermore, the accompanying drawings are only for more specific description of the embodiments and are not intended to specifically limit this utility model.
[0022] It should be noted that the use of terms such as "an embodiment," "an embodiment," "an exemplary embodiment," and "some embodiments" in the specification indicates that the described embodiment may include a specific feature, structure, or characteristic, but not every embodiment necessarily includes that specific feature, structure, or characteristic. Furthermore, when a specific feature, structure, or characteristic is described in connection with an embodiment, implementing such a feature, structure, or characteristic in conjunction with other embodiments (whether explicitly described or not) should be within the knowledge of those skilled in the art.
[0023] Generally, terms can be understood at least partly from their use in context. For example, depending at least partly on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in a singular sense, or a combination of features, structures, or characteristics in a plural sense. Additionally, the term "based on" can be understood not necessarily to convey an exclusive set of factors, but rather, alternatively, depending at least partly on the context, to allow for the presence of other factors that are not necessarily explicitly described.
[0024] It is understood that the meanings of “on”, “above”, and “above” in this utility model should be interpreted in the broadest manner, such that “on” not only means “directly on” something, but also includes the meaning of being “on” something with an intervening feature or layer, and that “above” or “above” not only means “on” something, but also includes the meaning of being “on” something without an intervening feature or layer.
[0025] Furthermore, spatially related terms such as “below,” “under,” “lower,” “above,” and “upper” are used herein for convenience to describe the relationship of one element or feature to one or more other elements or features, as illustrated in the accompanying drawings. Spatially related terms are intended to cover different orientations in the use or operation of the device other than those depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially related descriptive terms used herein can be interpreted similarly.
[0026] like Figure 1 , Figure 2 and Figure 3As shown, an embodiment of this utility model provides a concrete pouring conveying pipe, including a conveying pipe body 1, a joint sleeve 2, a first flange 3, a second flange 4, a joint insert 5, a clamp 6, and a clamp 16. The conveying pipe body 1 is made of rubber, and the inside of the pipe wall of the conveying pipe body 1 is provided with a braided mesh 12 and multiple reinforcing wires 13. The multiple reinforcing wires 13 are evenly distributed along the length of the conveying pipe body 1. This design can enhance the strength and tensile properties of the conveying pipe body 1 and prevent it from breaking due to excessive pressure during concrete conveying. The braided mesh 12 and the reinforcing wires 13 can be made of nylon.
[0027] Multiple clamps 6 are fitted on the conveying pipe body 1. The distance between two adjacent clamps 6 is one-tenth of the overall length of the conveying pipe body 1. Each clamp 6 has a break, and each end of the break is provided with a first lug 14. A pair of first lugs 14 are threaded together by a first connecting bolt 15. The tightness of the clamps 6 on the conveying pipe body 1 can be adjusted by adjusting the first connecting bolt 15 to ensure that the conveying pipe body 1 will not expand or deform due to internal pressure during use.
[0028] like Figure 1 and Figure 2 As shown, the connector sleeve 2 and connector insertion tube 5 are made of metal. The connector sleeve 2 is located at one end of the conveying pipe body 1, and its end is provided with a first flange 3. The second flange 4 is located at the other end of the conveying pipe body 1, and the connector insertion tube 5 is located on the end face of the second flange 4 away from the conveying pipe body 1. The connector insertion tube 5 is connected to the conveying pipe body 1. The second flange 4 and the connector sleeve 2 can be connected by a socket bonding method and a retaining ring for fastening. An inner insertion tube 7 is provided inside the connector sleeve 2. The inner insertion tube 7 is connected to the conveying pipe body 1, and a slot 8 is formed between the inner insertion tube 7 and the inner wall of the connector sleeve 2. The connector insertion tube 5 can be inserted into the slot 8. Rubber gaskets 9 are provided on the inner peripheral wall of the connector insertion tube 5 and the outer peripheral wall of the inner insertion tube 7. When the connector insertion tube 5 is inserted into the slot 8, the rubber gaskets 9 can make the connector insertion tube 5 fit tightly with the connector sleeve 2 and the inner insertion tube 7, preventing concrete from leaking from the connection during the conveying process.
[0029] like Figure 1 , Figure 2 and Figure 6 As shown, the second flange 4 has a plurality of protrusions 10 on the side facing the connector tube 5. The plurality of protrusions 10 are evenly arranged around the connector tube 5. The first flange 3 has a number of slots 11 equal to the number of protrusions 10. When the connector tube 5 is inserted into the slot 8, the first flange 3 and the second flange 4 fit together, and the protrusions 10 and the slots 11 are engaged, further enhancing the stability of the connection between the two conveying pipe bodies 1.
[0030] like Figure 1 , Figure 2 , Figure 5 , Figure 6 and Figure 7 As shown, the clamp 16 is also made of metal. The clamp 16 is symmetrically divided into two sections, with one end of each section hinged together. The other end of each section is provided with a second lug 18, and the pair of second lugs 18 are threaded together by a second connecting bolt 19. A groove 17 is provided on the inner wall of the clamp 16. When the connector tube 5 is inserted into the slot 8, the first flange 3 and the second flange 4 are attached and embedded in the groove 17. By tightening the second connecting bolt 19, the clamp 16 tightly clamps the first flange 3 and the second flange 4, ensuring a firm and reliable connection between the two conveying pipes 1.
[0031] The workflow of the technical solution provided by this utility model is as follows: When using the concrete pouring conveying pipe of this utility model for concrete transportation, multiple conveying pipe bodies 1 are first assembled through a connecting structure. The connector tube 5 of one conveying pipe body 1 is inserted into the slot 8 of the connector sleeve 2 of another conveying pipe body 1. During insertion, the rubber gaskets 9 on the inner circumferential wall of the connector tube 5 and the outer circumferential wall of the inner tube 7 press against each other, ensuring a tight fit and preventing concrete leakage. Simultaneously, the protrusion 10 on the second flange 4 is inserted into the groove 11 on the first flange 3, providing initial positioning and fixation. Then, the clamp 16 is fitted onto the connection between the first flange 3 and the second flange 4, so that the first flange 3 and the second flange 4 are both embedded in the groove 17 on the inner wall of the clamp 16. The second connecting bolt 19 is tightened, making the clamp 16 tightly hold the first flange 3 and the second flange 4, further enhancing the connection's strength. Multiple conveying pipe bodies 1 are connected sequentially using the above method to form a complete concrete conveying pipeline. During concrete delivery, the concrete enters from one end of the delivery pipe 1, passes through each delivery pipe 1 in sequence, and finally exits from the other end. The braided mesh 12 and reinforcing wires 13 inside the wall of the delivery pipe 1 can withstand the pressure generated during concrete delivery and prevent the delivery pipe 1 from breaking; the clamps 6 can prevent the delivery pipe 1 from expanding and deforming due to internal pressure, ensuring the smooth delivery of concrete.
[0032] This utility model encompasses any substitutions, modifications, equivalent methods, and solutions made within the spirit and scope of this utility model. To provide the public with a thorough understanding of this utility model, specific details are described in detail in the following preferred embodiments; however, those skilled in the art will fully understand this utility model even without these detailed descriptions. Furthermore, to avoid unnecessary confusion regarding the essence of this utility model, well-known methods, processes, procedures, components, and circuits are not described in detail.
[0033] The above description is only a preferred embodiment of the present utility model. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present utility model, and these improvements and modifications should also be considered within the protection scope of the present utility model.
Claims
1. A concrete pouring conveying pipe, comprising a conveying pipe body, characterized in that: One end of the conveying pipe is provided with a connector sleeve, and the end of the connector sleeve is provided with a first flange. The other end of the conveying pipe is provided with a second flange. The end face of the second flange away from the conveying pipe is provided with a connector insert. The connector insert is inserted into the connector sleeve. The first flange and the second flange are detachably fitted with clamps. The connector sleeve is provided with an inner tube, which is connected to the material conveying pipe body. A slot is formed between the inner tube and the inner wall of the connector sleeve. The connector tube is connected to the material conveying pipe body and can be inserted into the slot. Rubber pads are provided on the inner peripheral wall of the connector tube and the outer peripheral wall of the inner tube to ensure that the connector tube fits tightly with the connector sleeve and the inner tube when inserted into the slot. The second flange has a protrusion on the side facing the connector tube, and multiple protrusions are evenly arranged around the connector tube. The first flange has a number of slots equal to the number of protrusions, and the protrusions are inserted into the slots.
2. The concrete placing duct according to claim 1, characterized in that The inner wall of the clamp is provided with a groove. After the connector tube is inserted into the slot, the first flange and the second flange are attached to each other and embedded in the groove.
3. The concrete pouring conveyor pipe according to claim 2, characterized in that, The clamp is symmetrically divided into two sections. One end of the two clamp sections is hinged to each other, and the other end of each clamp section is provided with a second lug. A second connecting bolt is threaded between a pair of second lugs.
4. The concrete pouring conveyor pipe according to claim 1, characterized in that, The conveying pipe is fitted with multiple clamps, and the distance between two adjacent clamps is one-tenth of the overall length of the conveying pipe.
5. The concrete pouring conveyor pipe according to claim 4, characterized in that, The buckle has a break, and both ends of the break are provided with first lugs. A first connecting bolt is threaded between a pair of first lugs.
6. The concrete pouring conveyor pipe according to claim 4, characterized in that, The material of the conveying pipe body is rubber, and the material of the joint sleeve, the first flange, the second flange, the joint insert, the clamp, the inner insert, and the clamp is metal.
7. The concrete pouring conveyor pipe according to claim 1, characterized in that, The inner wall of the conveying pipe is provided with a woven mesh and multiple reinforcing wires, which are distributed along the length of the conveying pipe.